OC Streetcar | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Orange County Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Santa Ana and Garden Grove, California | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 10 (1 additional optional) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | OC Streetcar | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Streetcar | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Herzog Transit Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Siemens S700 [1] [a] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | August 2025 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 4.15 mi (7 km) [3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead lines, 750 V DC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 11.3 mph (18.2 km/h) (avg.) 44 mph (71 km/h) (top) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The OC Streetcar is a modern streetcar line currently under construction in Orange County, California, running through the cities of Santa Ana and Garden Grove. The electric-powered streetcar will be operated by the Orange County Transportation Authority (OCTA), and will serve ten stops in each direction along its 4.15-mile (6.68 km) route. [4]
With the exception of a short loop in downtown Santa Ana, the line will be double-tracked for its entire length. Most of the route follows the original path of the Pacific Electric Railway "Red Cars" that served Santa Ana in the early 20th century, before being abandoned in 1950. Construction on the streetcar broke ground on November 30, 2018. [3] As of October 2023, the line's expected revenue service date has been pushed to August 2025, per OCTA staff, despite initial plans for a 2021 start. [5]
The streetcar will operate between the Santa Ana Regional Transportation Center to a new Harbor Transit Center in Garden Grove, linking the Metrolink station and downtown Santa Ana. [6]
The streetcar's planned eastern terminus is the Santa Ana Regional Transportation Center, which is served by Metrolink commuter rail and the Amtrak Pacific Surfliner, as well as a number of bus routes.
From the train station, the streetcar route runs west along Santa Ana Boulevard to downtown Santa Ana and the Santa Ana Civic Center, the main administrative center for the City of Santa Ana and the County of Orange, where an estimated 38,000 jobs are located. [7] The route will split at Mortimer Street onto existing one-way streets with westbound service continuing on Santa Ana Boulevard through Civic Center, while returning eastbound service will travel on 4th Street (two blocks south), through the Arts District. [8]
After rejoining at Ross Street near the Santa Ana City Hall, the line will continue west along Santa Ana Boulevard to Raitt Street, where it will continue on the former Pacific Electric West Santa Ana Branch right-of-way along the north side of 4th Street. Turning northwest, the line will cross over the Santa Ana River and Westminster Avenue on bridges.
At the northwest end of the line, it will briefly enter the city of Garden Grove where an intermodal transit center will be constructed at the line's terminus at the intersection of Westminster Avenue and Harbor Boulevard. [8] [9] The transit center will connect streetcars to OCTA's Harbor Boulevard bus routes, which are the busiest in the county, accounting for about 8 percent of OCTA's ridership [10] and Westminster Avenue bus routes.
The streetcar will operate as a curbside, street running system between the Santa Ana station and Raitt Street; west of there, it will operate in a dedicated right-of-way. [11] The streetcar is proposed to operate from 6 a.m. to 11 p.m. Monday through Thursday; 6 a.m. to 1 a.m. on Fridays and Saturdays; and 7 a.m. to 10 p.m. on Sundays and holidays. [6] Trains will run every 10 minutes between 6 a.m. and 6 p.m., and every 15 minutes at other hours. [11] A single trip from end-to-end on the 4.15-mile (6.68 km) line is expected to take 22 minutes, an average speed of 11.3 miles per hour (18.2 km/h). [12]
The route will include 10 stations in each direction, which will connect to 18 existing OCTA bus lines. [4] Each station will include platforms near major cross streets. [6] The route will be double-tracked for its entire length. [13] The maintenance and storage facility will be located adjacent to 5th Street near the eastern terminus of the Pacific Electric right-of-way at Raitt Street. [4] The Harbor and Raitt stops will include park and ride lots in addition to the existing parking structure at the Santa Ana train station. [14]
Although the former Pacific Electric rail bridge over the Santa Ana River still exists, it is single-track and considered structurally inadequate due to its age. A new double-track bridge is being built parallel to the old bridge. In addition, the line will cross Westminster Avenue on an elevated bridge to reach the Harbor Transit Center in Garden Grove. [11]
Eight Siemens S700 [15] [a] light rail vehicles will service the route, with six in operation at any one time. [6] Overhead lines will deliver power to the trains at 750 volts, direct current. [11] OCTA projects a daily ridership of between 6,000 [9] and 7,300 [6] passengers, and each streetcar's total capacity is up to 180 people.
The OC Streetcar will use a proof-of-payment system, requiring valid payment before boarding and lacking a turnstile barrier at stations. Fares will be purchased as paper tickets and passes at ticket vending machines at stations, or through a mobile ticketing app.
Fares will be the same as charged on OCTA's OC Bus service. Herzog Transit Services won the contract to operate the service in 2020. [16]
District | Stop [11] | Locale [11] | Connecting services [17] |
---|---|---|---|
Station District | Santa Ana Regional Transportation Center | Santa Ana Blvd & Santiago St, near the Santiago Arts District | ![]() ![]() ![]() ![]() Park and ride: 315 spaces |
Lacy | Santa Ana Blvd & Lacy St | ||
French | Santa Ana Blvd & French St (westbound), 4th St and French St (eastbound), near the Yost Theater and Frida Cinema | ||
Downtown Santa Ana | Downtown | Santa Ana Blvd & Sycamore St (westbound), 4th St and Sycamore St (eastbound), near the Arts District and Old Orange County Courthouse | ![]() |
Civic Center | Ross | Santa Ana Blvd & Ross St (westbound), 4th St and Ross St (eastbound), near Santa Ana City Hall and Ronald Reagan Federal Building and Courthouse | ![]() |
Flower | Santa Ana Blvd & Flower St, near Sheriff's Department, Superior Court, Department of Public Works, and Santa Ana Stadium | ![]() | |
Artesia Pilar | Bristol | Santa Ana Blvd & Bristol St | ![]() |
Raitt | Santa Ana Blvd & Raitt St | ![]() | |
Fairview | Civic Center Dr & Fairview St | ![]() ![]() | |
City of Garden Grove | Willowick (potential future stop) | Near Clinton St & Redwood St, north of Willowick Golf Course | |
Harbor Transit Center | Westminster Ave & Harbor Blvd; the only station located in Garden Grove | ![]() |
The streetcar will partially follow the historic route of the Pacific Electric interurban railway's Santa Ana Line, whose Red Cars operated between Santa Ana and Downtown Los Angeles via the West Santa Ana Branch right-of-way starting in 1905. The Santa Ana Line began at the old Southern Pacific Station (now demolished) at Terminal Street just south of the current Santa Ana train station, and traversed downtown Santa Ana via 4th Street. [18] Service to Orange County was terminated in 1950 due to the increasing use of automobiles and buses, and the original tracks through town were removed and paved over. [19]
West of downtown Santa Ana, the original 100-foot (30 m) wide right of way – purchased by OCTA after its abandonment – remains as a strip of vacant land extending diagonally across Orange County's cardinal street grid, from Santa Ana northwest to Cypress/La Palma on the Los Angeles County line. Although OCTA has allowed some temporary uses (such as parking) in the historic right of way, and most of the tracks have been removed, the authority always intended to return this corridor to transit use in the future. [18]
As opposed to a streetcar system, the first proposals for a modern, second-generation light rail system serving north Orange County appeared in the 1990s. The CenterLine project would have created several light rail lines, including a main line running from Fullerton via Santa Ana to Irvine. It would have included service along the current OC Streetcar route between the Santa Ana train station and Bristol Street, but not along the diagonal West Santa Ana Branch right-of-way. Multiple branches were also proposed for the line to serve other areas of Orange County; most of the lines would have been elevated. The initial 1992 proposal called for 90 miles (140 km) of light rail, which due to political opposition was reduced to 32 miles (51 km) by 2001, and 9.3 miles (15.0 km) by 2004. [20] The CenterLine was opposed mainly due to its high cost (more than $1 billion for the 9.3-mile (15.0 km) segment between Santa Ana and John Wayne Airport) and was ultimately canceled in 2005. [13] [21]
A streetcar along the current, east-west route (the "Santa Ana-Garden Grove Fixed Guideway Corridor") was first proposed by OCTA in 2006. [6] The streetcar was the result of OCTA's "Go Local" initiative, which offered funds for Orange County cities to study potential new transit links to existing Metrolink rail stations. [13] The Measure M2 sales tax increase, also known as OC Go, will be partly used to fund transit projects in Orange County, was also passed in 2006. [13] [22] In 2008, the cities of Santa Ana and Garden Grove partnered with OCTA to develop the project. [23] The design was modeled after street-running light rail services of the Portland Streetcar (Portland, Oregon) and TRAX (Salt Lake City, Utah). [6]
Environmental reports were completed and the project qualified for federal funding status by 2015. [21] Former President Barack Obama included $125 million for OC Streetcar in the 2016-17 federal budget under the Major Capital Investments (New Starts) program. [24] In January 2017, Congress approved an additional $50 million in funding for the project, for a total of $175 million. [6] The streetcar was also one of the "Top 10 State Infrastructure Projects" that Governor Jerry Brown has recommended for expedited federal review. [25] The total funding would be 72.2 percent from the federal government, 8.6 percent from California's state cap and trade program, and 19.2 percent from the county sales tax. [26]
OCTA announced in September 2015 that HNTB Corporation would carry out design work. [27] The $15 million contract covered design of tracks, bridges, stations, associated utilities and the vehicle maintenance and storage facility. [28] In December 2016 OCTA released a request for proposals for the manufacturing and delivery of the light rail vehicles. [29] Construction is planned to start in 2018, and revenue service was expected to begin in 2020. [4] In March 2018, OCTA placed an order for 8 S70 vehicles (later rebranded as S700 by Siemens), [a] at a cost of $51.5 million. [30] By July 2018, costs had increased to a projected $407.76 million (up from an estimated $299.3 million as of June 2017 [6] ) with an expected completion in 2021. [31]
On September 24, 2018, OCTA awarded a $220.5 million contract to Walsh Construction Company to build the streetcar. [32]
On November 30, 2018, a groundbreaking ceremony was held, and the Federal Transit Administration announced that federal funding would be increased to $217 million. [33]
The line was expected to start operations in 2021, but the project has faced delays and setbacks, including the discovery of human remains at a construction site in September 2020 [34] and lawsuits from Walsh Construction Company in March 2022. [35] As of October 2023, OCTA staff will report a revenue service date of August 2025 to the Federal Transit Administration. [5]
Santa Ana mayor Miguel Pulido has suggested the OC Streetcar system could become "the hub of a light-rail system that could connect the county’s core," with potential future extensions to Disneyland, Anaheim's Platinum Triangle and the John Wayne Airport. [36] [37] An extension north to Anaheim along Harbor Boulevard could connect with the controversial Katella Avenue streetcar project (Anaheim Rapid Connection), should that project be built in the future. Although the Anaheim City Council rejected the Katella streetcar in January 2017, [38] [39] OCTA has listed a streetcar connection in its Central Harbor Boulevard Transit Corridor Study, leaving the possibility that it could be built as a county project, rather than a city project. [10]
OC Streetcar is one of two current transit projects intended to use the historic West Santa Ana Branch, the other being a Los Angeles Metro Rail Southeast Gateway Line. [40] The two services are not planned to connect; however, the possibility of re-establishing service between Santa Ana and Los Angeles has been studied by the Southern California Association of Governments (SCAG) since 2012. [41] Restoring full service to the Pacific Electric Santa Ana Line via light rail would cost about $3 billion to construct, and is expected to serve about 80,000 riders daily. [42] [43]
Reception of the streetcar has been mixed among business owners and residents along the proposed corridor. Supporters suggest that the project would increase property values and increase economic activity along the route, as has occurred with light rail projects such as the E Line in Los Angeles County. [7] Underutilized areas along the route could be reappropriated for denser transit-oriented development, reducing the need for automobiles among new residents. [21] The Willowick Golf Course in Garden Grove is being considered for redevelopment, potentially as a regional park with sports arenas and outdoor amphitheater, with mixed-used neighborhoods adjacent to a proposed stop on the streetcar route. [44] [45] In addition, 17.8 percent of households in the service area do not own a car, and the streetcar would markedly improve their access to the regional transit system. [7]
However, some businesses have opposed the project, citing that customers might avoid the area during construction, and that the rail line would eliminate parking spaces and increase traffic congestion. In addition, low-income residents have expressed concern over the potential gentrification of their neighborhoods and being unable to afford increased rents as a result of the rise in property value. [46] The streetcar project has been criticized for its high cost [13] (currently standing at about $129 million per mile), [47] and the inflexibility of a fixed-guideway transit system to adjust to system changes, as compared to buses. [48]
Orange County is a county located in the Los Angeles metropolitan area in Southern California, United States. As of the 2020 census, the population was 3,186,989, making it the third-most-populous county in California, the sixth-most-populous in the United States, and more populous than 19 American states and Washington, D.C. Although largely suburban, it is the second-most-densely-populated county in the state behind San Francisco County. The county's three most-populous cities are Anaheim, Santa Ana, and Irvine, each of which has a population exceeding 300,000. Santa Ana is also the county seat. Six cities in Orange County are on the Pacific coast: Seal Beach, Huntington Beach, Newport Beach, Laguna Beach, Dana Point, and San Clemente.
The Orange County Transportation Authority (OCTA) is the transportation planning commission for Orange County, California, in the Los Angeles metropolitan area. OCTA is responsible for funding and implementing transit and capital projects for the transportation system in the county, including freeway expansions, express lane management, bus and rail transit operation, and commuter rail funding and oversight.
The San Diego Trolley is a light rail system serving San Diego County, California. The trolley's operator, San Diego Trolley, Inc., is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of MTS, with connections to and integrated travel tickets with the local bus systems.
The Orange County Line is a commuter rail line run by Metrolink from Los Angeles through Orange County to Oceanside in San Diego County, connecting with the Coaster commuter rail service to San Diego. The Orange County Line carries passengers to the primary Metrolink hub at L.A. Union Station in downtown Los Angeles, as well as to many attractions in Orange County including the Knott's Berry Farm area, Angel Stadium of Anaheim and the Honda Center, the Disneyland Resort, Old Town Orange, Santa Ana Zoo, Mission San Juan Capistrano and many more. In San Diego County, it serves the Oceanside Pier and Camp Pendelton.
The Surf Line is a railroad line that runs from San Diego to Orange County along California's Pacific coast. It was so named because much of the line is near the Pacific Ocean, within less than 100 feet (30 m) in some places. It is the second busiest passenger rail corridor in the United States after the Northeast Corridor.
The Charlotte Area Transit System (CATS) is the agency responsible for public transportation in the Charlotte metropolitan area. CATS operates bus and rail transit services in Mecklenburg County and surrounding areas. Established in 1999, CATS' bus and rail operations carry about 320,000 riders on an average week. CATS is governed by the Metropolitan Transit Commission and is operated as a department of the City of Charlotte. In 2023, the system had a ridership of 13,476,600, or about 44,200 per weekday as of the third quarter of 2024.
The Santa Ana Regional Transportation Center is a transit center in Santa Ana, California, United States. It is used by Amtrak's Pacific Surfliner and Metrolink's Orange County Line and Inland Empire–Orange County Line trains. It is also a Greyhound station and a hub for the Orange County Transportation Authority bus system as well as a terminal for international bus services to Mexico.
The Orange Transportation Center is an intermodal transit center in Orange, California, United States. It serves Metrolink trains as well as Orange County Transportation Authority buses. The station is located at the site of two former Atchison, Topeka and Santa Fe Railway combination depots. The present depot structure was dedicated on May 1, 1938, and was closed with the Santa Fe's discontinuation of passenger service in 1971. The building was granted historic landmark status by the City on November 15, 1990.
Harbor Boulevard is a north–south road corridor in the counties of Los Angeles and Orange. One of the busiest routes in Orange County, the thoroughfare passes through some of the most densely populated areas in the region and carries about 8 percent of the county's bus riders. The route provides access for local residents to travel to work and for drivers travelling from Valley Boulevard in the City of Industry via Fullerton Road to Newport Beach.
Greater Los Angeles has a complex multimodal transportation infrastructure, which serves as a regional, national and international hub for passenger and freight traffic. The transportation system of Greater Los Angeles includes the United States' largest port complex, seven commuter rail lines, Amtrak service, a subway system within the city of Los Angeles, and numerous highways. Los Angeles is integrated into the Interstate Highway System by Interstate 5, Interstate 10, and Interstate 15, along with numerous auxiliary highways and state routes. Bus service is also included locally within the area by numerous local government agencies. Subways and light commuter rail lines are present within Los Angeles proper, allowing mass transportation within the city. Commuter railroads are run by Metrolink. Amtrak has numerous railroad lines that connect Los Angeles to the rest of the country.
Light rail is a mode of rail-based transport, usually urban in nature.
The Anaheim Regional Transportation Intermodal Center (ARTIC) is a transit center in Anaheim, California, United States. The intermodal hub serves as a train station for Amtrak intercity rail and Metrolink commuter rail, as well as a bus station used by the Orange County Transportation Authority (OCTA), Anaheim Resort Transportation (ART), Greyhound, Megabus, Flixbus and Tres Estrellas de Oro.
The West Santa Ana Branch is a rail right of way formerly used by the Pacific Electric's (PE) Santa Ana route in Los Angeles County and Orange County in Southern California. The Los Angeles County Metropolitan Transportation Authority (Metro) owns the segment of the right-of-way in Los Angeles County, and the Orange County Transportation Authority (OCTA) owns the segment in Orange County.
OC Bus is the transit bus service operated by the Orange County Transportation Authority (OCTA), serving every city in Orange County. Some of the lines serve the Los Angeles County border communities of Lakewood, La Mirada, Cerritos, Artesia, Hawaiian Gardens, and Long Beach. As of February 2023, there are 52 routes in the system.
The Santa Ana Line was an interurban route connecting Los Angeles and Santa Ana in Orange County. It ran between 1905 and 1958 and was predominantly operated by the Pacific Electric Railway for its history.
Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.
Anaheim Rapid Connection (ARC) was a proposed streetcar line in Anaheim, California. It would have been located in the Anaheim Resort and Platinum Triangle, with stops at the Disneyland Resort, the Anaheim Convention Center, and the Anaheim Regional Transportation Intermodal Center (ARTIC), among others. It has been the subject of much political controversy, which led to the project being cancelled by OCTA in 2018. Councilmembers from the cities of Anaheim and Fullerton stated opposition to the streetcar mode citing concerns about traffic impacts, safety, capital costs, and recent declining transit ridership. These cities also shared concerns about how implementation of dedicated transit lanes would impact automobile traffic.
The Southeast Gateway Line is a planned light rail line, mostly following the Pacific Electric's historic West Santa Ana Branch, connecting Downtown Los Angeles to the city of Artesia, along with other cities in southeastern Los Angeles County.
Harbor Transit Center is an under construction OC Streetcar station that will serve as the line's western terminus. It is located at the intersection of Harbor Boulevard and Westminster Avenue and will be the only OC Streetcar station in Garden Grove upon completion.