San Bernardino Line

Last updated

San Bernardino Line
SanBernardinoStationStreetside.jpg
Streetside of San Bernardino Santa Fe Depot in 2006
Overview
Locale Greater Los Angeles Area and Inland Empire
Termini
Stations17
Service
Type Commuter rail
System Metrolink
Operator(s) Metrolink
Daily ridership4,719 (June 2023) [1]
History
OpenedOctober 26, 1992
Technical
Line length57.6 miles (92.7 km) [2]
CharacterElevated and surface-level
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Operating speed79 mph (127 km/h)
Route map
San Bernardino Line San Bernardino Line highlighted in brown
BSicon tCONTg saffron.svg
BSicon CONTg green.svg
BSicon tKINTaq black.svg
BSicon lHST denim.svg
BSicon KSTRaq maroon.svg
BSicon tSTRr saffron.svg
BSicon STR+r maroon.svg
BSicon tSTR+r black.svg
BSicon STRr green.svg
L.A. Union Station
LAMetroLogo.svg
BSicon lCONTf3 black.svg
BSicon v-STR maroon.svg
BSicon tv-STR3 black.svg
BSicon v-STR3 black.svg
BSicon STR maroon.svg
BSicon eINT maroon.svg
L.A. General Medical Center
(proposed)
LAMetroLogo.svg
BSicon INT maroon.svg
Cal State L.A.
LAMetroLogo.svg
BSicon HST maroon.svg
El Monte
BSicon HST maroon.svg
Baldwin Park
BSicon BHF maroon.svg
Covina
BSicon STADIUM.svg
BSicon pHST maroon.svg
Fairplex
(fair days)
BSicon HST maroon.svg
BSicon exlINT.svg
Pomona–North
( LAMetroLogo.svg 2025)
BSicon HST maroon.svg
Claremont
BSicon HST maroon.svg
Montclair
BSicon HST maroon.svg
Upland
BSicon INT maroon.svg
Rancho Cucamonga
BSicon FLUG.svg via Bus-logo.svg ( Brightlineicon.png 2028)
BSicon RACE.svg
BSicon pHST maroon.svg
Auto Club Speedway
(race days)
BSicon HST maroon.svg
Fontana
BSicon HST maroon.svg
Rialto
BSicon lCONTf4 ruby.svg
BSicon v-STR maroon.svg
BSicon tv-STR+4 ruby.svg
BSicon v-STR+4 ruby.svg
BSicon tSTR ruby.svg
BSicon lBHF denim.svg
BSicon STR maroon.svg
San Bernardino–Depot
BSicon tSTR ruby.svg
BSicon mABZgl maroon+.svg
BSicon KDSTeq.svg
Arrow Maintenance Facility
BSicon tKINTe ruby.svg
BSicon STR maroon.svg
San Bernardino–Downtown
BSicon BUS3.svg
BSicon LSTR maroon.svg
  Arrow stations not served
BSicon KINTa lime.svg
BSicon KSTRe maroon.svg
Redlands–Downtown
(express)
BSicon CONTf lime.svg
  Arrow
BSicon tSTRq ruby.svg
BSicon STRq maroon.svg
Other service sharing track
BSicon tSTRq black.svg
BSicon STRq maroon.svg
Multiple services sharing track
BSicon lHST denim.svg
BSicon INTq maroon.svg
BSicon lBHF denim.svg
BSicon STRq maroon.svg
Stations with Amtrak service

Wheelchair symbol.svg All stations are accessible

The San Bernardino Line is a Metrolink line running between Downtown Los Angeles east through the San Gabriel Valley and the Inland Empire to San Bernardino, with limited express service to Redlands. It is one of the three initial lines on the original Metrolink system, along with the Santa Clarita Line (now the Antelope Valley Line) and the Ventura County Line.

Contents

As of September 2023, 18 round trips run between Los Angeles and San Bernardino on weekdays with one trip continuing on to Redlands. It was the first of the seven Metrolink lines to run on both Saturday and Sunday, with 8 trains to San Bernardino on Saturdays and Sundays. [3] Two Saturday and two Sunday trains would continue to Riverside–Downtown station until July 5, 2014, when weekend service on the 91 Line (now the 91/Perris Valley Line) began.

Route

The line is owned by Metrolink. [4] After leaving Union Station and crossing the Los Angeles River, the line follows the San Bernardino Freeway and El Monte Busway until just after the Cal State L.A. station; it then runs in the median of the San Bernardino Freeway to the El Monte Station along the former route of the Pacific Electric Railway's San Bernardino Line. Starting at El Monte, the line parallels the Union Pacific's Sunset Route (ex-Southern Pacific) for a few miles before turning northeast at Bassett [lower-alpha 1] onto a Southern Pacific branch. At the former Southern Pacific/Pacific Electric-Santa Fe crossing, [lower-alpha 2] it switches to the Santa Fe route; from Claremont to just west of San Bernardino it follows what was the Santa Fe's Pasadena Subdivision (and before that the Second District of the LA Division, the Santa Fe passenger main line). From San Bernardino Depot, the line follows the Santa Fe's Redlands branch line towards Downtown Redlands. The San Bernardino Line is mostly single track with seven passing sidings and short sections of double track near Covina, between Pomona and Montclair, west of Fontana, and throughout San Bernardino. [5]

History

Los Angeles County Transportation Commission acquired the Southern Pacific Railroad Burbank Branch in 1992. [6] When the line opened on October 26, 1992, service extended only as far as Pomona. [7] It was incrementally extended to Claremont that December, Montclair the following February, then finally to San Bernardino in May 1993. [8] Saturday service was added in 1997 and Sunday service in 1998 making it the first Metrolink line to offer weekend service.

San Bernardino Associated Governments (SANBAG) completed an environmental impact report (EIR) in 2015 [9] to extend Metrolink service southeast from the current eastern terminus in San Bernardino to Redlands. [10] The extension follows the 9-mile (14 km) Redlands Subdivision and comprises two projects. [11]

The Downtown San Bernardino Passenger Rail Project extended Metrolink southeast one mile via double trackage [ citation needed ] to a new terminus at the San Bernardino Transit Center. [12] The project's groundbreaking was in February 2014; [13] at that time, the extension was expected to be completed by mid-2016. [14] As of September 2015, the completion date had been extended to 2017. [15] Construction work on the extension continued through March and April 2017. [16] [17] [18] Test trains began running on the tracks in April 2017. [19] This phase of the project opened to the public on December 16, 2017.

Arrow is a rail extension to Redlands. By December 2015, SANBAG decided that this second phase of the project, from the San Bernardino Transit Center to Redlands, would no longer be a Metrolink extension, but rather an independent system.[ citation needed ] SANBAG planned to use diesel multiple units (DMUs) and have Omnitrans operate the system. However, San Bernardino Line express limited-stop trains would run on part of the extension, to a new station near the Downtown Redlands station. [20] [21] Construction was planned to begin in 2017, [22] [23] [24] however groundbreaking took place in July 2019 with a 2022 opening. [25] The selected route runs between the Downtown San Bernardino station and the University of Redlands with stops at Tippecanoe Avenue, Esri, and Downtown Redlands, adjacent to the Redlands Santa Fe Depot. Omnitrans was removed as the system's operator in 2019 amid mounting deficits, and Metrolink took over construction and procurement. [26] Arrow opened on October 24, 2022. [27] Arrow's DMU sets have been studied for wider deployment on the rest of the San Bernardino Line. [28] The rolling stock is the new EMD F125, and others were MPI MPXpress, EMD F59PH, and some cab cars.

Future development

The Los Angeles County Metropolitan Transportation Authority (LA Metro) has plans to add the current LA General Medical Center station on the El Monte Busway as an infill station to the line. This would involve building a second track and center platform. The cost of this project is estimated between $51 million and $110 million. [29] Currently, westbound Metrolink passengers must exit at the Cal State LA station and take any of the westbound buses one stop to the Medical Center.

Stations

The San Bernardino Line has 17 stations. Express trains only serve seven of the busiest stations on the line. They are, from west to east:

StationExpress service?ConnectionsLocation
L.A. Union Station Yes Metrolink icon 2022.svg Metrolink: 91/Perris Valley Antelope Valley Orange County Riverside Ventura County
BSicon LOGO Amtrak2.svg Amtrak: Coast Starlight , Pacific Surfliner , Southwest Chief , Sunset Limited , Texas Eagle
LAMetroLogo.svg Metro: LACMTA Circle A Line.svg  A Line LACMTA Circle B Line.svg  B Line LACMTA Circle D Line.svg  D Line LACMTA Square J Line.svg  J Line
BSicon BUS2.svg FlyAway to LAX BSicon FLUG.svg
BSicon BUS3.svg Foothill Transit: Silver Streak
Los Angeles Los Angeles County
Cal State L.A. Yes LAMetroLogo.svg Metro: LACMTA Square J Line.svg  J Line
BSicon BUS3.svg Foothill Transit: Silver Streak
University Hills
El Monte No El Monte
Baldwin Park No Baldwin Park
Covina Yes Covina
Fairplex
(fair days) [30]
No La Verne
Pomona–North No Pomona
Claremont No Claremont
Montclair Yes BSicon BUS3.svg Foothill Transit: Silver Streak Montclair San Bernardino County
Upland No Upland
Rancho Cucamonga YesAiga bus trans.svg Omnitrans: ONT Connect to ONT BSicon FLUG.svg Rancho Cucamonga
Auto Club Speedway
(race days) [31]
No Fontana
Fontana No
Rialto No Rialto
San Bernardino–Depot Yes Metrolink icon 2022.svg Metrolink: Inland Empire–Orange County
BSicon LOGO Amtrak2.svg Amtrak: Southwest Chief
San Bernardino
San Bernardino–Downtown No Metrolink icon 2022.svg Metrolink: Arrow Inland Empire–Orange County
BSicon BUS3.svg Omnitrans: SbX
Redlands–Downtown
(Express)
Yes Metrolink icon 2022.svg Metrolink: Arrow Redlands

Notes

  1. 34°03′03″N117°59′50″W / 34.0507°N 117.9971°W
  2. 34°05′38″N117°43′49″W / 34.0939°N 117.7303°W

Related Research Articles

<span class="mw-page-title-main">Metrolink (California)</span> Regional commuter rail system in Southern California

Metrolink is a commuter rail system in Southern California, serving Los Angeles, Orange, Riverside, San Bernardino, and Ventura counties, as well as to Oceanside in San Diego County. The system consists of eight lines and 69 stations operating on 545.6 miles (878.1 km) of track. This includes Arrow, which Metrolink operates under a contract with the San Bernardino County Transportation Authority (SBCTA).

<span class="mw-page-title-main">Inland Empire–Orange County Line</span> Commuter rail line in Southern California

The Inland Empire–Orange County (IEOC) Line is a commuter rail line run by Metrolink in Southern California. It runs from San Bernardino through Orange County to Oceanside in northern San Diego County. When the line opened it became the first Metrolink line not to serve Union Station in Los Angeles nor cross the Los Angeles River and was the only line until the Arrow service opened in October 2022. The line was also the first suburb-to-suburb commuter rail line in the United States. It runs for 100.1 miles (161.1 km), making it the system's longest line.

<span class="mw-page-title-main">Orange County Line</span> Commuter rail line in Southern California

The Orange County Line is a commuter rail line run by Metrolink from Los Angeles through Orange County to Oceanside in San Diego County, connecting with the Coaster commuter rail service to San Diego. The Orange County Line carries passengers to the primary Metrolink hub at L.A. Union Station in downtown Los Angeles, as well as to many attractions in Orange County including the Knott's Berry Farm area, Angel Stadium of Anaheim and the Honda Center, the Disneyland Resort, Old Town Orange, Santa Ana Zoo, Mission San Juan Capistrano and many more. In San Diego County, it serves the Oceanside Pier and Camp Pendelton.

<span class="mw-page-title-main">Claremont station (California)</span> Commuter rail station

Claremont station is a passenger rail and bus station in Claremont, California, United States. It is served by Metrolink's San Bernardino Line which runs from Los Angeles Union Station to San Bernardino–Downtown. The Mission Revival-Spanish Colonial Revival style station is listed on the U.S. National Register of Historic Places as Atchison, Topeka and Santa Fe Railroad Station.

<span class="mw-page-title-main">San Bernardino Santa Fe Depot</span> Railway station in San Bernardino, California

The San Bernardino Santa Fe Depot is a Mission Revival Style passenger rail terminal in San Bernardino, California, United States. It has been the primary station for the city, serving Amtrak today, and the Santa Fe and Union Pacific Railroads in the past. Until the mid-20th century, the Southern Pacific Railroad had a station 3/4 of a mile away. It currently serves one Amtrak and two Metrolink lines. The depot is a historical landmark listed on the National Register of Historic Places as Atchison, Topeka and Santa Fe Railway Passenger and Freight Depot.

<span class="mw-page-title-main">Riverside–Downtown station</span> Train station in Riverside, California, U.S.

Riverside–Downtown station is a train station in Riverside, California, United States. It is served by three Metrolink commuter rail lines – the 91/Perris Valley Line, Inland Empire–Orange County Line, and Riverside Line – and Amtrak intercity rail service on the Southwest Chief. The station is owned by the Riverside County Transportation Commission.

<span class="mw-page-title-main">Rialto station</span>

Rialto station is a Metrolink San Bernardino Line station located at 292 South Palm Avenue in Rialto, in San Bernardino County, California, just south of Rialto Avenue off of Riverside Avenue. The station is named for former Assemblymember and Rialto Mayor John Longville.

<span class="mw-page-title-main">Fontana station (California)</span>

Fontana station is a train station served by Metrolink San Bernardino Line commuter rail, located in the city of Fontana, California. It is immediately adjacent to Fontana's Downtown District. The station opened on November 22, 1993, and is owned by the City of Fontana.

<span class="mw-page-title-main">Rancho Cucamonga station</span> Commuter rail station in California

Rancho Cucamonga station in Rancho Cucamonga, in San Bernardino County, California, serves the Metrolink San Bernardino Line commuter rail. With the under construction Brightline high-speed rail and a potential underground tunnel project to Ontario International Airport, local officials expect increased tourism and economic growth for the Inland Empire. The station is owned by the City of Rancho Cucamonga and is near the former Empire Lakes Golf Club. It is located just west of Milliken Avenue and has 330 parking spaces.

<span class="mw-page-title-main">Montclair Transcenter</span> Intermodal transit center

Montclair Transcenter is an intermodal transit center located at 5091 Richton Street in Montclair, California. It is located between Central and Monte Vista Avenues on Richton Street just north of the Montclair Plaza shopping center.

<span class="mw-page-title-main">Pomona–North station</span> Commuter rail station in Pomona, California

Pomona–North station is a railroad station located in Pomona, California. It is located just west of Garey Avenue and south of Bonita Avenue, and has 225 free parking spaces which are accessible from either Santa Fe Street or Fulton Road. Formerly an intercity train station, it is served by the Metrolink commuter rail system. The extension of the Los Angeles Metro Rail A Line light rail line to Pomona-North is projected to open in 2025.

<span class="mw-page-title-main">San Bernardino Associated Governments</span> Government agency in San Bernardino County, California, United States

San Bernardino Associated Governments was an association of the San Bernardino County local governments and the regional transportation planning agency and regional planning organization for the county, with policy makers consisting of mayors, councilmembers, and county supervisors. It was also the funding agency for the county's transit systems, which include Omnitrans, Victor Valley Transit Authority, Morongo Basin Transit Authority, Mountain Area Regional Transit Authority, Barstow Area Transport, and Needles Area Transit.

<span class="mw-page-title-main">Arrow (rail service)</span> Commuter rail service in San Bernardino County, California

Arrow is a rail service in San Bernardino County, California, United States. Opened on October 24, 2022, the line runs from the San Bernardino Transit Center in Downtown San Bernardino in the west to the University of Redlands in Redlands in the east.

<span class="mw-page-title-main">San Bernardino Transit Center</span> Transit hub in San Bernardino, California, US

The San Bernardino Transit Center is an intermodal transit center in downtown San Bernardino, California, United States. It is owned and operated by Omnitrans, the area's public transportation agency. Opened in September 2015, the center consolidates three Metrolink commuter rail services and more than a dozen local bus services, including the sbX bus rapid transit service into one central location.

<span class="mw-page-title-main">San Bernardino County Transportation Authority</span> Planning and operating agency in California

The San Bernardino County Transportation Authority (SBCTA) is the successor to San Bernardino Associated Governments (SANBAG). They are responsible for administering the Measure I half-cent tax which voters in San Bernardino County, California, passed most recently in 2004. The SBCTA conducts transportation planning, construction, and operation in San Bernardino County. The SBCTA is a joint powers authority comprising the entire county and its cities. Every city and county supervisor is provided one seat on the board, and it also includes a nonvoting member from the California Department of Transportation's (Caltrans) District 8.

<span class="mw-page-title-main">Redlands–Downtown station</span> Train station in Redlands, California, US

Redlands–Downtown station is a rail station serving downtown Redlands, California, United States. The station was built in 1910 for the Atchison, Topeka and Santa Fe Railway and operated until 1938. The facility was preserved and reopened on October 24, 2022 as part of the Arrow commuter rail service.

<span class="mw-page-title-main">Redlands–University station</span> Train station in Redlands, California

Redlands–University station is a terminal station on the Arrow rail service that serves the University of Redlands. The station was built as part of the Arrow service and opened on October 24, 2022.

<span class="mw-page-title-main">Redlands–Esri station</span> Train station in Redlands, California, US

Redlands–Esri station is a rail station in Redlands, California. It is located north of the headquarters of the geographic information system company Esri, who funded the station's construction. The station opened on October 24, 2022 and is served directly by the Arrow rail line. Metrolink's San Bernardino Line express trains to Redlands–Downtown utilize the main track, but do not stop at this station.

<span class="mw-page-title-main">San Bernardino–Tippecanoe station</span> Train station in San Bernardino, California, US

San Bernardino–Tippecanoe station is a rail station located on Tippecanoe Avenue in San Bernardino, California. The station opened on October 24, 2022, and is served directly by the Arrow rail line. Metrolink's San Bernardino Line express trains to Redlands–Downtown utilize the main track, but do not stop at this station.

References

  1. "Quarterly Fact Sheet Q4 2022-2023" (PDF). Metrolink . June 30, 2023. Retrieved November 3, 2023.
  2. "Fact Sheet" (PDF). Metrolink. Retrieved March 10, 2023.
  3. "Metrolink Timetable" (PDF). June 6, 2016. Archived from the original (PDF) on November 23, 2016. Retrieved August 12, 2016.
  4. "Redlands Passenger Rail Project: Final Environmental Impact Statement and Record of Decision/Environmental Impact Report" (PDF). February 2015.
  5. SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation. p. 19–20.
  6. "Metrolink to include S.B. County". Daily Press. April 22, 1992. p. 7. Retrieved September 6, 2023 via Newspapers.com. Lock-green.svg
  7. Tony Knight (October 26, 1992). "Trains for L.A. – Metrolink commuter service begins today". Daily News of Los Angeles .
  8. "Metrolink trains start from San Bernardino". Daily News of Los Angeles . May 18, 1993.
  9. Emerson, Sandra (March 4, 2015). "Redlands Passenger Rail Project environmental report gets SanBAG support". Redlands Daily Facts. Retrieved December 18, 2019.
  10. "Redlands Passenger Rail Project". SANBAG. Archived from the original on February 5, 2012. Retrieved February 17, 2012.
  11. "Redlands First Mile and Passenger Rail Project" (PDF). Archived from the original (PDF) on October 6, 2010.
  12. "Downtown San Bernardino Passenger Rail Project". SANBAG. Archived from the original on March 6, 2016. Retrieved March 15, 2016.
  13. Macduff, Cassie (February 26, 2014). "SAN BERNARDINO: Agencies pool money for transit center, Metrolink extension". The Press Enterprise.
  14. "Destination: San Bernardino" (PDF). SANBAG. Archived from the original (PDF) on February 8, 2016. Retrieved March 15, 2016.
  15. Hagen, Ryan (September 8, 2015). "San Bernardino Transit Center opening makes commuting easier". The San Bernardino Sun . Retrieved March 15, 2016.
  16. "3rd Street Closure at Railroad Tracks" (PDF). SANBAG. Archived from the original (PDF) on February 8, 2016. Retrieved March 15, 2016.
  17. Valenzuela, Beatriz (March 1, 2017). "Construction to interrupt Metrolink service in Inland Empire". The San Bernardino Sun . Retrieved May 5, 2017.
  18. "Metrolink train service resumes at San Bernardino, Rialto stations". The San Bernardino Sun . April 17, 2017. Retrieved May 5, 2017.
  19. "Train Testing to Begin as Part of Downtown San Bernardino Passenger Rail Project". SBCTA Newsroom. San Bernardino County Transportation Authority. April 12, 2017. Archived from the original on November 14, 2017. Retrieved May 5, 2017.
  20. Emerson, Sandra (November 15, 2017). "What new ownership at Redlands Santa Fe Depot could mean to future rail service". Redlands Daily Facts. Retrieved January 8, 2018.
  21. Emerson, Sandra (August 19, 2016). "Where Redlands rail project is heading". The Press-Enterprise . Retrieved May 1, 2017.
  22. Emerson, Sandra (November 7, 2015). "SanBAG begins design of Redlands Passenger Rail Project". Redlands Daily Facts . Retrieved March 15, 2016.
  23. "Redlands Passenger Rail Project Fact Sheet" (PDF). SANBAG. December 2015. Archived from the original (PDF) on December 22, 2015. Retrieved March 15, 2016.
  24. Emerson, Sandra (November 7, 2017). "Passenger rail project remains priority for Rail to Redlands Working Group". Redlands Daily Facts. Retrieved January 8, 2018.
  25. "Construction begins for rail connecting Redlands to San Bernardino". Redlands Daily Facts. July 19, 2019.
  26. Scauzillo, Steve (October 21, 2019). "$520 million deficit has Omnitrans eyeing layoffs and bus-line reductions, but is it enough?". The Sun. Retrieved November 24, 2019.
  27. Asperin, Alexa Mae (October 24, 2022). "Metrolink's new 'Arrow' train service from Redlands to San Bernardino begins". KTTV . Fox Television Stations . Retrieved October 24, 2022.
  28. "Hybrid Rail Being Studied for Future Use along the Metrolink Corridor". goSBCTA e-Newsletter. San Bernardino County Transportation Authority. March 2017. Retrieved May 5, 2017.
  29. @numble (June 20, 2023). "LA Metro study on infill Metrolink station at LA General Medical Center (LA County-USC Medical Center). Would build a second track and center platform. Cost $51m-$110m (depends on if pedestrian bridge is built). Existing bridge is hard to retrofit" (Tweet) via Twitter.
  30. "Metrolink to make special stop at the L.A. County Fair" (Press release). Metrolink. August 26, 2013. Retrieved May 1, 2015.
  31. "Special Metrolink service to Auto Club 400 available" (Press release). Metrolink. March 12, 2014. Retrieved May 1, 2015.
Template:Attached KML/San Bernardino Line
KML is from Wikidata