Tappan Street | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| An outbound train at Tappan Street in 2016 | |||||||||||
| General information | |||||||||||
| Location | Beacon Street at Tappan Street Brookline, Massachusetts | ||||||||||
| Coordinates | 42°20′18″N71°08′19″W / 42.338469°N 71.138705°W | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| History | |||||||||||
| Rebuilt | 2026 (planned) | ||||||||||
| Passengers | |||||||||||
| 2011 | 674 (weekday average boardings) [1] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Tappan Street station is a light rail station on the MBTA Green Line C branch, located in the median of Beacon Street east of Tappan Street in Brookline, Massachusetts. The station consists of two side platforms which serve the C branch's two tracks. Tappan Street is not accessible; a reconstruction for accessibility is planned for 2026.
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [2] Design work for Tappan Street and seven other C Branch stations was 15% complete by December 2022. [3] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including Tappan Street. [4] The MBTA awarded a $41.9 million design-build contract in April 2025. [5] Design work for Tappan Street and Englewood Avenue was complete by September 2025, with the Tappan Street platforms to be widened and rebuilt at their current locations. [6] As of December 2025 [update] , construction is expected to take place from spring 2026 to fall 2026. Tappan Street and Englewood Avenue are planned to be the first to be completed. [7]
Media related to Tappan Street station at Wikimedia Commons