Green Line D branch

Last updated
Green Line D branch
Outbound train leaving Longwood station, September 2022.JPG
An outbound train leaving Longwood station in 2022
Overview
Locale Boston, Brookline, Cambridge, Newton, and Somerville, Massachusetts
Termini
Stations25
Service
Type Light rail
System Green Line (MBTA subway)
Daily ridership24,632 (surface boardings, 2011) [1]
History
OpenedJuly 4, 1959 [2]
Technical
CharacterGrade-separated, partially underground
Track gauge 4 ft 8+12 in (1,435 mm)
Electrification 600 V DC overhead
Route map

Contents

BSicon uCONTg.svg
BSicon uKACCa.svg
BSicon uSTRc2.svg
BSicon uKBHFa.svg
BSicon uSTR3.svg
Union Square
BSicon uABZg+1.svg
BSicon uSTRc4.svg
BSicon uACC.svg
BSicon uhBHFa.svg
Lechmere
BSicon dWASSERq.svg
BSicon uhKRZW.svg
BSicon dWASSERq.svg
BSicon uhACC.svg
Science Park
BSicon uhtSTRa.svg
BSicon PORTALf.svg
BSicon uCONTg@G.svg
BSicon utINTACC-L.svg
BSicon utINTACC-R.svg
North Station
MBTA white T logo.svg MBTA.svg BSicon LOGO Amtrak2.svg
BSicon utACC-L.svg
BSicon utACC-R.svg
Haymarket
MBTA white T logo.svg
BSicon utSTR.svg
BSicon utCONTf.svg
BSicon utCONTgq.svg
BSicon lACC.svg
BSicon utKRZt.svg
BSicon utCONTfq.svg
Government Center
MBTA white T logo.svg
BSicon utCONTgq.svg
BSicon lACC.svg
BSicon utKRZt.svg
BSicon utCONTfq.svg
Park Street
MBTA white T logo.svg MBTA white T logo.svg MBTA white T logo.svg
BSicon utBHF.svg
Boylston
MBTA white T logo.svg
BSicon utACC.svg
Arlington
BSicon utACC.svg
Copley
BSicon utABZg2.svg
BSicon utSTRc3.svg
Copley Junction
BSicon utSTR+tc1.svg
BSicon utCONT4.svg
BSicon utBHF.svg
Hynes Convention Center
BSicon utACC.svg
Kenmore
BSicon utSTRc2.svg
BSicon utABZg3.svg
BSicon utCONT1.svg
BSicon utSTRc4.svg
BSicon utABZg2.svg
BSicon utSTRc3.svg
BSicon MFADEf.svg
BSicon PORTALg.svg
BSicon uSTR+tc1.svg
BSicon utSTR+4.svg
BSicon utSTRe.svg
Fenway incline
BSicon uHSTACC.svg
Fenway
BSicon uHSTACC.svg
Longwood
BSicon uHSTACC.svg
Brookline Village
BSicon uHSTACC.svg
Brookline Hills
BSicon uHST.svg
Beaconsfield
BSicon MFADEg.svg
BSicon uSTR.svg
BSicon uSTR.svg
BSicon uKHSTACCe.svg
BSicon lKGRZ2.svg
BSicon uSTR.svg
Cleveland Circle
BSicon uHSTACC.svg
BSicon lKGRZ4.svg
Reservoir
BSicon uHST.svg
Chestnut Hill
BSicon uHSTACC.svg
Newton Centre
BSicon uHSTACC.svg
Newton Highlands
BSicon uHST.svg
Eliot
BSicon uHST.svg
Waban
BSicon uHSTACC.svg
Woodland
BSicon uACC.svg
Riverside
BSicon uKDSTe.svg
Riverside Yard

The Green Line D branch (also referred to as the Highland branch or Riverside Line) is a light rail line in Boston, Brookline, Cambridge, Newton, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs on a grade separated surface right-of-way for 9 miles (14 km) from Riverside station to Fenway station. The line merges into the C branch tunnel west of Kenmore, then follows the Boylston Street subway and Tremont Street subway to North Station. It is the longest and busiest of the four Green Line branches. As of February 2023, service operates on 8 to 9-minute headways at weekday peak hours and 8 to 11-minute headways at other times, using 13 to 19 trains (26 to 38 light rail vehicles). [3]

Unlike the other three Green Line branches, the D branch did not originate as a streetcar line running on city streets. The Boston and Albany Railroad Highland branch, built in segments from 1848 to 1886, operated as a commuter rail line until its 1958 closure. It was converted to a streetcar rapid transit line by the Metropolitan Transportation Authority and reopened on July 4, 1959. Ownership passed to the MBTA in 1964; Tremont Street subway service was designated as the Green Line in 1965, with the Riverside Line becoming the D branch in 1967.

The line was substantially rebuilt in the mid-1970s, in 2007, and in 2018–2020. The downtown terminal was shifted between Park Street, Government Center, North Station, and Lechmere a number of times; it was extended to Union Square in September 2022 as part of the Green Line Extension project. Nine of the line's thirteen surface stations have been rebuilt for accessibility; the remaining four are scheduled for rebuilding beginning in 2024.

History

Commuter rail

Newton Center station around 1910 Newton Center station postcard.jpg
Newton Center station around 1910

What is now the surface section of the D branch was formerly the Highland branch of the Boston and Albany Railroad (B&A). The portion between Brookline Junction and Brookline Village was built by B&A predecessor Boston and Worcester Railroad in 1848. [4] :339 The Charles River Branch Railroad extended the line to Newton Upper Falls in 1852, and later to Woonsocket, Rhode Island. [4] :352 The B&A purchased the line between Brookline Village and Cook Street (in Newton Highlands) from the New York and New England Railroad (NY&NE) in 1883. A short extension from Cook Street to Riverside on the B&A mainline opened in 1886. The B&A instituted bidirectional "Newton Circuit" loop service via the Highland branch and mainline, while the NY&NE continued to use the branch east of Cook Street. [4] :343 NY&NE successor New York, New Haven and Hartford Railroad began routing most NY&NE trains over a new cutoff from Needham Junction to West Roxbury in 1906. [4] :351 The remaining grade crossings on the line were eliminated in 1905–07. [5] Passenger service on the 1852-built line south of Cook Street ended in 1927. (A portion in Needham remains in use as part of the Needham Line). [4] :351 Passenger service on the line ended on May 31, 1958. [6] :4

Conversion to light rail

The new Reservoir station around 1961 Reservoir station and loop, circa 1961.jpg
The new Reservoir station around 1961

Conversion of the Highland branch to a third-rail rapid transit line was proposed in 1913. That proposal called for trains to reach downtown Boston using the then-under-construction Boylston Street subway, which was built for streetcars but sized for rapid transit conversion, with a connection near Governor Square. [6] :17 In May 1924, the state legislature directed the Metropolitan District Commission to plan an expanded rapid transit system in Boston. [7] The plan, released in 1926, called for the existing streetcar subway to be converted into two rapid transit lines. A number of potential future extensions were listed; among them was conversion of most of the Highland branch to rapid transit, linking with a Huntington Avenue subway at Brookline Village. [8]

In 1943, the state legislature appointed a commission headed by Arthur W. Coolidge to plan for the future of transit in the Boston region. In 1945, a preliminary report from the Coolidge Commission recommended nine suburban rapid transit extensions – most similar to the 1926 plan – along existing railroad lines. [9] [10] The Highland branch was to be converted to a rapid transit line, using low-floor trains that could operate in the existing streetcar subway. A branch would use the former Charles River Branch Railroad route to Needham Junction. Separately, two tracks of the B&A mainline would be converted to rapid transit, also terminating at Riverside. [11] [9] The final report in 1947 did not recommend any changes to the Highland branch route, though it recommended extending the Needham Junction spur to Bird's Hill. [12] [11] :18 Cost was estimated at $1.544 million in 1941 dollars (equivalent to $25 million in 2023) for the Riverside route, plus $424,000 (equivalent to $7 million in 2023) for the Needham spur. [11] :13

On June 20, 1957, the state legislature authorized the Metropolitan Transit Authority (MTA) to acquire the Highland branch and convert it to rapid transit at a cost not to exceed $9.2 million (equivalent to $76 million in 2023). [13] The project was approved by the MTA Advisory Board on October 1, 1957, and the state Department of Public Utilities on December 6. The Interstate Commerce Commission gave a certificate of abandonment early in 1958. [14] The B&A ran its last passenger trains on the branch on May 31, 1958. [15] [6] :4 On June 9, the $7.0 million main construction contract (equivalent to $57 million in 2023) was awarded to the Perini Corporation. [16] The MTA acquired the line from the B&A at a cost of $600,000 (equivalent to $5 million in 2023) on June 24. [6] :4 [15]

A train leaving Riverside in 1965 MBTA 3275 leaving Riverside Terminal, September 1965.jpg
A train leaving Riverside in 1965

Work began with a groundbreaking ceremony on July 10, 1958. [6] :4 The work was done at relatively low cost by reusing the railroad infrastructure, including bridges and tracks; the only new right-of-way was a 1,100-foot (340 m) tunnel connecting Fenway station with the existing Beacon Street Line subway. [6] :14 Using trains of streetcars represented a substantial savings versus using third-rail rapid transit trains, which would have required significant work in the existing subway. [6] :2 Ten of the twelve existing station sites on the line were reused for new stations; two others, Riverside and Woodland, were relocated. An additional station, Fenway Park, was added at Park Drive. Small wooden shelters and new platforms were built at the stations; a larger brick waiting room was built at Riverside. All but three of the old station buildings were demolished for parking lots. These lots included a 1,960-space lot at Riverside, a 350-space lot at Woodland, and smaller lots at six other stations. [6] :8

A storage yard was built at Riverside, and a connection with the existing Reservoir Carhouse of the Beacon Street Line was made at Reservoir station. An overhead loop for short turns was also built at Reservoir. [6] :4 The line was electrified with 600 V DC overhead lines; a new substation was built at Cook Street to power the Riverside–Reservoir section, while the inner section was fed by existing substations. [6] :11–12 Three-aspect color light block signals, similar to those already used in the subway, were added. They were spaced to allow four-minute headways west of Reservoir and two-minute headways to the east. [6] :13–14 Train testing began on June 11, 1959. [14]

Streetcar operation began on the Highland branch on July 4, 1959. [6] :3 Trains operated with one to three PCC streetcars. [6] :15 By the end of 1959, the line carried 26,000 daily riders, versus 3,140 before conversion. [17] Initial plans called for every other train to short turn at Reservoir. However, the outer section of the line had higher ridership than expected, and soon all trains operated to Riverside. [6] :11 The yard at Riverside was expanded from June 1960 to January 12, 1961, with additional storage tracks and maintenance facilities to meet the additional demand. [14] The signals were also adjusted to allow for two-minute headways on the whole line. [6] :14,15 Initial fares were 20 cents for all rides –substantially lower than the previous B&A fares. This was adjusted in 1961 as part of a systemwide fare change, with 40-cent fares west of Reservoir and 30-cent fares at Reservoir through Longwood. [6] :7 Riverside service initially ran to Park Street; it was extended to Lechmere (except on Sundays) on November 20, 1961. [2]

The MBTA takeover

The Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in August 1964. The streetcar routes entering the Central Subway were designed as the Green Line on August 26, 1965. Sunday service was extended to Lechmere on September 10, 1966. In 1967, the five remaining Green Line branches were given letter designations; the Riverside Line became the D branch. [2]

A train of Boeing LRVs at Eliot station in 1984 MBTA 3425 at Eliot station 1984 postcard.jpg
A train of Boeing LRVs at Eliot station in 1984

The tracks were rebuilt in the mid-1970s to prepare for the new Boeing light rail vehicles. From September 8 to December 28, 1973, buses replaced streetcars between Newton Highlands and Riverside. A temporary loop was built at Cook Junction to turn the single-ended PCC streetcars. [18] [2] (The loop track were later reused by the Seashore Trolley Museum.) [18] [19] [20] From June 8 to September 11, 1974, buses ran between Kenmore and Reservoir while the inner portion of the line was reconstructed. A temporary loop was used near Reservoir station, allowing D branch trains to use the C branch between Reservoir and Kenmore. [18] [2] [21] (On March 5, 1974, the downtown terminal had been cut back from Lechmere to North Station to accommodate the longer running times associated with this rerouting.) [2] From September 28, 1974 to September 20, 1975, single-tracking took place between Cook Junction and Reservoir. [18] [2] Station platforms were also rebuilt during these shutdowns. [18] A new maintenance facility at Riverside was opened on July 12, 1976, to serve the new LRV fleet. [14]

The MBTA's first LRVs operated on the D branch on December 30, 1976. The downtown terminal was changed several times in 1976–77; PCCs and LRVs sometimes used different terminals (as LRVs could use stub-end tracks, while PCCs required a loop). On December 15, 1977, all D branch trains running with LRVs began using the newly rebuilt Canal Street surface terminal at North Station; the small number of PCCs continued to loop at Government Center. [2] Regular use of PCC cars on the D branch ended March 23, 1978, though later LRV shortages prompted the occasional return of PCC streetcars. [2] The downtown terminal was again changed several times from 1980 to 1984; after January 20, 1984, D branch trains terminated at Government Center at rush hours and Lechmere at other times. Rush hour service was cut back to Government Center on June 20, 1987. [2]

Riverside station on the D branch is located about 13 mile (0.54 km) southeast of the station on the mainline, which saw commuter rail service until 1977. The tracks between the two stations were largely disused by the 1960s, though they were used for LRV deliveries in the 1970s. On October 20, 1996, flooding from the Muddy River inundated the Green Line subway. D branch trains only ran between Riverside and Brookline Village until October 27, when they were extended to Park Street. [2] Special commuter rail shuttle trains also ran between South Station and a temporary platform near the Riverside light rail station from October 23–25 to supplement Green Line service. [22] Weekend D branch service was extended to Lechmere on March 28, 1997; weekday service followed on June 21. It was cut back to Government Center on June 19, 2004, to accommodate the demolition of the Causeway Street elevated and the opening of the new underground North Station. Green Line service to Lechmere resumed on November 12, 2005, though the D branch continued to terminate at Government Center. [2]

21st century

A three-car train at Reservoir in 2011 Three-car train at Reservoir station, March 2011.jpg
A three-car train at Reservoir in 2011

The tracks were rehabilitated again in 2007 because new Type 8 LRVs did not operate reliably at the desired 40 to 50 mph (64–80 km/h) speeds. Unlike previous rolling stock, the D branch was the last to get the new LRvs due to the need to upgrade the tracks. [2] Shuttle buses replaced rail service between Riverside and Reservoir from June 23 to August 3, 2007, and between Reservoir and Fenway from August 4–31. [23] [2] On May 28, 2008, two trains collided between Woodland and Waban stations, killing the operator of the rear train. [24] [25] The National Transportation Safety Board investigation concluded that the operator likely had an episode of micro-sleep caused by sleep apnea. [26]

On October 25, 2010, the MBTA began operating some three-car trains on the D branch at peak hours. This was expanded on March 21, 2011, but was discontinued on March 21, 2016, in favor of operating two-car trains on more consistent headways. [2] On March 22, 2014, Government Center closed for reconstruction. D branch trains terminated at Park Street during peak hours and North Station at other times. All D branch trains resumed terminating at Government Center when it reopened on March 22, 2016. [2]

Work from 2018 to 2021 included a full modern signal system for the line between Beaconsfield and Riverside plus partial track replacements. Between October and December 2018, shuttle bus service replaced service between Brookline Hills and Reservoir every weekday evening and every weekend until after December 16. During 2019 and 2020, shuttle buses replaced service on 15 weekends and on all weeknights. [27] The Fenway Portal project was completed on November 23, 2020. [28] The track and signal work was completed in December 2021. [29] Three nine-day closures of the whole D branch took place between September 24 and October 28, 2022, to allow for work including installation of a train protection system and track replacement between Eliot and Riverside. [30] [31]

Accessibility

Raised platforms at Newton Centre station, which were added around 2003 Shelter at Newton Centre station, December 2015.JPG
Raised platforms at Newton Centre station, which were added around 2003

Riverside station was rebuilt in the late 1990s, with raised platforms to provide accessible boarding on the then-under-construction Type 8 LRVs. Reservoir and Brookline Village were temporarily fitted with portable lifts for accessibility, with Brookline Hills added by 2003. [32] [33] [34] Newton Centre, Reservoir, and Fenway were retrofitted with raised platforms around 2003. [33] Woodland was rebuilt for accessibility in 2006, followed by Longwood and Brookline Village in 2009. [35] [36] Reconstruction of Brookline Hills station took place from September 2019 to January 2022 as part of the construction of an expansion of Brookline High School. [37] Temporary work to make Newton Highlands accessible was done in 2019–2020; a full reconstruction will begin in 2024. [38] In 2019, the MBTA indicated that the remaining four non-accessible stops (Beaconsfield, Chestnut Hill, Eliot, and Waban) were "Tier I" accessibility priorities. [39] A preliminary design contract for accessibility modifications at the four stations was issued in February 2021. [40] Design was completed in late 2022, with construction planned to begin in mid-2024. [38] [41]

Green Line Extension

Original plans for the Green Line Extension called for the D branch to be extended through the rebuilt Lechmere station to Medford/Tufts station, with several intermediate stops. [42] [43] However, in April 2021, the MBTA indicated that the D branch would instead be extended to Union Square, with the E branch running to Medford/Tufts. [44] The D and E branches were chosen for the extension because they serve the Longwood Medical Area; the D branch was assigned to the shorter Union Square Branch because its western leg is longer than that of the E branch. [45]

The D branch was temporarily extended to North Station on October 24, 2021, as part of changes in preparation for the opening of the extension. [46] [45] The Union Square Branch opened on March 21, 2022. [47] It was initially served by the E branch rather than the D branch. The western portion of the E branch was closed from August 6–20, 2022, for track work; during that time, Union Square was served by C branch trains plus Reservoir short turns from the D branch. [2] All service was cut back to Government Center from August 22 to September 18, 2022, to allow for final integration of the Medford Branch and other work. [48] Upon reopening, most D branch service (plus E branch service) began running to Union Square, though some peak hour trains short turned at Government Center. E branch trains began non-revenue test service to Medford/Tufts on November 1, 2022, leaving only the D branch serving Union Square. [2]

The Union Square Branch was closed from September 18 to October 12, 2023, during repairs to Squires Bridge, which carries the McGrath Highway over the tracks. [49] [50] The closure was originally planned for July 18 to August 28, but was delayed and shortened due to public criticism. [51] [52] [53]

Green Line D branch

Station listing

LocationStationOpenedNotes and connections
Somerville Wheelchair symbol.svg Union Square March 21, 2022Aiga bus trans.svg MBTA bus: 85 , 86 , 87 , 91 ,  CT2
East Cambridge Wheelchair symbol.svg Lechmere Aiga bus trans.svg MBTA bus: 69 , 80 , 87 ,  88
Aiga bus trans.svg EZRide
Original surface station was open from July 10, 1922, to May 23, 2020.
West End Wheelchair symbol.svg Science Park August 20, 1955
North End Wheelchair symbol.svg North Station June 28, 2004 MBTA.svg MBTA subway:  Orange 
MBTA white T logo.svg MBTA Commuter Rail: Fitchburg, Lowell, Haverhill, Newburyport/Rockport
Aiga bus trans.svg MBTA bus: 4
BSicon LOGO Amtrak2.svg Amtrak: Downeaster
Aiga bus trans.svg EZRide
Original surface station was open from September 3, 1898 to March 27, 1997. Elevated station was open from June 1, 1912 to June 24, 2004.
Wheelchair symbol.svg Haymarket September 3, 1898 MBTA.svg MBTA subway:  Orange 
Aiga bus trans.svg MBTA bus: 4 , 92 , 93 , 111 , 354 , 426 , 428 ,  450
Downtown Boston Wheelchair symbol.svg Government Center MBTA.svg MBTA subway:  Blue 
Aiga bus trans.svg MBTA bus: 354
Wheelchair symbol.svg Park Street September 1, 1897 MBTA.svg MBTA subway:  Red   Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
At Downtown Crossing: MBTA.svg  Orange  ; Aiga bus trans.svg 7 , 11 , 501 , 504 ,  505
Boylston MBTA.svg MBTA subway:  Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
Back Bay Wheelchair symbol.svg Arlington November 13, 1921Aiga bus trans.svg MBTA bus: 9 , 501 ,  504
Wheelchair symbol.svg Copley October 3, 1914Aiga bus trans.svg MBTA bus: 9 , 10 , 39 , 55 , 501 ,  504
Hynes Convention Center Aiga bus trans.svg MBTA bus: 1 ,  55
Fenway–Kenmore Wheelchair symbol.svg Kenmore October 23, 1932Aiga bus trans.svg MBTA bus: 8 , 19 , 57 , 60 ,  65
At Lansdowne: MBTA white T logo.svg Framingham/Worcester
Wheelchair symbol.svg Fenway July 4, 1959Aiga bus trans.svg MBTA bus: 47 ,  CT2
Brookline Wheelchair symbol.svg Longwood
Wheelchair symbol.svg Brookline Village Aiga bus trans.svg MBTA bus: 60 , 65 ,  66
Wheelchair symbol.svg Brookline Hills Aiga bus trans.svg MBTA bus: 60
Beaconsfield
Wheelchair symbol.svg Reservoir Aiga bus trans.svg MBTA bus: 51 ,  86
At Cleveland Circle: MBTA.svg  Green  (C)
Newton Chestnut Hill
Wheelchair symbol.svg Newton Centre Aiga bus trans.svg MBTA bus: 52
Wheelchair symbol.svg Newton Highlands Aiga bus trans.svg MBTA bus: 59
Aiga bus trans.svg 128 Business Council: N1
Eliot
Waban
Wheelchair symbol.svg Woodland Aiga bus trans.svg MWRTA: 1, Weekend GLC
Wheelchair symbol.svg Riverside Aiga bus trans.svg MBTA bus: 558
Aiga bus trans.svg MWRTA: MassBay Riverside Shuttle

Related Research Articles

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 137,700 in 2019, it is the third most heavily used light rail system in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Kenmore station</span> Subway station in Boston, Massachusetts, US

Kenmore station is a light rail station on the MBTA Green Line, located under Kenmore Square in the Fenway/Kenmore neighborhood of Boston, Massachusetts, United States. The station opened on October 23, 1932 as a one-station extension of the Boylston Street subway to relieve congestion in the square. Kenmore is the primary station for passengers wishing to visit Fenway Park, located one block away.

<span class="mw-page-title-main">Science Park station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Science Park station is an elevated light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line in Boston, Massachusetts, United States. The station is located at the Boston end of the Charles River Dam Bridge at Leverett Circle. It is at the southeast end of the Lechmere Viaduct, which carries the Green Line over the Charles River. The station is named for the nearby Boston Museum of Science. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after Suffolk Downs.

<span class="mw-page-title-main">Boston College station</span> Light rail station in Boston, Massachusetts, US

Boston College station is a light rail station on the MBTA Green Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue and Lake Street, on the border between the Brighton neighborhood of Boston and the Chestnut Hill neighborhood of Newton, Massachusetts. Originally opened in 1896, it has been the terminus of the Commonwealth Avenue line since 1900. The current station is planned to be replaced by a new station located in the median of Commonwealth Avenue just east of Lake Street.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Riverside station (MBTA)</span> Light rail station in Newton, Massachusetts, US

Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.

<span class="mw-page-title-main">Reservoir station (MBTA)</span> Light rail station in Brookline, Massachusetts, US

Reservoir station is a light rail station on the MBTA Green Line D branch, located in Brookline, Massachusetts, adjacent to the Cleveland Circle area of Brighton. The station is adjacent to Reservoir Yard and Carhouse, with the Cleveland Circle terminus of the C branch just a block away. With a daily ridership of 3,395, Reservoir is the second-busiest surface stop on the D branch.

<span class="mw-page-title-main">Green Line E branch</span> Light rail line

The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.

<span class="mw-page-title-main">Green Line C branch</span> Light rail line in Massachusetts, US

The C branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in the Brighton neighborhood of Boston and runs on the surface through Brookline along the median of Beacon Street. Reentering Boston, the line goes underground through the St. Mary's Street incline and joins the B and D branches at Kenmore. Trains run through the Boylston Street subway to Copley where the E branch joins, then continue through the Tremont Street subway to downtown Boston. The C branch has terminated at Government Center station since October 2021.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, the B branch runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Fenway station</span> Light rail station in Boston, Massachusetts, US

Fenway station is a light rail stop on the MBTA Green Line D branch, located under Park Drive near the Riverway in the Fenway–Kenmore neighborhood of Boston, Massachusetts. It opened along with the rest of the D branch on July 4, 1959, when trolleys replaced Highland branch commuter rail service. The station is fully accessible from Park Drive via the Landmark Center parking lot, as well as from Miner Street. Named after the Fenway parkway rather than Fenway Park, it is further from the stadium than Kenmore, though still used during events.

<span class="mw-page-title-main">Brookline Village station</span> Light rail station in Brookline, Massachusetts, US

Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.

<span class="mw-page-title-main">MBTA subway</span> Boston region transit service

The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit, light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, or the T system.

<span class="mw-page-title-main">Lechmere Viaduct</span> Bridge over the Charles River in Boston

The Lechmere Viaduct is a concrete arch bridge connecting the West End neighborhood of Boston to East Cambridge, Massachusetts. Opened in 1912, the viaduct carries the MBTA's Green Line over the Charles River. It is adjacent to the Charles River Dam Bridge, but structurally separate.

<span class="mw-page-title-main">Brookline Hills station</span> Light rail station in Brookline, Massachusetts, US

Brookline Hills station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line D branch in the Brookline Hills neighborhood of Brookline, Massachusetts. The station has two side platforms serving the line's two tracks. It was closed from April 2021 to January 2022 as part of adjacent construction on a Brookline High School building, which included renovations to make the station accessible.

<span class="mw-page-title-main">Babcock Street station</span> Light rail station in Boston, Massachusetts, US

Babcock Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Babcock Street and Pleasant Street.

<span class="mw-page-title-main">Green Line Extension</span> Light rail system in greater Boston, US

The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

<span class="mw-page-title-main">Magoun Square station</span> Light rail station in Somerville, Massachusetts, US

Magoun Square station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located at Lowell Street south of Magoun Square in Somerville, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.

<span class="mw-page-title-main">East Somerville station</span> Light rail station in Somerville, Massachusetts, US

East Somerville station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located in southeastern Somerville, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.

<span class="mw-page-title-main">North Station (subway)</span> Rapid transit station in Boston, Massachusetts, US

North Station is an underground MBTA subway station in Boston, Massachusetts. Served by the Massachusetts Bay Transportation Authority (MBTA) Green Line and Orange Line, it is connected to the North Station surface terminal used by MBTA Commuter Rail and Amtrak. The station is fully accessible.

References

  1. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  3. Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 10.
  4. 1 2 3 4 5 Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. pp. 338–346, 350–354. ISBN   9780942147124.
  5. Whitney, Walter C. (November 30, 1907). "Grade Crossing Abolition at Newton Highlands and Newton Centre, Mass". The Engineering Record. 56 (22): 586–589.
  6. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Dana, Edward (October 1960 – July 1961). "Riverside Line Extension, 1959". Transportation Bulletin. No. 65. Connecticut Valley Chapter of the National Railway Historical Society.
  7. "Chapter 45: Resolve providing for an investigation by the Division of Metropolitan Planning relative to the extension and development of rapid transit service in Boston, Somerville and surrounding cities and towns". Acts and resolves passed by the General Court of Massachusetts in the year 1924. May 24, 1924. pp.  602–603 via Internet Archive.
  8. Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. p. 7. hdl:2027/mdp.39015049422689.
  9. 1 2 Boston Elevated Railway; Massachusetts Department of Public Utilities (April 1945), Air View: Present Rapid Transit System – Boston Elevated Railway and Proposed Extensions of Rapid Transit into Suburban Boston via Wikimedia Commons
  10. Lyons, Louis M. (April 29, 1945). "El on Railroad Lines Unified Transit Plan". Boston Globe. pp. 1, 14 via Newspapers.com.
  11. 1 2 3 Metropolitan Transit Recess Commission (April 1, 1947). Report of the Metropolitan Transit Recess Commission. Commonwealth of Massachusetts via Internet Archive.
  12. Casey, Gene R. (April 6, 1947). "10 Electric-Train Lines Proposed by Board in Report to Legislature". The Boston Globe. pp. 1, 28 via Newspapers.com. (second section, third page) Open Access logo PLoS transparent.svg
  13. "Chapter 450: An Act Providing for Extension of Rapid Transit Facilities in the City of Boston, the Town of Brookline, and the City of Newton". Acts and resolves passed by the General Court of Massachusetts in the year 1957. Edward J. Cronin. June 20, 1957. pp. 369–370.
  14. 1 2 3 4 Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. pp. 62–64. ISBN   0938315048.
  15. 1 2 Lewis, William J. (May 17, 1958). "Highland Branch Ends Trains May 31". Boston Globe. pp. 1, 5 via Newspapers.com.
  16. 12th Annual Report (Year Ended – December 31, 1958) of the Board of Trustees of the Metropolitan Transit Authority. Metropolitan Transit Authority. 1959. p. 7.
  17. 13th Annual Report (Year Ended – December 31, 1959) of the Board of Trustees of the Metropolitan Transit Authority. Metropolitan Transit Authority. 1960. p. 8.
  18. 1 2 3 4 5 "Rebuilding to Riverside 1973–1975" (PDF). Newton Tab. Archived from the original (PDF) on September 30, 2007.
  19. Pence, Herbert (July–September 2020). "Talbott Park: A Destination For All Cars" (PDF). The Dispatch. Vol. 63, no. 3. New England Electric Railway Historical Society. pp. 13–15.
  20. "Letter to Members". 1992 Annual Report (PDF). New England Electric Railway Historical Society. p. 3.
  21. What's Going On Here, Anyway?. Massachusetts Bay Transportation Authority. May 1974.
  22. Moore, Scott; Chiasson, George; Belcher, Jonathan. "The Green Line Flood of 1996". NETransit. Archived from the original on August 28, 2005.
  23. Masis, Julie (July 1, 2007). "On D line, A for effort, D for delay". Boston Globe. Archived from the original on May 22, 2011.
  24. Bierman, Noah; et al. (28 May 2008). "Trolley operator dies after collision in Newton". Boston Globe. Archived from the original on 25 June 2013. Retrieved 6 August 2013.
  25. Szaniszlo, Marie; Ross, Casey. "Several hurt as 2 T trains collide in Newton". Boston Herald. Archived from the original on June 1, 2008.
  26. "Railroad Accident Report: Collision Between Two Massachusetts Bay Transportation Authority Green Line Trains: Newton, Massachusetts: May 28, 2008" (PDF). National Transportation Safety Board. July 23, 2009.
  27. "Green Line D Track and Signal Replacement". Massachusetts Bay Transportation Authority. Retrieved 23 October 2018.
  28. "Fenway Portal Flood Protection Project Now Complete" (Press release). Massachusetts Bay Transportation Authority. November 23, 2020.
  29. "MBTA Completes Green Line D Branch Track and Signal Replacement Project, Bringing Safer, More Reliable Service to D Branch Riders" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
  30. "Closure of the Green Line D Branch Begins September 24 for Infrastructure Upgrades" (Press release). Massachusetts Bay Transportation Authority. September 16, 2022.
  31. "Regular Green Line D Branch Service Will Resume Ahead of Schedule on Saturday Morning Following the Completion of the Final Full-Access Closure of 2022" (Press release). Massachusetts Bay Transportation Authority. October 28, 2022.
  32. "Subway Map" (PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original (PDF) on July 1, 2001.
  33. 1 2 "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. pp. 2–9. Archived from the original (PDF) on February 20, 2012.
  34. "Subway Service". Ridership and Service Statistics. Massachusetts Bay Transportation Authority. October 2003. p. 2.19 via Internet Archive.
  35. "MPO Agency Notes" (PDF). TRANSreport. Boston Region Metropolitan Planning Organization. April 2006 via Internet Archive.
  36. "Access in Motion: 2009 Calendar" (PDF). Massachusetts Bay Transportation Authority. 2009. Archived from the original (PDF) on 2 January 2010.
  37. "Brookline Hills Station Accessibility Improvements". Massachusetts Bay Transportation Authority. January 10, 2022.
  38. 1 2 "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 3, 4.
  39. "Preview of 2019 Recommendations: Presentation to the FMCB" (PDF). Plan for Accessible Transit Infrastructure (PATI). Massachusetts Bay Transportation Authority. April 1, 2019. p. 12.
  40. "D Branch Station Accessibility Improvements". Massachusetts Bay Transportation Authority. Archived from the original on March 19, 2021.
  41. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. p. 4.
  42. "MBTA Light Rail Transit System OPERATIONS AND MAINTENANCE PLAN" (PDF). Massachusetts Bay Transportation Authority. January 6, 2011. Archived from the original (PDF) on March 7, 2017.
  43. "Travel Forecasts: Systemwide Stats and SUMMIT Results" (PDF). Green Line Extension Project: FY 2012 New Starts Submittal. Massachusetts Department of Transportation. January 2012. Archived from the original (PDF) on March 7, 2017.
  44. DeCosta-Klipa, Nik (April 9, 2021). "The MBTA is planning to open part of the Green Line Extension this October". Boston Globe. Retrieved April 9, 2021.
  45. 1 2 DeCosta-Klipa, Nik (October 22, 2021). "A 'subtle' but permanent change is coming to the Green Line this weekend". Boston Globe. Retrieved October 24, 2021.
  46. "Alerts: Subway". Massachusetts Bay Transportation Authority. October 14, 2021. Archived from the original on October 14, 2021.
  47. MacCormack, Terry (March 21, 2022). "Baker-Polito Administration Celebrates Opening of the Green Line Extension" (Press release). Government of Massachusetts.
  48. "Building A Better T: GLX Medford Branch to Open in Late November 2022; Shuttle Buses to Replace Green Line Service for Four Weeks between Government Center and Union Square beginning August 22" (Press release). Massachusetts Bay Transportation Authority. August 5, 2022.
  49. "September Service Changes Will Allow Crews to Continue Improvement Work Across MBTA System" (Press release). Massachusetts Bay Transportation Authority. August 28, 2023.
  50. Cole, Katie (October 11, 2023). "MBTA Green Line service at Union Square reopens ahead of schedule with all slow zones lifted". WBUR. Retrieved October 11, 2023.
  51. Kool, Daniel (June 29, 2023). "That new Green Line branch to Union Square? The T is closing it for 42 days this summer". Boston Globe. Archived from the original on June 30, 2023.
  52. "July Service Changes Will Allow Crews to Continue Track Improvement Work Across MBTA System" (Press release). Massachusetts Bay Transportation Authority. June 29, 2023.
  53. Lisinski, Chris (July 5, 2023). "Project requiring Green Line Extension closure postponed to September". WBUR. Retrieved July 6, 2023.