Atlanta Streetcar | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | MARTA | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Atlanta, Georgia, United States | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Streetcar | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 12 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 900 (weekdays, Q2 2024) [1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Annual ridership | 184,500 (2023) [2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | December 30, 2014 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | At-grade street running | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 4 × Siemens S70 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train length | 1 car | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headway | 15 minutes (planned avg.) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 2.7 mi (4.3 km) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead line, 750 V DC [3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Atlanta Streetcar (also known as the Downtown Loop) is a streetcar line in Atlanta, Georgia. Testing on the line began in summer 2014 [4] with passenger service beginning as scheduled on December 30, 2014. [5] [6] [7] [8] [9] In 2023, the line had 184,500 rides, or about 900 per weekday in the second quarter of 2024.
The Downtown Loop is the Phase 1 of the Atlanta Streetcar project, which is planning to expand onto the BeltLine surrounding central Atlanta. The project is the first regular passenger streetcar service in Atlanta since the original Atlanta streetcars were phased out in 1949.
The Downtown Loop runs 2.7 miles (4.3 km) east-west, serving 12 stops, [10] from Centennial Olympic Park to the Martin Luther King, Jr. National Historic Site, with tracks that converge at Woodruff Park. [11] The route provides access to MARTA heavy rail lines at Peachtree Center. [12] The vehicle maintenance facility is located under the I-75/I-85 overpass on Edgewood Avenue [13]
The exact route is:
The Atlanta Streetcar system uses Siemens S70 light rail vehicles (LRVs). [15] A total of four S70 cars were purchased [9] and were built at two different facilities; the cars themselves were built in Sacramento, California while most other major components, like the propulsion system, were assembled at a plant about 30 miles (48 km) north of Atlanta, in Alpharetta. [16] [17] They were delivered in the first months of 2014 and are numbered 1001–1004. [18]
Atlanta Streetcar, Inc. (ASC) is a non-profit organization founded in 2003 with the mission to bring streetcars back to downtown Atlanta. ASC's board members include the leaders of Georgia Tech and Georgia State University, MARTA, Georgia World Congress Center, Buckhead Community Improvement District, Buckhead Coalition, Underground Atlanta, Central Atlanta Progress, Woodruff Arts Center, and many local corporate business leaders as well. [19]
In the summer of 2007, a new privately funded group called the Peachtree Corridor Partnership was formed, with the goal of determining how best to move forward the proposed rebuilding of Peachtree Street as a more attractive and pedestrian-friendly thoroughfare. [20] The addition of a modern streetcar line was (and remains) one of the main components of the proposed transformation of the corridor, so many of the board members of ASC became members of the Peachtree Corridor Task Force, and the partnership eventually replaced the function of ASC as the organization advocating for a streetcar line along Peachtree Street.
In July 2009, the Atlanta city council approved funding a feasibility study to work out certain details of the proposed streetcar line in time to apply for federal economic-stimulus funds for the construction of such a line. [21] However, several council members later expressed doubts over whether the remainder of the funding necessary to bring the project to fruition was likely, particularly during a time of recession. [22]
In September 2010, it was announced that Phase I of the Atlanta Streetcar Project had received $47 million in federal Transportation Investment Generating Economic Recovery (TIGER) II funding. The funding represents 8% of the overall TIGER II allotment, and will fund the construction of the downtown loop, not the Peachtree Corridor line, which is now regarded as Phase V of the project. [23] [24]
In May 2011, Siemens announced that it had won the $17.2 million contract to build the four streetcars that will run on the Downtown Connector line. They would be based on the company's S70 light rail vehicle platform, with the cars themselves being built in Sacramento, California, while other major components, including the propulsion system, were to be assembled at a Siemens plant about 30 miles (48 km) north of Atlanta, in Alpharetta. [16] [17]
In February 2012, the city announced that the budget would increase from $70 million to $90 million. The city attributed the increase to: [25]
In March 2012, the MARTA Board of Directors formally approved the design-build contract with URS Corporation for the Atlanta Streetcar. [26]
Groundbreaking for the project took place on February 1, 2012. [25] [27] At that time, the line was projected to open in May 2013, but various delays pushed the opening back, first to summer 2014 and later to December. [9] The first two S70 streetcars were delivered in February 2014 [18] and began test runs on the line in the spring. The initial 2.7 mile loop cost $98M which was almost $30M higher than originally projected.
The 2.7-mile (4.3 km) loop opened for service on December 30, 2014, [5] with all rides free until January 1, 2016. [8] [9]
By June 2018, MARTA agreed to take control and ownership of the streetcar; the route is planned to be integrated into a larger MARTA light rail system. [28] Operations were placed under the control of the newly formed Office of Light Rail Operations on July 1, 2018. [29]
Plans call for the Streetcar line to be extended along the Atlanta BeltLine. [30] The first phase of expansion, known as the Streetcar East Extension, is currently in final design and scheduled to begin operation in 2028. [31] The extension will see tracks extended east along Edgewood Avenue, Randolph St, and Auburn Ave, then north along the BeltLine to Ponce City Market. [32] The project is expected to cost $230 million, and is fully funded by the More MARTA tax, approved by voters in 2016. The City applied for a TIGER 7 grant in 2015 to fund the project, but was unsuccessful. [33]
There are also plans to extend the streetcar to west to Bankhead MARTA Station. [ citation needed ]
Counter-clockwise loop between Centennial Olympic Park and King Historic District
Stop | Direction | Notes |
---|---|---|
Centennial Olympic Park | Southbound | Serves Centennial Olympic Park, CNN Center, Georgia Aquarium, Mercedes-Benz Stadium, GWCC, National Center for Civil and Human Rights, State Farm Arena and World of Coca-Cola Terminus |
Luckie at Cone | Eastbound | Serves Fairlie−Poplar Historic District |
Park Place | Southbound | Serves Woodruff Park and Underground Atlanta (walking distance) |
Hurt Park | Eastbound | Serves Georgia State Capitol, Georgia State University and Hurt Park |
Sweet Auburn Market | Eastbound | Island side platform in middle of street Serves Grady Hospital and Sweet Auburn Curb Market |
Edgewood at Hilliard | Eastbound | In walking distance of Selena S. Butler Park |
King Historic District | Westbound | Intersection of Auburn and Jackson Streets Serves Martin Luther King Jr. National Historical Park and Oakland Cemetery (walking distance) |
Dobbs Plaza | Westbound | Platform located under the Downtown Connector (I-75/85) Serves Dobbs Plaza and Sweet Auburn |
Auburn at Piedmont | Westbound | Serves Calhoun Park |
Woodruff Park | Westbound | Serves Woodruff Park |
Peachtree Center | Northbound | Direct connection to MARTA rapid transit at Peachtree Center station Serves Peachtree Center district |
Carnegie at Spring | Westbound | Serves Fairlie−Poplar Historic District Final stop before reaching terminus at Centennial Olympic Park stop |
Since opening for service, the Atlanta Streetcar has been criticized by officials and residents for its short route, safety, poor management, and lower-than-expected ridership. Although boosters have claimed that up to $2.5 billion worth of new development can be attributed to the streetcar, independent analysis shows that many of those projects (totaling at least $323 million) pre-date it, and others—such as the College Football Hall of Fame—had not taken the streetcar into consideration. Regardless, the streetcar has contributed to at least some economic growth; for example, Southeast Capital Companies stated that it directly influenced their decision to build residential housing near Edgewood Avenue, and the Atlantic Seafood Market saw business rise 10% in the months following the start of service. [34]
In September 2015, officials from the Federal Transit Administration expressed concerns with the system's lack of safety, poor management, and failure to comply with requirements for reporting accidents. Atlanta mayor Kasim Reed and MARTA CEO Keith Parker have laid out steps to address those issues. [35]
On May 23, 2016, state officials sent a letter to (then mayor) Kasim Reed and MARTA CEO Keith Parker threatening to shut down the streetcar unless the city fixed numerous problems with it that had been outlined in multiple then-recent audits. [36]
The Metropolitan Atlanta Rapid Transit Authority is the principal public transport operator in the Atlanta metropolitan area. Formed in 1971 as strictly a bus system, MARTA operates a network of bus routes linked to a rapid transit system consisting of 48 miles (77 km) of rail track with 38 subway stations. MARTA's rapid transit system is the eighth-largest rapid transit system in the United States by ridership.
METRORail is the 22.7-mile (36.5 km) light rail system in Houston, Texas. In 2023, the system had a ridership of 13,883,700, or about 42,900 per weekday as of the second quarter of 2024. METRORail ranks as the second most-traveled light rail system in the Southern United States and the 10th most-traveled light rail system in the United States, and has the highest ridership per mile for light rail systems in the Southern US. METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).
The San Diego Trolley is a light rail system operating in the metropolitan area of San Diego. The trolley's operator, San Diego Trolley, Inc., is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of the MTS, with connections to and integrated travel tickets with the local bus systems.
The Atlanta Beltline is a 22 miles (35 km) open and planned loop of multi-use trail and light rail transit on a former railway corridor around the core of Atlanta, Georgia. The Atlanta Beltline is designed to reconnect neighborhoods and communities historically divided and marginalized by infrastructure, improve transportation, add green space, promote redevelopment, create and preserve affordable housing, and showcase arts and culture. The project is in varying stages of development, with several mainline and spur trails complete. Since the passage of the More MARTA sales tax in 2016, construction of the light rail streetcar system is overseen by MARTA in close partnership with Atlanta Beltline, Inc.
The Charlotte Area Transit System (CATS) is the agency responsible for public transportation in the Charlotte metropolitan area. CATS operates bus and rail transit services in Mecklenburg County and surrounding areas. Established in 1999, CATS' bus and rail operations carry about 320,000 riders on an average week. CATS is governed by the Metropolitan Transit Commission and is operated as a department of the City of Charlotte. In 2023, the system had a ridership of 13,476,600, or about 44,100 per weekday as of the second quarter of 2024.
The Siemens S70 and its successor, the Siemens S700, are a series of articulated low-floor light-rail vehicles (LRV) and modern streetcars manufactured for the United States market by Siemens Mobility, a division of German conglomerate Siemens AG. The series also includes a European tram-train variant, the Siemens Avanto.
Timeline of mass transit in Atlanta:
The Southwest LRT is an under–construction 14.5-mile (23.3 km) light rail transit corridor in Hennepin County, Minnesota, with service between Minneapolis and Eden Prairie. The estimated one-way travel time from Southwest Station in Eden Prairie to Target Field Station in Minneapolis is 32 minutes. The Southwest LRT will extend through St. Louis Park, Hopkins and Minnetonka along the route. Major locations on the line will include Bde Maka Ska, Cedar Lake, the Walker Art Center, the Minneapolis Sculpture Garden and Target Field in downtown Minneapolis.
Valley Metro Rail is a 29.8-mile (48 km) light rail system serving the cities of Phoenix, Tempe, and Mesa in Arizona, USA. The network, which is part of the Valley Metro public transit system, began operations on December 27, 2008. In 2023, the system had a ridership of 10,797,600, or about 31,200 per weekday as of the second quarter of 2024.
The Old Fourth Ward, often abbreviated O4W, is an intown neighborhood on the eastside of Atlanta, Georgia, United States. The neighborhood is best known as the location of the Martin Luther King Jr. historic site.
The Metropolitan Atlanta Rapid Transit Authority was created as the first public mass transit agency in metropolitan Atlanta. Its formation in 1965 was a result of the campaigning efforts of governmental planning agencies and Atlanta businessmen. The system broke ground on its rail system in 1975.
The CityLynx Gold Line is a streetcar line in Charlotte, North Carolina. A component of the Charlotte Area Transit System's Lynx rail system, it follows a primarily east-west path along Beatties Ford Road, Trade Street and Central Avenue through central Charlotte. The initial 1.5-mile (2.4 km), six-stop segment between Time Warner Cable Arena and Presbyterian Hospital opened for service on July 14, 2015. A further 2.5-mile (4.0 km) segment from the Charlotte Transportation Center to French Street, and from Hawthorne & 5th to Sunnyside Avenue, opened for service on August 30, 2021.
Capitol View is a historic intown southwest Atlanta, Georgia neighborhood. The neighborhood is 2.5 miles from downtown and was named for its views of the Georgia State Capitol building. Its boundaries include Metropolitan Parkway to the east, Lee Street to the west, and the Beltline to the north. On the south, the border follows Arden Street, Deckner Avenue, and Perkerson Park.
Streetcars originally operated in Atlanta downtown and into the surrounding areas from 1871 until the final line's closure in 1949.
Atlanta's transportation system is a complex multimodal system serving the city of Atlanta, Georgia, widely recognized as a key regional and global hub for passenger and freight transportation. The system facilitates inter- and intra-city travel, and includes the world's busiest airport, several major freight rail classification yards, a comprehensive network of freeways, heavy rail, light rail, local buses, and multi-use trails.
Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.
The Wave was a planned 2.7-mile (4.3 km) streetcar line in Fort Lauderdale, Florida. Construction costs were estimated to be $200 million. The project was cancelled in 2018.
Edgewood Avenue is a street in Atlanta, Georgia, United States which runs from Five Points in Downtown Atlanta, eastward through the Old Fourth Ward. The avenue runs in the direction of the Edgewood neighborhood, and stops just short of it in Inman Park. Edgewood Avenue was first important as the route of a streetcar line to Inman Park, Atlanta's first garden suburb and home to many of its most prominent citizens. Today, the avenue is known for its restaurants and nightlife around its intersection with Boulevard.
The OC Streetcar is a modern streetcar line currently under construction in Orange County, California, running through the cities of Santa Ana and Garden Grove. The electric-powered streetcar will be operated by the Orange County Transportation Authority (OCTA), and will serve ten stops in each direction along its 4.15-mile (6.68 km) route.
This is the timeline of the development of the BeltLine, a ring of trails and parks around central Atlanta.