Atlanta Streetcar

Last updated

Atlanta Streetcar
Atlanta Streetcar.JPG
Atlanta Streetcar logo.svg
Overview
Owner MARTA
Locale Atlanta, Georgia, United States
Transit type Streetcar
Number of lines1
Number of stations12
Daily ridership900 (weekdays, Q2 2024) [1]
Annual ridership184,500 (2023) [2]
Operation
Began operationDecember 30, 2014;9 years ago (2014-12-30)
CharacterAt-grade street running
Rolling stock 4 × Siemens S70
Train length1 car
Headway 15 minutes (planned avg.)
Technical
System length2.7 mi (4.3 km)
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  750 V DC [3]
System map
Atlanta Streetcar Atlanta Streetcar highlighted in black
BSicon udSTR+l.svg
BSicon dNULgq.svg
BSicon udHSTq.svg
BSicon udSTR+r.svg
Centennial Olympic Park
BSicon uSTRf.svg
BSicon uHST(L)g.svg
Carnegie at Spring
BSicon uHST(R)f.svg
BSicon uSTRg.svg
Luckie at Cone
BSicon uSTRf.svg
BSicon uINT(L)g.svg
Peachtree Center
BSicon ubSHI2+lr.svg
BSicon uHST(L)g.svg
Woodruff Park
BSicon ubSHI2lr.svg
BSicon uHST(R)f.svg
BSicon uSTRg.svg
Park Place
BSicon uHST(R)f.svg
BSicon uSTRg.svg
Hurt Park
BSicon uSTRf.svg
BSicon uHST(L)g.svg
Auburn at Piedmont
BSicon uHST(R)f.svg
BSicon uSTRg.svg
Sweet Auburn Market
BSicon uSTRf.svg
BSicon uHST(L)g.svg
Dobbs Plaza
BSicon uSKRZ-G4hl.svg
BSicon ulvDSTq.svg
BSicon hRP4q.svg
BSicon uSKRZ-G4hr.svg
BSicon udABZgl.svg
BSicon udABZqlr.svg
BSicon udABZgr.svg
vehicle
maintenance facility
BSicon uHST(R)f.svg
BSicon uSTRg.svg
Edgewood at Hilliard
BSicon uSTRf.svg
BSicon uHST(L)g.svg
King Historic District
BSicon uxABZgl+xl.svg
BSicon uSTRr.svg
 
East Extension
BSicon uexCONTf.svg
to the BeltLine (2028)
 
BSicon uexSTR.svg
to the BeltLine (2028)
 
BSicon uexHST2.svg
BSicon uexSTRc3.svg
Edgewood at Boulevard
BSicon uexSTRc1.svg
BSicon uexHST+4.svg
Auburn at Irwin
BSicon fCONT4+f.svg
BSicon uexSTR.svg
BeltLine Eastside Trail
BSicon fSTR.svg
BSicon uexHST.svg
Freedom-Highland
BSicon fSTR.svg
BSicon uexHST.svg
Ralph McGill
BSicon fSTR.svg
BSicon uexKHSTe.svg
Ponce de Leon
BSicon fCONTf.svg
BeltLine Eastside Trail

Wheelchair symbol.svg All stations are accessible
A streetcar turning onto Auburn Avenue from Jackson Street, approaching the King Historic District stop, in 2017 Atlanta Streetcar arriving at King Memorial Stop.jpg
A streetcar turning onto Auburn Avenue from Jackson Street, approaching the King Historic District stop, in 2017

The Atlanta Streetcar (also known as the Downtown Loop) is a streetcar line in Atlanta, Georgia. Testing on the line began in summer 2014 [4] with passenger service beginning as scheduled on December 30, 2014. [5] [6] [7] [8] [9] In 2023, the line had 184,500 rides, or about 900 per weekday in the second quarter of 2024.

Contents

The Downtown Loop is the Phase 1 of the Atlanta Streetcar project, which is planning to expand onto the BeltLine surrounding central Atlanta. The project is the first regular passenger streetcar service in Atlanta since the original Atlanta streetcars were phased out in 1949.

Operations

Route

The Downtown Loop runs 2.7 miles (4.3 km) east-west, serving 12 stops, [10] from Centennial Olympic Park to the Martin Luther King, Jr. National Historic Site, with tracks that converge at Woodruff Park. [11] The route provides access to MARTA heavy rail lines at Peachtree Center. [12] The vehicle maintenance facility is located under the I-75/I-85 overpass on Edgewood Avenue [13]

The exact route is:

Rolling stock

The Atlanta Streetcar system uses Siemens S70 light rail vehicles (LRVs). [15] A total of four S70 cars were purchased [9] and were built at two different facilities; the cars themselves were built in Sacramento, California while most other major components, like the propulsion system, were assembled at a plant about 30 miles (48 km) north of Atlanta, in Alpharetta. [16] [17] They were delivered in the first months of 2014 and are numbered 1001–1004. [18]

History

Atlanta Streetcar, Inc.

Atlanta Streetcar, Inc. (ASC) is a non-profit organization founded in 2003 with the mission to bring streetcars back to downtown Atlanta. ASC's board members include the leaders of Georgia Tech and Georgia State University, MARTA, Georgia World Congress Center, Buckhead Community Improvement District, Buckhead Coalition, Underground Atlanta, Central Atlanta Progress, Woodruff Arts Center, and many local corporate business leaders as well. [19]

Peachtree Corridor Partnership

In the summer of 2007, a new privately funded group called the Peachtree Corridor Partnership was formed, with the goal of determining how best to move forward the proposed rebuilding of Peachtree Street as a more attractive and pedestrian-friendly thoroughfare. [20] The addition of a modern streetcar line was (and remains) one of the main components of the proposed transformation of the corridor, so many of the board members of ASC became members of the Peachtree Corridor Task Force, and the partnership eventually replaced the function of ASC as the organization advocating for a streetcar line along Peachtree Street.

In July 2009, the Atlanta city council approved funding a feasibility study to work out certain details of the proposed streetcar line in time to apply for federal economic-stimulus funds for the construction of such a line. [21] However, several council members later expressed doubts over whether the remainder of the funding necessary to bring the project to fruition was likely, particularly during a time of recession. [22]

Downtown Loop route funded

In September 2010, it was announced that Phase I of the Atlanta Streetcar Project had received $47 million in federal Transportation Investment Generating Economic Recovery (TIGER) II funding. The funding represents 8% of the overall TIGER II allotment, and will fund the construction of the downtown loop, not the Peachtree Corridor line, which is now regarded as Phase V of the project. [23] [24]

In May 2011, Siemens announced that it had won the $17.2 million contract to build the four streetcars that will run on the Downtown Connector line. They would be based on the company's S70 light rail vehicle platform, with the cars themselves being built in Sacramento, California, while other major components, including the propulsion system, were to be assembled at a Siemens plant about 30 miles (48 km) north of Atlanta, in Alpharetta. [16] [17]

In February 2012, the city announced that the budget would increase from $70 million to $90 million. The city attributed the increase to: [25]

In March 2012, the MARTA Board of Directors formally approved the design-build contract with URS Corporation for the Atlanta Streetcar. [26]

Construction and opening

Groundbreaking for the project took place on February 1, 2012. [25] [27] At that time, the line was projected to open in May 2013, but various delays pushed the opening back, first to summer 2014 and later to December. [9] The first two S70 streetcars were delivered in February 2014 [18] and began test runs on the line in the spring. The initial 2.7 mile loop cost $98M which was almost $30M higher than originally projected.

The 2.7-mile (4.3 km) loop opened for service on December 30, 2014, [5] with all rides free until January 1, 2016. [8] [9]

MARTA takeover

By June 2018, MARTA agreed to take control and ownership of the streetcar; the route is planned to be integrated into a larger MARTA light rail system. [28] Operations were placed under the control of the newly formed Office of Light Rail Operations on July 1, 2018. [29]

Expansion

Plans call for the Streetcar line to be extended along the Atlanta BeltLine. [30] The first phase of expansion, known as the Streetcar East Extension, is currently in final design and scheduled to begin operation in 2028. [31] The extension will see tracks extended east along Edgewood Avenue, Randolph St, and Auburn Ave, then north along the BeltLine to Ponce City Market. [32] The project is expected to cost $230 million, and is fully funded by the More MARTA tax, approved by voters in 2016. The City applied for a TIGER 7 grant in 2015 to fund the project, but was unsuccessful. [33]

There are also plans to extend the streetcar to west to Bankhead MARTA Station. [ citation needed ]

List of streetcar stations

Counter-clockwise loop between Centennial Olympic Park and King Historic District

Atlanta Streetcar map.svg
StopDirectionNotes
Centennial Olympic ParkSouthboundServes Centennial Olympic Park, CNN Center, Georgia Aquarium, Mercedes-Benz Stadium, GWCC, National Center for Civil and Human Rights, State Farm Arena and World of Coca-Cola
Terminus
Luckie at ConeEastboundServes Fairlie−Poplar Historic District
Park PlaceSouthboundServes Woodruff Park and Underground Atlanta (walking distance)
Hurt ParkEastboundServes Georgia State Capitol, Georgia State University and Hurt Park
Sweet Auburn MarketEastboundIsland side platform in middle of street
Serves Grady Hospital and Sweet Auburn Curb Market
Edgewood at HilliardEastboundIn walking distance of Selena S. Butler Park
King Historic DistrictWestboundIntersection of Auburn and Jackson Streets
Serves Martin Luther King Jr. National Historical Park and Oakland Cemetery (walking distance)
Dobbs PlazaWestboundPlatform located under the Downtown Connector (I-75/85)
Serves Dobbs Plaza and Sweet Auburn
Auburn at PiedmontWestboundServes Calhoun Park
Woodruff ParkWestboundServes Woodruff Park
Peachtree CenterNorthboundDirect connection to MARTA rapid transit at Peachtree Center station
Serves Peachtree Center district
Carnegie at SpringWestboundServes Fairlie−Poplar Historic District
Final stop before reaching terminus at Centennial Olympic Park stop

Criticism

Since opening for service, the Atlanta Streetcar has been criticized by officials and residents for its short route, safety, poor management, and lower-than-expected ridership. Although boosters have claimed that up to $2.5 billion worth of new development can be attributed to the streetcar, independent analysis shows that many of those projects (totaling at least $323 million) pre-date it, and others—such as the College Football Hall of Fame—had not taken the streetcar into consideration. Regardless, the streetcar has contributed to at least some economic growth; for example, Southeast Capital Companies stated that it directly influenced their decision to build residential housing near Edgewood Avenue, and the Atlantic Seafood Market saw business rise 10% in the months following the start of service. [34]

In September 2015, officials from the Federal Transit Administration expressed concerns with the system's lack of safety, poor management, and failure to comply with requirements for reporting accidents. Atlanta mayor Kasim Reed and MARTA CEO Keith Parker have laid out steps to address those issues. [35]

On May 23, 2016, state officials sent a letter to (then mayor) Kasim Reed and MARTA CEO Keith Parker threatening to shut down the streetcar unless the city fixed numerous problems with it that had been outlined in multiple then-recent audits. [36]

See also

Related Research Articles

<span class="mw-page-title-main">Metropolitan Atlanta Rapid Transit Authority</span> Public transit operator in Metro Atlanta, Georgia

The Metropolitan Atlanta Rapid Transit Authority is the principal public transport operator in the Atlanta metropolitan area. Formed in 1971 as strictly a bus system, MARTA operates a network of bus routes linked to a rapid transit system consisting of 48 miles (77 km) of rail track with 38 subway stations. MARTA's rapid transit system is the eighth-largest rapid transit system in the United States by ridership.

<span class="mw-page-title-main">METRORail</span> Light rail system in Houston, Texas

METRORail is the 22.7-mile (36.5 km) light rail system in Houston, Texas. In 2023, the system had a ridership of 13,883,700, or about 42,900 per weekday as of the second quarter of 2024. METRORail ranks as the second most-traveled light rail system in the Southern United States and the 10th most-traveled light rail system in the United States, and has the highest ridership per mile for light rail systems in the Southern US. METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).

<span class="mw-page-title-main">San Diego Trolley</span> Light rail system serving San Diego, California

The San Diego Trolley is a light rail system operating in the metropolitan area of San Diego. The trolley's operator, San Diego Trolley, Inc., is a subsidiary of the San Diego Metropolitan Transit System (MTS). The trolley operates as a critical component of the MTS, with connections to and integrated travel tickets with the local bus systems.

The Atlanta Beltline is a 22 miles (35 km) open and planned loop of multi-use trail and light rail transit on a former railway corridor around the core of Atlanta, Georgia. The Atlanta Beltline is designed to reconnect neighborhoods and communities historically divided and marginalized by infrastructure, improve transportation, add green space, promote redevelopment, create and preserve affordable housing, and showcase arts and culture. The project is in varying stages of development, with several mainline and spur trails complete. Since the passage of the More MARTA sales tax in 2016, construction of the light rail streetcar system is overseen by MARTA in close partnership with Atlanta Beltline, Inc.

The Charlotte Area Transit System (CATS) is the agency responsible for public transportation in the Charlotte metropolitan area. CATS operates bus and rail transit services in Mecklenburg County and surrounding areas. Established in 1999, CATS' bus and rail operations carry about 320,000 riders on an average week. CATS is governed by the Metropolitan Transit Commission and is operated as a department of the City of Charlotte. In 2023, the system had a ridership of 13,476,600, or about 44,100 per weekday as of the second quarter of 2024.

<span class="mw-page-title-main">Siemens S700 and S70</span> Light rail transit vehicle

The Siemens S70 and its successor, the Siemens S700, are a series of articulated low-floor light-rail vehicles (LRV) and modern streetcars manufactured for the United States market by Siemens Mobility, a division of German conglomerate Siemens AG. The series also includes a European tram-train variant, the Siemens Avanto.

Timeline of mass transit in Atlanta:

<span class="mw-page-title-main">Southwest LRT</span> Under-construction light rail transit line in Minneapolis

The Southwest LRT is an under–construction 14.5-mile (23.3 km) light rail transit corridor in Hennepin County, Minnesota, with service between Minneapolis and Eden Prairie. The estimated one-way travel time from Southwest Station in Eden Prairie to Target Field Station in Minneapolis is 32 minutes. The Southwest LRT will extend through St. Louis Park, Hopkins and Minnetonka along the route. Major locations on the line will include Bde Maka Ska, Cedar Lake, the Walker Art Center, the Minneapolis Sculpture Garden and Target Field in downtown Minneapolis.

<span class="mw-page-title-main">Valley Metro Rail</span> Light rail line connecting Phoenix and Mesa, Arizona

Valley Metro Rail is a 29.8-mile (48 km) light rail system serving the cities of Phoenix, Tempe, and Mesa in Arizona, USA. The network, which is part of the Valley Metro public transit system, began operations on December 27, 2008. In 2023, the system had a ridership of 10,797,600, or about 31,200 per weekday as of the second quarter of 2024.

<span class="mw-page-title-main">Old Fourth Ward</span> Neighborhoods of Atlanta in Fulton County, Georgia, United States

The Old Fourth Ward, often abbreviated O4W, is an intown neighborhood on the eastside of Atlanta, Georgia, United States. The neighborhood is best known as the location of the Martin Luther King Jr. historic site.

The Metropolitan Atlanta Rapid Transit Authority was created as the first public mass transit agency in metropolitan Atlanta. Its formation in 1965 was a result of the campaigning efforts of governmental planning agencies and Atlanta businessmen. The system broke ground on its rail system in 1975.

<span class="mw-page-title-main">CityLynx Gold Line</span> Streetcar line in Charlotte, North Carolina, US

The CityLynx Gold Line is a streetcar line in Charlotte, North Carolina. A component of the Charlotte Area Transit System's Lynx rail system, it follows a primarily east-west path along Beatties Ford Road, Trade Street and Central Avenue through central Charlotte. The initial 1.5-mile (2.4 km), six-stop segment between Time Warner Cable Arena and Presbyterian Hospital opened for service on July 14, 2015. A further 2.5-mile (4.0 km) segment from the Charlotte Transportation Center to French Street, and from Hawthorne & 5th to Sunnyside Avenue, opened for service on August 30, 2021.

<span class="mw-page-title-main">Capitol View, Atlanta</span> Neighborhood in Atlanta, Georgia, US

Capitol View is a historic intown southwest Atlanta, Georgia neighborhood. The neighborhood is 2.5 miles from downtown and was named for its views of the Georgia State Capitol building. Its boundaries include Metropolitan Parkway to the east, Lee Street to the west, and the Beltline to the north. On the south, the border follows Arden Street, Deckner Avenue, and Perkerson Park.

<span class="mw-page-title-main">Streetcars in Atlanta</span> Aspect of the history of Atlanta, Georgia, USA

Streetcars originally operated in Atlanta downtown and into the surrounding areas from 1871 until the final line's closure in 1949.

<span class="mw-page-title-main">Transportation in Atlanta</span>

Atlanta's transportation system is a complex multimodal system serving the city of Atlanta, Georgia, widely recognized as a key regional and global hub for passenger and freight transportation. The system facilitates inter- and intra-city travel, and includes the world's busiest airport, several major freight rail classification yards, a comprehensive network of freeways, heavy rail, light rail, local buses, and multi-use trails.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

The Wave was a planned 2.7-mile (4.3 km) streetcar line in Fort Lauderdale, Florida. Construction costs were estimated to be $200 million. The project was cancelled in 2018.

<span class="mw-page-title-main">Edgewood Avenue</span> Street in Atlanta, Georgia, United States

Edgewood Avenue is a street in Atlanta, Georgia, United States which runs from Five Points in Downtown Atlanta, eastward through the Old Fourth Ward. The avenue runs in the direction of the Edgewood neighborhood, and stops just short of it in Inman Park. Edgewood Avenue was first important as the route of a streetcar line to Inman Park, Atlanta's first garden suburb and home to many of its most prominent citizens. Today, the avenue is known for its restaurants and nightlife around its intersection with Boulevard.

The OC Streetcar is a modern streetcar line currently under construction in Orange County, California, running through the cities of Santa Ana and Garden Grove. The electric-powered streetcar will be operated by the Orange County Transportation Authority (OCTA), and will serve ten stops in each direction along its 4.15-mile (6.68 km) route.

<span class="mw-page-title-main">Timeline of the BeltLine</span>

This is the timeline of the development of the BeltLine, a ring of trails and parks around central Atlanta.

References

  1. "Transit Ridership Report Second Quarter 2024" (PDF). American Public Transportation Association. September 3, 2024. Retrieved September 5, 2024.
  2. "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. Schield, Aubrey (August 1, 2014). "What to expect on an Atlanta Streetcar ride". Atlanta Magazine. Retrieved December 10, 2018.
  4. "Revenue service update". Atlanta Streetcar. June 23, 2014. Archived from the original on July 14, 2014. Retrieved December 23, 2014.
  5. 1 2 David Wickert (December 30, 2014). "Atlanta streetcar takes first trip". Atlanta Journal-Constitution . Retrieved December 30, 2014.
  6. Thomas Wheatley (December 23, 2014). "Atlanta Streetcar to start passenger service on Tuesday". Creative Loafing Atlanta. Retrieved December 23, 2014.
  7. Keith Laing (December 23, 2014). "Fed-supported Atlanta streetcar to open Dec. 30". The Hill . Retrieved December 23, 2014.
  8. 1 2 "Atlanta Streetcar Enters Service". Passenger Transport. American Public Transportation Association. January 9, 2015. Retrieved April 12, 2015.
  9. 1 2 3 4 "Atlanta meets New Year deadline: Streetcars return to the streets of Georgia after a 65-year break". Tramways & Urban Transit . UK: LRTA Publishing. February 2015. p. 53.
  10. "A Better Way to Get Around". Atlanta Streetcar. Archived from the original on October 29, 2014. Retrieved December 30, 2014.
  11. Josh Green (February 26, 2014). "How The Atlanta Streetcar Loop Looks Right Now". Curbed Atlanta. Vox Media Inc. Retrieved March 10, 2014.
  12. Douglas John Bowen (May 14, 2013). "MARTA revises Atlanta streetcar contract". Railway Age. Simmons-Boardman Publishing Inc. Retrieved March 10, 2014.
  13. Gregory Wallace (November 1, 2012). "Downtown streetcar construction on track". Atlanta INtown Paper. Springs Publishing LLC. Retrieved March 10, 2014.
  14. "Where Will the Streetcar Go?". Atlanta Streetcar. Archived from the original on March 10, 2014. Retrieved March 10, 2014.
  15. "Fact Sheet" (PDF). Atlanta Streetcar. July 2013. Archived from the original (PDF) on January 31, 2017. Retrieved July 1, 2014.
  16. 1 2 "Siemens to build Atlanta streetcars". Atlanta Business Chronicle. American City Business Journals. Retrieved August 2, 2016.
  17. 1 2 "Siemens is supplying Atlanta with the American type S70 LRT vehicles". Siemens.com. Siemens. Retrieved August 2, 2016.
  18. 1 2 "Worldwide Review (regular news section)". Tramways & Urban Transit . UK: LRTA Publishing. April 2014. p. 175.
  19. "Board of Directors". Atlanta Streetcar, Inc. Archived from the original on July 27, 2007. Retrieved August 2, 2007.
  20. "Collaboration to build a 'destination street'". Peachtree Corridor Partnership. 2007. Archived from the original on September 14, 2009. Retrieved November 15, 2009.
  21. Dave Williams (July 20, 2009). "Atlanta City Council OKs streetcar study". Atlanta Business Chronicle . Retrieved November 15, 2009.
  22. Dave Williams (October 12, 2009). "Council members question streetcar funding". Atlanta Business Chronicle . Retrieved November 15, 2009.
  23. "TIGER's Biggest Bite: Atlanta Streetcar Proposal Gets $47 Million". Streetsblog USA. October 15, 2010.
  24. Jay Bookman (October 15, 2010). "Streetcar money breaks Atlanta transit losing streak". The Atlanta Journal-Constitution . Cox Media Group. Archived from the original on July 14, 2014. Retrieved June 3, 2015.
  25. 1 2 Jeremiah McWilliams (February 1, 2012). "Atlanta kicks off streetcar construction". Atlanta Journal-Constitution .
  26. Doug DeLoach (March 30, 2012). "Atlanta Streetcar design-build phase begins". Atlanta Business Chronicle . Retrieved August 30, 2014.
  27. "Atlanta streetcar breaks ground". Railway Gazette International . February 21, 2012. Retrieved July 1, 2014.
  28. "MARTA To Take Over Atlanta Streetcar On July 1". WABE. June 6, 2018. Retrieved June 29, 2018.
  29. King, Michael (July 1, 2018). "MARTA officially assumes operations of Atlanta Streetcar". 11Alive. Retrieved July 1, 2018.
  30. Keenan, Sean (October 5, 2018). "After Beltline transit win, More MARTA project list is officially approved". Curbed. Retrieved December 11, 2018.
  31. "MARTA SELECTS FIRM FOR FINAL DESIGN OF STREETCAR EAST EXTENSION". itsmarta.com. Metropolitan Atlanta Rapid Transit Authority. Retrieved February 21, 2024.
  32. Green, Josh. "MARTA picks designer for streetcar extension into Atlanta BeltLine". Urbanize Atlanta. Urbanize Media LLC. Retrieved February 21, 2024.
  33. "Atlanta seeks TIGER funding for streetcar connection to BeltLine". ATL Urbanist. May 27, 2015. Retrieved June 3, 2015.
  34. "Cling Clang Clunk? Inside the Atlanta Streetcar's first year". December 19, 2015. Retrieved May 29, 2016.
  35. "FTA sends stern letter to city, MARTA over Streetcar woes". Atlanta Journal-Constitution. September 29, 2015. Retrieved May 29, 2016.
  36. David Wickert (May 26, 2016). "State threatens to close Atlanta streetcar". Atlanta Journal-Constitution. Retrieved June 3, 2016.
Template:Attached KML/Atlanta Streetcar
KML is from Wikidata