Forest Hills | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Washington Street at Hyde Park Avenue Jamaica Plain, Boston, Massachusetts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 42°18′03″N71°06′51″W / 42.30073°N 71.11406°W | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Attleboro Line (Northeast Corridor, Southwest Corridor) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 island platforms (1 for each service) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 (Orange Line) 4 (commuter rail) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connections | MBTA bus: 16, 21, 30, 31, 32, 34, 34E, 35, 36, 37, 38, 39, 40, 42, 50, 51 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking | 206 spaces ($6.00 fee) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bicycle facilities | 32 spaces ("Pedal and Park" bicycle cage) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fare zone | 1A (Commuter Rail) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1842 (commuter rail station) November 22, 1909 (elevated rapid transit station) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | April 30, 1987 (elevated Orange Line station) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt | May 4, 1987 (modern combined station) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Previous names | Tollgate | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Passengers | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FY2019 | 12,538 [1] (Orange Line weekday average) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2018 | 142 [2] (Needham Line weekday average) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Forest Hills station is an intermodal transfer station in Boston, Massachusetts. It serves the MBTA rapid transit Orange Line and three MBTA Commuter Rail lines (Needham, Providence/Stoughton, and Franklin/Foxboro) and is a major terminus for MBTA bus routes. It is located in Forest Hills, in the southern part of the Jamaica Plain neighborhood. Most Providence/Stoughton Line and Franklin/Foxboro Line trains, and all Amtrak Northeast Corridor trains, pass through the station without stopping. Forest Hills station is fully accessible on all modes.
Forest Hills station is located at the southern end of the Jamaica Plain neighborhood, where Washington Street, South Street, and Hyde Park Avenue intersect the Arborway parkway. To the west of the station is Arnold Arboretum; to the east is the small Forest Hills neighborhood plus Forest Hills Cemetery and Franklin Park
Six tracks run through the Southwest Corridor cut at Forest Hills. On the west side are the two tracks of the Orange Line with an island platform between them. Orange Line trains use both tracks; a crossover north of the platforms allows trains to switch tracks for regular right-hand drive operation on the rest of the line. To the east are one track of the Needham Branch (track 5) and the three tracks of the Northeast Corridor (tracks 3, 1, and 2). An island platform for MBTA Commuter Rail tracks is located between tracks 5 and 3. Forest Hills is the junction between the Needham Branch and the Northeast Corridor: track 5 merges into track 3 north of the station, while a second Needham Branch track splits from track 3 just to the south.
The station building is at ground level above the tracks. Several small retailers are located in the station along with an MBTA Police substation.
Forest Hills serves as a major bus transfer station; 16 MBTA bus routes terminate at the station. Routes 16 , 21 , 31 , 32 , and 42 run on Hyde Park Avenue, Washington Street (north of the station), and the Arborway, and use the lower busway located off Hyde Park Avenue east of the station. Routes 30 , 34 , 34E , 35 , 36 , 37 , 38 , 39 , 40 , 50 , and 51 run on South Street and Washington Street; they use the upper busway west of the station. [3]
The Boston and Providence Railroad (B&P) was chartered on June 22, 1831, to build a rail line between its two namesake cities. Construction began in late 1832, and the B&P opened from Park Square, Boston to Canton in 1834. [4] : 29 The remaining section of the B&P main line from Canton to Providence opened the following year with the completion of the Canton Viaduct. The B&P, like many early railroads, was primarily intended for intercity travel; the only intermediate stations north of Canton were at Dedham Plain (later called Readville) and Pierpont Village (later called Roxbury Crossing). [5] : 8 (However, there was also an early flag stop at Tollgate where the line crossed the Norfolk and Bristol Turnpike adjacent to one of its toll gates. [6] )
Two additional stations in Jamaica Plain were added in 1842: Jamaica Plain at Green Street, and Tollgate at the former flag stop. [5] The B&P began regularly running Dedham Specials (which used the main line to Readville and the Dedham Branch to Dedham station) in June 1842, which made commuting from Tollgate and the other intermediate stations possible. [7] [4] : 29 A second track from Roxbury Crossing to Readville was added in 1845. [4] : 31 A small station building at Tollgate was added that year, and several businesses soon sprung up around the station. [5]
On July 14, 1849, the B&P opened a second branch to Dedham – this one from Tollgate via West Roxbury. [8] [4] : 29 Commuter traffic on the B&P – which had numbered just 320 daily passengers from the eight stations north of Readville in 1849 – was rapidly expanding. [9] [10] The railroad cut sharply into the profits of the private turnpike; it became a free public road south of Dedham in 1843, and north of Dedham in 1857. [5] : 9 The Forest Hills Cemetery was founded nearby in 1848; by the late 1850s, the station was renamed Forest Hills. [11] [12] [5] : 14 A new station building was constructed in 1873. [13] It was similar to the structure built at Hyde Park the previous year. [14]
The railroad would soon face its own competition in the form of horsecar lines. The West Roxbury Railroad opened from South Street at McBride Street in Jamaica Plain (1,900 feet (580 m) north of Forest Hills station) to Roxbury Crossing in 1857. It was immediately acquired by the Metropolitan Railroad and connected to its existing trackage, providing service from Jamaica Plain to downtown Boston. [15] : 60 After the former Turnpike (soon renamed Washington Street) became a free public road in 1857, a horsecar line was constructed on it between Tollgate and existing tracks at Dudley Square. [5] : 10
Most horsecar service in Boston was consolidated under the West End Street Railway in 1887. [15] : 8 Electric streetcar service in Boston began with the Beacon Street line in 1888; the Washington Street line was electrified on September 2, 1890. [5] : 11 The West End built its first Forest Hills Yard (renamed Arborway Yard in 1924) in 1895. [5] : 34 The West End was acquired by the Boston Elevated Railway (BERy) in 1897. [15] : 35 The line on South Street was extended to Forest Hills Yard in 1902; through service to the Tremont Street subway on the Arborway Line began in 1915. [15] : 61 The Washington Street and South Street lines converged at Forest Hills Square, just east of the station; a covered platform was built there to aid transfers. [5] : 11
Between 1891 and 1897, the New Haven Railroad raised its main line from just south of Back Bay to Forest Hills onto a 4-track stone embankment to eliminate dangerous grade crossings. The Forest Hills viaduct was designed by Frederick Law Olmsted as an important element of the Emerald Necklace. Five new local stations in Dorchester and Jamaica, including Forest Hills, opened on June 1, 1897. [16] The station building at Forest Hills was similar to the still-extant station at Norwood Central, built two years later. [17]
On November 22, 1909, the Washington Street Elevated was extended from Dudley Square to Forest Hills, with a grand elevated station and a maintenance facility located between Hyde Park Avenue and the mainline tracks. [18] As with most Boston Elevated Railway stations, Forest Hills was designed for efficient streetcar-to-elevated transfers; Forest Hills and nearby Arborway became major streetcar hubs. Designed by Edmund M. Wheelwright, the station was called "the chef-d'œuvre of rapid transit development in Boston". [19]
The New Haven Railroad briefly operated high-frequency local service from Forest Hills to South Station, but it failed to compete with the El and was cut back. The five local stops were abandoned on September 29, 1940. [16] The Forest Hills stop alone was revived in June 1973 for Needham Line service, although by 1976 it was used by less than 50 riders a day, versus 15,000 at the Elevated station. [18] [20]
From 1979 to 1987, Forest Hills was completely rebuilt as an intermodal transfer station as part of the Southwest Corridor project. The project involved removing the century-old viaduct and moving the tracks into a trench with three mainline tracks plus two Orange Line tracks to replace the aging Washington Street Elevated. The new rapid transit stations mirror the locations of the former mainline stations between Forest Hills and Back Bay. Needham Line service was suspended on October 13, 1979; Providence/Stoughton Line and Franklin Line service (which do not stop) were rerouted over the Fairmount Line on November 3, 1979. [18] The Forest Hills viaduct was destroyed with a controlled explosion on November 12, 1983; work on the new station began on June 1, 1984. [21]
The $38 million station, designed by Cambridge Seven Associates, was constructed of brick, steel and glass; it was meant to resemble a greenhouse to fit in with the surrounding parks. The station's $120,000 clock tower has become a local landmark; it is mirrored by four interior clocks. [21] [22] [23] Orange Line service on the El ended on May 4, 1987, and began on the Southwest Corridor on May 7. The corridor reopened to commuter rail and Amtrak on October 5, 1987, though Needham Line service did not resume until October 19. [18]
The new station included streetcar loops on the north end of the station for the relocated Arborway station, also signed as "Forest Hills", to allow closer connections than were available at Arborway. The small station included waiting shelters, maps and a turnaround loop. On December 28, 1985, the Arborway Line (Green Line E branch) service was "temporarily" suspended while construction work was performed in the Huntington Avenue subway. Service was restored to Brigham Circle on July 26, 1986 and Heath Street on November 4, 1989. [18] However, service was never restored to Forest Hills due to the MBTA's objection to running streetcars in mixed traffic. Restoration of Green Line trolley service to Arborway was part of air pollution remediation promised for the Big Dig, but a lawsuit mandating the return of service was defeated in court in January 2011, nullifying plans to restore service. [24]
A bicycle cage – the first MBTA "Pedal and Park" cage in Boston – opened at Forest Hills on September 28, 2009. [25] Work performed as part of the Casey Overpass removal, which began in 2015, involved a rebuilt upper busway and a second Orange Line headhouse. [26] The canopy was constructed as a $11 million change order to the Arborway project. [27] The never-used Green Line loops and waiting area near the north entrance to Forest Hills were demolished. [28] Route 39 buses, which used the streetcar loops, were permanently rerouted to the upper busway on October 14, 2017. [29] The new headhouse opened on November 6, 2019. [27]
In August 2020, the MBTA awarded a $6.9 million design contract for additional renovations including repair or replacement of the curtain wall, replacement of the existing elevators, and a new elevator connecting the two busways. [30] Design work began in April 2021; by November 2023, it was expected to be completed in mid-2024. [31] [32] As of June 2024 [update] , design work is ongoing and the scope of the project will depend on funding. [33]
On April 5, 2021, the final weekday outbound Providence/Stoughton Line train began stopping at Forest Hills to serve as a transfer train to the Needham Line, as the final weekday Needham-bound train originates there. [34] [35] The entire Orange Line was closed from August 19 to September 18, 2022. [36] Some Providence/Stoughton Line trains stopped at the station to provide alternate service; some Franklin Line trains began stopping on September 3. [37] [38] Some of the additional commuter rail stopping service – eight peak Franklin Line trains and one midday train to Providence – was retained after the Orange Line closure. [39] [40]
The Southwest Corridor or Southwest Expressway was a project designed to bring an eight-lane highway into the City of Boston from a direction southwesterly of downtown. It was supposed to connect with Interstate 95 (I-95) at Route 128. As originally designed, it would have followed the right of way of the former Penn Central/New Haven Railroad mainline running from Readville, north through Roslindale, Forest Hills and Jamaica Plain, where it would have met the also-cancelled I-695. The 50-foot-wide median for the uncompleted "Southwest Expressway" would have carried the southwest stretch of the MBTA Orange Line within it, replacing the Washington Street Elevated railway's 1901/1909-built elevated railbed. Another highway, the four-lane South End Bypass, was proposed to run along the railroad corridor between I-695 in Roxbury and I-90 near Back Bay.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Route 128 station is a passenger rail station located at the crossing of the Northeast Corridor and Interstate 95/US Route 1/Route 128 at the eastern tip of Dedham and Westwood, Massachusetts, United States. The station is shared by Amtrak and the Massachusetts Bay Transportation Authority (MBTA). It is served by most MBTA Commuter Rail Providence/Stoughton Line trains, as well as by all Amtrak Northeast Regional and Acela intercity trains. The station building, platforms, and parking garage are all fully accessible. It is the 23rd busiest Amtrak station in the country and the fifth busiest in New England.
Ruggles station is an intermodal transfer station in Boston, Massachusetts. It serves Massachusetts Bay Transportation Authority (MBTA) rapid transit, bus, and commuter rail services and is located at the intersection of Ruggles and Tremont streets, where the Roxbury, Fenway–Kenmore, and Mission Hill neighborhoods meet. It is surrounded by the campus of Northeastern University. Ruggles is a station stop for the Orange Line subway, as well as the Providence/Stoughton Line, Franklin/Foxboro Line, and Needham Line of the MBTA Commuter Rail system. Thirteen MBTA bus routes stop at Ruggles.
The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.
The Boston and Providence Railroad was a railroad company in the states of Massachusetts and Rhode Island which connected its namesake cities. It opened in two sections in 1834 and 1835 - one of the first rail lines in the United States - with a more direct route into Providence built in 1847. Branches were built to Dedham in 1834, Stoughton in 1845, and North Attleboro in 1871. It was acquired by the Old Colony Railroad in 1888, which in turn was leased by the New Haven Railroad in 1893. The line became the New Haven's primary mainline to Boston; it was realigned in Boston in 1899 during the construction of South Station, and in Pawtucket and Central Falls in 1916 for grade crossing elimination.
Green Street station is a rapid transit station in Boston, Massachusetts. It serves the MBTA's Orange Line and is located in the southern part of the Jamaica Plain neighborhood. Green Street is the least-used station on the Orange Line, averaging 3,055 weekday boardings in FY 2019. Like all Orange Line stations, it is fully accessible.
The Franklin/Foxboro Line is part of the MBTA Commuter Rail system. It runs from Boston's South Station in a southwesterly direction toward Franklin, Massachusetts. Most weekday trains use the Northeast Corridor before splitting off onto the namesake Franklin Branch at Readville, though some weekday trains and all weekend trains use the Dorchester Branch between Boston and Readville.
The Needham Line is a branch of the MBTA Commuter Rail system, running west from downtown Boston, Massachusetts through Roxbury, Jamaica Plain, Roslindale, West Roxbury, and the town of Needham. The second-shortest line of the system at just 13.7 miles (22.0 km) long, it carried 4,881 daily riders in October 2022. Unlike the MBTA's eleven other commuter rail lines, the Needham Line is not a former intercity mainline; instead, it is composed of a former branch line, a short segment of one intercity line, and a 1906-built connector.
The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.
Hyde Park station is an MBTA Commuter Rail station in Boston, Massachusetts. It primarily serves the Providence/Stoughton Line, and also serves some weekday outbound Franklin/Foxboro Line trains. It is located on the Northeast Corridor in the Hyde Park neighborhood.
Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by the MBTA Commuter Rail Fairmount, Franklin/Foxboro, and Providence/Stoughton Lines. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Attleboro Line tracks at ground level and the Dorchester Branch above. Franklin/Foxboro Line trains that run on the Northeast Corridor use a connecting track with a separate platform. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.
Jackson Square station is a Massachusetts Bay Transportation Authority (MBTA) Orange Line rapid transit station located on Centre Street near Columbus Avenue in the Jamaica Plain neighborhood of Boston, Massachusetts. The station opened in 1987 as part of the Southwest Corridor project. It is served by MBTA bus routes 14, 22, 29, 41, and 44, which operate into an off-street busway located adjacent to the station.
Roslindale Village station is an MBTA Commuter Rail station on the Needham Line, located in the Roslindale Square business district of the Roslindale neighborhood in Boston, Massachusetts. The station has a single side platform serving the line's single track, with a mini-high platform for accessibility.
Bellevue station is an MBTA Commuter Rail station in West Roxbury, Massachusetts. Located in the Bellevue neighborhood, it serves the Needham Line. The station has a mini-high platform for accessibility.
West Roxbury station is an MBTA Commuter Rail station in Boston, Massachusetts, served by the Needham Line. It is located on an embankment above Lagrange Street in the West Roxbury neighborhood. The station is accessible with a short mini-high platform on the outbound end of the main platform.
Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.
Mount Hope station was a railroad station on the Northeast Corridor in Roslindale, Boston, Massachusetts. The station consisted of two separate depots on opposite sides of the tracks. The brick outbound depot was located just north of the Blakemore Street bridge, while the wooden inbound depot was located south of the overpass.
The Dedham Branch was a spur line of the Boston and Providence Railroad, opened in 1835, which ran from the junction with the main line at Readville through to central Dedham; it was the first railroad branch line in Massachusetts. In 1966, it became part of the MBTA Commuter Rail system, but was abandoned the next year.
The history of rail in Dedham, Massachusetts begins with the introduction of the first rail line in 1836 and runs to the present day. Multiple railroads have serviced Dedham since then, and current service is provided by the MBTA. The station in Dedham Square built in 1881 out of Dedham Granite was demolished in 1951 and the stones were used to put an addition on the Town's library. There are two active stations today, and multiple others in close proximity.