Newton Corner | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | Washington Street at Centre Street Newton Corner, Newton, Massachusetts | ||||||||||||||||||||
Coordinates | 42°21′27″N71°11′04″W / 42.35756°N 71.18441°W | ||||||||||||||||||||
Connections | MBTA bus: 52, 57, 501, 504, 553, 554, 556, 558 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | c. 1834 (commuter rail) 1863 (streetcars) | ||||||||||||||||||||
Closed | April 1959 (commuter rail) [1] June 21, 1969 (Green Line) [2] | ||||||||||||||||||||
Former services | |||||||||||||||||||||
|
Newton Corner is an MBTA bus transfer point in the Newton Corner neighborhood of Newton, Massachusetts, located on the rotary where Washington Street crosses the Massachusetts Turnpike. The Newton Corner station, known simply as Newton for much of its lifetime, served commuters on the Worcester Line (run by the New York Central Railroad and its predecessors) from 1834 to 1959. A streetcar stop, located on the surface streets, served a number of routes beginning in 1863, including the Green Line A branch until 1969. Newton Corner is now a stop and transfer point for MBTA routes 52 , 57 , 501 , 504 , 553 , 554 , 556 , and 558, which include express routes to downtown Boston as well as local routes, with stops on the north and south sides of the rotary.
The Boston and Worcester Railroad opened the segment from downtown Boston to West Newton on April 7, 1834, with a station called Newton Corner opening then or soon after in the Angier's Corner neighborhood. [3] [4] The station was located on the south side of the tracks west of Centre Street. [5] [6] A second track was added in 1839, and in 1843 the railroad began offering season fares for around $60, making it one of the first commuter rail systems. [3] Newton Corner was among the most popular stations, with ridership of 26,000 in 1866. [7]
A village petition around 1870 resulted in the station being renamed as simply Newton. [4] [7] Third and fourth tracks through the station were built in 1884. [1] Around this time, a new station building was built in the Richardsonian Romanesque style. The Boston & Worcester became part of the Boston and Albany Railroad in 1867, which itself was leased by the New York Central Railroad in 1900. [3]
The Massachusetts Turnpike was extended from Route 128 in Weston to I-93 in downtown Boston. The highway occupied a significant portion of the right-of-way, dropping the Worcester Line from 4 to 2 tracks from Back Bay to Riverside. Newton and the local stops in Boston were closed and demolished; station buildings further west in Newton were removed, but service to those stops continued. [1]
The Cambridge Railroad extended its Central Square–Oak Square horsecar line to Nonantum Square (Newton Corner) in 1863, though it was cut back to Oak Square in 1871. In 1881, the company extended its Harvard Square–Watertown line to Nonantum Square. That line began using electric streetcars on December 13, 1893. [8] : 214 The Cambridge Railroad merged in 1887 into the West End Street Railway, which in turn was leased by the Boston Elevated Railway (BERy) in 1897. On June 13, 1896, the West End opened trackage on Commonwealth Avenue and Brighton Avenue, providing a electrified route between Oak Square and downtown more direct than the previous route through Cambridge. At the same time, the line was extended to just short of Newton Corner. [9] [8] : 214
The line begun running to Park Street in the new Tremont Street Subway on November 8, 1897. On May 21, 1898, the line was extended to Nonantum Square. [9] [8] : 215 On December 9, 1912, the transfer point between the Harvard and Oak Square lines was changed from Nonantum Square to Watertown Yard. [9] This completed the Watertown Line from Park Street to Watertown Yard - its route for the next half-century. In the 1920s, a concrete boarding island was built in the square. [10] The BERy was replaced by the Metropolitan Transit Authority (MTA) in 1947.
The Newton Street Railway opened an extension of its Waltham–West Newton streetcar line to Nonantum Square in 1890. The square soon became a transfer point between the Newton Street Railway's expanding suburban system and service into Cambridge and Boston. The Newton Square Railway was merged into the Middlesex and Boston Street Railway (M&B) in 1909. [8] : 248 The M&B operated through services from Newton Corner as far west as Framingham. These routes were replaced by buses in the 1920s; the final M&B streetcar route to Newton Corner was the Framingham route, which was converted to buses in September 1929. [8] : 252
The Massachusetts Bay Transportation Authority (MBTA) took over MTA transit service in 1964. That year, the exit 17 rotary was constructed at Newton Corner. Expecting little traffic at the intersection, the streetcar tracks were placed in a contraflow lane, while the platforms were moved to the north side of the rotary in a dedicated median. However, the rotary proved to be busy and congested, resulting in frequent delays and automobile-streetcar collisions. [9] In 1967, the route 69 streetcar line was renamed as the Green Line A branch. After a series of temporary bustitutions during the 1960s, the A branch was again "temporarily" substituted on June 21, 1969. However, the replacement route 57 bus became permanent and the trolleys never returned. [2] [9] The trackage was intact for non-revenue moves to Watertown Carhouse until 1994. [9]
Although no longer served by rail transport, Newton Corner remained a transfer point for bus routes. In 1967, the MBTA began operating express bus routes from Watertown Yard and Oak Square (later extended to Brighton Center) to downtown Boston. A Watertown–Copley Square express route was added in 1968; the three routes were renumbered 504, 501, and 502 in 1970. In 1972, the MBTA took over remaining M&B bus service, including six routes that terminated at Newton Corner. The Framingham–Newton Corner route was extended to Boston in 1974, but discontinued in 1981. In 1983, four routes running between Waltham points and Newton Corner were extended to Boston. These routes were renumbered into the 550 series in 1996, while the 300-series routes were renumbered in the 500s. [2]
When proposals to reactivate the A branch were considered in the 1970s and 1980s, a likely possibility was that the streetcars would only return as far as Oak Square, with trolleybuses filling the gap between Watertown and Oak Square. The City of Newton did not approve of overhead lines, however, and the proposals never came to fruition. However, a limited version of the proposal was considered wherein the route 71 trolleybus would be extended from Watertown to Newton Corner. In the 2004 Program for Mass Transportation, the $1.5 million project was estimated to add 600 new daily transit riders but was given low priority compared to other bus expansion projects. [11]
The combination of local routes (the 57 and the ex-M&B 52) and express routes has kept Newton Corner a significant transfer point. In 2006, over 60 buses traversed the rotary hourly during the morning peak. Stops are located on both the north and south side of the rotary. While this allows passengers to avoid crossing the bus rotary on foot, it caused some routes to loop the rotary just to serve both stops. The 550-series routes formerly looped one-and-one-half times around the rotary before re-entering the Turnpike. [12]
On September 1, 2019, outbound route 502 and 504 buses began turning directly onto Galen Street rather than serving the Newton Corner rotary stops; outbound route 501 and 503 buses began serving the rotary stops at that time. [13] Most MBTA service began operating on Saturday schedules on March 17, 2020, due to the COVID-19 pandemic. Weekday-only routes 502, 503, 554, 556, and 558 were suspended (along with route 501 in June), while Newton Corner became the east terminal for route 553 except evenings. [2] [14] [15] Routes 501, 554, 556, and 558 resumed on August 31, 2020, with Newton Corner the east terminal for the 550-series routes; evening route 553 service was similarly cut back that December. [16] [2] The MBTA's November 2022 bus network redesign plan calls for Newton Corner to no longer be a terminal though it would continue to see frequent bus service. Routes 501 and 504 would continue operating, routes 502 and 503 would not resume operation, routes 556 and 558 would become local routes (56 and 58) running to Watertown Yard via Newton Corner, and routes 553 and 554 would become local routes that no longer serve Newton Corner. [17]
The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 137,700 in 2019, it is the third-most heavily used light rail system in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.
The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 310,700 per weekday as of the first quarter of 2024.
Forest Hills station is an intermodal transfer station in Boston, Massachusetts. It serves the MBTA rapid transit Orange Line and three MBTA Commuter Rail lines and is a major terminus for MBTA bus routes. It is located in Forest Hills, in the southern part of the Jamaica Plain neighborhood. Most Providence/Stoughton Line and Franklin/Foxboro Line trains, and all Amtrak Northeast Corridor trains, pass through the station without stopping. Forest Hills station is fully accessible on all modes.
Boston College station is a light rail station on the MBTA Green Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue and Lake Street, on the border between the Brighton neighborhood of Boston and the Chestnut Hill neighborhood of Newton, Massachusetts. Originally opened in 1896, it has been the terminus of the Commonwealth Avenue line since 1900. The current station is planned to be replaced by a new station located in the median of Commonwealth Avenue just east of Lake Street.
Key bus routes of the Massachusetts Bay Transportation Authority (MBTA) system are 15 routes that have high ridership and higher frequency standards than other bus lines, according to the 2004 MBTA Service Policy. Together, they account for roughly 40% of the MBTA's total bus ridership. These key bus routes ensure basic geographic coverage with frequent service in the densest areas of Boston, and connect to other MBTA services to give access to other areas throughout the region.
The Middlesex and Boston Street Railway (M&B) was a streetcar and later bus company in the area west of Boston. Streetcars last ran in 1930, and in 1972, the company's operations were merged into the Massachusetts Bay Transportation Authority (MBTA).
The Newton and Boston Street Railway was a streetcar company in the Boston, Massachusetts area, eventually bought by the Middlesex and Boston Street Railway. Its line is now the 59 Needham Junction – Watertown Square via Newtonville bus.
The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.
The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, the B branch runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.
The Green Line D branch is a light rail line in Boston, Brookline, Cambridge, Newton, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs on a grade separated surface right-of-way for 9 miles (14 km) from Riverside station to Fenway station. The line merges into the C branch tunnel west of Kenmore, then follows the Boylston Street subway and Tremont Street subway to North Station. It is the longest and busiest of the four Green Line branches. As of June 2024, service operates on 6 to 8-minute headways at weekday peak hours and 7 to 13-minute headways at other times, using 13 to 19 trains.
The A branch or Watertown Line was a streetcar line in the Boston, Massachusetts, area, operating as a branch of the Massachusetts Bay Transportation Authority Green Line. The line ran from Watertown through Newton Corner, Brighton, and Allston to Kenmore Square, then used the Boylston Street subway and Tremont Street subway to reach Park Street station.
The Boston-area trolleybus system formed part of the public transportation network serving Greater Boston in the U.S. state of Massachusetts. It opened on April 11, 1936, with a large network operating for the next quarter-century. Measured by fleet size, the Boston-area system was the second-largest trolleybus system in the United States at its peak, with only the Chicago system having more trolleybuses than Boston's 463. After 1963, the only remaining portion was a four-route cluster operating from the Harvard bus tunnel at Harvard station, running through Cambridge, Belmont, and Watertown. The Massachusetts Bay Transportation Authority took over the routes in 1964.
As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.
Ashmont station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located at Peabody Square in the Dorchester neighborhood of Boston, Massachusetts. It is the southern terminus of the Ashmont branch of the rapid transit Red Line, the northern terminus of the connecting light rail Ashmont–Mattapan High-Speed Line, and a major terminal for MBTA bus service. Ashmont has two side platforms serving the below-grade Red Line and a single side platform on an elevated balloon loop for the Mattapan Line. The station is fully accessible for all modes.
Route 86 is a local bus route in Boston, Cambridge, and Somerville, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA) as part of MBTA bus service. It operates on a circumferential route between Sullivan Square station and Reservoir station via Union Square, Somerville, Harvard Square, and Brighton Center. In 2018, it had the 18th-highest weekday ridership on the system, though it ranked 37th by number of weekday trips. A 2018–19 MBTA review of its bus system found that route 86 had infrequent and unreliable service, including irregular scheduled headways, despite its high ridership and significance as a crosstown connecting route.
Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.
Watertown Carhouse is a bus maintenance facility and former streetcar carhouse located in the southern section of Watertown, Massachusetts, across the Charles River from Watertown Square. As Watertown Yard, the site also serves as a bus depot serving local and express routes 52, 57, 59, and 504, with additional connections available at Watertown Square station on the opposite end of the Watertown Bridge.
Babcock Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Babcock Street and Pleasant Street.
Amory Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Amory Street and St. Paul Street.
The Ipswich Street line was a streetcar line in Boston and Brookline, Massachusetts. The line ran on Boylston Street and Ipswich Street in the Fenway–Kenmore neighborhood, and on Brookline Avenue through what is now the Longwood Medical Area to Brookline Village.