San Diego Trolley

Last updated

San Diego Trolley
SDTI Logo.svg
MTSgreenline-convctr.jpg
Overview
Owner San Diego Metropolitan Transit System
Locale San Diego County, California, United States
Transit type Light rail
Number of lines3, plus 1 limited service heritage streetcar line [1] [2]
Number of stations62 [1]
Daily ridership119,200 (weekdays, Q3 2023) [3]
Annual ridership34,053,400 (2022) [4]
Headquarters James R. Mills Building
1255 Imperial Avenue
San Diego, California
Website San Diego Trolley
Operation
Began operationJuly 26, 1981;42 years ago (1981-07-26) [2]
Operator(s)San Diego Trolley, Inc.
Number of vehicles128 light rail vehicles: [5]

3 historic vehicles:

Technical
System length65 mi (105 km) [1]
No. of tracks2 tracks [note 1]
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  600 V DC [5]
Top speed55 mph (89 km/h) [5]
System map
San Diego Trolley System Map.png
San Diego Trolley
BSicon KBHFa jade.svg
Santee Logo Green Line (San Diego Trolley).svg
BSicon BHF jade.svg
Gillespie Field
BSicon tKINTa carrot.svg
BSicon STR jade.svg
Arnele Avenue Logo Orange Line (San Diego Trolley).svg
BSicon tINT carrot.svg
BSicon STR jade.svg
El Cajon
BSicon tINT carrot.svg
BSicon STR jade.svg
Amaya Drive
BSicon tINT carrot.svg
BSicon STR jade.svg
Grossmont
BSicon STR jade.svg
BSicon tKRWl carrot.svg
BSicon KRWl carrot.svg
BSicon KRW+r carrot.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
70th Street
BSicon BHF jade.svg
BSicon STR carrot.svg
Alvarado Medical Center
BSicon tBHFa@g jade.svg
BSicon STR carrot.svg
SDSU
Logo Blue Line (San Diego Trolley).svg UTC
BSicon hKBHFa denim.svg
BSicon htBHFe@g jade.svg
BSicon STR carrot.svg
Grantville
Executive Drive
BSicon hBHF denim.svg
BSicon hBHFe jade.svg
BSicon STR carrot.svg
Mission San Diego
UC San Diego Health La Jolla
BSicon hBHF denim.svg
BSicon hBHFae jade.svg
BSicon STR carrot.svg
Stadium
UC San Diego Central Campus
BSicon hBHFe denim.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
Fenton Parkway
VA Medical Center
BSicon BHF denim.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
Rio Vista
Nobel Drive
BSicon hBHFae denim.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
Mission Valley Center
Balboa Avenue
BSicon BHF denim.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
Hazard Center
Clairemont Drive
BSicon BHF denim.svg
BSicon hBHFae jade.svg
BSicon STR carrot.svg
Fashion Valley
Tecolote Road
BSicon BHF denim.svg
BSicon BHF jade.svg
BSicon STR carrot.svg
Morena/Linda Vista
BSicon STR denim.svg
BSicon tKRW+l jade.svg
BSicon KRW+l jade.svg
BSicon KRWr jade.svg
BSicon STR carrot.svg
BSicon LOGO Amtrak2.svg NCTD COASTER Icon (2019).svg BSicon FLUG.svg (via BSicon BUS2.svg )
Old Town
BSicon tINT jade.svg
BSicon STR denim.svg
BSicon STR carrot.svg
Washington Street
BSicon tINT jade.svg
BSicon STR denim.svg
BSicon STR carrot.svg
BSicon FLUG.svg (via BSicon BUS2.svg )
Middletown
BSicon tINT jade.svg
BSicon STR denim.svg
BSicon STR carrot.svg
County Center/Little Italy
BSicon tINT jade.svg
BSicon STR denim.svg
BSicon STR carrot.svg
BSicon LOGO Amtrak2.svg NCTD COASTER Icon (2019).svg BSicon FLUG.svg (via BSicon BUS2.svg )
Santa Fe Depot
BSicon tINT jade.svg
BSicon STR denim.svg
BSicon STR carrot.svg
BSicon STRl denim.svg
BSicon tSTR jade.svg
BSicon LSTR+l grey.svg
BSicon STR jade.svg
BSicon LSTR+r grey.svg
BSicon STR+r denim.svg
BSicon STR carrot.svg
BSicon FLUG.svg (via BSicon BUS2.svg )
America Plaza
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR denim.svg
BSicon BHF carrot.svg
La Mesa Boulevard
Logo Orange Line (San Diego Trolley).svg Courthouse
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon KHSTa carrot.svg
BSicon LSTR grey.svg
BSicon lBHF carrot.svg
BSicon STR denim.svg
BSicon BHF carrot.svg
Spring Street
Civic Center
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
Lemon Grove Depot
Fifth Avenue
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
Massachusetts Avenue
closed
1986
San Diego Square
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon uexlHST.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
Encanto/62nd Street
BSicon FLUG.svg (via BSicon BUS2.svg )
City College
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
Euclid Avenue
Park & Market
BSicon LSTR grey.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
47th Street
Seaport Village
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
32nd & Commercial
Convention Center
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon STR carrot.svg
BSicon BHF carrot.svg
25th & Commercial
Gaslamp Quarter
BSicon LSTR grey.svg
BSicon lINT.svg
BSicon STR jade.svg
BSicon LSTR grey.svg
BSicon STR carrot.svg
BSicon STR carrot.svg
Logo Green Line (San Diego Trolley).svg Logo Silver Line (San Diego Trolley).svg 12th & Imperial
BSicon LSTRl grey.svg
BSicon uKSTRa~L.svg
BSicon lINT~L.svg
BSicon STRl jade.svg
BSicon LSTRr grey.svg
BSicon uKSTRa~R.svg
BSicon KINTa-R carrot.svg
BSicon STR carrot.svg
BSicon STR carrot.svg
Storage & Maintenance Yard
BSicon MASKl.svg
BSicon ulDST.svg
BSicon uSTRr+1h.svg
BSicon STR denim.svg
BSicon STRl carrot.svg
BSicon uBS2c4.svg
BSicon STRr carrot.svg
Barrio Logan
BSicon BHF denim.svg
Harborside
BSicon BHF denim.svg
Pacific Fleet
BSicon BHF denim.svg
8th Street
BSicon BHF denim.svg
24th Street
BSicon BHF denim.svg
E Street
BSicon BHF denim.svg
H Street
BSicon BHF denim.svg
Palomar Street
BSicon BHF denim.svg
Palm Avenue
BSicon BHF denim.svg
Iris Avenue
BSicon BHF denim.svg
Beyer Blvd.
BSicon BHF denim.svg
Logo Blue Line (San Diego Trolley).svg San Ysidro
BSicon KBHFe denim.svg
Key
Blue Line Logo Blue Line (San Diego Trolley).svg
BSicon STRq denim.svg
BSicon LSTRq grey.svg
Logo Silver Line (San Diego Trolley).svg Silver Line
Green Line Logo Green Line (San Diego Trolley).svg
BSicon STRq jade.svg
BSicon tSTRq jade.svg
BSicon STRq denim.svg
Multiple services
Orange Line Logo Orange Line (San Diego Trolley).svg
BSicon STRq carrot.svg

Wheelchair symbol.svg All stations are accessible

The San Diego Trolley (known colloquially as "the Trolley") is a light rail system operating in the metropolitan area of San Diego. The Trolley's operator, San Diego Trolley, Inc.( reporting mark SDTI), is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of the MTS, with connections to and integrated travel tickets with the local bus systems.

Contents

The Trolley system serves 62 stations, over about 67.9 miles (109.3 km) of route, using three primary lines (the Blue, Green, and Orange lines) that operate daily, and the "downtown loop" heritage streetcar line (the Silver Line) that uses historic streetcars on select holidays. There is one downtown station where all the lines connect, and 13 other stations that provide transfers to a second line (and two of these also provide connections to heavy rail systems).

The Trolley began service on July 26, 1981, making it the oldest of the second-generation light rail systems in the United States. In 2022, the Trolley had the highest ridership of any light rail system in the United States, with 38,047,300 annual rides, or about 119,200 per weekday as of the third quarter of 2023. In 2015, farebox receipts recovered 40.6% of operating costs; the California average of farebox recovery was 27.9%. [6]

History

2023 is the 42nd anniversary of the San Diego Trolley, and the MTS has prepared a brief historical review of San Diego trolleys, and in particular the San Diego Trolley. MTS also has a more extensive slideshow and timeline available. On April 23, 1949 San Diego became the first California city to replace its trolley system with an all bus fleet, and on July 19, 1981 rail trolley cars returned to San Diego streets in the first modern American light rail system integrated with its bus system.

Early history

Electric rail service in San Diego traces its roots back to 1891 when John D. Spreckels incorporated the San Diego Electric Railway. [7] San Diego's streetcar system had been replaced with buses in 1949, and by 1966 the local bus company, San Diego Transit, was facing a financial crisis and public takeover.

Planning for mass transit in the San Diego region began in 1966 under the auspices of the Comprehensive Planning Organization (CPO, now known as the San Diego Association of Governments, SANDAG), an intergovernmental agency of 13 cities and San Diego County. [8]

Over the next decade, the CPO researched various technologies were studied including improvements to local buses, express buses, heavy rail, light rail, and advanced technologies. The CPO also closely studied the San Francisco Bay Area Rapid Transit (BART) system, then under construction. Ultimately, the early studies went nowhere due to disagreements between stakeholders and a lack of funding.

In 1975, the CPO published the Regional Transportation Plan which included 58-mile (93 km) intermediate capacity fixed guideway system (an untested technology at the time) at a cost of $1.5 billion. [9]

Metropolitan Transit Development Board

In the early 1970s, three state legislative acts would set the stage for the construction of mass transit in the San Diego region.

Transportation Development Act, signed by Gov. Ronald Reagan in 1971, earmarked 25% of the state sales tax for funding transportation projects, including mass transit. A 1974 amendment to Article 19 of the Constitution of California permitted the use of gas tax revenues, previously reserved for highway construction, for construction of rail systems. Finally, a 1975 law established the San Diego Metropolitan Transit Development Board (MTDB) with a clear mission: design, construct and operate a guideway transit system. [9] The entire process was assigned to MTDB to assure accountability. [9] The legislation was written and supported by State Senator James R. Mills, the President Pro Tem during this period and a strong transit advocate. [10]

The MTDB formally started operations on January 1, 1976. The MTDB's enabling legislation and principles adopted by the Board required the planning give added weight to systems that satisfy a number of criteria: priority consideration for technologies available and in use, a system that is capable of being brought into operation incrementally, and using rights-of-way owned by public entities to minimize construction costs. [9]

In December 1976, the MTDB launched its 18-month Guideway Planning Project to be held in two phases. Phase 1 involved the evaluation of potential corridors based on the CPO's 1975 Regional Transportation Plan and was guided by principles set by the MTDB board: the corridor should extend a long-distance and offer high-speed operation, the system should be at grade in a mostly exclusive right-of-way, capital costs should be low, and operating deficits should be minimized. Phase 1 studied over 100 miles of potential corridors with 45 miles of corridor recommended for further evaluation in Phase 2. At about the same time, a working paper presented an evaluation of four guideway technologies: light rail, two categories of heavy rail, and Automated Small Vehicle Transit. [9]

In August 1977, the MTDB board selected the South Bay region for the detailed Phase 2 study. There would be several potential corridors to consider, including along freeways (Interstate highways I-5, I-8 & I-805 and State Routes 94 & 16), along existing railroad rights-of-way, and arterial roads.

In October 1977 the board selected light rail as the lone guideway transit technology to be studied (it would also be compared to several all-bus alternatives). In making the decision to pursue light rail, the MTBD board said it best followed the principles it laid out as light rail can offer high-speed travel, the right-of-way is flexible, and construction costs can be low when at-grade construction is maximized. [9] The technology was new for the United States, but was well established in Germany.

Hurricane Kathleen

On September 10, 1976, nature intervened, setting off a chain of events that would help decide the corridor to be used.

Hurricane Kathleen destroyed parts of San Diego and Arizona Eastern Railway (SD&AE) Desert Line (east of San Diego), which at the time was owned by Southern Pacific (SP) railroad. [8] The SD&AE offered freight service with a line that traveled between Downtown San Diego, San Ysidro, northern Baja California (in Mexico), and Imperial County before connecting with the rest of the SP system in Plaster City, California. The hurricane caused $1.3 million worth of damage to the line ($6.69 million adjusted for inflation), primarily in Imperial County, east of San Diego. [9] Freight service was suspended, and in light of the extensive damages, SP petitioned the Interstate Commerce Commission to abandon the SD&AE on August 9, 1977.

The MTDB immediately began studying the SD&AE corridor between Downtown San Diego and the San Ysidro Port of Entry for joint use by electric light rail and freight trains. In June 1978, the MTDB found the entire joint-use project feasible. [9]

At the same time, the San Diego County Board of Supervisors became concerned about the potential loss of freight service on the SD&AE, which was seen as vital to the county's economic interests and the continued viability of San Diego as a deep-water port. The county commissioned its own study to examine using a portion of the SD&AE tracks for passenger service which would share the track with freight services, the motivation being the transit services could share the costs of maintaining the tracks. San Diego County proposed operating either commuter rail trains or self-powered diesel rail cars.

Initial implementation

Diagram of the South Line as originally opened in 1981 MTS Original South Line.svg
Diagram of the South Line as originally opened in 1981

In 1978, the Interstate Commerce Commission denied the request to abandon the SD&AE, prompting Southern Pacific to offer the railroad for sale to anyone willing to maintain freight operations on the line. The MTDB stepped in and offered to buy the SD&AE for $18.1 million if the Southern Pacific fully repaired the hurricane-damaged line. The deal closed on August 20, 1979, with the final acquisition occurring on November 1, 1979. [11] [9] The MTDB quickly secured a deal with the San Diego and Imperial Valley Railroad to continue freight service along the line.

The purchase gave MTDB ownership of two sections of right-of-way that could be used for mass transit: the SD&AE Main Line from Downtown San Diego to San Ysidro, and the SD&AE La Mesa Branch from Downtown San Diego to El Cajon.

With all the planning in place, construction of the 15.9-mile (25.6 km) "South Line" transit corridor (the southern portion of today's Blue Line) was able to begin just one month after acquisition in December 1979 and would be accomplished in two phases. [9]

The first phase of the project cost $86 million, which included the purchase of the SD&AE, 14 light rail vehicles, construction of a single-tracked electrified light rail line along the 14.2-mile (22.9 km) SD&AE Main Line and construction of a 1.7-mile (2.7 km) section of new street running tracks in Downtown San Diego. [9] To control costs, only minor rehabilitation was conducted on the SD&AE corridor, with the MTDB replacing about 40% of the ties, welding the jointed rail, constructing electric catenaries, and installing an absolute block signal system.

Funding for the project came entirely from Transportation Development Act state sales tax and local gas tax revenues. Federal funds were not actively sought due to the locally perceived notion that San Diego would not qualify due to low population densities, uncongested highways, and undefined corridors. [9]

San Diego Trolley in 1982, about six months after opening San Diego Trolley 1982.jpg
San Diego Trolley in 1982, about six months after opening

In August 1980, the MTDB established San Diego Trolley, Inc. to operate and maintain the new light rail system and on July 26, 1981, service began. Trains operated every 20 minutes (timed to meet at four passing tracks on the single track sections) between 5 am and 9 pm and carried approximately 10,000 passengers a day. [7]

In light of the strong ridership, construction of the second phase was started almost immediately, which involved double-tracking the SD&AE corridor and purchasing 10 additional vehicles. Upon completion of double-tracking in February 1983, the total cost of the project was $116.6 million. [9]

Early expansions

Construction of the Little Italy extension in October 1991 San Diego Trolley track work at Union Station, October 1991.jpg
Construction of the Little Italy extension in October 1991

The San Diego Trolley added a second line on March 23, 1986, that shared the same Downtown tracks and traveled east to Euclid Avenue on the La Mesa Branch of the SD&AE. The new route was then called the Euclid Line (part of today's Orange Line). [7] [8] This line was extended to El Cajon by June 23, 1989, at which time it was renamed the East Line. [7] Service was expanded beyond the old SD&AE right-of-way when the line was extended further, north, to Santee on August 26, 1995. [7] [8]

The East Line's Bayside Connection extension to the Convention Center and Gaslamp Quarter opened on June 30, 1990. [12] Later in the decade, the South Line was extended to the north, reaching Little Italy on July 2, 1992, [12] and Old Town on June 16, 1996. [8] [12]

The system was further expanded east from the Old Town station as the Mission Valley Line, which opened on November 23, 1997. It proceeded eastward from Old Town to Fashion Valley Mall, Mission Valley Mall, and San Diego Stadium. At the same time, the South Line (which now traveled north of downtown San Diego to Old Town) and East Line of the system were renamed the Blue Line and the Orange Line, respectively. [7] [8] [12]

The Mission Valley East extension, which opened on July 10, 2005, built the only underground station in the system at San Diego State University, as well as its highest elevated station at Grantville. This line was then renamed the Green Line. [12] The line also featured the first low-floor trolley vehicles, that allow passengers to board without climbing stairs and allowed passengers using wheelchairs to use a small bridge plate instead of the slower lifts on the older trains. But, the new vehicles could only operate on the Green Line, forcing passengers heading between Mission Valley and Downtown San Diego to change trains in Old Town. (This restriction no longer applies.)

Trolley Renewal Project

A low-floor trolley operating on the Blue Line at Fifth Avenue station, rebuilt as part of the Trolley Renewal Project. Core-Columbia, San Diego, CA, USA - panoramio (26).jpg
A low-floor trolley operating on the Blue Line at Fifth Avenue station, rebuilt as part of the Trolley Renewal Project.

In the late 2000s, as parts of the San Diego Trolley approached 30 years old, the system was in need of an overhaul of its oldest facilities. Also, after the success of the low-floor trolley cars on the Green Line, the MTS wanted to operate similar vehicles on all lines. [13]

Officials secured $660 million in funding after the 2008 election as voters passed the TransNet half-cent local sales tax and two statewide transportation bond measures. The project also received funding from the American Recovery and Reinvestment Act and federal formula funds. [14]

The "Trolley Renewal Project" would entail several improvements. Each station would get larger shelters to provide more protection from sun and rain, new benches, and digital "next arrival" signs. Worn-out infrastructure was replaced as needed, including rails, ties, catenary wires, power lines and electrical substations. [13] The project also included a new signalling system that would allow two freight trains to operate at night, rather than one. [14]

To enable the switch to a low-floor light rail vehicle (LRV) fleet, platforms at 35 stations would need to be raised from either ground level or sidewalk level (4-inch (102 mm)) to 6-inch (152 mm). Stations also needed a new "safety edge tile" with a smooth surface in the center to allow wheelchair ramps to deploy (the existing safety tile would stop ramps from fully deploying). The other complication of the switch to low-floor LRVs was that the traditional Siemens S70, like those ordered for the Green Line, were over 90 feet (27 m) long, so a three-car train would not fit within Downtown San Diego's 240 feet (73 m) blocks. [13] The MTS teamed up with the Utah Transit Authority, which faced a similar problem with its system. The solution for both agencies was a specialized design Siemens called the S70 US ("Ultra Short") which retains the low-floor design, but would be the same length as the older high-floor vehicles (80 feet (24 m)). [14]

The MTS and SANDAG agreed to purchase a total of 65 vehicles, which would arrive between September 2011 and January 27, 2015. [13] [15] However, there was not enough funding to replace all 123 high-floor cars at once. The decision was made to retire the original Siemens-Duewag U2 LRVs, and operate three-car trains with the new low-floor LRVs in the front and back, and an older high-floor Siemens SD-100 car in the middle.

In late 2010, work to rebuild the stations started at the Old Town Transit Center and worked south. [16] [17] By September 2, 2012, work was completed on the Old Town and Bayshore lines, allowing for a realignment of service. [18] [19] The Green Line was extended from its former western terminus in Old Town south to 12th & Imperial Transit Center's Bayside Terminal platform, while the Orange Line was truncated to Santa Fe Depot and the Blue Line to America Plaza. [20] The new alignment meant all lines now passed through downtown and created a universal transfer point for all lines at 12th & Imperial Transit Center.

By January 9, 2013, all stations on the Orange Line had been rebuilt, allowing low-floor LRVs to begin service on a second line. [21] Rebuilding of the remaining stations (all on the Blue Line) was completed by January 27, 2015, [22] The project, including remaining station and track renovations, was completed in late 2015. [23]

Mid-Coast Trolley extension project

In 2011, SANDAG received key approval for the Mid-coast extension of the Blue Line, [24] running from the Old Town Transit Center 11 miles (17.7 km) north to the University City community, serving major activity and employment centers such as Mission Bay Park, the University of California, San Diego (UCSD) campus, three major hospitals on (and adjacent to) the campus, and University Towne Centre (UTC) shopping center. [25] [26] [27] Construction began in October 2016, [28] and train testing on the line began in late June 2021. [29] The Mid-Coast extension opened on November 21, 2021. [30]

The Blue Line was re-extended north from its original northern terminus at America Plaza to run through five existing stations (up to and including its pre-2012 terminus, the Old Town Transit Center), and continuing to nine new trolley stations: Tecolote Road, Clairemont Drive, Balboa Avenue, Nobel Drive, VA Medical Center, UCSD West/Pepper Canyon, UCSD East/Voigt Drive, Executive Drive, and UTC. The northern terminal station, UTC, is part of the UTC Transit Center, at Westfield UTC (a major shopping center) in the University City/UCSD area. [25]

Current service

Lines

As of 2021, trolley service operates on three daily lines: the Blue, Green, and Orange Lines, and traveling through 65 total miles of mostly double-track rail and serving 62 stations. [1] A fourth line, the heritage streetcar Silver Line, operates more limited weekday and weekend service, in a clockwise 'circle-loop' around downtown San Diego only. (This is an overlay of existing parts of other lines in downtown.) [31]

LineOpening [2] Length [2] Stations [2] TerminalsOperation
Logo Blue Line (San Diego Trolley).svg Blue Line 198126.3 mi (42.3 km) [2] [32] 32 University City

UTC Transit Center

San Ysidro

San Ysidro Transit Center

Daily
Downtown San Diego

America Plaza Station

Logo Orange Line (San Diego Trolley).svg Orange Line 198618.0 mi (29.0 km)19Downtown San Diego

Courthouse Station

El Cajon

Arnele Avenue Station

Daily
Logo Green Line (San Diego Trolley).svg Green Line 200523.6 mi (38.0 km)27Downtown San Diego

12th & Imperial Transit Center

Santee

Santee Town Center

Daily
Logo Silver Line (San Diego Trolley).svg Silver Line 20112.7 mi (4.3 km)9Downtown San Diego

12th & Imperial Transit Center

Selected days

Stations

The routes are arranged approximately geographically true; the Blue Line runs from the upper left corner (La Jolla) to the lower right corner (San Ysidro): the Orange Line runs from the left middle (downtown San Diego) to the upper right (El Cajon), and the Green Line also runs from the left middle (downtown San Diego) to the upper right (Santee), taking a route that lies largely along Mission Valley / Interstate 8. The universal transfer station is 12th & Imperial. SD Trolley with Blue Line Extension.svg
The routes are arranged approximately geographically true; the Blue Line runs from the upper left corner (La Jolla) to the lower right corner (San Ysidro): the Orange Line runs from the left middle (downtown San Diego) to the upper right (El Cajon), and the Green Line also runs from the left middle (downtown San Diego) to the upper right (Santee), taking a route that lies largely along Mission Valley / Interstate 8. The universal transfer station is 12th & Imperial.

The San Diego Trolley system has 62 operational stations serving its four Trolley lines. [33]

Fourteen of the Trolley system's stations operate as transfer stations, which allow passengers to transfer between lines. There is one universal transfer point (i.e. allowing for transfers among all four lines) in the system in downtown San Diego: the 12th & Imperial Transit Center station. The adjacent Santa Fe Depot/America Plaza/Courthouse stations, which are within walking distance of each other, also allow for transfer among the four lines. Six Trolley stations are end-of-line stations. Thirty-seven stations are within the city limits of San Diego, serving various neighborhoods in San Diego; the other stations are located in the cities of Chula Vista, El Cajon, La Mesa, Lemon Grove, National City, and Santee.

Most of the stations in the San Diego Trolley system are 'at-grade' stations. There are 8 aerial stations, mostly on the newer Green Line. There is just one Trolley station in the system that is underground – the SDSU Transit Center station – also on the Green Line.

About half of San Diego Trolley stations offer free park and ride lots. [34] Most Trolley stations offer connections to MTS bus lines.

Hours of operation

The San Diego Trolley's three main lines operate regular service between 5 am and midnight, seven days a week. Limited service on particular segments is provided before 5 am and after midnight. However, there is no rail service between 2 am and 3:30 am. [35] During these hours when there is no passenger service, freight trains of the San Diego and Imperial Valley Railroad operate on the trolley's right of way.

Service on the Blue Line operates every 15 minutes, seven days a week, with service every 7.5 minutes during weekday rush-hours; late-night service on this line runs every 30 minutes. [35] The Green and Orange Lines operate service every 15 minutes on Monday–Saturday mid-days, but every 30 minutes on weekend mornings, on Sundays, and during evenings. [35]

Fares and fare collection

The San Diego Trolley operates on a proof-of-payment system. Passengers must have proof of fare (ticket or pass) before boarding. Self-serve ticket-vending machines located at each station sell one-way paper tickets and passes (one day and monthly) on the Pronto Card. (An older fare card that was used was the Compass card.)

Roving transit enforcement personnel conduct random ticket inspections throughout the system. If customers are caught without a valid fare, they may be fined. Based on frequent security inspections, nearly 98% of the 37 million patrons have proper fares. [2]

One-way fares are good for up to two hours from the time of purchase. The fare does include a transfer to other routes, as long as it is within two hours from the time of purchase. [36]

One-day and monthly passes are sold on the Pronto Card. The card itself costs $2, and fares are loaded on to it as needed for the different transit systems within San Diego County (including the San Diego Trolley, MTS Bus, MTS Rapid buses, NCTD Breeze buses, and the NCTD Sprinter (a light rail line in North San Diego County). More expensive premium passes include access to the NCTD Coaster commuter rail service, MTS Rapid Express, and MTS Rural buses.

Pronto cards are linked to an account which can store value to be used at any time. The Pronto card uses the "best fare," which is similar to pay-as-you-go. The card will automatically deduct a one-way fare each time it is tapped, and will cap the total fare deducted in a day to the limit of a Day Pass, which is $6. Pronto will also cap the total monthly fare to the same price as a Month Pass, which is $72.

The Pronto card must be tapped on a Pronto Card validator (located just outside the paid area of stations), or the QR code must be scanned from within the Pronto App when entering and transferring within the system in order to be validated.

Ridership

As of the Fourth Quarter (Q4) of 2013, the average weekday ridership on the San Diego Trolley system was 119,800, [38] making it the fourth busiest Light rail system in the United States. Taking overall track length into consideration, the San Diego Trolley transported 2,239 daily passengers per route mile in Q4 2014, making it the twelfth busiest Light rail system on a per mile basis over this time period. Weekday ridership on the Trolley has been relatively high since Q3 2013 (see table at right).

In all of 2014, the San Diego Trolley provided 39,731,900 unlinked passenger transits according to the American Public Transportation Association (APTA). [38] MTS reported that there were 39,694,197 trips on the Trolley in Fiscal Year 2014 (FY 2014), a 34% increase over Fiscal Year 2013. [39] Of the Trolley's three lines, the Blue Line has the system's highest ridership with 15,094,878 riders during FY 2014, followed by the Green Line with 13,673,926 FY 2014 riders, and the Orange Line with 10,896,289 FY 2014 riders. [39] The Silver Line, operating only mid-days just four days a week (and with some service interruptions during the year), carried 29,104 passengers around the downtown loop in FY2014.

According to figures from APTA, previous to 2014, the San Diego Trolley achieved the highest level of ridership in 2007, when there were 36,386,100 unlinked passenger transits on the system over that entire year. [41] The Trolley system's highest average weekday ridership of 124,300 was achieved in Q3 2007 [48] – this corresponded to 2,323 passengers per route mile daily.

Proposed extensions

Proposed Balboa Park streetcar line

MTS began work in March 2011 on a study to evaluate the feasibility of reconnecting Balboa Park, the San Diego Zoo and Downtown San Diego through a fixed-guideway, electrified streetcar line – the final study on the subject was published in October 2012. [49] The project study corridor runs between the City College Trolley Station area, and Balboa Park in the vicinity of the San Diego Zoo. [50] An alignment similar to the proposed one was last served by a streetcar system in 1949 on lines 7 (Park Boulevard-University Avenue to East San Diego) & 11 (Park Boulevard-Adams Avenue to Kensington). [51] The Committee evaluated what types of streetcars to use for this proposed line, the possible options including the recently ordered 57 Ultra Short 2011 S70s in the "Modern Streetcar" category, and the restored PCC Streetcars from the Downtown Silver Line in the "Vintage Streetcar" category. [52] [53] The major construction issues were how to cross I-5 without having to reconstruct the entire bridge, and how to make the construction strong enough to support the full weight of heavier light rail trains (for possible line extension). No low-cost solution to this problem was identified. The estimated cost for construction of this line was $68.2 million, with each trolley car estimated to cost between $850,000 (for a restored PCC trolley car) to $3.6 million (for a modern trolley car). Four cars are anticipated for service on this line. No funding sources were identified. No further action on this proposal has taken place since the October 2012 release of the study.

Proposed airport extension

One of the biggest gaps in the San Diego Trolley system is the lack of a connection to the San Diego International Airport. [54] The MTS says the extension presents engineering challenges and would be costly, but the agency's polls and outreach show the extension is one of the most desired projects among the public. Over the years there have been several proposals, with the most serious coming as part of the proposed "Elevate SD 2020" transit tax. That project would have created a new line that connected the airport to both the 12th & Imperial Transit Center and the Old Town Transit Center with a wye spur between the Middletown and Little Italy stations. [55] In April 2020, MTS decided not to pursue the transit tax ballot initiative. [56] However, an extension of the trolley to the airport is included as an alternative proposal as part of SANDAG's Central Mobility Hub project for the airport, which is in the Draft Environmental Impact Report phase as of 2021. [57] [58]

Connecting service between the Trolley and the airport is provided by local bus Route 992 that serves the Santa Fe Depot/America Plaza transit area. Additionally, the airport runs two shuttles: one that stops at the Old Town station (called the San Diego Flyer), and another that stops a block from the Middletown station (the rental car shuttle). Both have stops at both terminals. [59]

Proposed Purple Line

The Purple Line is a proposed San Diego Trolley line that would run from San Ysidro Transit Center at the United States–Mexico border to Kearny Mesa with a possible extension to Carmel Valley. It would run along, or close to I-805 and I-15.

In April 2011, the San Diego Association of Governments (SANDAG) released a draft of its 2050 Regional Transportation Plan, which was approved by the SANDAG Board of Directors on October 28, 2011. An inland Trolley line from San Ysidro to Kearny Mesa, though not yet called the Purple Line, was included in the plan. [60] [61] [62]

In 2016, SANDAG had a measure on the ballot to fund development of the Purple Line. It failed to pass. [63]

In April 2019, the MTS again included the Purple Line in a final version of a November ballot initiative to increase the countywide sales tax by a half-cent to fund future transit plans. [64] In April 2020, MTS decided not to pursue the transit tax ballot initiative. [56]

Fleet

San Diego Trolley interior San Diego Trolley 07.jpg
San Diego Trolley interior

The San Diego Trolley operates on all its main lines with an all-Siemens fleet of light-rail vehicles (LRVs). It also runs 2 "heritage" PCC street cars on the Silver Line, a downtown-only circuit on a select schedule.

When the system opened in 1981, the agency purchased a fleet of 71 high-floor Siemens–Duewag U2 vehicles, originally designed for and used by the Frankfurt U-Bahn. At the time, no purpose-built LRVs were being manufactured for the North American market, so the model was adapted for use by San Diego and other transit systems in Canada. The vehicles were built in West Germany, with some assistance from a Siemens facility in Florin, California, a suburb of Sacramento. These cars were withdrawn from service between 2010 and 2015. Eleven of the U2 cars were sold to the new Metrotranvía Mendoza in Mendoza, Argentina in 2010, [65] 29 were retired after the Orange Line was converted in early 2013, [2] and the rest were retired after the Blue Line was converted in January 2015. [66] Six U2 cars have been preserved: car 1001 was retained by MTS for use on the Silver Line, [67] cars 1003 and 1008 were donated to the Southern California Railway Museum, [68] cars 1017 and 1018 were donated to the Western Railway Museum, [69] and car 1019 was donated to the Rockhill Trolley Museum. [70] Car 1035 was sold in late 2020 to the Memphis Area Transit Authority, which operates a vintage-trolley system and intends to use the LRV for testing of modern, higher-capacity vehicles on its Madison Avenue Line. [71] [72]

In 1995, the San Diego Trolley purchased a fleet of 52 high-floor Siemens SD-100 vehicles, an evolution of the U2, but redesigned for the North American market. Starting with this order, all of San Diego's future LRVs would be built in California at the Florin factory.

Starting in 2005, San Diego started shifting to a low-floor fleet. The design of the Siemens S70 vehicles required that stations be designed with slightly higher platforms, so the 11 car fleet could only operate on the newly constructed Green Line. [12] The other limitation of the S70 fleet was that they were about 9.34 feet (2.85 m) longer than the SD-100 vehicles, which would make three-car trains longer than a single block in Downtown San Diego. [15]

In 2009, San Diego ordered a fleet of 65 specialized Siemens S70 US ("Ultra Short") vehicles, which retain the low-floor design but would be the same length as the SD-100 vehicles.

In 2016, San Diego ordered an additional 45 specialized LRVs, this time the Siemens S700 US, which has a redesigned center section, with longitudinal seating (passengers facing the aisle) instead of the S70's more traditional seating with passengers sitting four-across, facing forward or back, with an aisle in between. This change, was made to eliminate a seating layout that had been criticized as cramped and ease the movement of passengers within that section. [73] [74] The San Diego Trolley ordered an additional 25 S700 US vehicles in 2019; these vehicles were delivered by the end of 2021. [75]

Current rail fleet

ImageModelFleet Numbers (Qty.)First PurchaseEntered ServiceNotes
San Diego Trolley fleet
San Diego Trolley Santee Trolley Town Center.JPG Siemens SD-100 2001–2052 (52)19931995Being replaced by Siemens S700 US; 39 being donated to Metrotranvía Mendoza [76] [77]
SD Trolley Green Line (cropped).jpg Siemens S70 3001–3011 (11)2004July 2005First low-floor trolley cars in system; restricted to Green Line service due to length

SDT4046 (cropped).jpg

Siemens S70 US4001–4065 (65)2009January 2012Replaced Siemens-Duewag U2 fleet
SDT 5000 Series.jpg Siemens S700 US5001–5045 (45)2016April 20195045 dedicated to late CEO Paul Jablonski
5046–5070 (25)2019November 2021Replacing Siemens SD-100 fleet
Silver Line heritage fleet (3 cars in service)
Car529PCCRightSDMar2014.JPG PCC streetcar 529
530
(2)
2005 [78] August 2011 (529)
March 2015 (530)
Both are painted in San Diego Electric Railway livery:
529 is a continuation beyond 528, the last original SDER streetcar (this was ex-San Francisco Muni 1122);
530 was unveiled in 2015 for the Centennial of Panama–California Exposition (this was ex-San Francisco Muni 1123)
San Diego Trolley 1982.jpg Siemens-Duewag U2 1001
(1)
1979July 2019First vehicle purchased for the San Diego Trolley

Specifications

Below are the technical specifications of the system's five different fleet series of light rail vehicles:. [5] [79]

Specification Siemens–Duewag U2 Siemens SD-100 Siemens S70 Siemens S70 US Siemens S700 US
ManufacturerDuewag (with assistance from Siemens; Düsseldorf, West Germany and Florin, California)Siemens (Florin, California)
TypeDouble-ended articulated car, 6 axle, multiple-unit operation to 5 cars
Height
(top of car to rail)
12.4 feet (3,780 mm)
Center Aisle Floor Height39 inches (991 mm)15 inches (381 mm)
Width (exterior)8.7 feet (2,652 mm)
Length (end to end)76 feet (23.165 m)76.71 feet (23.381 m)88.5 feet (26.975 m)79.2 feet (24.140 m)
Length
(over coupler faces)
79.67 feet (24.283 m)81.36 feet (24.799 m)90.7 feet (27.645 m)81.4 feet (24.811 m)
Weight (empty)77,161 pounds (35,000 kg)89,000 pounds (40,370 kg)97,900 pounds (44,407 kg)96,000 pounds (43,545 kg)
Car BodyLightweight welded steel, fiberglass operator cab and articulation coversLow alloy high tensile steel and composite materials
InteriorVinyl-covered foam bench seats (fire-resistant), rubber flooring, simulated wood panelingVinyl-covered foam individual seats (fire-resistant), rubber flooring, color-coordinated paneling
WheelsSteel with acoustic dampening
BrakingFull dynamic braking from top speed down to 3 miles per hour (4.8 km/h) with traction motors acting as generators, fades when speed reduced to approx. 12–3 miles per hour (0.8–4.8 km/h). Friction braking completes the stop.
VentilationRoof-mounted air conditioning units, ventilation hatches on windows Heating, ventilation, and air conditioning system integrated into cars
Speed50 miles per hour (80.5 km/h) maximum55 miles per hour (88.5 km/h) maximum65 miles per hour (104.6 km/h) maximum (design)
55 miles per hour (88.5 km/h) limit (operational)
Overhead Traction Power 600 V DC
Operating Power Requirements500 kW to accelerate from a stationary position, 150 kW needed to maintain speed550 kW to accelerate from a stationary position, 165 kW needed to maintain speed550 kW to accelerate from a stationary position, 130 kW to maintain speed.
Passenger Capacity [5] [79] Seated: 64 (wheelchair areas no longer used)
Commute: 96
Special Events: 150
Seated: 68 (56 with 4 wheelchairs)
Commute: 104
Special Events: 200
Seated: 60 (52 with 4 wheelchairs)
Commute: 102
Special Events: 150
Seated: 58 (50 with 4 wheelchairs)
Commute: 102
Special Events: 150
Doors – 8 per carLow-level stair boarding through double-folding doors, individually activated by passenger pushing button after locks released by operator, one door blocked by wheelchair lift Low-level stair boarding through double-folding doors, opened by operator and/or individually activated by passenger pushing button after locks released by operator, one door blocked by wheelchair liftLow-floor level boarding through sliding doors, opened by operator and/or individually activated by passenger pushing button after locks released by operator
Door Safety SystemIncludes photo-electric cells and sensitive door leaf edges, weight sensor on lower step.Photo-electric cells and sensitive door leaf edges.
Wheelchair access Wheelchair lift located at one dedicated door at the vehicle's "A" end. (No longer used) Bridge plates/ramps on center doors.

In addition to the aforementioned vehicles, two heritage Presidents Conference Committee (PCC) streetcars from 1946 operate on the Silver Line.

Floor plans

Below are the floor plans of the system's five different models of light rail vehicle, comparing the various sizes and interior layouts: [5] [79]

Floor plan
  • Siemens–Duewag U2
  • Car nos.: 1001–1071 (71 units)
  • All retired except 1001 which remains in heritage fleet
  • First purchase: 1979
U2 LRV Drawing.svg
  • Siemens SD-100
  • Car nos.: 2001–2052 (52 units)
  • First purchase: 1993
SD100 LRV Drawing.svg
  • Siemens S70
  • Car nos.: 3001–3011 (11 units)
  • First purchase: 2004
S70 LRV Drawing.svg
  • Siemens S70 US ("Ultra Short")
  • Car nos.: 4001–4065 (65 units)
  • First purchase: 2009
  • Siemens S700 US ("Ultra Short")
  • Car nos.: 5001–5070 (70 units)
  • First purchase: 2016

See also

Notes

  1. There is a single track section of the Green Line at its eastern terminus.

Related Research Articles

<span class="mw-page-title-main">Siemens–Duewag U2</span> Type of light rail vehicle

The Siemens–Duewag U2 is a type of light rail vehicle (LRV), built by consortium of Siemens, Duewag and Wegmann & Co built between 1968 and 1990.

<span class="mw-page-title-main">Siemens SD-100 and SD-160</span> Type of Siemens-built light rail vehicle

The SD-100 and SD-160 are light rail vehicles (LRV) that were manufactured by Siemens Mobility between 1992 and 2013 for the North American market. The vehicles were all constructed at the Siemens facility in Florin, California.

<span class="mw-page-title-main">Coaster (rail service)</span> Commuter rail service in San Diego County, California

Coaster is a commuter rail service in the central and northern coastal regions of San Diego County, California, United States, operated by the North County Transit District (NCTD). The 41-mile (66 km) commuter rail line features eight stops, with a travel time of about an hour and five minutes end-to-end. The service operates primarily during weekday peak periods, with limited midday, weekend and holiday service. The Coaster first entered service on February 27, 1995, and has since grown in ridership and capacity. In 2022, the line had a ridership of 735,100, or about 2,900 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">San Diego and Arizona Eastern Railway</span> Short-line American railroad founded in 1906

The San Diego and Arizona Eastern Railway Company is a short-line American railroad founded in 1906 as the San Diego and Arizona Railway (SD&A) by sugar magnate, developer, and entrepreneur John D. Spreckels. Dubbed "The Impossible Railroad" by many engineers of its day due to the immense logistical challenges involved, the line was established in part to provide San Diego with a direct rail link to the east by connecting with the Southern Pacific Railroad lines in El Centro, California.

<span class="mw-page-title-main">San Diego and Imperial Valley Railroad</span> Class III railroad in San Diego County, California, US

The San Diego and Imperial Valley Railroad (SD&IV) is a class III railroad operating freight rail service in the San Diego area, providing service to customers in the region and moving railcars between the end of the BNSF Railway in Downtown San Diego and the Mexico–United States border in San Ysidro. The railroad has exclusive trackage rights to operate over tracks of the San Diego and Arizona Eastern Railway, a subsidiary of the Metropolitan Transit System, the regional public transit service provider. Tracks are shared with the San Diego Trolley, another subsidiary of the Metropolitan Transit System, and freight trains are only operated at night when passenger service is not in operation. The San Diego & Imperial Valley Railroad was established in October 1984 and is owned and operated by Genesee & Wyoming, a holding company that operates more than 100 shortline railroads like the SD&IV.

<span class="mw-page-title-main">Siemens S700 and S70</span> Light rail transit vehicle

The Siemens S70 and its successor, the Siemens S700, are a series of low-floor light-rail vehicles (LRV) and modern streetcars manufactured for the United States market by Siemens Mobility, a division of German conglomerate Siemens AG. The series also includes a European tram-train variant, the Siemens Avanto.

<span class="mw-page-title-main">Sprinter (rail service)</span> Hybrid rail service in San Diego County, California, United States

Sprinter is a hybrid rail service operating in the North County area of San Diego County between the cities of Escondido and Oceanside, California, United States. The service uses the 22-mile (35 km) Escondido Subdivision of the San Diego Northern Railroad. Station platforms were constructed for the line's fifteen stations serving the cities of Oceanside, Vista, San Marcos, and Escondido. The line provides service to California State University, San Marcos and Palomar College. Sprinter service operates every 30 minutes and is targeted towards students and commuters.

<span class="mw-page-title-main">North County Transit District</span> Public transportation agency in Northern San Diego County, California

The North County Transit District is the agency responsible for public transportation in Northern San Diego County, California. The agency manages the COASTER commuter rail service between Oceanside and San Diego, the SPRINTER hybrid rail service between Escondido and Oceanside, the BREEZE transit bus service, LIFT paratransit service, and FLEX on-demand and point-deviation service.

<span class="mw-page-title-main">Light rail in North America</span> Mode of public transit

Light rail is a commonly used mode of public transit in North America. The term light rail was coined in 1972 by the Urban Mass Transportation Administration to describe new streetcar transformations which were taking place in Europe and the United States. The Germans used the term Stadtbahn, which is the predecessor to North American light rail, to describe the concept, and many in UMTA wanted to adopt the direct translation, which is city rail. However, in its reports, UMTA finally adopted the term light rail instead.

<span class="mw-page-title-main">Old Town Transit Center</span> Passenger train, light rail, and bus station in San Diego, California, United States

Old Town Transit Center, also known as San Diego–Old Town station, Old Town San Diego station, or UC San Diego Health South station, is an intermodal transportation station located in the Old Town neighborhood of San Diego, California. It is served by Amtrak's Pacific Surfliner, the COASTER commuter rail service, and the San Diego Trolley, as well as numerous San Diego Metropolitan Transit System bus lines.

<span class="mw-page-title-main">San Diego Metropolitan Transit System</span> Public transportation agency in Southern San Diego County, California

The San Diego Metropolitan Transit System is a public transit service provider for central, southern, northeast, and southeast San Diego County, California, as well as for the city of San Diego. The agency directly operates a large transit system that includes the MTS Bus, San Diego Trolley light rail, and Rapid bus rapid transit services. The MTS also controls the San Diego and Arizona Eastern (SD&AE) freight railway and regulates taxicabs, jitneys, and other private for-hire passenger transportation services.

<span class="mw-page-title-main">Blue Line (San Diego Trolley)</span> San Diego Trolley light rail line

The Blue Line is a 26.3-mile (42.3 km) light rail line in the San Diego Trolley system, operated by San Diego Trolley, Inc., an operating division of the San Diego Metropolitan Transit System (MTS). With an end-to-end travel time of one hour and twenty-three minutes, it operates between the UTC Transit Center and the San Ysidro Transit Center, the latter of which is at the border with Mexico directly adjacent to the San Ysidro Port of Entry, facilitating easy connections across the border. The line serves La Jolla, Downtown San Diego, National City, Chula Vista, and San Ysidro.

<span class="mw-page-title-main">Orange Line (San Diego Trolley)</span> San Diego Trolley light rail line

The Orange Line is an 18.0-mile (29.0 km) light rail line in the San Diego Trolley system, operated by San Diego Trolley, Inc. an operating division of the San Diego Metropolitan Transit System. The route connects Downtown San Diego with the cities of Lemon Grove, La Mesa, and El Cajon. The Orange Line has the lowest ridership of the San Diego Trolley's three regular lines, transporting 10,896,289 riders during FY 2014 according to the MTS.

<span class="mw-page-title-main">Light rail in the United States</span> Overview of light rail in the United States

Light rail is a mode of rail-based transport, usually urban in nature. When compared to heavy rail systems like commuter rail or rapid transit (subway), light rail systems are typically designed to carry fewer passengers and are capable of operating in mixed traffic or on routes that are not entirely grade-separated. Systems typically take one of four forms: the "first-generation" legacy systems, the "second-generation" modern light rail systems, streetcars, and hybrid rail systems. All of the systems use similar technologies, and some systems blur the lines between the different forms.

<span class="mw-page-title-main">Silver Line (San Diego Trolley)</span> San Diego Trolley Heritage line

The Silver Line is a 2.7-mile (4.3 km) heritage streetcar line operated by the San Diego Trolley, an operating division of the San Diego Metropolitan Transit System. It currently operates the "downtown loop"; a circle of tracks around Downtown San Diego, and is operated using renovated historic vehicles. The line is one of four lines in the Trolley system, sharing tracks of the other lines; the other three lines are the Blue, Orange, and Green lines.

<span class="mw-page-title-main">Rapid (San Diego)</span> Bus Rapid Transit System

Rapid is the brand name given to the bus rapid transit system in San Diego County, California. The system serves nearly half the county, operating mainly on the HOV lanes on Interstates 15 and 805, with most of the stops also served by other routes. In addition, there are stations, dubbed as CenterLine in the medians of Interstate 15, Park Boulevard in San Diego and on East Palomar Street in Chula Vista, that are designed in a similar manner to the light rail stations. The system operates with a dedicated fleet, although buses from the Mainline fleet are regularly substituted. The system is administered, built and managed by San Diego Association of Governments (SANDAG) and is operated as part of the San Diego Metropolitan Transit System (MTS).

<span class="mw-page-title-main">Courthouse station (San Diego Trolley)</span> San Diego Trolley station

Courthouse station is a light rail station in San Diego, California, United States. It is the western terminus of the San Diego Trolley's Orange Line and is located between the Hall of Justice and San Diego Central Courthouse in Downtown San Diego, on C Street between State and Union streets. The station opened on April 29, 2018, after nearly a year of construction.

References

  1. 1 2 3 4 "About MTS". 2021. Archived from the original on March 15, 2022. Retrieved November 29, 2021. Light rail service is operated by SDTI on four lines (the UC San Diego Blue, Orange, Green and Silver Lines) with a total of 62 stations and 65 miles of rail.
  2. 1 2 3 4 5 6 7 8 "San Diego Trolley, Inc. Fact Sheet" (PDF). San Diego Metropolitan Transit System. February 2013. Archived (PDF) from the original on September 10, 2020. Retrieved April 14, 2021 via sdmts.com/about-mts.
  3. "Transit Ridership Report Third Quarter 2023" (PDF). American Public Transportation Association. November 30, 2023. Retrieved December 6, 2023.
  4. "Transit Ridership Report Fourth Quarter 2022" (PDF). American Public Transportation Association. March 1, 2023. Retrieved March 29, 2023.
  5. 1 2 3 4 5 6 "San Diego Trolley Light Rail Vehicles" (PDF). San Diego Metropolitan Transit System. February 2015. Archived (PDF) from the original on December 22, 2015. Retrieved December 11, 2015 via sdmts.com/about-mts.
  6. "Farebox Recovery Ratio". TransitWiki. Archived from the original on October 15, 2023. Retrieved October 11, 2023.
  7. 1 2 3 4 5 6 "MTS Historical Timeline". San Diego Metropolitan Transit System. 2013. Archived from the original on August 20, 2013. Retrieved April 12, 2021.
  8. 1 2 3 4 5 6 Copeland, P. Allen (2002). California trolleys in color. Scotch Plains, NJ: Morning Sun Books. p. 27. ISBN   1-58248-076-1. OCLC   52471706. Archived from the original on February 27, 2024. Retrieved April 14, 2021.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 Euritt, Mark A.; Hoffman, M. Allen; Walton, C. Michael (August 1994). The Decision Process for Implementing Fixed-Guideway Systems (PDF) (Report). The University of Texas at Austin. Archived (PDF) from the original on March 21, 2023. Retrieved April 12, 2021.
  10. Wilkens, John (April 3, 2021). "James Mills, state legislator who championed public transit, historic preservation, dies at 93". The San Diego Union-Tribune . Archived from the original on April 4, 2021. Retrieved April 4, 2021.
  11. Gargrove, Dorian (September 10, 2014). "Crazy Train". San Diego Reader. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  12. 1 2 3 4 5 6 Ristine, Jeff (July 23, 2006). "After 25 years, the trolley keeps on moving". The San Diego Union-Tribune . Archived from the original on May 15, 2007. Retrieved June 14, 2009.
  13. 1 2 3 4 "San Diego Trolley Renewal Project Fact Sheet" (PDF). San Diego Association of Governments . September 2015. Archived (PDF) from the original on January 23, 2021. Retrieved April 14, 2021.
  14. 1 2 3 Cotey, Angela (April 2012). "San Diego Metropolitan Transit System's trolley renewal project". Progressive Railroading. Archived from the original on April 14, 2021. Retrieved April 14, 2021.
  15. 1 2 Cook, Morgan (August 24, 2015). "Trolley posteriors raise downtown ire". The San Diego Union-Tribune . Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  16. Robert J. Hawkins (September 22, 2010). "Construction Begins To Upgrade SD Trolley - $620M Project To Include New Track, Stations Along Blue, Orange Lines". KGTV ABC10 San Diego. Archived from the original on April 5, 2016. Retrieved March 23, 2016.
  17. "Several Blue Line trolley stops to close this weekend". The San Diego Union Tribune . October 27, 2010. Archived from the original on April 7, 2016. Retrieved March 23, 2016.
  18. "Green Line Will Finally Arrive Downtown". KPBS . April 30, 2012. Archived from the original on September 26, 2013. Retrieved May 1, 2012.
  19. "SDMTS Service Changes, September 2012". San Diego Metropolitan Transit System. September 2, 2012. Archived from the original on April 30, 2015. Retrieved October 22, 2012.
  20. "SDMTS Summer 2010 Newsletter" (PDF). San Diego Metropolitan Transit System. June 2010. Archived from the original (PDF) on March 19, 2015. Retrieved October 22, 2012.
  21. "Trolley Renewal Breakthrough: New Low-Floor Trolleys Now Operate on the Orange Line!" (Press release). September 24, 2015. Archived from the original on May 25, 2017. Retrieved April 14, 2021.
  22. "Blue Line Upgraded with a New Fleet of Low-Floor Trolley Cars". San Diego Metropolitan Transit System. January 27, 2015. Archived from the original on March 15, 2016. Retrieved April 17, 2016.
  23. "Trolley Renewal". San Diego Metropolitan Transit System. 2015. Archived from the original on March 22, 2016. Retrieved April 17, 2016 via sdmts.com/inside-mts/current-projects.
  24. "Mid-Coast Trolley gets key federal approval". U-T San Diego . September 16, 2011. Archived from the original on October 20, 2011. Retrieved September 17, 2011.
  25. 1 2 "Mid-Coast Corridor Transit Project". SANDAG. Archived from the original on May 15, 2018. Retrieved April 17, 2016.
  26. "Light Rail Transit Project". University of California, San Diego . Archived from the original on August 11, 2011. Retrieved September 15, 2011 via blink.ucsd.edu/.
  27. "Mid-Coast Corridor Transit Project Fact Sheet" (PDF). SANDAG. February 2015. Archived (PDF) from the original on September 24, 2015. Retrieved December 11, 2015.
  28. Stafford, Audra (March 29, 2019). "$2.17B Mid-Coast Trolley Project Reaches Milestone: It's Halfway Finished". NBC 7 San Diego. Archived from the original on August 29, 2019. Retrieved August 28, 2019.
  29. Stafford, Audra; Rendon-Alvarez, Karla (June 29, 2021). "MTS, SANDAG Celebrate First Test Run of Mid Coast Trolley Project's New Tracks". NBC 7 San Diego. Archived from the original on June 29, 2021. Retrieved June 29, 2021.
  30. Frausto, Elizabeth (February 11, 2021). "MTS workshop details bus route changes coming with new trolley extension". La Jolla Light. Archived from the original on February 15, 2021. Retrieved February 15, 2021.
  31. "Vintage Trolley". San Diego Metropolitan Transit System. 2015. Archived from the original on March 25, 2016. Retrieved March 23, 2016.
  32. "Mid-Coast Corridor Transit Project" (PDF). San Diego Association of Governments (SANDAG). April 2015. Archived (PDF) from the original on November 29, 2021. Retrieved November 29, 2021 via U.S. Department of Transportation.
  33. "Trolley". San Diego Metropolitan Transit System (MTS). May 22, 2015. Archived from the original on April 15, 2021. Retrieved April 6, 2021.
  34. "Transit Station Parking". San Diego Metropolitan Transit System (MTS). July 27, 2015. Archived from the original on April 10, 2021. Retrieved April 6, 2021.
  35. 1 2 3 "Trolley Timetable" (PDF). San Diego Metropolitan Transit System . September 20, 2020. Archived (PDF) from the original on December 22, 2015. Retrieved April 14, 2021.
  36. "Fares & Passes". San Diego Metropolitan Transit System. September 1, 2019. Archived from the original on September 3, 2017. Retrieved April 6, 2021.
  37. "Ridership Record Archives". American Public Transportation Association (APTA). Archived from the original on March 3, 2016. Retrieved December 18, 2014. Click on a link to get the Ridership Report for each Quarter from Q1 1996 onwards.
  38. 1 2 3 4 "Transit Ridership Report Fourth Quarter and End-of-Year 2014" (PDF). American Public Transportation Association (APTA). March 3, 2015. Archived (PDF) from the original on January 6, 2017. Retrieved March 14, 2015 via apta.com/resources/statistics/Pages/RidershipArchives.aspx.
  39. 1 2 "MTS Announces a Record 95 Million Passengers Rode the Bus and Trolley in FY 2014". San Diego Metropolitan Transit System. August 19, 2014. Archived from the original on December 22, 2015. Retrieved September 19, 2014 via sdmts.com/inside-mts-media-center/news-releases.
  40. "APTA – Ridership Report Archives". American Public Transportation Association's (APTA). 2015. Archived from the original on March 3, 2016. Retrieved April 3, 2015.
  41. 1 2 "APTA – 2007 Q4 Ridership Report" (PDF). American Public Transportation Association's (APTA). 2013. Archived (PDF) from the original on July 18, 2013. Retrieved June 28, 2013.
  42. "2017 APTA Fact Book" (PDF). Archived (PDF) from the original on October 12, 2019. Retrieved December 21, 2019.
  43. 1 2 "2019 APTA Fact Book" (PDF). Archived (PDF) from the original on March 10, 2020. Retrieved December 21, 2019.
  44. "Transit Ridership Report Fourth Quarter 2018" (PDF). American Public Transportation Association. April 12, 2019. Archived (PDF) from the original on May 8, 2019. Retrieved April 29, 2021 via apta.com/research-technical-resources/transit-statistics/ridership-report/ridership-report-archives/.
  45. "Transit Ridership Report Fourth Quarter 2019" (PDF). American Public Transportation Association. February 27, 2020. Archived (PDF) from the original on January 12, 2022. Retrieved April 4, 2020 via apta.com/research-technical-resources/transit-statistics/ridership-report/ridership-report-archives/.
  46. "Transit Ridership Report Fourth Quarter 2020" (PDF). American Public Transportation Association. March 4, 2021. Archived (PDF) from the original on March 16, 2021. Retrieved March 16, 2020.
  47. "Public Transit Ridership Report Fourth Quarter 2021" (PDF). American Public Transportation Association. March 10, 2022. Archived (PDF) from the original on April 1, 2022. Retrieved April 1, 2022.
  48. "APTA – 2007 Q3 Ridership Report" (PDF). American Public Transportation Association's (APTA). 2013. Archived (PDF) from the original on July 18, 2013. Retrieved June 28, 2013.
  49. "MTS City/Park Streetcar Feasibility Study". San Diego Metropolitan Transit System. October 9, 2012. Archived from the original on December 22, 2015. Retrieved December 27, 2015.
  50. "MTS Streetcar Proposed Alignment Map". San Diego Metropolitan Transit System. Archived from the original (gif) on May 11, 2015. Retrieved July 15, 2013.
  51. "Steering Committee Presentation & Discussion" (PDF). San Diego Metropolitan Transit System. April 5, 2011. p. 3. Archived (PDF) from the original on December 22, 2015. Retrieved July 6, 2011 via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  52. "Steering Committee Presentation & Discussion No. 3 Presentation" (PDF). San Diego Metropolitan Transit System. Archived (PDF) from the original on December 22, 2015. Retrieved December 17, 2011 via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  53. "STEERING COMMITTEE MEETING No. 2 PRESENTATION" (PDF). San Diego Metropolitan Transit System. Archived from the original (PDF) on October 2, 2011. Retrieved July 6, 2011 via sdmts.com/inside-mts-current-projects/streetcar-feasibility-study.
  54. "Airport Trolley". San Diego Metropolitan Transit System . September 27, 2020. Archived from the original on September 27, 2020. Retrieved April 7, 2021.
  55. "Elevate 2020 SD Draft Scenarios" (PDF). San Diego Metropolitan Transit System . December 12, 2019. Archived (PDF) from the original on August 1, 2021. Retrieved April 7, 2021.
  56. 1 2 Keatts, Andrew (April 16, 2020). "It's Official: MTS Won't Pursue Transit Tax in 2020". Voice of San Diego. Archived from the original on March 10, 2021. Retrieved April 6, 2021.
  57. "SANDAG seeks public comment on central mobility hub project by May 28". KUSI-TV . April 22, 2021. Archived from the original on April 22, 2021. Retrieved April 23, 2021.
  58. "Central Mobility Hub". SANDAG. Archived from the original on April 22, 2021. Retrieved April 23, 2021.
  59. "Public Transportation – Trolley Service". San Diego International Airport. Archived from the original on March 2, 2020. Retrieved August 12, 2021.
  60. "2050 Regional Transportation Plan – Chapter 6 – Systems Development: Offering More Travel Choices" (PDF). SANDAG. October 28, 2011. pp. 6–15–6–18 & 6–33. Archived (PDF) from the original on September 24, 2015. Retrieved August 1, 2013.
  61. Ojeda, Artie (October 28, 2011). "SANDAG Approves Transportation Plan". NBC San Diego (KNSD) . Archived from the original on October 30, 2011. Retrieved October 30, 2011.
  62. "PROJECTS :: San Diego's Regional Planning Agency". SANDAG. October 28, 2011. Archived from the original on July 31, 2013. Retrieved August 1, 2013.
  63. "The Red Flags in the Purple Line Plans". January 30, 2019. Archived from the original on December 16, 2022. Retrieved December 16, 2022.
  64. "First Reading: Regional Transportation Commission Ordinance No. RTC-CO-2017-01" (PDF). San Diego Association of Governments . June 24, 2016. Archived (PDF) from the original on April 22, 2021. Retrieved April 14, 2021.
  65. "San Diego U2 Trolleys successfully operate in Argentina". San Diego Metropolitan Transit System. March 9, 2010. Archived from the original on December 22, 2015. Retrieved December 11, 2015 via sdmts.com/inside-mts-media-center/news-releases.
  66. Bowen, Douglas John (January 30, 2015). "MTS adds S70 LRVs to San Diego Blue Line". Railway Age . Archived from the original on February 18, 2015. Retrieved February 17, 2015.
  67. "First Ever Trolley Goes Back into Service". San Diego Metropolitan Transit System (Press release). July 12, 2019. Archived from the original on February 27, 2024. Retrieved April 14, 2021.
  68. "Other Electric Railways Roster". Southern California Railway Museum . Archived from the original on April 15, 2021. Retrieved April 14, 2021.
  69. "Light Rail Cars Roster Collection". Western Railway Museum . Archived from the original on April 16, 2021. Retrieved April 14, 2021.
  70. "San Diego Trolley #1019". Rockhill Trolley Museum . June 29, 2014. Archived from the original on April 15, 2021. Retrieved April 14, 2021.
  71. "Worldwide Review [regular news section]". Tramways & Urban Transit . UK: Light Rail Transit Association/Mainspring Ltd. September 2021. pp. 389–390. ISSN   1460-8324.
  72. "Memphis' famous trolley cars will soon look very different". March 27, 2022. Archived from the original on February 27, 2024. Retrieved March 29, 2022.
  73. Burroughs, David (April 19, 2019). "San Diego unveils new-generation Siemens LRVs". International Railway Journal . ISSN   0744-5326. Archived from the original on April 11, 2021. Retrieved November 13, 2020.
  74. Emerson Smith, Joshua (April 17, 2019). "MTS rolls out newly designed trolley cars this weekend". The San Diego Union-Tribune . Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  75. "San Diego selects Siemens S700 light rail vehicles". Railway Gazette International. August 1, 2019. Archived from the original on April 12, 2021. Retrieved April 12, 2021.
  76. "Aging San Diego trolley cars find new life in Argentina". December 3, 2022. Archived from the original on December 12, 2022. Retrieved January 2, 2023.
  77. San Diego LRVs fins new home in Argentina Archived May 19, 2022, at the Wayback Machine Metro Report International May 19, 2022
  78. Copeland, P. Allen. "San Diego and the PCC Streetcar" (PDF). Archived (PDF) from the original on August 5, 2021. Retrieved July 19, 2021.
  79. 1 2 3 "San Diego Trolley, Inc. Light Rail Vehicles" (PDF). San Diego Metropolitan Transit System. January 2013. Archived from the original (PDF) on July 9, 2014. Retrieved November 26, 2013.
  80. "PCC Light Rail Vehicle" (PDF). San Diego Metropolitan Transit System. February 2013. Archived (PDF) from the original on December 22, 2015. Retrieved December 11, 2014 via sdmts.com/about-mts.
  81. "Restored Trolley from 1946 Makes Public Debut on Silver Line". San Diego Metropolitan Transit System. March 2, 2015. Archived from the original on December 22, 2015. Retrieved April 17, 2016.

Sources

  • Gena Holle, The San Diego Trolley, Interurban Press (1995); "Guideway Planning Project Final Report"
  • MTDB (1978); "Report on Feasibility of Using Existing SD&AE ROW for Commuter Service"
  • San Diego County (1978); MTDB publicity materials including "San Diego Trolley, Inc. Summary" (1997), MTDB Progress Report 1976–1986; Pacific Southwest Railway Museum, San Diego & Arizona Railway.
Template:Attached KML/San Diego Trolley
KML is from Wikidata