Green Line E branch

Last updated

Green Line E branch
Outbound train at Museum of Fine Arts station, December 2019.JPG
An outbound train at Museum of Fine Arts station in 2019
Overview
Locale Greater Boston
Termini
Stations25
Service
Type Light rail
System Green Line (MBTA subway)
Operator(s) Massachusetts Bay Transportation Authority
Technical
Line length8.6 miles (13.8 km)
Number of tracks2
Track gauge 4 ft 8+12 in (1,435 mm)
Electrification 600 V DC overhead
Route map
Green Line E branch
BSicon uexKACCa.svg
Mystic Valley Parkway
proposed
BSicon uKACCxa.svg
Medford/​Tufts
BSicon uACC.svg
Ball Square
BSicon uACC.svg
Magoun Square
BSicon uACC.svg
Gilman Square
BSicon uACC.svg
East Somerville
BSicon uCONTgq.svg
BSicon uABZg+r.svg
BSicon uhACCa.svg
Lechmere
BSicon lhSTRa@fq.svg
BSicon uexKACCaq.svg
BSicon uehABZg+r.svg
Lechmere
closed 2020
BSicon uhbKRZW.svg
BSicon uhACC.svg
Science Park
BSicon uhtSTRa.svg
BSicon PORTALf.svg
BSicon uCONTg@G.svg
BSicon utINTACC-L.svg
BSicon utINTACC-R.svg
North Station
BSicon LOGO Amtrak2.svg MBTA white T logo.svg MBTA white T logo.svg
BSicon utACC-L.svg
BSicon utACC-R.svg
Haymarket
MBTA white T logo.svg
BSicon utSTR.svg
BSicon utCONTf.svg
BSicon utCONTgq.svg
BSicon utTACCt.svg
BSicon utCONTfq.svg
Government Center
MBTA white T logo.svg
BSicon utSTR.svg
BSicon utCONTgq.svg
BSicon utTACCt.svg
BSicon utCONTfq.svg
Park Street
MBTA white T logo.svg MBTA white T logo.svg MBTA white T logo.svg
BSicon utBHF.svg
Boylston
MBTA white T logo.svg
BSicon utACC.svg
Arlington
BSicon utSTR.svg
BSicon utACC.svg
Copley
BSicon utSTRc2.svg
BSicon utABZg3.svg
BSicon utCONT1.svg
BSicon utSTR+tc4.svg
B, C, and D branches
BSicon utACC.svg
Prudential
BSicon utSTR.svg
Huntington Avenue subway
BSicon utBHF.svg
Symphony
BSicon MASKa.svg
BSicon utSTRe.svg
BSicon vRP2.svg
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Northeastern University
BSicon ueHST.svg
BSicon vRP2HST.svg
Forsyth Street
closed 1980
BSicon ueHST.svg
BSicon vRP2HST.svg
Parker Street
closed 1980
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Museum of Fine Arts
BSicon ueHST.svg
BSicon vRP2HST.svg
Vancouver Street
closed 1980
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Longwood Medical Area
BSicon ueHST.svg
BSicon vRP2HST.svg
Wigglesworth Street
closed 1980
BSicon uHSTACC.svg
BSicon vRP2HST.svg
Brigham Circle
BSicon uHST.svg
BSicon vRP2yRP4.svg
Fenwood Road
BSicon ueHST.svg
BSicon RP4.svg
Frawley Street
closed 1980
BSicon uHST.svg
BSicon RP4.svg
Mission Park
BSicon uHST.svg
BSicon RP4.svg
Riverway
BSicon uHST.svg
BSicon RP4.svg
Back of the Hill
BSicon uxABZgl.svg
BSicon RP4.svg
BSicon uKACCeq.svg
Heath Street
BSicon uexLSTR.svg
BSicon RP4.svg
Arborway Line
closed 1985
BSicon uexLSTR.svg
BSicon RP4.svg
South Huntington Avenue
street-running stops
BSicon uexLSTR.svg
BSicon RP4.svg
Centre Street
street-running stops
BSicon uexLSTR.svg
BSicon RP4.svg
South Street
street-running stops
BSicon HUB2.svg
BSicon uhKINTACCaq.svg
BSicon uexSTR.svg
BSicon MASKc.svg
BSicon uhSTRq.svg
BSicon HUBc3.svg
BSicon RP4.svg
BSicon uhCONTfq.svg
Forest Hills
MBTA white T logo.svg
BSicon HUBc1.svg
BSicon HUB4.svg
BSicon uexKBHFe.svg
Arborway

The E branch (also referred to as the Huntington Avenue branch, or formerly as the Arborway Line) is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle (the last MBTA street-running tracks in revenue service), in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains (26 to 34 light rail vehicles). [1]

Contents

Horsecar service on Centre and South streets in Jamaica Plain began in 1857, followed by service on Tremont Street (part of which became the west part of Huntington Avenue) to Brookline Village in 1859 and on the east part of Huntington Avenue in 1881–84. Jamaica Plain service was electrified in 1891, and Huntington Avenue service in 1894. Several branches of the Huntington Avenue line were opened west of Brookline Village between 1894 and 1900; both Huntington Avenue and Jamaica Plain service began using the new Tremont Street subway in 1897. A connector on South Huntington Avenue opened in 1903, allowing service to Jamaica Plain via Huntington Avenue. In the 1920s, Jamaica Plain service was extended to Arborway, while the western branches were reconfigured; they were cut in the 1930s.

The Huntington Avenue subway opened in 1941, cutting travel times through congested Copley Square. Ownership passed from the Boston Elevated Railway to the Metropolitan Transit Authority in 1947, and to the MBTA in 1964. Tremont Street subway service was designated as the Green Line in 1965, with the Huntington Avenue line becoming the E branch in 1967. Service was modified numerous times during the early MBTA era, including a major reconstruction of the line in 1980–82. In 1985, service past Brigham Circle was replaced with the route 39 bus – a "temporary" change that controversially became permanent, although service as far as Heath Street was restored in 1989 after replacement of the street trackage on Huntington Ave. The downtown terminal of the E branch underwent a number of changes during the MBTA era; from 1987 to 2020, it was usually Lechmere. In May 2020, the E branch was cut back to North Station for construction of the Green Line Extension, as part of which it was temporarily extended to Union Square in March 2022. It was permanently extended to Medford/Tufts in December 2022.

History

Horsecar lines

What became the E branch was formed from portions of several streetcar lines. The first of these was the West Roxbury Railroad, a horsecar line opened on November 14, 1857, in what was then West Roxbury. [2] [3] :60 It ran from Roxbury Crossing to Jamaica Plain along Lowell Street (now Columbus Avenue), Centre Street, and South Street. [4] The line was quickly leased by the Metropolitan Railroad, which operated through service between Jamaica Plain and downtown Boston using its line on Tremont Street. Travel time for the 4+12-mile (7.2 km)-long line was over an hour with a ten-cent fare. [3] :60 A two-track carhouse with a waiting room was located at the terminus of the line at Jamaica Street in Jamaica Plain. [5] :10 (The Metropolitan's main carhouse and barn was located at Roxbury Crossing.) [5] :10 In 1858, the Metropolitan opened a connector between Lowell Street and John Eliot Square, allowing Jamaica Plain cars to also use the Washington Street line (via Dudley Square) to reach downtown. The railroad also rebuilt the Jamaica Plain line that year to accommodate heavier ridership, including the double-tracking of some portions. [5] :10

On August 1, 1859, the Metropolitan was granted permission to add a 1.6-mile (2.6 km)-long branch to School Street (northwest of Brookline Village) along what was then called Washington Street. [6] [5] :11 (It was soon renamed as Tremont Street east of Brookline Village; the portion between Brigham Circle and Brookline Village was renamed again as part of Huntington Avenue in 1895.) The line opened on October 26, 1859. [7] Permission to double-track the line was given on September 9, 1879. [5] :11 The portion west of Brookline Village may have been intermittently operated. [8]

As the west part of the Back Bay was filled, Huntington Avenue became a major thoroughfare. The Metropolitan received rights to construct a double-track line on Huntington from Copley Square (where it connected to the existing Marlborough Street line) to West Chester Park (later renamed Massachusetts Avenue) on March 18, 1881. [5] :11 The 0.7-mile (1.1 km) line opened by that September, serving the exhibitions at the Mechanics Hall and New England Fair Building. [9] A 1.2-mile (1.9 km) extension along the newly-laid-out section of Huntington from West Chester Park to Brigham Circle was granted on October 29, 1883; its opening on October 1, 1884, completed a second Brookline–Boston route. [5] :11 [8] [10] A 1.2-mile (1.9 km) branch along Longwood Avenue to Coolidge Corner opened around late 1884. [11] [12] Around 1888, a 0.8-mile (1.3 km) branch was opened west from Brookline Village on Boylston Street and Cypress Street, serving the Pill Hill area. [13] [14] [15] (This may have been to compete with the Boston and Albany Railroad, which had begun its Newton Circuit service through Brookline in 1886. [16] )

Electrification

Streetcars on Huntington Avenue at Mechanics Hall (the modern location of Prudential station) in 1920 Streetcars and Mechanics Hall, March 1920.jpg
Streetcars on Huntington Avenue at Mechanics Hall (the modern location of Prudential station) in 1920

In November 1887, the Metropolitan was merged into the West End Street Railway as it consolidated the various Boston street railways into a unified system. [17] After the successful electrification of the Beacon Street line in 1888–89, the West End quickly moved to electrify its entire system. [3] :57 The Jamaica Plain–Northern Depots line was concerted to electric operation on October 14, 1891, followed by other Tremont Street lines on October 22. [18] [19] The horsecar barn at Jamaica Plain was replaced with a new structure for the electric cars; in early 1901, it was in turn replaced by a 320-by-325-foot (98 m × 99 m) carhouse with a passenger waiting room and space for 150 streetcars. [20] [5] :10–11

The West End electrified its Huntington Avenue line in 1893–94. Work was completed by mid-July 1894 except for a short stretch near the Riverway. [21] On August 4, all Brookline service via Huntington Avenue was converted to electric operation. This included the Washington Street branch (extended to Park Street), the Cypress Street branch, and the Tremont Street tracks to Roxbury Crossing. [22] [3] :61 The Washington Street branch was extended to Beacon Street at Washington Square on September 1, allowing through service between Reservoir via Brookline Village. [23] On August 15, 1896, an extension of the Beacon Street line opened on Chestnut Hill Avenue and Commonwealth Avenue to Lake Street. [24] Reservoir service via Brookline Village was extended to Lake Street, where a connection was made with the Commonwealth Avenue Street Railway. [3] :58

In November 1894, the Cypress Street branch was extended slightly to the new Cypress Street carhouse, which housed 36 streetcars. [25] [26] The carhouse was expanded in 1897, with a new capacity around 79 cars. [25] Electrification of the Longwood Avenue branch was after the other Huntington Avenue branches, completed in 1894 or 1895. [22] [27] Only the Boston portion of the branch was electrified (possibly owing to the deteriorated bridge over the Muddy River and the Highland branch, which was replaced in 1897–98 [28] ); in September 1894, Brookline directed the West End to remove the Longwood Avenue tracks west of the town line. [29] In 1894–96, the city paved Huntington Avenue as a boulevard, with the streetcar tracks moved into a dedicated median east of Brigham Circle. [30] [31] [32]

The first section of the Tremont Street subway opened on September 1, 1897. Among the lines immediately routed into the subway using the Public Garden incline were the Cypress Street via Huntington Avenue and Jamaica Plain crosstown via Huntington Avenue lines. [33] The southern subway section to the Pleasant Street incline opened on September 30, and Jamaica Plain cars via Tremont Street were routed into the subway. [34] [3] :23 Reservoir service via Huntington Avenue was added to the subway on November 8. [35] Longwood Avenue cars and Lake Street via Huntington Avenue cars soon used the subway as well. [3] :22 Other early services also used Huntington Avenue east of Massachusetts Avenue, including a Forest Hills–Park Street route via Washington Street (introduced on November 1, 1898) and a Humboldt Avenue–East Boston Ferries route. [3] :61 [36]

Expansion

Two connecting routes opened in August 1900. New tracks on Harvard Street from Brookline Village to Coolidge Corner allowed through service from Allston to the subway via Huntington Avenue. The Ipswich Street line provided an additional route between Brookline Village and the subway; service on that line initially ran to Cypress Street. [37] Service using the Ipswich Street line was extended west on Boylston Street from Cypress Street to Chestnut Hill Avenue on September 29, 1900, and to the Newton line at Chestnut Hill on November 19. [38] :201 Through service on the Longwood Avenue branch ended on August 8, 1901; it became a Brookline Avenue–Huntington Avenue shuttle. [36] On May 5, 1903, the Boston and Worcester Street Railway (B&W) began operations. It initially terminated at Chestnut Hill, but was extended over BERy tracks on Boylston Street and Huntington Avenue to Park Square on July 6. [39] [38] :154

The Main Line Elevated opened between Dudley Square and Sullivan Square on June 10, 1901. The Main Line used the outer tracks of the Tremont Street subway (the Pleasant Street incline tracks) and provided a significantly faster route to downtown that surface streetcars, prompting a rearrangement of the streetcar network. Jamaica Plain service was rerouted to the Dudley Square transfer station; a new Dudley–Brookline route was introduced soon after. [40] [41] Tracks on South Street between Jamaica Plain and Forest Hills Square (and the adjacent Forest Hills Yard) were approved by the city in June 1900. [42] Construction did not begin until April 1902, and the connector opened on May 17. [43] [3] :61 The Boston Elevated Railway opened tracks on the newly-laid-out South Huntington Avenue between Centre Street and Huntington Avenue on May 11, 1903, and began running Jamaica Plain–Park Street service via South, Centre, South Huntington, and Huntington. [44] [3] :61

By March 1907, regular service on Huntington Avenue west of Massachusetts Avenue included cars from Jamaica Plain via South Huntington Avenue, Lake Street (with some Reservoir short turns) via Washington Street, Oak Square via Harvard Street, and Allston Carhouse via Harvard Street, all entering the subway and looping at Park Street; as well as Cypress Street–Dudley cars and B&W cars. (A number of additional routes continued to use Huntington Avenue east of Massachusetts Avenue.) Additional routes used the tracks on South Street and Center Street in Jamaica Plain, including Forest Hills–Park Street (via Columbus Avenue), Jamaica Plain Carhouse–Dudley, and Jamaica Plain–Sullivan Square. [45] :20–21 Some Allston–Park Street cars were rerouted over Longwood Avenue on October 12, 1907, replacing the shuttle. [46] On November 30, 1908, Main Line trains were rerouted into the Washington Street Tunnel; the outer Tremont Street subway tracks and the Pleasant Street Incline reopened to streetcars on December 4, with some lines extended or rerouted from Dudley. Streetcars entering the subway on Boylston Street continued to loop at Park Street; those entering at Pleasant Street (including lines from Brookline via Tremont Street, and Jamaica Plain via Roxbury Crossing) exited the subway at Canal Street and looped at North Station. [47] [48] [45] :25

The Washington Street Elevated was extended to Forest Hills on November 22, 1909, increasing its prominence as a transfer location. [49] Requests from local residents and politicians to extend the South Huntington Avenue line from Jamaica Plain Carhouse to Forest Hills began before the extension was completed and continued throughout the 1910s. [50] [51] [52] Free transfers at Jamaica Plain Carhouse were added on March 1, 1913. [53] That April, the BERy indicated willingness to add express service to the South Huntington Avenue line, but could not extend the line until more cars were available. [54] On June 12, 1915, the Hyde Park–Forest Hills line was extended to Jamaica Plain Carhouse, with the Forest Hills–North Station (via Columbus Avenue) route cut back to Jamaica Plain Carhouse; this change was to provide more frequent service between Forest Hills and the carhouse. [55] The change was unpopular with residents; on October 2, 1915, the Hyde Park line was cut back to Forest Hills and the Charles River line extended in its stead, establishing a direct connection between West Roxbury and the South Huntington Avenue line. [56] [57] [58] On March 1, 1924, the BERy opened a streetcar transfer station inside Arborway Yard to relieve crowding at Forest Hills station. [59] The South Huntington Avenue line was soon extended to Arborway, improving connections with the other lines. [60] [61] [62]

Reroutes and buses

Beginning on January 25, 1913, both Allston–Brookline Village–Park Street lines were extended to North Station, providing through service between the Back Bay and North Station. [63] On May 24, 1914, the BERy began operating a Allston–Dudley crosstown line via Brookline Village. [25] :5 The Boylston Street subway opened on October 3, 1914, extending the subway west to Kenmore Square. Huntington Avenue and Ipswich Street service began using a portal in the median of Boylston Street, which replaced the Public Garden Incline. [64] The outer terminal of Washington Street service was cut to Washington Square except at rush hours as part of the October 3 changes, and the peak-hour terminal was cut to Reservoir on November 21. [64] [65] Oak Square–Park Street service via Huntington Avenue was cut back to Allston–Park Street on January 30, 1915, and a Cypress Street–Park Street line via Longwood Avenue was added. [66] Washington Street service was re-extended to Lake Street on November 6, 1915, as Beacon Street service was cut to Reservoir. [67]

By 1921, four subway services operated on Huntington Avenue: Lake Street, Jamaica Plain, Longwood, and Opera Place short turns. That November, the BERy proposed to operate the line as a quasi-rapid transit service. Brookline Village–Park Street service would operate with two-car trains of large center-entrance streetcars (three-car trains at peak hours); single-car shuttles would operate Jamaica Plain–Huntington and South Huntington and Lake Street–Brookline Village service. [68] Jamaica Plain residents were strongly opposed to the forced transfer, causing the Elevated to revise its plans. [69] Beginning on February 6, 1922, two-car trains were operated between Brookline Village (Cypress Street) and Park Street; Washington Street service was operated as a Brookline Village–Lake Street shuttle. Jamaica Plain service was not changed. [70] Francis Street–Park Street short turns ran from October 20, 1926, to June 27, 1932, and were resumed on June 25, 1934. [3] :61

On June 13, 1925, Ipswich Street service was cut to Massachusetts–Chestnut Hill, which ended direct service between Chestnut Hill and downtown Boston. In March 1926, the Huntington Avenue and Ipswich Street lines swapped outer terminals, with Huntington Avenue trains running to Chestnut Hill to restore direct service. [25] :5 In December 1928, the BERy began running South Huntington Avenue cars express over Huntington Avenue during the evening peak. [71] The Longwood Avenue shuttle was converted to bus on June 22, 1925. [38] :197 Rarely shown on maps, it was discontinued in 1942 (after an abortive 1934 plan to run the Cypress Street–Kenmore bus over Longwood Avenue [72] ); not until the introduction of route 47 in 1972 was Longwood Avenue again used for transit. [73] [38] :197 The Washington Street shuttle was converted to bus on April 24, 1926. [38] :197 It was redirected to Brighton Center on June 23, 1928, and eventually became route 65. [38] :52 [49] The rails were removed for scrap during World War II. [74]

In the 1930s, the Worcester Turnpike was paved as Massachusetts Route 9, an intercity highway, which forced the removal of streetcars. Buses replaced Boston and Worcester Street Railway cars on June 11, 1932. [38] :156 That November, paving reached Chestnut Hill; Huntington Avenue cars were cut back to Cypress Street and Ipswich Street cars to Brookline Village, and a Chestnut Hill–Brookline Village bus route was added. The Ipswich Street line was cut to a short shuttle route in mid-1933, with a new Brookline Village–Kenmore bus route. [25] :5 Cypress Street Carhouse closed on December 3, 1933; the Cypress Street route joined the South Huntington Avenue route in operating from Arborway Yard. [25] :3

On June 10, 1934, Cypress Street service was cut back to Brookline Village, and buses began operating between Cypress Street and Kenmore. [25] :5 The two bus routes were modified numerous times; they were combined in 1985 and are now MBTA bus route 60. [49] The Allston–Dudley route was replaced by buses on September 10, 1938, with the Brookline Village cars from Huntington Avenue cut back as additional Brigham Circle short turns. [25] [75] The city immediately demolished the Brookline Village transfer station to speed traffic flow through the square. [75] [76] :111

Huntington Avenue subway

Map of the 1926 proposal Map of 1926 proposal for Boston rapid transit lines.png
Map of the 1926 proposal

A subway for the Huntington Avenue line was proposed as early as 1906 to remove streetcars from congested Boylston Street and Copley Square. [77] (Streetcars operated in mixed traffic on those segments, with a dedicated median only on Huntington Avenue west of Dartmouth Street.) A subway as far as Mechanics Hall was proposed in 1911, but it was rejected in 1912 on the grounds that the opening of the Cambridge subway and the Boylston Street subway would halve the number of streetcars on Boylston Street. [78] [79]

In May 1924, the state legislature directed the Metropolitan District Commission to plan an expanded rapid transit system in Boston, including an extension of the Boylston street Subway under Governors Square. [80] The report, released in December 1926, called for the existing streetcar tunnels in Boston to be reorganized into two rapid transit lines with high-floor rolling stock. [81] One line was to run from Lechmere through the existing Tremont Street subway, parallel the New Haven Railroad tracks towards Providence using tunnels and an embankment as far as Massachusetts Avenue, then run along the surface on Huntington Avenue to Francis Street (Brigham Circle). The extension would have new stations at Pleasant Street, Back Bay station, West Newton Street, and Massachusetts Avenue, plus consolidated surface stops at the Museum of Fine Arts and the Longwood Medical Area. Streetcar lines on Tremont Street and Huntington Avenue would connect with rapid transit trains at a surface-level transfer station at Brigham Circle. Future extension of the tunnel to Brookline Village was considered. [81]

Symphony station shortly after its 1941 opening. The streetcar is a route 57 car bound for the Francis Street (Brigham Circle) cutback. BERy 5358 at Symphony Station, 1941.jpg
Symphony station shortly after its 1941 opening. The streetcar is a route 57 car bound for the Francis Street (Brigham Circle) cutback.

After the Berkeley Street line was closed around 1930, only Huntington Avenue cars used the Boylston Street Incline. [45] :26 In June 1932, the state legislature authorized the construction of a tunnel from Gainsborough Street under Huntington Avenue, Stuart Street, Columbus Avenue, and the Boston Common to Park Street station. The BERy did not approve the project because the portion east of Copley Square would have duplicated the existing subways at considerable cost, and it would not relieve congestion at the intersection with Massachusetts Avenue; the state act did not allow for any modifications to the route. [82] [83] [84]

Mayor James Michael Curley advanced a new plan in 1933, calling for an $8.5 million subway from Copley Square to Longwood Avenue, to be funded by the National Industrial Recovery Act rather than imposing local debt. [85] [86] :106 In July 1933, the state legislature provided conditions for the construction of the subway with more route flexibility. It was approved by the city and the BERy, but not by the state Emergency Finance Board. The Boston Transit Department developed six possible tunnel plans for evaluation. A tunnel as far west as Longwood Avenue or as short as Dartmouth Street was considered, as splitting from the existing subway east of Copley station (with a new station added under Copley Square) or to the west. [87]

In October 1936, construction of the subway to just shy of West Newton Street was approved as a federal Works Progress Administration (WPA) project. Work was expected to last 1 year and cost $1.715 million, with the city's share about $539,000. [88] The Boston City Council and Boston Elevated Railway approved the plans in April 1937. [89] [90] Construction began on September 18, 1937. [91] :96 In 1938, the Boston Transit Department extended the project to Opera Place, with underground stations at Mechanics and Symphony and an auto underpass of Massachusetts Avenue adjacent to Symphony station. [91] :96 Federal approval was granted in early August. [92]

The subway was constructed as twin tubes some 4,316 feet (1,316 m) long; they were adjacent except at Symphony station, where they ran on opposite sides of the underpass. [93] The final cost of the project was $7.13 million (equivalent to $114 million in 2023), of which the city paid $1.93 million and the federal government $5.20 million. [94] It was the second-largest project to be primarily funded by the WPA, exceeded only by LaGuardia Airport. [86] :107

The Huntington Avenue subway opened on February 16, 1941, taking Huntington Avenue cars (the last to use the Boylston Street Portal) underground for a larger part of their route. [91] :96 By then, three routes used the Huntington Avenue line: [91] :74,88 [95]

A loop at Heath Street was constructed in 1945 to allow use of the new PCC streetcars, which only had an operator's cab at one end and could not use crossovers like the one at Francis Street to reverse direction. Route 57 was extended to the new loop on December 15, 1945, and began using PCC streetcars on January 3, 1946. [91] :97 From June 1947 to June 1949, and again in the 1950s, an additional Northeastern University–Park Street shuttle was run. [91] :98

Route 41 was replaced by buses on June 8, 1949. [91] :70 In 1954, route 57 was extended to the surface terminal at North Station. [96] :194 Route 57 - by then a weekday-only route - was discontinued effective September 1, 1961. The number was reassigned to the short-lived BoylstonPleasant Street shuttle in November 1961. [96] :194 From September 1962 to March 1965, a single Lechmere–Heath Street round trip was operating during the morning peak to serve school demand. This trip was the only time that three-car trains of PCC cars were used on Huntington Avenue. [49]

MBTA era

The Massachusetts Bay Transportation Authority (MBTA) took over from the MTA in 1964. The MBTA gave color designations to the four subway lines in 1965, with the Tremont Street subway routes designated as the Green Line. On December 26, 1964, Heath Street–Government Center short turns using the newly opened loop at Government Center were added to accommodate ridership from the new Prudential Center.These trips were cut back to Park Street the next month, but returned to Government Center on March 25, 1967. [49] On September 19, 1966, the Heath Street short turn was increased in frequency, with every other trip terminating at Heath Street during peak hours. This experiment was unsuccessful and was ended on November 7. [49] The Heath Street short turns were reduced from two-car trains to single cars on January 3, 1972. [49]

A two-car train at Arborway in 1967 MBTA 3032 and 3034 at Arborway in 1967.jpg
A two-car train at Arborway in 1967

The five Green Line branches were lettered in 1967, with the Huntington Avenue line designated the E branch. [49] In 1968, the city and the MBTA began planning a widening of Huntington Avenue east of Brigham Circle. Three of the eight stops (Forsyth Street, Vancouver Street, and Wigglesworth Street) would be closed, with platforms widened (the original impetus for the project) at the remaining five. The long siding would be moved inside the reservation, and fencing would be placed between the tracks to deter pedestrians from crossing the tracks away from intersections. [97] The project was stalled in 1969 by federal budget cuts. [98] In 1971, the MBTA replaced both tracks between Brigham Circle and Parker Hill Street. [99] The widening project was revived in 1972, with the addition of a footbridge at Northeastern. [100] The project faced opposition from the Museum of Fine Arts, which objected to the taking of a 10-foot (3.0 m)-wide strip of the museum's lawn. [101] It was placed on hold in 1975 due to the ongoing recession. [102]

From September 11, 1976, to January 1, 1977, service was replaced with buses at night to allow installation of new lighting and electrical equipment in the Huntington Avenue subway. [49] On January 1, all peak and midday service was cut to Heath Street as winter weather caused a car shortage; buses designated route 39 ran between Arborway and Copley. [49] This ended on March 19; regular Heath Street turns were extended to North Station from then to June 18, 1977. [49] Route 39 buses again replaced weekday service past Heath Street from June 18 to September 9 due to track work on Centre Street. [49] Continued streetcar shortages and delays with the new Boeing LRVs caused weekday service to be replaced with buses past Heath Street on October 17, 1977. Service to Arborway resumed in stages, with full service restored on December 31, 1978. [49] The new LRVs were first used on the line for Northeastern short turns on January 16, 1978; these were extended to Heath Street on April 24. [49]

Although the planned road widening never occurred, the MBTA ultimately reconstructed the line for use by the new LRVs as part of other road and sewer work on Huntington Avenue. [103] The MBTA work largely followed the plans proposed in the 1960s; the Northeastern footbridge was not included. The three previously proposed stops were cut along with Parker Street; the remaining stops at Brigham Circle, Longwood Medical Area, Museum-Ruggles, and Northeastern were rebuilt with wider and longer platforms. On March 21, 1980, service was cut back to a Symphony–Park Street shuttle (run by LRVs) to allow for construction, with route 39 buses again operating. [104] [49] The shuttle was extended to Northeastern on June 21 and Brigham Circle on September 20. [49] Symphony was closed on January 3, 1981, during a budget crisis. [105] [49] Service restoration on the outer section of the line, originally scheduled for 1981, was delayed by the budget issues. [104] [106] Arborway service ultimately resumed on June 26, 1982, including peak-hour Heath Street short turns and the reopening of Symphony. [49] [107] [108]

Heath Street service was extended to Lechmere on January 2, 1983. A snowstorm on February 11 temporarily shut down the Arborway Line; a Lechmere–Government Center shuttle was run to replace the Heath Street cars. The Arborway Line quickly reopened, but the Heath Street turns were not resumed; the shuttle ran until March 26. [49] From October 12 to November 11, 1983, the line was cut back to Brigham Circle (with double-ended LRVs) due to Southwest Corridor construction near Arborway, with route 39 buses running. [49] Heath Street short turns were resumed on September 18, 1984, using LRVs. [49]

Arborway restoration controversy

Unused E branch tracks at the intersection of South Huntington Avenue and Moraine Street in 2006 Abandoned Arborway Line tracks at Canary Square, December 2006.jpg
Unused E branch tracks at the intersection of South Huntington Avenue and Moraine Street in 2006

On December 28, 1985, the Arborway Line was indefinitely replaced by route 39 (Arborway–Copley) bus service due to road construction on Huntington Avenue. This ended PCC streetcar service on the Green Line, though they remained in use on the Mattapan Line. [49] LRV service was resumed to Brigham Circle on July 26, 1986; the downtown terminal was Lechmere on weekdays, and Government Center nights and weekends. [49] On June 20, 1987, all Brigham Circle service was extended to Lechmere, with newer Type 7 LRVs replacing the Boeing LRVs. [49] Heath Street service resumed on November 4, 1989, but route 39 buses continued to provide all service south of Heath Street. [49] That December, route 39 was extended to Back Bay station to connect with the Orange Line; fares were reduced from subway to bus prices. [49] By 1990, the Centre Street/South Huntington Avenue corridor was the single busiest MBTA bus corridor, with 19,040 daily riders on route 39. [109] From 2000 to 2017, buses used a loop - originally built for the Green Line, but never used by revenue trains - at Forest Hills. [49]

Whether to restore E branch service to Arborway became controversial; much of Jamaica Plain wanted the line to return, while the MBTA did not wish to resume using the long street-running section. [110] A 1987 study found that restoring service to Arborway would cost $37.4 million in construction and $5.9 million in annual operating costs, but would draw more riders than bus service. [111] To settle a lawsuit with the Conservation Law Foundation, the Massachusetts Executive Office of Transportation and Construction (EOTC) agreed to environmental mitigation for increased automobile emissions due to the Central Artery/Tunnel Project. In 2000, an Administrative Consent Order (ACO) affirmed specific project commitments, including restoration of streetcar service beyond Heath Street to Arborway. Restoration was also included in the State Implementation Plan for the Clean Air Act (SIP) which is required by the Environmental Protection Agency due to non-attainment of National Ambient Air Quality Standards. [112] [113] After some MBTA and community opposition, a revised settlement resulted in the substitution of other projects with similar regional air quality benefits, though no longer localized along the E branch corridor. EOTC promised to consider other transit enhancements in the Arborway corridor. [114]

A 2004 study stated that since tracks to Arborway would be street-running along South and Centre streets, trolley traffic would increase local congestion and could potentially block emergency vehicles. Councilor John Tobin asked the MBTA to remove the tracks in March 2005, which by then had (along with the overhead poles) deteriorated to the point where they were not usable. [115] The Arborway Committee filed suit in 2007, but an appeals court ruled in January 2011 that the lawsuit was a decade too late to be considered – effectively ending any attempt for the restoration of streetcar service for the foreseeable future. [116] About 140 remaining overhead wire support poles were removed by the MBTA in late 2023. [117] The City of Boston has proposed extending the E branch southward to Hyde Square in Jamaica Plain. [118]

Dedicated lanes were added on several streets in Boston during the August–September 2022 closure of the Orange Line. Four sections, all of which are used by route 39 buses, were made permanent: Boylston Street from Ring Road to Clarendon Street, Clarendon from Boylston to Columbus Avenue, St. James Avenue from near Berkeley Street to Dartmouth Street, and Huntington Avenue from Brigham Circle to Gainsborough Street (39 and 66). [119] In September 2023, the MBTA indicated that the Huntington Avenue lanes saved up to two minutes per trip at peak hours. [120] In May 2022, the MBTA released a draft plan for a systemwide network redesign. The draft proposed that route 39 be extended to Porter via Central and Fenway, taking over portions of routes 47, 91, and 87. The portion from Longwood Avenue to Back Bay would be discontinued. [121] [122] A November 2022 draft network plan reverted route 39 to its existing routing, with a more frequent route 47 instead extended to Union Square. [123] [124]

Later changes

Reconstruction of the E branch along Huntington Avenue in November 2006 E Line reconstruction.jpg
Reconstruction of the E branch along Huntington Avenue in November 2006

On October 20, 1996, the Muddy River flooded the central subway. The E branch was replaced by buses; service was restored to Northeastern on October 25, Brigham Circle on November 9, and Heath Street on December 7. [49] From July 24 to December 17, 2000, the line was cut back to Brigham Circle for track work on South Huntington Avenue, with route 39 supplemented by express service. [49]

In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility as part of the Light Rail Accessibility Program. Portable lifts were installed at Heath Street and Museum of Fine Arts around 2000 as a temporary measure. [125] [126] For much of mid-2002, buses replaced weekend service to allow for the station construction. [49] The accessible platforms at Northeastern, Museum of Fine Arts, Longwood, Brigham Circle, and Heath Street - part of a $32 million modification of thirteen B, C, and E branch stations - were completed in 2003. [127] [128] Prudential station was made accessible in 2002–03 as part of the construction of 111 Huntington Avenue nearby. [129] [130]

From June 28, 2004, to November 12, 2005, E branch service was cut back to North Station as the Causeway Street elevated was replaced by a new tunnel. [49] Track work again caused the line to be cut to Brigham Circle from September 2 to December 30, 2006. [49] Three-car trains were operated on the line for a brief period beginning on March 21, 2011. [49] Service was cut to North Station from April 30 to November 4, 2011, as Science Park was renovated. [49]

As part of a series of service reductions due to a budget crisis, weekend service was cut to Brigham Circle on July 1, 2012. [49] The cutback was unpopular with local residents, who considered it an unnecessary inconvenience. [131] On October 13, 2012, the cut was quietly reversed by reducing frequency on the branch slightly, thus allowing the same equipment to cover the full line at no additional cost. [132] This was made official with the December 29, 2012 timetable. [49]

Medford/Tufts station under construction in September 2022 Medford Tufts station under construction (1), September 2022.JPG
Medford/Tufts station under construction in September 2022

From August 3–29, 2020, Prudential–Heath Street service was replaced by buses to allow for expedited track work. Seven grade crossings and 9,500 feet (2,900 m) of track were replaced during the closure. [133] An additional monthlong closure between Heath Street and Brigham Circle took place August 2–29, 2021. [134] The first phase of construction for accessibility modifications at Symphony station began in 2023, but the main phase was placed on hold in 2024 after bids came in higher than expected. [135] [136]

On May 24, 2020, service was cut back from Lechmere to North Station to allow the old Lechmere Elevated to be demolished and the Lechmere Viaduct connected to the Green Line Extension viaduct. [49] Original plans for the Green Line Extension called for the E branch to run to Union Square. [137] [138] However, in April 2021, the MBTA indicated that the E branch would instead be extended to Medford/Tufts, with the D branch running to Union Square. [139] The D and E branches were chosen for the extension because they serve the Longwood Medical Area; the E branch was assigned to the longer Medford Branch because its western leg is shorter than that of the D branch. [140]

The Union Square Branch opened as part of the E branch on March 21, 2022. [141] From August 6–20, 2022, the E branch was closed between Heath Street and Copley for track replacement and installation of a train protection system; Union Square was served by C and D branch trains. [142] [143] The section between Union Square and Government Center was closed from August 22 to September 18, 2022, to allow for final integration of the Medford Branch, elimination of a speed restriction on the Lechmere Viaduct, and other work. [144] After the closure, both D and E trains served Union Square. On November 1, 2022, Lechmere became the terminal for E branch service, with trains continuing out-of-service to Medford/Tufts as test trains. [49] Medford Branch revenue service began on December 12, 2022. [145]

In 2021, the MBTA indicated plans to modify the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations. [146] Design work began in July 2023; as of June 2024, design is expected to be 15% complete in July 2024. [135] [136] The full project is expected to cost $86 million. [147]

Station listing

LocationStationOpenedNotes and connections
Medford Wheelchair symbol.svg Medford/​Tufts December 12, 2022Aiga bus trans.svg MBTA bus: 80 , 94 ,  96
Wheelchair symbol.svg Ball Square Aiga bus trans.svg MBTA bus: 80 ,  89
Somerville Wheelchair symbol.svg Magoun Square
Wheelchair symbol.svg Gilman Square Aiga bus trans.svg MBTA bus: 80
Wheelchair symbol.svg East Somerville Aiga bus trans.svg MBTA bus: 86 , 90 , 91 ,  CT2
East Cambridge Wheelchair symbol.svg Lechmere March 21, 2022The Lechmere Viaduct opened on June 1, 1912, with a direct connection to surface lines until July 9, 1922. The surface station was open from July 10, 1922, to May 23, 2020.
Aiga bus trans.svg MBTA bus: 69 , 80 , 87 ,  88
Aiga bus trans.svg EZRide
West End Wheelchair symbol.svg Science Park August 20, 1955
North End Wheelchair symbol.svg North Station June 28, 2004 MBTA.svg MBTA subway:  Orange 
MBTA white T logo.svg MBTA Commuter Rail: Fitchburg, Lowell, Haverhill, Newburyport/Rockport
Aiga bus trans.svg MBTA bus: 4
BSicon LOGO Amtrak2.svg Amtrak: Downeaster
Aiga bus trans.svg EZRide
Original surface station was open from September 3, 1898 to March 27, 1997. Elevated station was open from June 1, 1912 to June 24, 2004.
Wheelchair symbol.svg Haymarket September 3, 1898 MBTA.svg MBTA subway:  Orange 
Aiga bus trans.svg MBTA bus: 4 , 92 , 93 , 111 , 354 , 426 , 428 ,  450
Downtown Boston Wheelchair symbol.svg Government Center MBTA.svg MBTA subway:  Blue 
Aiga bus trans.svg MBTA bus: 354
Wheelchair symbol.svg Park Street September 1, 1897 MBTA.svg MBTA subway:  Red   Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
At Downtown Crossing: MBTA.svg  Orange  ; Aiga bus trans.svg 7 , 11 , 501 , 504 ,  505
Boylston MBTA.svg MBTA subway:  Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
Back Bay Wheelchair symbol.svg Arlington November 13, 1921Aiga bus trans.svg MBTA bus: 9 , 501 ,  504
Wheelchair symbol.svg Copley October 3, 1914Aiga bus trans.svg MBTA bus: 9 , 10 , 39 , 55 , 501 ,  504
Wheelchair symbol.svg Prudential February 16, 1941Aiga bus trans.svg MBTA bus: 39 ,  55
Fenway–Kenmore Symphony Aiga bus trans.svg MBTA bus: 1 ,  39
Wheelchair symbol.svg Northeastern University August 4, 1894Aiga bus trans.svg MBTA bus: 39
Forsyth StreetClosed March 22, 1980
Parker StreetClosed March 22, 1980
Wheelchair symbol.svg Museum of Fine Arts Aiga bus trans.svg MBTA bus: 8 , 19 , 39 , 47 , CT2 ,  CT3
Vancouver StreetClosed March 22, 1980
Longwood Medical Area Wheelchair symbol.svg Longwood Medical Area Aiga bus trans.svg MBTA bus: 39 , CT2 ,  MIS
Wigglesworth StreetClosed March 22, 1980
Wheelchair symbol.svg Brigham Circle Aiga bus trans.svg MBTA bus: 39 , 66 ,  MIS
Mission Hill Fenwood Road Aiga bus trans.svg MBTA bus: 39 , 66 ,  MIS
Mission Park Aiga bus trans.svg MBTA bus: 39 ,  66
Riverway Aiga bus trans.svg MBTA bus: 39 ,  66
Back of the Hill June 26, 1982Aiga bus trans.svg MBTA bus: 39
Wheelchair symbol.svg Heath Street December 15, 1945Aiga bus trans.svg MBTA bus: 14 ,  39
Jamaica Plain Stops on South Huntington AvenueJuly 11, 1903Closed December 28, 1985
Stops on Centre Street and South StreetOctober 14, 1891
Stops on South StreetMay 17, 1902
Arborway Closed December 28, 1985
Terminal for other streetcar (until 1953) and bus lines.
Connection to Orange Line at adjacent Forest Hills station.

Related Research Articles

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it is among the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Brigham Circle station</span> Light rail station in Boston, Massachusetts, US

Brigham Circle station is a station on the light rail MBTA Green Line "E" branch, located just east of Brigham Circle in the Mission Hill neighborhood of Boston, Massachusetts. With raised platforms installed in a 2001-03 renovation, the station is accessible when served by low-floor streetcars.

<span class="mw-page-title-main">MBTA bus</span> Greater Boston bus network

The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 318,100 per weekday as of the second quarter of 2024.

<span class="mw-page-title-main">Forest Hills station (MBTA)</span> Transit station in Boston, Massachusetts, US

Forest Hills station is an intermodal transfer station in Boston, Massachusetts. It serves the MBTA rapid transit Orange Line and three MBTA Commuter Rail lines and is a major terminus for MBTA bus routes. It is located in Forest Hills, in the southern part of the Jamaica Plain neighborhood. Most Providence/Stoughton Line and Franklin/Foxboro Line trains, and all Amtrak Northeast Corridor trains, pass through the station without stopping. Forest Hills station is fully accessible on all modes.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Heath Street station</span> Light rail station in Boston, Massachusetts, US

Heath Street station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Boston, Massachusetts. It is the southwestern terminus of the Green Line E branch. It is located at the intersection of South Huntington Avenue and Heath Street on the border between the Mission Hill and Jamaica Plain neighborhoods.

<span class="mw-page-title-main">MBTA key bus routes</span> Bus routes utilized and ran by the MBTA

Key bus routes of the Massachusetts Bay Transportation Authority (MBTA) system are 15 routes that have high ridership and higher frequency standards than other bus lines, according to the 2004 MBTA Service Policy. Together, they account for roughly 40% of the MBTA's total bus ridership. These key bus routes ensure basic geographic coverage with frequent service in the densest areas of Boston, and connect to other MBTA services to give access to other areas throughout the region.

<span class="mw-page-title-main">Green Line C branch</span> Light rail line in Massachusetts, US

The C branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in the Brighton neighborhood of Boston and runs on the surface through Brookline along the median of Beacon Street. Reentering Boston, the line goes underground through the Saint Mary's Street incline and joins the B and D branches at Kenmore. Trains run through the Boylston Street subway to Copley where the E branch joins, then continue through the Tremont Street subway to downtown Boston. The C branch has terminated at Government Center station since October 2021.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, B branch service runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Green Line D branch</span> Light rail line

The Green Line D branch is a light rail line in Boston, Brookline, Cambridge, Newton, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs on a grade separated surface right-of-way for 9 miles (14 km) from Riverside station to Fenway station. The line merges into the C branch tunnel west of Kenmore, then follows the Boylston Street subway and Tremont Street subway to North Station. It is the longest and busiest of the four Green Line branches. As of June 2024, service operates on 6 to 8-minute headways at weekday peak hours and 7 to 13-minute headways at other times, using 13 to 19 trains.

<span class="mw-page-title-main">Green Line A branch</span> Former streetcar line in Massachusetts, US

The A branch or Watertown Line was a streetcar line in the Boston, Massachusetts, area, operating as a branch of the Massachusetts Bay Transportation Authority Green Line. The line ran from Watertown through Newton Corner, Brighton, and Allston to Kenmore Square, then used the Boylston Street subway and Tremont Street subway to reach Park Street station.

<span class="mw-page-title-main">Boston-area streetcar lines</span>

As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.

<span class="mw-page-title-main">Arborway station</span> Boston MBTA former subway station

Arborway station was an MBTA light rail stop and bus transfer location in Boston, Massachusetts. It served the MBTA Green Line E branch. It was located in Arborway Yard near the Forest Hills station complex. It closed in 1985 when the outer section of the branch was temporarily—and ultimately permanently—closed.

The Massachusetts Bay Transportation Authority (MBTA) maintains a large public transit system in the Boston, Massachusetts area, and uses various methods to name and number their services for the convenience of users.

<span class="mw-page-title-main">Prudential station</span> Light rail subway station in Boston, Massachusetts, US

Prudential station is an underground light rail station on the MBTA Green Line E branch, located below Huntington Avenue next to the Prudential Tower complex near Belvidere Street in Boston, Massachusetts. Prudential station is accessible, featuring low raised platforms and elevator service to the Huntington Arcade of the Prudential Center shopping mall at the base of the Prudential Tower.

<span class="mw-page-title-main">Huntington Avenue</span> Thoroughfare in Boston, United States

Huntington Avenue is a thoroughfare in the city of Boston, Massachusetts, beginning at Copley Square and continuing west through the Back Bay, Fenway, Longwood, and Mission Hill neighborhoods. It is signed as Massachusetts Route 9. A section of Huntington Avenue has been officially designated the Avenue of the Arts by the city of Boston.

<span class="mw-page-title-main">Back of the Hill station</span> Light rail station in Boston, Massachusetts, US

Back of the Hill station is a surface stop on the light rail MBTA Green Line E branch, located in the Mission Hill neighborhood of Boston, Massachusetts. It is named after, and primarily serves, the adjacent Back of the Hill apartment complex, a Section 8 development for elderly and disabled residents. Back of the Hill is located on the street running section of the E branch on South Huntington Avenue. The station has no platforms; passengers wait in bus shelters on the sidewalks and cross a traffic lane to reach Green Line trains.

<span class="mw-page-title-main">Brookline Village station</span> Light rail station in Brookline, Massachusetts, US

Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.

<span class="mw-page-title-main">Egleston station</span> Boston MBTA former subway station

Egleston was a rapid transit station in Boston, Massachusetts. It served the Washington Street Elevated, part of the MBTA's Orange Line. It was located over Egleston Square at the intersection of Washington Street and Columbus Avenue in the Roxbury neighborhood. The station opened in November 1909, and was closed in April 1987 when the Orange Line was rerouted to the west along the Southwest Corridor.

<span class="mw-page-title-main">Ipswich Street line</span> Former streetcar line in Boston and Brookline, Massachusetts

The Ipswich Street line was a streetcar line in Boston and Brookline, Massachusetts. The line ran on Boylston Street and Ipswich Street in the Fenway–Kenmore neighborhood, and on Brookline Avenue through what is now the Longwood Medical Area to Brookline Village.

References

  1. Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 10.
  2. "Miscellaneous Items". New England Farmer. November 21, 1857. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  3. 1 2 3 4 5 6 7 8 9 10 11 Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN   0938315048.
  4. "Chapter 230: An Act in addition to an Act to incorporate the West Roxbury Railroad Company". Acts and Resolves passed by the General Court of Massachusetts in the years 1856–7. William White. 1857. pp. 564–567 via Internet Archive.
  5. 1 2 3 4 5 6 7 8 Heath, Richard (May 16, 2013). "A History of Forest Hills" (PDF). Jamaica Plain Historical Society.
  6. Bolton, Charles Knowles, 1867-1950 (1897). Brookline: the history of a favored town. C. A. W. Spencer. p. 58 via Internet Archive.{{cite book}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  7. "Horse Railroad to Brookline". New England Farmer. October 29, 1859. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  8. 1 2 The Boston Horse and Street Railroad Guide. Edward E. Clark. 1887. pp. 26–29 via Internet Archive.
  9. "Amusements". Boston Globe. September 20, 1881. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  10. "From Brookline to the Fair". Boston Globe. September 27, 1884. p. 4 via Newspapers.com. Open Access logo PLoS transparent.svg
  11. "On the Rollers". Boston Globe. November 23, 1884. p. 15 via Newspapers.com. Open Access logo PLoS transparent.svg
  12. "Table Gossip". Boston Globe. November 16, 1884. p. 18 via Newspapers.com. Open Access logo PLoS transparent.svg
  13. "[Untitled classified ad]". Boston Globe. October 4, 1888. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  14. "By Lewis J. Bird & Co., Auctr's". Boston Globe. October 15, 1889. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  15. "Two Horses Electrocuted". Boston Globe. July 27, 1890. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  16. "The Railroad". Boston Globe. May 17, 1886. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  17. Pinanski, Abraham Edward (1908). The Street Railway System of Metropolitan Boston. McGraw Publishing. p. 17 via Google Books.
  18. "More Electric Cars". Boston Globe. October 13, 1891. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  19. "More Electric Cars". Boston Globe. October 21, 1891. p. 6 via Newspapers.com. Open Access logo PLoS transparent.svg
  20. "Storage House for 150 Electric Cars". Boston Globe. January 14, 1901. p. 12 via Newspapers.com. Open Access logo PLoS transparent.svg
  21. "Reaching Out With Iron Bands". Boston Globe. July 16, 1894. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  22. 1 2 "Brookline". Boston Globe. August 4, 1894. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  23. "This Time in History". Rollsign. Vol. 56, no. 9/10. Boston Street Railway Association. September–October 2019. p. 13.
  24. "Newton". Boston Globe. August 15, 1896. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  25. 1 2 3 4 5 6 7 8 Barber, Richard (March–April 1984). "Fifty Years Ago... The Last Days of Cypress Street Carhouse". Rollsign. Vol. 21, no. 3/4. Boston Street Railway Association. pp. 3–7.
  26. West End Street Railway (1894). Annual Report of the West End Street Railway Company for the Year Ending September 30, 1894. Walker, Young & Co. p. 4 via Google Books.
  27. "Changes in Car Routes". Boston Globe. August 24, 1895. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  28. "Longwood Av Bridge". Boston Globe. December 8, 1898. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  29. Massachusetts Board of Railroad Commissioners (January 1896). "Locations and Motive Power". Twenty-Seventh Annual Report of the Board of Railroad Commissioners. Wright and Potter. p. 320 via Google Books.
  30. "New Surfaces". Boston Globe. September 9, 1896. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  31. Atlas of the City of Boston: Boston Proper and Roxbury. G.W. Bromley & Co. 1895 via Ward Maps.
  32. "City Document No. 170: Ninety-Third Location". Documents of the City of Boston for the Year 1894. Vol. 4. Rockwell and Churchill. 1895. pp. 1–2 via Google Books.
  33. "Subway Notice". Boston Globe. August 31, 1897. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  34. "Notice Served". Boston Globe. September 29, 1897. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  35. "Subway Notice". Boston Globe. November 6, 1897. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  36. 1 2 "Changes in Street Railway Service". Boston Globe. August 8, 1901. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  37. "New Electric Car Routes". Boston Globe. July 30, 1900. p. 12 via Newspapers.com. Open Access logo PLoS transparent.svg
  38. 1 2 3 4 5 6 7 Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit.
  39. Carlson, Stephen P.; Harding, Thomas W. (1990). From Boston to the Berkshires: a pictorial review of electric transportation in Massachusetts. Boston Street Railway Association. p. 123. ISBN   093831503X.
  40. "Making Ready". Boston Globe. June 8, 1901. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  41. "To Open Elevated Tomorrow". Boston Globe. June 9, 1901. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  42. "Document 101: West End Street Railway - Two Hundred and First Location". Documents of the City of Boston for the Year 1900. Vol. 3. City of Boston. June 1, 1900 via Hathi Trust.
  43. "West Roxbury District". Boston Globe. April 7, 1902. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  44. "New Route Open". Boston Globe. May 11, 1903. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  45. 1 2 3 Chasson, George Jr. (1987). Lonto, Arthur J. (ed.). "Boston's Main Line El: The Formative Years 1879-1908". Headlights. 49. Electric Railroader's Association.
  46. "Through Car Service on Longwood Av". Boston Globe. October 11, 1907. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  47. "Pleasant-st Service Again". Boston Globe. December 4, 1908. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  48. "Boston Elevated to our Patrons". Boston Globe. November 27, 1908. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  49. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  50. "West Roxbury District". Boston Globe. March 26, 1907. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  51. "West Roxbury District". Boston Globe. October 23, 1912. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  52. "Tell Needs of West Roxbury". Boston Globe. March 30, 1912. p. 6 via Newspapers.com. Open Access logo PLoS transparent.svg
  53. "More Rush-Hour Cars". Boston Globe. March 1, 1913. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  54. "Elevated Will Increase Cars". Boston Globe. April 19, 1913. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  55. "Important Changes in Street Car Service". Boston Globe. June 11, 1915. p. 4 via Newspapers.com. Open Access logo PLoS transparent.svg
  56. "West Roxbury District". Boston Globe. June 14, 1915. p. 4 via Newspapers.com. Open Access logo PLoS transparent.svg
  57. "Boston Elevated Surface Changes". Boston Globe. October 1, 1915. p. 16 via Newspapers.com. Open Access logo PLoS transparent.svg
  58. "West Roxbury District". Boston Globe. September 17, 1915. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  59. Annual Report of the Public Trustees of the Boston Elevated Railway for the Year Ending December 31, 1924. Boston Elevated Railway. 1925. p. 9 via Internet Archive.
  60. "West Roxbury District". Boston Globe. March 26, 1924. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  61. "There are 83 Car-runs for Five-cent Fare". Boston Globe. February 19, 1922. p. 4 via Newspapers.com. Open Access logo PLoS transparent.svg
  62. "West Roxbury District". Boston Globe. October 2, 1928. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  63. "Through to the Back Bay". Boston Globe. January 24, 1913. p. 6 via Newspapers.com. Open Access logo PLoS transparent.svg
  64. 1 2 "Changes Made by New Subway". Boston Globe. October 1, 1914. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  65. "Some of Old Lines are Discontinued". Boston Globe. November 20, 1914. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  66. "Car Service Changes". Boston Globe. January 28, 1915. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  67. "Lake St and Reservoir Car Changes". Boston Globe. November 6, 1915. p. 10 via Newspapers.com. Open Access logo PLoS transparent.svg
  68. "Train Service on Huntington-Av Line". Boston Globe. November 29, 1921. p. 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  69. "Elevated Trustees to Change the Plan". Boston Globe. December 21, 1921. p. 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  70. "New 2-Car Trains on Huntington Av Feb 6". Boston Globe. January 24, 1922. p. 18 via Newspapers.com. Open Access logo PLoS transparent.svg
  71. "Jamaica Plain Trolley Changes Announced". Boston Globe. December 8, 1928. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  72. "Brookline". Boston Globe. August 7, 1934. p. 13 via Newspapers.com. Open Access logo PLoS transparent.svg
  73. "'L' cuts bus service". Boston Globe. October 10, 1942. pp. 1, 4 via Newspapers.com.
  74. "Brookline". Boston Globe. August 31, 1946. p. 3 via Newspapers.com.
  75. 1 2 "Brookline". Boston Globe. September 7, 1938. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  76. Cheney, Frank; Sammarco, Anthony M. (1997). Trolleys Under the Hub. Arcadia Publishing. ISBN   0752409077.
  77. "More Subways Will be Needed". Boston Globe. January 20, 1906. pp. 1, 3 via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  78. "Remodeling of Copley Sq". Boston Globe. December 31, 1911. p. 25 via Newspapers.com. Open Access logo PLoS transparent.svg
  79. "Long Tunnel in Dorchester". Boston Globe. February 7, 1912. pp. 1, 2 via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  80. "Chapter 45: Resolve providing for an investigation by the Division of Metropolitan Planning relative to the extension and development of rapid transit service in Boston, Somerville and surrounding cities and towns". Acts and resolves passed by the General Court of Massachusetts in the year 1924. May 24, 1924. pp.  602–603 via Internet Archive.
  81. 1 2 Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689.
  82. Report of the Transit Department for the Year Ending December 31, 1932. City of Boston. 1933. pp. 7–8 via Internet Archive.
  83. "Huntington-Av Subway Change". Boston Globe. October 31, 1932. p. 6 via Newspapers.com. Open Access logo PLoS transparent.svg
  84. "'L' Directors Turn Down Subway Plan". Boston Globe. November 14, 1932. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  85. "2400 City Lights to Shine Again". Boston Globe. August 1, 1933. pp. 1, 8 via Newspapers.com.
  86. 1 2 Cudahy, Brian J. (2003). "Chapter 2: Change at Park Street Under". A Century of Subways: Celebrating 100 Years of New York's Underground Railways. Fordham University Press. ISBN   9780823222933.
  87. Report of the Transit Department for the Year Ending December 31, 1933. City of Boston. 1934. pp. 2–3, 38–39 via Internet Archive.
  88. "Subway for Huntington Av". Boston Globe. October 16, 1936. pp. 1, 36 via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  89. "Council Passes Subway Plans". Boston Globe. April 13, 1937. pp. 1, 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  90. "Subway Extension Faces New Hurdles". Boston Globe. April 16, 1937. p. 21 via Newspapers.com. Open Access logo PLoS transparent.svg
  91. 1 2 3 4 5 6 7 Clarke, Bradley H. (2003). Streetcar Lines of the Hub - The 1940s. Boston Street Railway Association. ISBN   0938315056.
  92. "Enlarge Huntington Avenue Subway Project". Works Progress Bulletin. Works Progress Administration. August 10, 1938 via Internet Archive.
  93. Twenty-second Annual Report of the Board of Public Trustees for the Boston Elevated Railway: Year Ended December 31, 1940. Boston Elevated Railway. 1936. p. 24 via Internet Archive.
  94. "Mayor and W. P. A. Officials View Huntington-Av. Subway". Boston Globe. February 8, 1941. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  95. Twenty-third Annual Report of the Board of Public Trustees for the Boston Elevated Railway: Year Ended December 31, 1941. Boston Elevated Railway. 1936. p. 24 via Internet Archive.
  96. 1 2 Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN   9780938315070.
  97. Plotkin, A.S. (August 23, 1968). "Huntington Av. Face-Lifting". Boston Globe. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  98. Plotkin, A.S. (October 22, 1969). "MBTA Unable to Start Huntington Av. Project". Boston Globe. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  99. Plotkin, A.S. (May 19, 1971). "Huntington av. trolley, paving to get face lift". Boston Globe. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  100. "Surface Lines Report". Rollsign. Vol. 9, no. 8/9. Boston Street Railway Association. August–September 1972.
  101. Plotkin, A.S. (February 2, 1973). "$5m Huntington av. plan almost ready". Boston Globe. p. 43 via Newspapers.com. Open Access logo PLoS transparent.svg
  102. Plotkin, A.S. (August 21, 1975). "Highway projects worth $146m stalled for lack of money". Boston Globe. p. 14 via Newspapers.com. Open Access logo PLoS transparent.svg
  103. Radin, Charles A. (April 24, 1980). "MBTA to halt BC trolley line". Boston Globe. p. 24 via Newspapers.com. Open Access logo PLoS transparent.svg
  104. 1 2 Radin, Charles A. (March 8, 1980). "Arborway line closing until '81". Boston Globe. p. 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  105. "Bowdoin, Symphony T stations close today". Boston Globe. January 3, 1981. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  106. Pave, Marvin (February 4, 1982). "T asks 15-cent fare cut and improvements if advisory panel votes $16m-$20m more". Boston Globe. pp. 15, 16 via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  107. "Hot tar shuts down Arborway trolleys". Boston Globe. July 8, 1982. p. 31 via Newspapers.com. Open Access logo PLoS transparent.svg
  108. "T reducing some fares". Boston Globe. April 14, 1982. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  109. Operations Directorate Planning Division (November 1990). "Ridership and Service Statistics" (3 ed.). Massachusetts Bay Transportation Authority. p. iv via Internet Archive.
  110. Greer, Michael (November 22, 2002). "Streetcars in Jamaica Plain: A History". Jamaica Plain Gazette via Jamaica Plain Historical Society.
  111. Howe, Peter J. (December 3, 1987). "MBTA to decide soon on future of Arborway line: bus or trolley". Boston Globe. p. 32 via Newspapers.com. Open Access logo PLoS transparent.svg
  112. Central Transportation Planning Staff (January 2004). "Executive Summary". Program for Mass Transportation (PDF). Massachusetts Bay Transportation Authority. p. ES-15. Archived from the original (PDF) on April 12, 2005.
  113. "Massachusetts DEP Air Pollution Control Regs 310 CMR 7.25-7.60". Massachusetts Department of Transportation. Archived from the original on June 5, 2005.
  114. Ruch, John (March 7, 2008). "State suggests Route 39 changes". Jamaica Plain Gazette. Retrieved April 1, 2015.
  115. Park, Madison (May 15, 2005). "The unused track runs through it". The Boston Globe. Retrieved December 28, 2018.
  116. Ruch, John (August 26, 2011). "Trolley comeback killed by court". Jamaica Plain Gazette. Retrieved February 19, 2013.
  117. Pugh, John (November–December 2023). "MBTA & Regional Transit News". Rollsign. Vol. 60, no. 11/12. Boston Street Railway Association. p. 5.
  118. "Go Boston 2030 Vision and Action Plan" (PDF). March 7, 2017. Retrieved March 14, 2017.
  119. "City of Boston Announces Permanent Street Changes Following Orange Line Shutdown" (Press release). City of Boston. September 20, 2022.
  120. "Data Reveals Time Savings from Quick-Build Huntington Avenue Bus Lanes; MBTA and The City of Boston Announce Upcoming Striping Work to Complete Permanent Huntington Avenue Bus-Bike Lanes to Improve Transit for Thousands of Bus Riders" (Press release). Massachusetts Bay Transportation Authority. September 25, 2023.
  121. "A better bus network: new connections, more service, more frequency. See what this means in Cambridge" (PDF). Massachusetts Bay Transportation Authority. May 2022.
  122. "Draft Bus Network Redesign Map" (PDF). Massachusetts Bay Transportation Authority. May 2022.
  123. "What we changed from the May 2022 Proposal" (PDF). Massachusetts Bay Transportation Authority. November 7, 2022.
  124. "Revised Bus Network Fall 2022" (PDF). Massachusetts Bay Transportation Authority. November 3, 2022.
  125. "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. pp. 2–9. Archived from the original (PDF) on February 20, 2012.
  126. "Subway Map" (PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original (PDF) on July 1, 2001.
  127. "Planned Accessibility Projects - On Board the Green Line". Massachusetts Bay Transportation Authority. Archived from the original on August 10, 2004.
  128. "Transportation Short Notes" (PDF). TRANSreport. Boston Metropolitan Planning Organization. July 2003. p. 3. Archived from the original (PDF) on January 16, 2011.
  129. "2007 Rudy Bruner Award for Urban Excellence: The Prudential Center Redevelopment" (PDF). Bruner Foundation. 2007.
  130. "THE VIOLA: AN ICONIC MIXED-USE DEVELOPMENT". The Peebles Corporation. November 7, 2014. p. 5. Archived from the original on October 25, 2018.
  131. Fox, Jeremy (June 30, 2012). "Loss of weekend E train service worries riders". Boston Globe. Retrieved February 23, 2015.
  132. Rocheleau, Matt (December 28, 2012). "MBTA reinstates weekend trolley service for entire E branch of the Green Line". Boston Globe. Retrieved February 23, 2015.
  133. "E Branch 28-Day Full Access" (PDF). Massachusetts Bay Transportation Authority. August 2020.
  134. "MBTA Announces Accelerated Construction to Replace 20-year-old Track and Intersections on the Green Line E Branch from August 2 through August 29" (Press release). Massachusetts Bay Transportation Authority. June 30, 2021.
  135. 1 2 "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 4, 5.
  136. 1 2 "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. pp. 4, 5.
  137. "MBTA Light Rail Transit System OPERATIONS AND MAINTENANCE PLAN" (PDF). Massachusetts Bay Transportation Authority. January 6, 2011. Archived from the original (PDF) on March 7, 2017.
  138. "Travel Forecasts: Systemwide Stats and SUMMIT Results" (PDF). Green Line Extension Project: FY 2012 New Starts Submittal. Massachusetts Department of Transportation. January 2012. Archived from the original (PDF) on March 7, 2017.
  139. DeCosta-Klipa, Nik (April 9, 2021). "The MBTA is planning to open part of the Green Line Extension this October". Boston Globe. Retrieved April 9, 2021.
  140. DeCosta-Klipa, Nik (October 22, 2021). "A 'subtle' but permanent change is coming to the Green Line this weekend". Boston Globe. Retrieved October 24, 2021.
  141. MacCormack, Terry (March 21, 2022). "Baker-Polito Administration Celebrates Opening of the Green Line Extension" (Press release). Government of Massachusetts. Archived from the original on December 4, 2022. Retrieved December 13, 2022.
  142. "Building A Better T: Major Orange Line Revitalization Work to Be Accelerated during 30-day Shutdown of Entire Line" (Press release). Massachusetts Bay Transportation Authority. August 3, 2022.
  143. "Green Line E Branch 16-Day Closure Successfully Completed, E Branch Service to Resume Early" (Press release). Massachusetts Bay Transportation Authority. August 21, 2022.
  144. "Building A Better T: GLX Medford Branch to Open in Late November 2022; Shuttle Buses to Replace Green Line Service for Four Weeks between Government Center and Union Square beginning August 22" (Press release). Massachusetts Bay Transportation Authority. August 5, 2022.
  145. "MBTA Celebrates Opening of the Green Line Extension Medford Branch" (Press release). Massachusetts Bay Transportation Authority. December 12, 2022.
  146. Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  147. "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. p. 47.
Template:Attached KML/Green Line E branch
KML is from Wikidata

Commons-logo.svg Media related to Green Line E branch at Wikimedia Commons