Green Line (MBTA)

Last updated

Green Line
MBTA Green Line Type 9 Train at Park Street August 2024.jpg
A northbound Green Line train at Park Street station in 2024
Overview
Owner Massachusetts Bay Transportation Authority
Locale Boston, Brookline, Cambridge, Medford, Newton, and Somerville, Massachusetts
Termini
Stations70
Service
Type Semi-metro, Light rail
System MBTA subway
Services4 (B branch, C branch, D branch, E branch)
Rolling stock Kinki Sharyo Type 7
AnsaldoBreda Type 8
CAF Type 9
Daily ridership101,000 (2023) [1]
History
OpenedSeptember 1, 1897 (1897-09-01) (Tremont Street subway)
Technical
Line length26.7 miles (43.0 km) [2]
CharacterSubway, grade-separated surface ROW, viaduct, median reservation, street running
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Minimum radius 33 feet (10 m) [3]
Electrification Overhead line,  600 V DC
Route map
Green Line (MBTA)
BSicon uexKACCa.svg
Mystic Valley Parkway
proposed
BSicon uKACCxa.svg
Medford/​Tufts
BSicon uLSTR.svg
BSicon uACC.svg
Magoun Square
BSicon uACC.svg
Gilman Square
BSicon uACC.svg
East Somerville
BSicon uSTR.svg
BSicon uKACCaq.svg
BSicon uABZg+r.svg
Union Square
BSicon lACC.svg
BSicon uhBHFa.svg
Lechmere
BSicon lhSTRa@fq.svg
BSicon uexKACCaq.svg
BSicon uehABZg+r.svg
Lechmere
(
closed
2020
)
BSicon uhbKRZW.svg
BSicon uhACC.svg
Science Park
BSicon POINTER+4.svg
BSicon uexhKRW+l.svg
BSicon uehKRWgr.svg
BSicon uexhSTR.svg
BSicon uhtSTRa.svg
BSicon utCONTg.svg
BSicon HUBaq.svg
BSicon uexhACC.svg
BSicon HUBq.svg
BSicon utKACCxa.svg
BSicon HUBeq.svg
BSicon utACC.svg
North Station
BSicon LOGO Amtrak2.svg MBTA.svg MBTA white T logo.svg
BSicon POINTER+2.svg
BSicon uexhtSTRa.svg
BSicon utSTR.svg
BSicon utSTR.svg
Canal Street Incline (
closed
2004
)
BSicon uextKRWl.svg
BSicon uetKRWg+r.svg
BSicon utSTR.svg
BSicon HUBaq.svg
BSicon utACC.svg
BSicon HUBeq.svg
BSicon utACC.svg
Haymarket MBTA white T logo.svg
BSicon utSTR.svg
BSicon utCONTf.svg
BSicon utCONTgq.svg
BSicon utACC.svg
BSicon uetTBHFt.svg
BSicon utCONTfq.svg
Government Center
MBTA white T logo.svg
BSicon utCONTgq.svg
BSicon utACC.svg
BSicon utTBHFt.svg
BSicon utCONTfq.svg
Park Street
MBTA white T logo.svg MBTA white T logo.svg MBTA white T logo.svg
BSicon POINTERg@fq.svg
BSicon utSTR.svg
BSicon utINT.svg
Boylston
MBTA white T logo.svg
BSicon POINTERg@fq.svg
BSicon utSTR.svg
BSicon utACC.svg
Arlington
BSicon utACC.svg
Copley
BSicon utKRWgl.svg
BSicon utKRW+r.svg
Copley Junction
BSicon utSTR.svg
BSicon MASKa@f.svg
BSicon utLSTR.svg
BSicon utSTRe@f.svg
BSicon utHSTACC.svg
Prudential
BSicon utHST.svg
Symphony
BSicon MFADEg.svg
BSicon utSTRe@g.svg
BSicon vRP2.svg
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Northeastern University
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Museum of Fine Arts
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Longwood Medical Area
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Brigham Circle
BSicon uHST.svg
BSicon vRP2yRP4.svg
Fenwood Road
BSicon uHST.svg
BSicon RP4.svg
Mission Park
BSicon uHST.svg
BSicon RP4.svg
Riverway
BSicon MFADEg.svg
BSicon utSTR.svg
BSicon uHST.svg
BSicon RP4.svg
Back of the Hill
BSicon utSTR.svg
BSicon uxABZgl.svg
BSicon RP4.svg
BSicon uKACCeq.svg
Heath Street
BSicon utSTR.svg
BSicon MFADEf.svg
BSicon uexCONTf@F.svg
BSicon RP4.svg
Arborway Line (
closed
1985
)
BSicon MFADEf.svg
BSicon utSTR.svg
BSicon uexLSTR.svg
BSicon RP4.svg
Arborway Line (
closed
1985
)
BSicon HUB2.svg
BSicon uhKINTACCaq.svg
BSicon MASKc.svg
BSicon uxKRZh.svg
BSicon HUBc3.svg
BSicon RP4.svg
BSicon uhCONTfq.svg
Forest Hills
MBTA.svg
BSicon HUBc1.svg
BSicon uexKHSTe.svg
BSicon HUB4.svg
BSicon RP4S2r.svg
Arborway
BSicon MFADEg.svg
BSicon utSTR.svg
BSicon utBHF.svg
Hynes Convention Center
BSicon utACC.svg
Kenmore
BSicon utKRWgl.svg
BSicon utKRW+r.svg
BSicon MFADEg.svg
BSicon uLSTR.svg
BSicon PORTALg.svg
BSicon vRP2.svg
BSicon utKRWgl.svg
BSicon utKRW+r.svg
BSicon MFADEg.svg
BSicon utSTRe.svg
BSicon vRP2.svg
BSicon MFADEf.svg
BSicon utSTR.svg
BSicon MFADEf.svg
BSicon utSTR.svg
Blandford Street Portal
BSicon uHST.svg
BSicon vRP2HST.svg
Blandford Street
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Boston University East
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Boston University Central
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Amory Street
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Babcock Street
BSicon uexKRW+l.svg
BSicon ueKRWgr.svg
BSicon vRP2.svg
BSicon uexCONTf.svg
BSicon uSTR.svg
BSicon vRP2y-RP2.svg
A branch (
closed
1969
)
BSicon uexSTR.svg
BSicon uSTR.svg
BSicon MFADEf.svg
BSicon vRP2.svg
A branch (
closed
1969
)
BSicon uexHST.svg
Packards Corner
BSicon uexHST.svg
St. Luke's Street
BSicon uexHST.svg
Chester Street
BSicon uexHST.svg
Linden Street
BSicon uexHST.svg
Harvard Avenue
BSicon uexHST.svg
Allston Street
BSicon uexHST.svg
Union Square
BSicon uexLSTR.svg
BSicon RP4.svg
Cambridge Street
street-running stops
BSicon uexLSTR.svg
BSicon RP4.svg
BSicon uexlv-HST@F.svg
BSicon uexSPLa.svg
Oak Square
BSicon uexSHI1+l.svg
BSicon uexvWSLe.svg
Oak Square Loop
BSicon uexLSTR.svg
BSicon RP4.svg
BSicon uexHST.svg
Newton Corner
BSicon uexLSTR.svg
BSicon RP4.svg
Galen Street
street-running stops
BSicon uexKBHFe.svg
BSicon uSTR.svg
BSicon MFADEg.svg
BSicon v-RP2.svg
Watertown Yard
BSicon uBHF.svg
BSicon v-RP2.svg
Packards Corner
BSicon uACC.svg
BSicon v-RP2.svg
Harvard Avenue
BSicon uHST.svg
BSicon v-RP2.svg
Griggs Street
BSicon uHST.svg
BSicon v-RP2.svg
Allston Street
BSicon uHST.svg
BSicon v-RP2yRP2.svg
Warren Street
BSicon uACC.svg
BSicon vRP2BHF.svg
Washington Street
BSicon uHST.svg
BSicon vRP2HST.svg
Sutherland Road
BSicon uHST.svg
BSicon vRP2HST.svg
Chiswick Road
BSicon uHST.svg
BSicon vRP2HST.svg
Chestnut Hill Avenue
BSicon uABZgl+l.svg
BSicon vRP2eRP4.svg
BSicon MFADEfq.svg
BSicon uCONTf@Fq.svg
BSicon RP4q.svg
to Reservoir Carhouse
BSicon uHST.svg
BSicon vRP2HST.svg
BSicon MFADEg.svg
BSicon utSTR.svg
BSicon MFADEg.svg
BSicon utSTR.svg
South Street
BSicon uKACCe.svg
BSicon vRP2BHF.svg
BSicon utSTR.svg
BSicon utSTR.svg
Boston College
BSicon MFADEg.svg
BSicon uLSTR.svg
BSicon PORTALg.svg
BSicon vRP2.svg
BSicon utSTR.svg
BSicon MASKa.svg
BSicon utSTRe.svg
BSicon vRP2.svg
Saint Mary's Street Portal
BSicon uACC.svg
BSicon vRP2BHF.svg
Saint Mary's Street
BSicon uHST.svg
BSicon vRP2HST.svg
Hawes Street
BSicon uHST.svg
BSicon vRP2HST.svg
Kent Street
BSicon uHST.svg
BSicon vRP2HST.svg
Saint Paul Street
BSicon uACC.svg
BSicon vRP2BHF.svg
Coolidge Corner
BSicon uHST.svg
BSicon vRP2HST.svg
Summit Avenue
BSicon uHST.svg
BSicon vRP2HST.svg
Brandon Hall
BSicon uHST.svg
BSicon vRP2HST.svg
Fairbanks Street
BSicon uACC.svg
BSicon vRP2BHF.svg
Washington Square
BSicon uHST.svg
BSicon vRP2HST.svg
Tappan Street
BSicon uHST.svg
BSicon vRP2HST.svg
Dean Road
BSicon uHST.svg
BSicon vRP2HST.svg
BSicon MFADEg.svg
BSicon utSTR.svg
Englewood Avenue
BSicon uKRW+l.svg
BSicon vRP2K+l.svg
BSicon uKRWr.svg
BSicon vRP2Kr.svg
BSicon PORTALg.svg
BSicon uLSTR.svg
BSicon utSTRe.svg
Fenway Portal
BSicon uACC.svg
Fenway
BSicon uACC.svg
Longwood
BSicon uACC.svg
Brookline Village
BSicon uACC.svg
Brookline Hills
BSicon uSTR.svg
BSicon MFADEg.svg
BSicon vRP2.svg
BSicon uBHF.svg
Beaconsfield
BSicon GRZaq.svg
BSicon uKACCe.svg
BSicon vRP2n.svg
BSicon GRZ2+r.svg
BSicon uSTR.svg
Cleveland Circle
BSicon uABZgl+l.svg
BSicon vRP2.svg
BSicon uKDSTa.svg
BSicon uDSTq.svg
BSicon uABZgr.svg
Reservoir Carhouse
BSicon lKGRZ2.svg
BSicon uACC.svg
BSicon vRP2.svg
BSicon uSTR+c2.svg
BSicon uABZg3.svg
Cleveland Circle
BSicon MFADEgq.svg
BSicon uCONTg@Gq.svg
BSicon RP4q.svg
BSicon RP4q.svg
BSicon uABZqlr.svg
BSicon vRP2n.svg
BSicon uABZr+1g.svg
BSicon GRZ2+4.svg
BSicon RP4yRP22+w.svg
BSicon uSTR+c4.svg
BSicon uACC.svg
BSicon lKGRZ4.svg
Reservoir
BSicon uLSTR.svg
BSicon uBHF.svg
Chestnut Hill
BSicon uACC.svg
Newton Centre
BSicon uACC.svg
Newton Highlands
BSicon uBHF.svg
Eliot
BSicon uBHF.svg
Waban
BSicon uACC.svg
Woodland
BSicon uKACCe.svg
Riverside
BSicon STRc1.svg
BSicon ABZ4+2xl.svg
BSicon uKDST1.svg
BSicon STRc3.svg
BSicon exSTRr+1.svg
BSicon uSTRc4.svg
Riverside Carhouse
BSicon STRc1.svg
BSicon CONT4.svg

The Green Line is a semi-metro system [4] [5] (form of light rail) run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. [6] It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it is among the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston. [7] [8] [9]

Contents

The four branches are the remnants of a large streetcar system, which began in 1856 with the Cambridge Horse Railroad and was consolidated into the Boston Elevated Railway several decades later. The branches all travel downtown through the Tremont Street subway, the oldest subway tunnel in North America. The Tremont Street subway opened its first section on September 1, 1897, to take streetcars off overcrowded downtown streets; it was extended five times over the next five decades. The streetcar system peaked in size around 1930 and was gradually replaced with trackless trolleys and buses, with cuts as late as 1985. The new D branch opened on a converted commuter rail line in 1959. The Green Line Extension project extended two branches into Somerville and Medford  in 2022.

Route description

Schematic map of Green Line branches and stations MBTA Green Line.svg
Schematic map of Green Line branches and stations

The Green Line's core is the central subway, a group of tunnels which run through downtown Boston. [10] The Tremont Street subway runs roughly north–south through downtown, with stations at Boylston, Park Street, Government Center, Haymarket, and North Station – all with connections to other lines of the MBTA subway system. The Boylston Street subway runs roughly east–west through the Back Bay neighborhood, with stations at Arlington, Copley, Hynes Convention Center, and Kenmore; it connects to the Tremont Street subway at Boylston. The Huntington Avenue subway diverges from the Boylston Street subway at a flat junction west of Copley, running southwest, with stations at Prudential and Symphony. [11] :96 A branch of the Tremont Street subway, disused since 1962, runs south from Boylston to the former Pleasant Street incline.

The Green Line has four western surface branches, each with a letter designation:

B and C branch service terminates at Government Center, while D and E branch service continues north from downtown Boston. North of North Station, the line inclines up to the Lechmere Viaduct, which crosses the Charles River with an elevated station at Science Park. The elevated Lechmere station is located on the Green Line Extension viaduct, which continues north to a flying junction with two branches:

Former branches

The Green Line A branch was the northernmost of the branches, running from the Blandford Street portal (still used by the B branch), west to Watertown, mostly street-running. The 57 bus replaced the streetcar line in 1969. The A branch diverged from Commonwealth Avenue west of Boston University and ran to a terminus in Watertown, across the Charles River from Watertown Square, until 1969. Although the route-letter scheme had been introduced two years prior to its closure, the "A" designation was never signed on streetcars to Watertown. It was, however, included in the destination signs on the Boeing-Vertol LRVs ordered in the mid-1970s, when reopening service to Watertown was under consideration. The "A" line tracks remained in non-revenue service to access maintenance facilities at Watertown until 1994.

The Pleasant Street portal hosted two services in its final days. The 9 to City Point ended in 1953, and the 43 to Egleston was cut back to Lenox Street in 1956, cut back to the portal in 1961, and ended operation in 1962. Prior to that, the 48 serviced Tremont Street to Dover Street and Washington Street, ending at Dudley, and last running in 1938.

The last two routes to continue beyond the Canal Street portal both ran to Sullivan. The 92 ran via Main Street, last running in 1948, and the 93 via Bunker Hill Street last ran in 1949. Until 1997, trains continued to use the portal and its North Station surface station as a terminal.

In addition to the lines that later became the E branch, the predecessors to the 58 and 60 split in Brookline, one branch running into the current "E" tracks and into the Boylston Street portal, and the other running up Brookline Street to end at Massachusetts Avenue station. These were truncated in 1932 into a shorter route from Brookline Village to the subway via the Boylston Street portal, which itself stopped running in 1938 (being cut back to Brigham Circle short-turn trips), three years before the closure of that portal.

The last "foreign" cars to operate in the subway were those of the Eastern Massachusetts Street Railway, running from the Canal Street portal to the Brattle Loop at Scollay Square until 1935. It was then that the old Mystic River Bridge to Chelsea was closed to streetcars and the lines were replaced by bus service; the next year the Boston Elevated Railway (BERy) bought the Eastern Mass Chelsea Division and through-routed it with its lines connecting to the East Boston Tunnel at Maverick.

Rolling stock

Like the three other MBTA subway lines, the line uses standard gauge tracks. However, instead of heavy rail metro rolling stock, the Green Line uses modern streetcars (light rail vehicles) as heavy rail stock would be inappropriate for the surface branches with their numerous grade crossings.

Listing

Active fleet

Rolling stock as of June 2024: [2] [12]

Year BuiltManufacturerModelImageLengthWidthFleet NumbersQuantity
1986–1988 Kinki Sharyo Type 7 LRV MBTA Green Line 3634 at Newton Highlands station.jpg 72 ft (22 m)104 in (2.64 m)3600–3699100 (78 active, all overhauled)
1997 Inbound train at Kenmore station, July 2019.JPG 3700–371920 (15 active, all overhauled)
1998–2007 AnsaldoBreda Type 8 LRV MBTA Green Line B.jpg 74 ft (23 m)3800–389495 (80 active)
2018–2020 CAF USA Type 9 LRV Type 9 on Reservoir yard leads, March 2022.JPG 3900–392324 (all active)

Retired fleet

Only MBTA operated vehicles are included here, not cars from the Boston Elevated Railway era.

Years in ServiceManufacturerModelImageLengthWidthFleet NumbersQuantity
1976–2007 Boeing Vertol US Standard Light Rail Vehicle 1977 Boeing LRV 3466 of MBTA (Boston) at Beacon and Hawes in 1987.jpg 71 ft (22 m)104 in (2.64 m)3400–3543144 (31 units cancelled)
1937–1985 [lower-alpha 1] Pullman Standard PCC streetcar PCC streetcars at Arborway Yard, June 1983.jpg 48 ft (15 m)100 in (2.54 m)3000–3346344 (2 cars scrapped before 1964)
  1. 10 PCC streetcars are currently in revenue service on the Mattapan line.

History

Early rolling stock

PCC streetcars on the D branch in 1965 MBTA 3275 leaving Riverside Terminal, September 1965.jpg
PCC streetcars on the D branch in 1965

When it opened at the end of the 19th century, the Tremont Street subway was not intended as a full-scale rapid transit line (though it was built to semi-metro standards), but to allow ordinary streetcars to bypass the worst street congestion in downtown Boston. [6] [13] Operations by several different companies were eventually consolidated into the Boston Elevated Railway, which ran a mixture of car types. After receiving a test unit in 1937, the BERy began to standardize on PCC streetcars, acquiring 320 units between 1941 and 1951 plus an additional 25 in 1959 to phase out the last older cars. [12] Beginning in 1923, all streetcars on the system were painted orange for maximum visibility in traffic. In 1971, the MBTA began painting Green Line streetcars in a green and white scheme to match the new line name. [14]

Two older streetcars are on display on the unused outer inbound track at Boylston station, which formerly carried cars coming from the Pleasant Street portal. Car #5734, a Type 5 A-1 car built in 1924 and retired in 1959, is owned by the Seashore Trolley Museum, but resides semipermanently in Boston. PCC #3295, built in 1951 and retired in 1986, is owned by the MBTA. [12] The cars were formerly used for fantrips, the most recent one being in 1998.

Boeing LRV

Boeing LRV on the C branch in 2005 Boeing USSLRV (MBTA 3523).jpg
Boeing LRV on the C branch in 2005

In the early 1970s, light rail—which had largely disappeared from North America after the slow decline of streetcar systems from the 1920s to the 1950s—was reintroduced as a method of urban renewal less expensive than conventional metro systems. [15] In 1971, as part of a program to supply further work to defense contractors as the Vietnam War wound down, the Urban Mass Transit Administration selected Boeing Vertol as systems manager for a project to design a new generic light rail vehicle. The UMTA hoped that this "US Standard Light Rail Vehicle" would jumpstart the development of transit lines just as the standardized PCC streetcars had done decades prior. [16]

Boston (with its older streetcar tunnel systems) and San Francisco (with a new Muni Metro streetcar tunnel being built as part of BART construction) were chosen as the testbeds for this new rolling stock. [15] [17] The vehicle was designed as the largest rolling stock that would fit through the Tremont Street tunnel, the Muni Metro's Twin Peaks Tunnel, and SEPTA's subway–surface lines tunnel. [13] The new cars were faster—a top speed of 50 miles per hour (80 km/h) versus the PCC's 36 miles per hour (58 km/h)—and had an articulated middle section for higher capacity. [13]

Boeing began construction of 175 cars for the MBTA in May 1973. [16] The first LRVs entered service on the D branch in December 1976 but were immediately beset with problems. Certain cars frequently derailed on tight turns in the Riverside, Boston College and Lechmere yards. Battery trays, air conditioners—mounted under the cars, continually drawing in dirt and debris from under the car when in the tunnels—and air compressors all suffered numerous failures; the plug-style doors had trouble sealing properly; and traction motors failed sooner than expected. [18]

Desperate for reliable rolling stock, in 1977 MBTA launched an overhaul program to extend the availability of its older PCC cars. A total of 34 cars, primarily out-of-service wrecks and parts cars, were rebuilt to as-new condition. [18] As of 2022, some of these rebuilt PCC cars still run on the Ashmont–Mattapan High Speed Line. [12] [18]

After years of fighting between the MBTA and Boeing-Vertol, both sides reached a settlement in 1979. MBTA was allowed to reject the final 40 SLRVs, and Boeing would return $40 million to MBTA for the cost of repairs and modifications to several cars. [19] [20]

Modern fleet

Type 7 (left) and Type 8 streetcars at Tappan Street in 2012 Tappan Street with trains.JPG
Type 7 (left) and Type 8 streetcars at Tappan Street in 2012

In the early 1980s, with a final settlement with Boeing in place, MBTA started looking for new equipment to supplement and replace the problematic LRVs.

In 1980, the MBTA tested Canadian Light Rail Vehicles for three months to determine whether they could be used on the Green Line. [21] The MBTA ultimately found them unsuitable.

Ultimately, the MBTA purchased LRVs from the Japanese firm Kinki Sharyo. These Type 7 were designed with the best features of the US SLRV, the Canadian LRV, and the PCC cars. A total of 120 Type 7 vehicles were purchased, 100 were delivered between 1986 and 1988, and an additional 20 cars ordered and delivered in 1997. [22]

Low-floor LRVs were added starting in 1998, allowing for accessible boarding directly from slightly raised platforms. MBTA ordered 100 of these Type 8 cars from Italian company AnsaldoBreda. [12] The first Type 8s entered revenue service in March 1999, and quickly proved problematic and difficult to maintain: the first cars failed every 400 miles (640 km), far short of the 9,000 miles (14,000 km) specified by the MBTA, and were prone to derailment at higher speeds as well as brake problems, echoing the problems with the Boeing stock. In December 2004, the MBTA canceled orders for the cars still to be delivered as part of the authority's nine-year, US$225 million deal with Breda. [23] One year later, in December 2005 the MBTA announced that it had entered into a restructuring of the deal, reducing the order to 85 cars (with spare parts to be provided in lieu of the 15 remaining cars), and providing for the remaining payment under the original deal only if the cars met performance requirements. [24] Construction of the last car under the order was completed on December 14, 2006. [25] Ultimately, 10 additional cars would be assembled and delivered in late 2007, with five spare shells retained (95 cars in service). The MBTA was criticized for their failure to assess Bredas' reliability before entering into the deal, and during delivery. The agency was also forced to spend an additional US$9.5 million to modify tracks to prevent derailments and the Type 8 fleet was unable to be used on the D branch (where cars reach full speed) after those modifications were complete in 2008. [7]

As the final Type 8s were delivered, the last of the Boeing-Vertol cars were retired in March 2007 and all except ten of the cars were scrapped. [26] Of the remaining cars, six were sold to the US Government and are now in Pueblo, Colorado for testing purposes, one was given to the Seashore Trolley Museum, and three were retained by the MBTA for work service.

In 2006, as part of a legal settlement, the MBTA committed to always operate at least one low-floor car in each train, with no trains consisting only of Type 7 cars. [27]

Of the 120 Type 7 cars, 103 were overhauled by Alstom in Hornell, New York. The work includes new propulsion systems, climate control systems and interiors as well as exterior work. The pilot car for the program left in October 2012 and was returned in November 2014, with the last car overhauled in April 2019. [28] [12]

Type 9
Type 9 LRV at Cleveland Circle in 2023 MBTA Green Line 3900 at Cleveland Circle station, February 2023.jpg
Type 9 LRV at Cleveland Circle in 2023

Twenty-four new Type 9 Green Line cars were delivered between 2017 and 2020. Revenue service began in late 2018 and all 24 cars were planned to enter service by the fall of 2019, although actual acceptance continued through 2021. The Type 9 cars will provide additional rolling stock to allow for Green Line Extension operations, and will not replace any of the existing fleet. [29] The cars were made by CAF USA, Inc., with the shells and frames made in Spain, and final assembly and testing done at their plant in Elmira, New York. [30] As of March 2017, the first unit had been expected to enter passenger service in Spring 2018, with all 24 cars in service by the end of the year. [31] The first Type 9 car, #3900, began revenue service on December 21, 2018. [32]

Future fleet

A full-scale mockup of the planned Type 10 "Supercar" LRV MBTA Green Line Type 10 mockup exterior 5.jpg
A full-scale mockup of the planned Type 10 "Supercar" LRV

Planning for a Type 10 fleet—which would replace all Type 7 and Type 8 cars in the mid-2020s—began in 2018 with plans for a fully low floor fleet. [33] [34] At 113 feet (34 m) long, Type 10 cars would be significantly longer than the existing fleet, and carry twice as many passengers as existing cars. [35] The MBTA released a request for proposals in December 2019, with notice to proceed expected to be given in 2021. In June 2021, the MBTA indicated that the initial order would be for 102 LRVs operating as single cars, with two-car trains deferred for a later project with federal funding. Manufacturer bids were due in July 2021. [36]

The MBTA awarded a $811 million contract to CAF USA on August 31, 2022, to manufacture 102 seven-segment Type 10 "Supercar" LRVs. Four pilot vehicles are to be delivered in spring 2026, with deliveries of two LRVs per month from spring 2027 to spring 2031. [37] The contract included options for additional LRVs. [38] As a separately-funded project, Lake Street Yard will be fully reconstructed to support Type 10 vehicles, with Riverside Yard and the GLX Vehicle Maintenance Facility also modified. [39] When the Type 10 cars are delivered, the Type 9 fleet is expected to be transferred over to the Ashmont–Mattapan High-Speed Line, replacing the PCC streetcars. [35]

Accessibility

A low-floor Type 8 car at Longwood station, which has slightly raised platforms for accessible boarding Longwood MBTA station, Brookline MA.jpg
A low-floor Type 8 car at Longwood station, which has slightly raised platforms for accessible boarding

The Red Line, Blue Line, and Orange Line run rapid transit cars and use stations with high platforms level with the car floor providing easy access for the disabled. The Green Line originated as a streetcar line, and used a variety of streetcars before converting to light rail vehicles.

Originally all the Green Line stations had platforms at track level, and passengers had to ascend several steps up into the vehicles. This limited accessibility for persons with disabilities. To address this issue and comply with changing federal and state laws, additional facilities have been added: [40]

History

Beginning in the 1850s, Boston sprouted a large network of horsecar lines, the first public transit in the city. The West End Street Railway was created by the state legislature in 1887 to build a single line, but soon consolidated many of the existing lines into a single privately owned system with consistent fares and route designations. The Allston – Park Square line (which served the general area of the A branch) was the first section to be converted to electric traction in 1889. It used modified existing horsecars outfitted with Frank J. Sprague's revolutionary electrical equipment, which had first been demonstrated the previous year in Richmond, Virginia. [42] :9–10 In 1897, the West End Street Railway property was handed over to the Boston Elevated Railway in the form of a 24-year lease, and the companies were ultimately combined.

By the early 1890s, the sheer quantity of streetcars during peak periods was clogging the streets of downtown Boston. The Tremont Street subway, the first passenger subway in North America, was opened in stages in 1897 and 1898, with underground stations at Boylston, Park Street, Scollay Square, Adams Square, and Haymarket. The Main Line Elevated was run through the tunnel from 1901, displacing through-running streetcars, [42] :19–21 until it was rerouted to its own Washington Street Tunnel in 1908, and the streetcars were returned to the Tremont tunnel. [42] :27

Though initially intended merely to clear streetcars from the busiest sections of downtown streets, the Tremont Street subway became useful as a rapid transit service in its own right. The 1912 completion of the Causeway Street Elevated and Lechmere Viaduct extended grade-separated service to Lechmere Square in Cambridge, and in 1922 the Lechmere transfer station was built. In 1914, the Boylston Street subway opened as a westward extension to just short of Kenmore Square, and in 1933 Kenmore station and short tunnel extensions towards two surface lines were added. In 1941, the Huntington Avenue subway and its two additional underground stations removed the last surface streetcars from downtown Boston.

Beginning in the 1930s, the massive surface streetcar system was "bustituted" with buses and trackless trolleys which had lower operating costs and more flexible routes. As the 1950s closed out, the only remaining streetcar lines were the Watertown Line, Commonwealth Avenue Line, Beacon Street Line, Arborway Line, and the Lenox Street Line plus several short turn services. In 1959, the Boston and Albany Railroad's Highland Branch was converted to the Riverside Line, a fully grade-separated suburban service. In 1961, the last through service to Lenox Street via the Pleasant Street portal ended, though a Pleasant Street – Boylston shuttle continued for one more year. In 1963, part of the original subway was rebuilt under Government Center, abandoning and partially demolishing Adams Square station.

In 1947, the now-bankrupt BERy was replaced by the public Metropolitan Transit Authority (M.T.A.). The new agency was unpopular, even spawning a popular protest song; in 1964, it was replaced with the Massachusetts Bay Transportation Authority which had an expanded funding area to preserve suburban commuter rail lines. In 1967, as part of a systemwide rebranding that included new station names and color names for the transit lines, the remaining streetcar services were designated the "Green Line" because several of them traveled near the Emerald Necklace park system. The streetcar lines were given letter designations: "A" to the Watertown Line, "B" to the Commonwealth Avenue Line, "C" to the Beacon Street Line, "D" to the Riverside Line, and "E" to the Arborway Line.

The Watertown Line ran mostly in mixed traffic after diverging from Commonwealth Avenue; it was permanently replaced with buses in 1969. The section of the Arborway Line past Heath Street was "temporarily" – ultimately permanently – bustituted in 1985. In 2001, with new low-floor streetcars entering service, the MBTA began retrofitting underground stations and major surface stops with low raised platforms for accessibility for all. In 2004, the Causeway Street Elevated was replaced with a new tunnel under the Boston Garden, which consolidated the Orange Line and Green Line at a new North Station "superstation", while continuing to connect to Commuter Rail service north of Boston.

The name "Green Line" was assigned in 1967 as part of a major reorganization of the MBTA system's branding. [7] In the 1970s, the Green Line and all other MBTA lines were re-evaluated by the Boston Transportation Planning Review for region-wide efficacy and future modernization alternatives initiated as far as physical plant and operating measures.

Operations and signaling

Trains on the D branch operate using wayside signals. Green Line wayside signals near Newton Highlands.jpg
Trains on the D branch operate using wayside signals.

As of February 2023, each of the four branches operate on 7- to 9-minute headways during weekday peak hours, and 8- to 12-minute headways at other times. Vehicle usage ranges from 45 trains (90 cars) to 62 trains (124 cars). [43]

Unlike the MBTA's heavy rail subway lines, the Green Line has only limited central control and monitoring. This also means that it has lagged behind the other three rail lines in the availability of countdown signs and "next train" arrival information. The line is signalled with advisory wayside signals, except on surface portions in street medians or in-street running. Wayside signal territory stretches from Lechmere to the surface portals at Kenmore, and along the entire length of the D–Riverside branch. There are no automatic protection devices, but the cars have track brakes, giving the ability to stop quickly under control of the operator. Interlockings are controlled through a wayside Automatic Vehicle Identification (AVI) system that relies on the operator properly entering the destination manually on a roto-wheel in the train cab at the beginning of a run.

The line is monitored from the Operations Control Center (OCC). Responsibility for controlling service is shared by the control room and field personnel along the right of way. Track circuit and signal indications are not transmitted to the operational personnel sites. In lieu of track circuit indications, the AVI system is displayed in the control room to provide a periodic update to train position wherever AVI detectors exist. The AVI system user interface was solely text based until the current control room was opened, in which a new schematic display based on AVI data was instituted. Track circuit indications are available digitally in signal houses at the Park Street interlocking, at the new North Station interlocking, and at the new Kenmore interlocking, but are not transmitted to OCC. In January 2013, the MBTA announced plans to add full vehicle location tracking on the Green Line for countdown signs and smartphone applications, including using AVI data in the tunnels and GPS receivers on the surface lines. [44] The first real-time data—location data on the surface lines—became available in October 2014. Full tracking was expected by early 2015. [45]

The MBTA typically runs two-car trains at all times. The last scheduled use of one-car trains on weekdays was in March 2007. [7] Three-car trains were added on the B and D branches in 2010 – their first use since 2005 – and a four-car train was tested in April 2011. [7] In March 2011, the number of three-car trains was substantially increased, including use on the E branch. [7] [46] However, three-car trains suffered from reliability problems and slow boarding. [47] The use of three-car trains ended in March 2016. [7]

Positive train control

The MBTA approved a $82.6 million contract in May 2019 for a train protection system for the Green Line. The system would enforce red signals and automatically stop a train if it approached another train too closely. [48] The project was 28% complete by December 2021; installation of in-vehicle electronics was scheduled to be complete by September 2023, with wayside installation complete in June 2024 and full operation that December. [49] A reallocation of funds in January 2022 shortened the project timeline, with completion expected in 2023. [50] However, in January 2023, an NTSB report found that the project had been delayed to June 2025. [51] The MBTA cancelled the contract in June 2024 citing a lack of progress and an inability by the contractor to complete the project. The agency planned to instead use an off-the-shelf system from a different vendor. [52]

Turnarounds

A D branch train on the loop at Kenmore station in 2024 D train on Kenmore Loop October 2024.jpg
A D branch train on the loop at Kenmore station in 2024

Aside from the terminal stations, several locations have turnaround loops or crossover switches where trains can reverse direction for short turns. One of these, where northbound trains can turn southbound, is regularly used as the downtown terminal for two of the branches:

Several other loops and crossovers are not used in regular revenue service, but may be used during construction work or service disruptions, or for non-revenue trains, with some having been regularly used as terminals in the past: [2] [7]

Location tracking

Activated countdown signs at Kenmore station in August 2015 Activated countdown signs at Kenmore station, August 2015.JPG
Activated countdown signs at Kenmore station in August 2015

The Red, Orange, and Blue lines have block signalling systems that make tracking the location of trains easier. Signs in most station on those lines began to display real-time train information in late 2012 and early 2013, while data feeds have been available for smartphone applications since 2010. [44] However, the wayside signalling system used in the Green Line's tunnels and the D branch does not provide for that level of tracking, nor do the basic stop/go signals used on the street-level branch lines. In January 2013, the MBTA announced plans to provide full tracking data for the Green Line by 2015, allowing use of smartphone applications and in-station countdown signs. [44] The $13.4 million system is funded by MassDOT; it uses existing Automatic Vehicle Identification (AVI) systems plus additional sensors in the tunnels, and GPS receivers on the surface sections. [54]

In September 2013, the MBTA announced that "Next Train" signs would be unveiled at Kenmore that month. [55] On October 23, 2014, location tracking data became available for Green Line trains above ground. Arrival predictions for surface stations – including the activation of countdown signs along the D branch – and underground tracking and predictions were to be rolled out in two phases by early 2015. [45] In March 2015, the MBTA announced that enough AVI equipment had been installed to allow the release of some underground data by April. [54] Most underground data was live by August, but trains near Park Street and Boylston waited until September.

The first predictive countdown signs on the Green Line were activated at Newton Centre and Newton Highlands on April 24, 2015, followed shortly by other D branch stations. [56] Countdown signs at Kenmore and Hynes were activated in August 2015. Signs at Copley and Arlington plus eastbound-only signs from Boylston through Science Park were activated in October 2015. [57] The final set of signs – those on the westbound platforms of Science Park through Boylston – were activated in January 2016. Because holding and short-turning trains at the downtown terminals makes time-based predictions unreliable, the signs instead show how many stops away a train is. [58]

Projects

Somerville/Medford extension

Map of the Green Line Extension. Nearby parts of the Red Line and Orange Line are also shown. Green Line Extension.svg
Map of the Green Line Extension. Nearby parts of the Red Line and Orange Line are also shown.

The Green Line Extension (GLX) project added two new branches into the northern suburbs of Somerville and Medford. The project opened in two phases in 2022 at a total cost of $2.28 billion. The rebuilt Lechmere station and the Union Square Branch to Union Square opened on March 21, 2022, as an extension of the D branch (briefly the E branch). The Medford Branch opened to Medford/​Tufts on December 12, 2022 as an extension of the E branch, with intermediate stations at East Somerville, Gilman Square, Magoun Square, and Ball Square. [59] [60] The total project cost is estimated to be $2.28 billion: $0.996 billion from the federal government and $1.28 billion from the state. Daily ridership on the extension is projected to be 45,000 by 2030. [61]

The GLX begins at the north end of the Lechmere Viaduct, with a new elevated line continuing north for about 0.6 miles (0.97 km) parallel to the O'Brien Highway. The former surface-level Lechmere station was replaced by an elevated station on the new alignment. The two branches split with an aerial flying junction on the Red Bridge viaduct in the Inner Belt area. The Union Square Branch runs 0.7 miles (1.1 km) west from Red Bridge, sharing the Fitchburg Line right of way. The Medford Branch runs 3.0 miles (4.8 km) northwest from Red Bridge, sharing the Lowell Line right of way. Like the existing D branch, the new branches are fully grade-separated, with no level crossings. A new vehicle storage yard and maintenance facility is located in the Inner Belt area, with leads from both branches at Red Bridge. An extension of the Somerville Community Path runs along the Medford Branch south of Lowell Street, with a high bridge carrying it above the Red Bridge viaduct.

An extension north from Lechmere was first proposed in the 1920s, and again several times during the 20th century. To settle a lawsuit with the Conservation Law Foundation to mitigate increased automobile emissions from the Big Dig, the Commonwealth of Massachusetts agreed in 1990 to extend the Green Line from Lechmere to Medford Hillside through Somerville and Medford, two suburbs underserved by the MBTA relative to their population densities, commercial importance, and proximity to Boston. After delays in planning, the state agreed in 2006 to complete the project by 2014. [62] The preferred alternative from the 2009 Draft Environmental Impact Report added the Union Square Branch; the Medford Branch terminus was set as College Avenue, with a potential future extension to Mystic Valley Parkway.

The planned completion was delayed to 2018 in 2011, and to 2020 in 2014. [63] [64] A groundbreaking ceremony was held in December 2012. [65] The project was expected to cost about $2.2 billion, with half of that paid by the Federal Transit Administration (FTA). However, in 2015 it became clear that the project would cost $3 billion, putting its future in doubt. [66] The project was value engineered to reduce its cost: station designs were simplified, several bridge reconstructions eliminated, the Community Path extension shortened, and the maintenance facility reduced in size. [67] [68] The FTA approved the modified $2.3 billion plan on April 4, 2017. [69] The contract was rebid with a provision for the optional restoration of six of the elements deleted in the 2016 plan. The winning bid, selected in November 2017, included six optional elements, including canopies and additional elevators at stations, public art, a full-size vehicle maintenance facility, and the full extension of the Community Path to East Cambridge. [70] [71] Construction reached 20% completion in November 2019; it was over 50% completed by October 2020, and 80% by June 2021. [72] [73] [74]

Accessibility renovations

Government Center station under reconstruction in September 2014 Government Center construction, September 2014.jpg
Government Center station under reconstruction in September 2014

The majority of the Green Line opened by 1959, long before the 1990 Americans with Disabilities Act mandated that new construction be fully accessible. The MBTA began modifying Red, Orange, and Blue Line stations for accessibility in the late 1980s; however, Green Line stations were not modified until the late 1990s, when the Type 8 vehicles were under construction. The MBTA began the Light Rail Accessibility Program in 1996. [75] :30 Because modifying the numerous stations all at once would be prohibitively expensive, the MBTA designated "key stations" – largely those with high ridership or bus connections – for prioritization. [76]

Riverside station was completely rebuilt with raised accessible platforms around 1998. North Station and Park Street (both of which already had elevators from previous projects) were outfitted with portable lifts for temporary accessibility around 2000, as were Lechmere and ten surface stations. [76] Between 2001 and 2003, 16 surface stations (4 on the B branch, 4 on the C branch, 3 on the D branch, and 5 on the E branch) were retrofitted with raised platforms. [77] The 13 B, C, and E branch stations collectively cost $32 million. [78] Construction of raised platforms was completed at Park Street and Haymarket around 2003; Prudential was also reconstructed that year by the developer of 111 Huntington Avenue. The fully accessible underground "superstation" at North Station opened in 2004. [7] Wooden mini-high platforms, allowing level boarding on older Type 7 LRVs, were installed at eight Green Line stations in 2006–07 as part of the settlement of Joanne Daniels-Finegold, et al. v. MBTA . [27] [79]

Renovations for accessibility were completed at Arlington in 2009, [80] Kenmore and Copley in 2010, [81] [82] and Science Park in 2011. [83] A two-year closure of Government Center ended in 2016 with the opening of the accessible transfer station. [84] As part of the Green Line Extension, Lechmere was replaced by a fully accessible elevated station in 2022. Reconstruction work on Symphony began in 2023 but was placed on hold in 2024. Hynes Convention Center (with renovations in design) and Boylston are the other remaining inaccessible stations in the central subway. [85]

Other projects have moved towards full accessibility of the surface branches. Woodland was made accessible in 2006. [86] Renovations completed in 2009 made Longwood accessible for the first time, and replaced the lifts at Boston College and Brookline Village. [87] [88] A reconstruction of Brookline Hills (replacing lifts) was completed in 2022. [89] Construction of two accessible stations (Babcock Street and Amory Street) on the B branch to replace four non-accessible stations took place in 2021. [90] Temporary work to make Newton Highlands accessible was done in 2019; design work for a full reconstruction is complete. The four remaining non-accessible D branch stations are expected to have similar temporary modifications completed by the end of 2024. Accessibility modifications at most remaining B and C branch stops are expected to take place in 2025–2026. In 2023, the MBTA began design work for modifying the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations. [85]

Station listing

This listing includes only the Green Line section between Lechmere and Kenmore, which are served by multiple branches. For stops served by only one branch, see Green Line B branch § Station listing, Green Line C branch § Station listing, Green Line D branch § Station listing, and Green Line E branch § Station listing. All stations in the central subway have prepaid fare areas (fare control).

LocationStationBranchesOpenedNotes and connections
East Cambridge Wheelchair symbol.svg Lechmere D, EMarch 21, 2022The Lechmere Viaduct opened on June 1, 1912, with a direct connection to surface lines until July 9, 1922. The surface station was open from July 10, 1922, to May 23, 2020.
Aiga bus trans.svg MBTA bus: 69 , 80 , 87 ,  88
Aiga bus trans.svg EZRide
West End Wheelchair symbol.svg Science Park August 20, 1955
North End Wheelchair symbol.svg North Station June 28, 2004Original surface station was open from September 3, 1898, to March 27, 1997. Elevated station was open from June 1, 1912, to June 24, 2004.
MBTA.svg MBTA subway:  Orange 
MBTA white T logo.svg MBTA Commuter Rail: Fitchburg, Lowell, Haverhill, Newburyport/Rockport
Aiga bus trans.svg MBTA bus: 4
BSicon LOGO Amtrak2.svg Amtrak: Downeaster
Aiga bus trans.svg EZRide
Wheelchair symbol.svg Haymarket September 3, 1898 MBTA.svg MBTA subway:  Orange 
Aiga bus trans.svg MBTA bus: 4 , 92 , 93 , 111 , 354 , 426 , 428 ,  450
Downtown Boston Wheelchair symbol.svg Government Center B, C, D, E MBTA.svg MBTA subway:  Blue 
Aiga bus trans.svg MBTA bus: 354
Wheelchair symbol.svg Park Street September 1, 1897 MBTA.svg MBTA subway:  Red   Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
At Downtown Crossing: MBTA.svg  Orange  ; Aiga bus trans.svg 7 , 11 , 501 , 504 ,  505
Boylston MBTA.svg MBTA subway:  Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
Back Bay Wheelchair symbol.svg Arlington November 13, 1921Aiga bus trans.svg MBTA bus: 9 , 501 ,  504
Wheelchair symbol.svg Copley October 3, 1914Aiga bus trans.svg MBTA bus: 9 , 10 , 39 , 55 , 501 ,  504
Hynes Convention Center B, C, DAiga bus trans.svg MBTA bus: 1 ,  55
Fenway–Kenmore Wheelchair symbol.svg Kenmore October 23, 1932Aiga bus trans.svg MBTA bus: 8 , 19 , 57 , 60 ,  65
At Lansdowne: MBTA white T logo.svg Framingham/Worcester

Incidents and accidents

Type 7 LRV car wrecked in the May 2008 accident 2008 Green Line wreck.png
Type 7 LRV car wrecked in the May 2008 accident

On May 28, 2008, two D branch trains collided in Newton. The operator of one of the trains was killed and numerous riders were taken to area hospitals with injuries of varying degrees of seriousness. While it was originally thought that cell phone use was responsible for the accident, the cause was officially determined to be an episode of micro-sleep caused by the driver's sleep apnea. [91]

On May 8, 2009, two trolleys rear-end collided underground between Park Street and Government Center when the driver of one of the trolleys, 24-year-old Aiden Quinn, was text messaging his girlfriend while driving. [92] Quinn had run through a red light before the crash, which injured 46 people. MBTA officials estimated that the cost of the crash was $9.6 million. [93] A strict ban on cell phone usage by MBTA operators was later enacted. [94]

On October 8, 2012, two E branch trolleys collided in the 700 block of Huntington Avenue near Brigham Circle when one derailed into the other, injuring three people including a train operator. [95] The next month on November 29, two trolleys collided at low speed at Boylston, injuring several dozen passengers. [96]

On March 10, 2014, a D branch trolley with passengers aboard derailed in the tunnel just west of Kenmore Station, near the flat junction between the "D" and "C" branches. A second train had to brake suddenly to avoid hitting the derailed train. [97] Ten people were treated for moderate injuries. [98]

In October 2016, The Boston Globe reported that the Green Line had the highest number of derailments and accidents on light rail lines in the United States in 2015. The number of incidents had been increasing for several years due to deferred maintenance on tracks and wheels, which resulted in more low-speed derailments of Type 8 cars. [99]

On July 30, 2021, two B branch trains collided at Babcock Street, causing 25 injuries. [100]

On October 1, 2024, a train derailed near Lechmere, injuring 7 people and disrupting service on the Green Line Extension. [101] [102] Regular service resumed on October 3rd. The National Transportation Safety Board, Federal Transit Administration, and Massachusetts Department of Public Utilities are investigating the derailment. [103] A preliminary NTSB report noted the train was going 36mph in a 10mph zone and passed through a double red signal that required a stop. The train passed through a switch that was still moving into position, causing part of the first truck of the lead car to go straight and the red of the train into the diverging track and causing the derailment. [104]

In 2009, the National Transportation Safety Board recommended that the Green Line be outfitted with positive train control to prevent collisions as part of its various crash investigations. The MBTA decided in 2012 not to implement PTC, estimating the cost at $645 million to $721 million. In 2015, as crashes continued to happen, the NTSB complained the agency was moving too slowly identifying a feasible alternative. In 2019, the MBTA awarded a contract to implement a similar safety system by 2024, at a cost of $170 million. A train would automatically brake if a driver violates a traffic signal, or if cameras or radar detect an obstacle. [105] This contract was scrapped in June 2024. [52]

Related Research Articles

<span class="mw-page-title-main">Mattapan Line</span> Light rail line in Boston and Milton, Massachusetts

The Mattapan Line is a partially grade-separated light rail line which forms part of the MBTA's Red Line rapid transit line. The line, which runs through Boston and Milton, Massachusetts, opened on August 26, 1929, as a conversion of a former commuter rail line. It exclusively uses PCC streetcars built in the 1940s. Passengers must transfer at Ashmont to access the rest of the Red Line, which uses heavy rail metro rolling stock.

<span class="mw-page-title-main">Park Street station (MBTA)</span> Subway station in Boston, Massachusetts, US

Park Street station is an MBTA subway station in Boston, Massachusetts. It is located at the intersection of Park Street and Tremont Street at the eastern edge of Boston Common in Downtown Boston. One of the two oldest stations on the "T", and part of the oldest subway line in the United States, Park Street is the transfer point between the Green and Red lines, as one of the quartet of "hub stations" on the MBTA subway system. Park Street is the fifth-busiest station in the MBTA network, with an average of 16,571 entries each weekday in FY2019.

<span class="mw-page-title-main">Kenmore station</span> Subway station in Boston, Massachusetts, US

Kenmore station is an underground light rail station on the MBTA Green Line, located under Kenmore Square in the Fenway/Kenmore neighborhood of Boston, Massachusetts, United States. It is served by the B, C, and D branches of the Green Line. The station has two island platforms, one for each direction. Kenmore is the primary station for Fenway Park, which is 1,000 feet (300 m) to the south. The station opened on October 23, 1932 as a one-station extension of the Boylston Street subway to relieve congestion in the square. It was renovated for accessibility in 2005–2010.

<span class="mw-page-title-main">Boylston station</span> Subway station in Boston, Massachusetts, US

Boylston station is a light rail station on the MBTA Green Line in downtown Boston, Massachusetts, located on the southeast corner of Boston Common at the intersection of Boylston Street and Tremont Street. A southbound street-level stop for the SL5 route of the bus rapid transit Silver Line is outside fare control. The station has two island platforms; each has one disused track, making them effectively side platforms. Boylston is not accessible for Green Line trains.

<span class="mw-page-title-main">Science Park station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Science Park station is an elevated light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line in Boston, Massachusetts, United States. The station is located at the Boston end of the Charles River Dam Bridge at Leverett Circle. It is at the southeast end of the Lechmere Viaduct, which carries the Green Line over the Charles River. The station is named for the nearby Boston Museum of Science. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after Suffolk Downs.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

<span class="mw-page-title-main">Green Line E branch</span> Light rail line

The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.

<span class="mw-page-title-main">Green Line C branch</span> Light rail line in Massachusetts, US

The C branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in the Brighton neighborhood of Boston and runs on the surface through Brookline along the median of Beacon Street. Reentering Boston, the line goes underground through the Saint Mary's Street incline and joins the B and D branches at Kenmore. Trains run through the Boylston Street subway to Copley where the E branch joins, then continue through the Tremont Street subway to downtown Boston. The C branch has terminated at Government Center station since October 2021.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, B branch service runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Green Line D branch</span> Light rail line

The Green Line D branch is a light rail line in Boston, Brookline, Cambridge, Newton, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs on a grade separated surface right-of-way for 9 miles (14 km) from Riverside station to Fenway station. The line merges into the C branch tunnel west of Kenmore, then follows the Boylston Street subway and Tremont Street subway to North Station. It is the longest and busiest of the four Green Line branches. As of June 2024, service operates on 6 to 8-minute headways at weekday peak hours and 7 to 13-minute headways at other times, using 13 to 19 trains.

<span class="mw-page-title-main">Boston-area streetcar lines</span>

As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.

<span class="mw-page-title-main">Tremont Street subway</span> Boston subway tunnel

The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third-oldest still in use worldwide to exclusively use electric traction, opening on September 1, 1897. It was originally built, under the supervision of Howard A. Carson as chief engineer, to get streetcar lines off the traffic-clogged streets, instead of as a true rapid transit line. It now forms the central part of the Green Line, connecting Boylston Street to Park Street and Government Center stations.

<span class="mw-page-title-main">MBTA subway</span> Boston region transit service

The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit, light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, the T system, or simply the T.

<span class="mw-page-title-main">Lechmere Viaduct</span> Bridge over the Charles River in Boston

The Lechmere Viaduct is a concrete arch bridge connecting the West End neighborhood of Boston to East Cambridge, Massachusetts. Opened in 1912, the viaduct carries the MBTA's Green Line over the Charles River. It is adjacent to the Charles River Dam Bridge, but structurally separate.

<span class="mw-page-title-main">Blandford Street station</span> Light rail station in Boston, Massachusetts, US

Blandford Street station is a surface-level light rail station on the MBTA's Green Line B branch located in Boston, Massachusetts. The station is located in the center median of Commonwealth Avenue at Silber Way and Blandford Mall, about 2 blocks west of Kenmore Square, near the east end of Boston University. The station consists of two low side platforms, which serve the B branch's two tracks. The station is the first station outbound on the B branch after it splits off from the C and D branches at Kenmore.

<span class="mw-page-title-main">Babcock Street station</span> Light rail station in Boston, Massachusetts, US

Babcock Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Babcock Street and Pleasant Street.

<span class="mw-page-title-main">Green Line Extension</span> Light rail system in greater Boston, US

The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

<span class="mw-page-title-main">Amory Street station</span> Light rail station in Boston, Massachusetts, US

Amory Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Amory Street and Saint Paul Street.

<span class="mw-page-title-main">North Station (subway)</span> Rapid transit station in Boston, Massachusetts, US

North Station is an underground MBTA subway station in downtown Boston, Massachusetts. Served by the Massachusetts Bay Transportation Authority (MBTA) Green Line and Orange Line, it is connected to the surface terminal of the same name used by MBTA Commuter Rail and Amtrak. The station is fully accessible.

References

  1. O'Hara, Mary Ann; Turners, Pat (August 22, 2024). "History of Funding Update" (PDF). Massachusetts Bay Transportation Authority. p. 2.
  2. 1 2 3 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  3. Booz • Allen & Hamilton Inc. (1995). "Applicability of Low-Floor Light Rail Vehicles in North America" (PDF). Transit Cooperative Research Program. Retrieved August 7, 2013.
  4. Ian Yearsley (December 21, 1972). "Trams are coming back". New Scientist . Reed Business Information Ltd. Archived from the original on January 17, 2023. Retrieved August 28, 2023. ... San Francisco and Boston, both with semi-metros and independent plans for new tramcars.
  5. De Leuw, Cather & Company (1976). Light Rail Transit: A State of the Art Review. p. 9. Retrieved August 28, 2023.
  6. 1 2 Most, Doug (January 26, 2014). "The bigger dig". Boston Globe. Retrieved January 22, 2016.
  7. 1 2 3 4 5 6 7 8 9 10 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  8. Sanborn, George M. (1992). A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived from the original on November 27, 2019. Retrieved January 21, 2016 via MIT.
  9. "Curiosity Carcards" (PDF). Massachusetts Bay Transportation Authority. Archived from the original (PDF) on February 18, 2017. Retrieved January 21, 2016.
  10. Malikova, Alexandra A. (June 2012). "MBTA Green Line 3-Car Train Operating Plans to Enhance Reliability and Capacity (Master's Thesis)" (PDF). Massachusetts Institute of Technology Department of Civil and Environmental Engineering. Retrieved August 7, 2013.
  11. Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN   0938315056.
  12. 1 2 3 4 5 6 "The MBTA Vehicle Inventory Page". NETransit. Retrieved September 23, 2018.
  13. 1 2 3 Diamant, Emanuel S.; et al. (Spring 1976). "Light Rail Transit : A State of the Art Review". United States Department of Transportation. Retrieved August 7, 2013.
  14. "This Time In History". Rollsign. Vol. 58, no. 9/10. Boston Street Railway Association. September–October 2021. p. 14. ISSN   0035-7898.
  15. 1 2 Thompson, Gregory L. (November 2003). "Defining an Alternative Future: Birth of the Light Rail Movement in North America" (PDF). Transportation Research Board. Retrieved August 7, 2013.
  16. 1 2 "History: Light Rail Vehicle/Rapid Transit Car". Boeing. Retrieved August 7, 2013.
  17. Vuchic, Vukan R. (October 1972). Light Rail Transit Systems: A Definition and Evaluation (Report). Urban Mass Transportation Administration, US Department of Transportation. Retrieved December 20, 2018.
  18. 1 2 3 Moore, Scott. "Boston's Green Line Crisis". NETransit. Archived from the original on April 6, 2004. Retrieved August 7, 2013.
  19. Sheley Jr., W. H. (November 10, 1980). Massachusetts Bay Transportation Authority's Termination of Contract for Light Rail Vehicles PSAD-81-11 (PDF) (Report). United States General Accounting Office. Retrieved December 22, 2018.
  20. Sullivan, Kathleen (September 14, 1998). "Muni knew about trolley lemons in '70s: Test runs in Boston found major trouble in many systems". The San Francisco Examiner . p. A. Retrieved December 7, 2012.
  21. A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. 1981. p. 14 via Internet Archive.
  22. "Boston – MBTA: Green Line – Technical Data" (PDF). Kinki-Sharyo. Archived from the original (PDF) on July 20, 2014. Retrieved August 7, 2013.
  23. Flint, Anthony. "MBTA Halts Purchase of Green Line 'Lemons'" (mirrored copy). The Boston Globe . December 12, 2004.
  24. Daniel, Mac (December 17, 2005). "Green Line seeks zippier service with upgrade plan". The Boston Globe. Archived from the original on January 25, 2007., archived as of January 25, 2007
  25. "Bredas". The Boston Globe. December 14, 2006. Archived from the original on January 24, 2007. archived as of January 24, 2007
  26. "End of the line for T pioneers". The Boston Globe. March 16, 2007. Retrieved August 7, 2013.
  27. 1 2 "Settlement Agreement" (PDF). Joanne Daniels-Finegold et al. v. MBTA. April 10, 2006. pp. 10–11.
  28. Annear, Steve (November 18, 2014). "First of Refurbished Green Line Trolleys Heads Back Home". Boston . Archived from the original on February 6, 2017. Retrieved November 25, 2014.
  29. Annear, Steve (May 13, 2014). "New Green Line Trains Will Hit the Tracks by 2017". Boston . Archived from the original on July 13, 2017. Retrieved May 20, 2014.
  30. "CAF wins Boston Green Line order". Railway Gazette. May 16, 2014. Archived from the original on August 7, 2020. Retrieved May 20, 2014.
  31. "Green Line Type 9 Project Update" (PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 11. Archived from the original (PDF) on March 29, 2017. Retrieved March 29, 2017.
  32. "New MBTA Green Line Car goes into Passenger Service" (Press release). Massachusetts Bay Transportation Authority. December 21, 2018.
  33. "Green Line Transformation Program: Future Capacity Study Update - Fiscal & Management Control Board" (PDF). MBTA . May 7, 2018. Retrieved February 10, 2021.
  34. Brelsford, Laura (May 26, 2020). "SWA Initiatives—May 2020" (PDF). p. 18.
  35. 1 2 Vaccaro, Adam (January 31, 2020). "Next on the MBTA spending spree: bigger Green Line cars". Boston Globe . Retrieved February 10, 2021.
  36. Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 9.
  37. Peña, Angel; Wolfgang, Bill (August 31, 2022). "RFP No 367F-19 Type 10 Supercar Update and Procurement Award" (PDF). Massachusetts Bay Transportation Authority.
  38. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022.
  39. "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. pp. 66, 67.
  40. "MBTA > About the MBTA > Transit Projects > Transit Projects and Accessibility". Archived from the original on January 18, 2012. Retrieved October 23, 2018.
  41. "MBTA reaches 75 percent design completion on Green Line D branch accessibility improvements project". Mass Transit Magazine. June 3, 2022. Retrieved September 26, 2022.
  42. 1 2 3 Cudahy, Brian J. (1972). Change at Park Street Under; the story of Boston's subways . Brattleboro, Vt.: S. Greene Press. ISBN   0-8289-0173-2.
  43. Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 60, no. 1–2. Boston Street Railway Association. p. 10.
  44. 1 2 3 Rocheleau, Matt (January 22, 2013). "MBTA: Mobile apps will be able to track Green Line trains by 2015". Boston Globe. Retrieved January 22, 2013.
  45. 1 2 "CUSTOMERS ARE NOW ABLE TO TRACK GREEN LINE TRAINS" (Press release). Massachusetts Bay Transportation Authority. October 23, 2014. Retrieved October 28, 2014.
  46. "Green Line to nearly triple the number of 3-car trains" (Press release). Massachusetts Bay Transportation Authority. March 16, 2011.
  47. Vaccaro, Adam (May 3, 2016). "Why is the Green Line so crowded?". Boston Globe.
  48. "Green Line Train Protection System (GLTPS) System Integration Contract" (PDF). Massachusetts Bay Transportation Authority. May 20, 2019.
  49. "GLTPS Monthly Review and Lookahead" (PDF). Massachusetts Bay Transportation Authority. December 15, 2021.
  50. "New Funding Accelerates Green Line Train Protection System Project Timeline" (Press release). Massachusetts Bay Transportation Authority. February 25, 2022.
  51. Dolven, Taylor (January 5, 2023). "Green Line crash "would have been prevented" if MBTA had installed train tech earlier, NTSB finds". Boston Globe. Archived from the original on January 5, 2023.
  52. 1 2 Dolven, Taylor (June 7, 2024). "T scraps Green Line crash-prevention contract recommended by NTSB in 2009". The Boston Globe. Archived from the original on June 7, 2024.
  53. "MBTA Capital Investment Program FY15-FY19" (PDF). MBTA. March 12, 2014. p. 124. Archived from the original (PDF) on July 25, 2014. Retrieved April 23, 2015.
  54. 1 2 "MBTA installing underground tracking system for Green Line trolleys" (Press release). Massachusetts Bay Transportation Authority. March 3, 2015. Retrieved March 12, 2015.
  55. Annear, Steve (September 18, 2013). "The MBTA's Green Line Is Getting 'Next Train' Electronic Information Boards". Boston Magazine. Archived from the original on April 8, 2016. Retrieved September 18, 2013.
  56. "Green Line's First Countdown Signs Go Live in Newton" (Press release). Massachusetts Bay Transportation Authority. April 24, 2015. Retrieved April 25, 2015.
  57. Roberts, Sarah (October 6, 2015). "Green Line to get countdown clocks in downtown stations". Boston Globe. Retrieved October 6, 2015.
  58. Levenson, Eric (January 20, 2016). "Why the Green Line's new countdown clocks measure 'stops away' instead of time". Boston Globe. Retrieved January 20, 2016.
  59. MacCormack, Terry (March 21, 2022). "Baker-Polito Administration Celebrates Opening of the Green Line Extension" (Press release). Government of Massachusetts. Archived from the original on December 4, 2022. Retrieved December 13, 2022.
  60. "MBTA Celebrates Opening of the Green Line Extension Medford Branch" (Press release). Massachusetts Bay Transportation Authority. December 12, 2022.
  61. "About the Green Line Extension Project". Massachusetts Department of Transportation. Retrieved September 28, 2020.
  62. Cummings, Claire (August 9, 2007). "Proponents rap delay to extend Green Line". The Boston Globe . Retrieved August 26, 2007.
  63. Byrne, Matt (August 1, 2011). "State: Green Line extension will be delayed til 2018". boston.com (The Boston Globe). Retrieved August 1, 2011.
  64. Metzger, Andy (September 13, 2014). "Green Line Extension Cost Rises To $2 Billion". WBUR. Retrieved February 10, 2015.
  65. "Green Line Extension Phase 1 Construction Begins". Commonwealth Conversation: Transportation. Massachusetts Department of Transportation. December 11, 2012. Archived from the original on June 22, 2013. Retrieved December 15, 2012.
  66. Vaccaro, Adam (December 14, 2015). "Transit officials won't commit additional state money to Green Line extension". Boston Globe. Retrieved December 15, 2015.
  67. Interim Project Management Team Report: Green Line Extension Project Report to the MBTA Fiscal and Management Control Board and the MassDOT Board of Directors Archived August 29, 2017, at the Wayback Machine Submitted May 9, 2016
  68. Vaccaro, Adam (May 13, 2019). "Somerville's getting a brand new bike path with the Green Line extension. Is it wide enough?". The Boston Globe.
  69. Dungca, Nicole (April 4, 2017). "Feds OK Green Line extension costs, securing project's future". Boston Globe. Retrieved April 4, 2017.
  70. Jessen, Klark (November 17, 2017). "Green Line Extension Project Design-Build Team Firm Selected" (Press release). Massachusetts Department of Transportation. Archived from the original on January 28, 2022. Retrieved June 22, 2021.
  71. "MBTA chooses winning bidder for Green Line extension and awards its biggest contract ever - The Boston Globe". BostonGlobe.com. Archived from the original on April 6, 2019. Retrieved November 22, 2017.
  72. Thompson, Katie (November 15, 2019). "Construction on Green Line extension 20 percent complete". WCVB.
  73. "Baker-Polito Administration, Transportation Officials Visit Green Line Extension Project" (Press release). Massachusetts Bay Transportation Authority. October 1, 2020.
  74. Dalton, John (June 21, 2021). "Green Line Extension Update" (PDF). Massachusetts Bay Transportation Authority. p. 19.
  75. Official Audit Report – Issued June 16, 2014: Massachusetts Bay Transportation Authority, For the period January 1, 2005 through December 31, 2012 (PDF) (Report). Auditor of the Commonwealth. June 16, 2014.
  76. 1 2 "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. pp. 2–9. Archived from the original (PDF) on February 20, 2012.
  77. Ridership & Service Statistics (9 ed.). Massachusetts Bay Transportation Authority. 2004. p. 2.19 via Internet Archive.
  78. "Planned Accessibility Projects – On Board the Green Line". Massachusetts Bay Transportation Authority. Archived from the original on August 10, 2004.
  79. "Green Line Stations Upgraded to Improve Accessibility" (PDF). TRANSReport. Boston Regional Metropolitan Planning Organization. June 2007. Archived from the original (PDF) on January 16, 2011.
  80. Bierman, Noah (June 2, 2009). "Arlington T station reopens with disabled access". Boston Globe. Retrieved May 23, 2012.
  81. Rocheleau, Matt (September 14, 2010). "Copley station project nears end; historic church plans repairs". Boston Globe. Retrieved May 23, 2012.
  82. Moskowitz, Eric (April 25, 2010). "Kenmore station upgrades done, finally". Boston Globe. p. B2 via Newspapers.com. Open Access logo PLoS transparent.svg
  83. "Trolley service to resume as project end". Boston Globe. November 3, 2011. Archived from the original on May 31, 2012. Retrieved May 23, 2012.
  84. Moskowitz, Eric (March 21, 2016). "Government Center reopens". Boston Globe. Retrieved March 21, 2016.
  85. 1 2 "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. pp. 2–5.
  86. "MPO Agency Notes" (PDF). TRANSreport. Boston Region Metropolitan Planning Organization. April 2006 via Internet Archive.
  87. Rocheleau, Matt (September 28, 2012). "MBTA to hold meeting on $20m project to rebuild Boston College Station". Boston Globe.
  88. "Access in Motion: 2009 Calendar" (PDF). Massachusetts Bay Transportation Authority. 2009. Archived from the original (PDF) on January 2, 2010.
  89. "Brookline Hills Station Accessibility Improvements". Massachusetts Bay Transportation Authority. January 10, 2022.
  90. "New Babcock Street and Amory Street Stations Open November 15" (Press release). Massachusetts Bay Transportation Authority. November 12, 2021.
  91. Collision Between Two Massachusetts Bay Transportation Authority Green Line Trains, Newton, Massachusetts, May 28, 2008 (NTSB/RAR-09-02) (PDF) (Report). National Transportation Safety Board. July 14, 2009. Archived from the original (PDF) on October 16, 2011.
  92. "Trolley Driver Was Texting Girlfriend At Time Of Crash: 46 Injured In Green Line Crash" Archived February 22, 2012, at the Wayback Machine , WCVB, Boston, May 8, 2009.
  93. Texting Trolley Driver Is Transgendered Male, ABC News, May 11, 2009
  94. "Trolley Crash Inspires Tougher Cell Phone Policy: NTSB Still Investigating Crash" Archived February 22, 2012, at the Wayback Machine , WCVB, May 9, 2009
  95. "MBTA: Human error caused Green Line collision, derailment". WCVB. October 8, 2012. Retrieved September 17, 2024.
  96. Moskowitz, Erik; et al. (November 29, 2012). "35 taken to hospital after two trolleys collide at Boylston MBTA station". Boston Globe. Retrieved November 29, 2012.
  97. Tempera, Jacqueline; Martine Powers (March 10, 2014). "Seven injured as MBTA Green Line train derails near Kenmore Station". Boston.com. Retrieved March 11, 2014.{{cite news}}: CS1 maint: multiple names: authors list (link)
  98. "Green Line train derails; 'it was intense'". Boston Herald. March 10, 2014. Archived from the original on March 11, 2014. Retrieved March 10, 2014.
  99. Dungca, Nicole (October 13, 2016). "The Green Line had the most derailments in the nation last year". The Boston Globe . Retrieved October 13, 2016.
  100. Crimaldi, Laura (July 31, 2021). "NTSB investigating Green Line crash that left 25 injured; MBTA operator placed on leave". Boston Globe.
  101. Becker, Kaitlin McKinley (October 1, 2024). "Green Line train derails near Cambridge MBTA station; 7 people injured". NBC Boston. Retrieved October 2, 2024.
  102. "Shuttle Buses Continue to Replace Green Line Service between North Station and Union Square and Medford/Tufts". www.mbta.com. October 2, 2024. Retrieved October 2, 2024.
  103. "Green Line Service Has Resumed between North Station and Union Square and Medford/Tufts". www.mbta.com. October 3, 2024. Retrieved October 3, 2024.
  104. "Massachusetts Bay Transit Authority Derailment". National Transportation Safety Board. Retrieved October 17, 2024.
  105. Laura Crimaldi; Elizabeth Koh Globe (August 15, 2021). "On the T's Green Line, another serious crash and questions about the lack of safety technology". The Boston Globe .
Template:Attached KML/Green Line (MBTA)
KML is from Wikidata