Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Service type | Regional rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Seasonal (Memorial Day–Labor Day) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Southeast Massachusetts | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Predecessor |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
First service | May 24, 2013 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current operator(s) | CCRTA using MBTA trains | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 9,473 (2022) [7] 12,825 (2023) [8] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | South Station Hyannis Transportation Center | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stops | 8 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Distance travelled | 78 miles (126 kilometres) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average journey time | 2 hours, 19 minutes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service frequency | Friday, Saturday, and Sundays | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) used | Middleborough Main Line Cape Main Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
On-board services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Disabled access | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track owner(s) | MBTA, MassDOT | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The CapeFlyer (stylized CapeFLYER) is a passenger rail service in Massachusetts between Boston and Cape Cod that began in 2013. It is operated by the Cape Cod Regional Transit Authority (CCRTA) in collaboration with the Massachusetts Bay Transportation Authority (MBTA) and the Massachusetts Department of Transportation (MassDOT). The service runs on the weekends, beginning Friday evenings and including holidays, between Memorial Day weekend and Labor Day weekend.
During 2013, its first season, the CapeFLYER carried a total of 16,586 passengers, with service extended from Labor Day to Columbus Day weekend due to its early success. [1] In October 2013, MassDOT announced the service would return in 2014 and become a permanent seasonal service. Year-round weekend service over the route and full MBTA Commuter Rail service as far as Buzzards Bay are under consideration. [9] [10]
It is the first scheduled passenger train to Cape Cod since Amtrak's Cape Codder ceased operation in 1996, and the first direct service between South Station in Boston and Cape Cod since 1961. [11] The Cape Cod & Hyannis Railroad operated scheduled service between Braintree station, south of Boston (the southern terminus of the MBTA's Red Line), and the Cape from 1984 until 1988, but did not extend that service to Boston proper.
The CapeFLYER utilizes the MBTA Middleborough/Lakeville Line from Boston's South Station to Middleborough and continues to Hyannis via the Cape Cod Canal Railroad Bridge and the Cape Main Line, a state-owned rail corridor. The corridor is also used for freight by the Massachusetts Coastal Railroad, and heritage service provided by the Cape Cod Central Railroad. [12]
Scheduled travel time between Boston and Hyannis, a distance of 78 miles, is about 2 hours and 20 minutes. [13] The relatively slow running time is due to the track conditions between Buzzards Bay and Hyannis, which limits the speed of passenger trains on the Cape to 30 miles per hour. [12] Extensive track rehabilitation was completed in early 2013, resulting in faster operating speeds between Middleborough and Buzzards Bay. [14] [15]
The Cape Cod Canal separates Cape Cod from the mainland and only two highway bridges cross it, the Sagamore and Bourne Bridges. Plans for a third highway bridge have stalled. [16] Severe traffic jams are common at peak periods. The CapeFlyer, by crossing the canal over a separate railroad bridge, avoids this congestion. [17]
The adult fare between Boston and Hyannis is $22 one-way and $40 round-trip. CapeFLYER tickets, which are unreserved, can be purchased at the ticket office in South Station or on board the train at no additional cost, as well as being purchased with the MBTA mTicket app. [14] [18]
On-board concessions, including beer and wine, are sold in the Cafe Car. [19] A designated bicycle car offers storage and maintenance for passengers' bicycles, and free wireless internet service is also available aboard the entire train. [20]
The first passenger train, which was operated by the Cape Cod Railroad Company, arrived in Hyannis on July 8, 1854. It is said that the train was met by a crowd estimated at 3,000. Immediately the line started running three trains a day to and from Boston. [21]
Year-round direct passenger service between Boston and Hyannis continued until June 30, 1959, when the New York, New Haven & Hartford Railroad (NH) ended passenger service on its Old Colony division. [21] Up until that time, daily passenger service between Boston and Cape Cod had been operated to both Hyannis and Woods Hole with trains such as The Cranberry, The Sand Dune, and The Buttermilk Bay [22] Service to Provincetown ended in 1941. [23] The bridge over the Neponset River between Dorchester and Quincy burned soon after, preventing the quick return of service on the Old Colony Main Line.
The New Haven operated year-round trains from Boston to the Cape. However, the railroad's trains made stops at several stations eliminated from present-day CapeFlyer service: Sandwich, West Barnstable, Barnstable and Yarmouth. In addition to the Hyannis branch, the New Haven operated a southward branch that went to Falmouth and Woods Hole, for ferry service to the large islands to the south of Cape Cod, Martha's Vineyard and Nantucket Island. The stations of the Woods Hole branch included Monument Beach, Pocasset, North Falmouth, Falmouth and Woods Hole. [24]
From the 1930s to the early 1960s, the company offered various summertime Cape Codder trains from New York City to the Cape. It offered a daily Day Cape Codder. On Friday afternoons it offered the Neptune; and on Friday nights offered a night train, the Night Cape Codder. Sunday nights had trains returning from Hyannis. [25] Already by 1955, the New York service was reduced to summer only. However, the New Haven operated daily year-round service from Boston's South Station. [26]
From 1960 to 1964 NH operated weekend service from New York to Hyannis/Woods Hole. Riding from Boston generally required a change of trains in either Attleboro or Providence, though a Boston-Hyannis trip ran via Stoughton and Taunton briefly in mid-1961. [11]
Since then, numerous attempts have been made to restore regular passenger service. In 1974 officials from Penn Central, the owner of the rail lines on the Cape at that time, met with state and local officials to discuss the possible restoration of service. [27] Most remaining trackage on the Cape was purchased by the Commonwealth of Massachusetts in 1976 to preserve the infrastructure for both freight service and future passenger service. [28] A trial passenger train between Hyannis, Buzzards Bay and Falmouth, was operated for a week in the summer of 1979 after trackage was rehabilitated. Politicians hoped to have service regularly operating by 1981. [29]
During the summers of 1984 to 1988 the Cape Cod & Hyannis Railroad operated scheduled passenger service between Braintree and Cape Cod, with service to both Hyannis and Falmouth. The one-way trip to Hyannis took 2 hours and 25 minutes. [30] In its last year of service, the Braintree-Cape Cod service carried 89,000 passengers. It was the last time Falmouth was served by passenger trains; derelict trackage was dismantled south of North Falmouth in 2007 and replaced with an extension of the Shining Sea Bikeway amid public opposition.
The Cape Cod & Hyannis Railroad ceased operation in February 1989 when the Massachusetts Executive Office of Transportation and Construction suspended the subsidy for the 1989 season due to the state's fiscal crisis. [31]
From 1986 to 1996 Amtrak operated a train known also known as the Cape Codder from Washington, DC/New York City to Hyannis. The service was routed from Attleboro to Taunton via a section of track that was once part of the Taunton Branch Railroad. Traveling between Boston and Cape Cod required transferring to Providence/Stoughton Line or Regional service at Providence. The Cape Codder was discontinued after 1996, despite moderate success, due to the end of the state subsidy.
The Middleborough/Lakeville Line opened in September 1997 along with the Plymouth/Kingston Line, restoring passenger service to 60 miles of the Old Colony network. [11] Initial plans called for full service as far as Buzzards Bay, but the final route was scaled back due to high costs and uncertain ridership. In 2007, a Boston Region Metropolitan Planning Organization report analyzed the possibility of an extension to Buzzards Bay. At that time ridership was estimated to be between 1,766 weekday riders with four daily trips, and 2,750 riders with all Middleborough trains extended to Buzzards Bay. [32]
The Cape Cod Railroad operated excursion service from 1989 to 1997, followed by the Cape Cod Central Railroad starting in 1999. [11] However, neither service ventured north of Buzzards Bay and occasionally Wareham, making them largely useless for those traveling to the Cape from outside areas.
In early 2011 the CCRTA awarded a contract to the Transportation Planning and Resource Group, a consulting firm, to study the "obstacles, impediments and funding issues associated with reviving passenger rail service to Cape Cod." [33] At that time the CCRTA had hoped to launch seasonal rail service from Boston for the summer of 2012. The launch of service was pushed back a year, to 2013, in part to avoid the perception that the CCRTA's new service to the Cape might be adding to the MBTA's fiscal problems. [34]
In late 2012 the CCRTA announced that a decision had been made to restore passenger service between Boston South Station and Cape Cod starting Memorial Day weekend 2013. [35] The Patrick-Murray administration made the announcement official on April 2, 2013 at a press conference at South Station in Boston. [36]
A test train with passengers aboard was run on May 18, 2013 – the first direct train from Boston to Cape Cod since 1961, and the first via the Old Colony main line since 1959. The CapeFLYER's inaugural journey departed South Station at 5:12 p.m. on Friday, May 24, 2013, with about 200 passengers destined for Buzzards Bay and Hyannis. [37] The CapeFLYER has operated one round trip on Fridays, Saturdays and Sundays each year since its inception.
During its first year of service, the train only made stops at South Station, Braintree, Middleborough/Lakeville, Buzzards Bay, and Hyannis. New stops have been added on three separate occasions: at the newly-constructed Wareham Village station in 2014, at the existing Brockton commuter rail station in 2015, and the newly-constructed Bourne station in 2019.
For the 2013 season, total ridership was 16,586 passengers. [38] Revenue was $293,000 (including the period after Labor Day), and $27,000 in advertising revenue. [39]
For the 2014 season, the CapeFlyer carried 12,625 passengers, down from about 15,000 for the similar period in 2013. [3] Fare revenue was $221,000, with $93,000 from advertising. [39]
For 2015, ridership was 13,278 – up from 2014, but still down from 2013 – with fare revenue of $223,000. [3]
In 2016 ridership was 13,663, however there were only 15 weekends of service vs. 16 in 2015, so per round trip ridership was up 9.2%. Revenue was $230,000. [4]
In its inaugural season the CapeFlyer generated $290,756 in fare revenue and its operating costs were estimated to be $180,000 to $190,000. Marketing costs during the first year were between $110,000 and $120,000. These costs were offset by ticket sales and revenue collected from on-board concessions and advertising. [40] [41] [42]
The capital costs associated with the start of the CapeFLYER in 2013 were approximately $3.4 million. This included track surfacing, fresh track ballast, installation of new railroad ties, new signage, improvements to the Buzzards Bay and Hyannis stations, and repairs to numerous grade crossings along the Cape Main Line. [12]
MassDOT's draft Capital Investment Plan for FY2014-FY2018 includes $31 million to complete track and signal projects necessary to restore permanent, seasonal Cape Flyer passenger service to Cape Cod. [43]
In 2014 a new station platform in Wareham was constructed and the station platforms in Buzzards Bay and Hyannis were expanded, at a total cost of about $2.5 million. [44]
In October 2013, MassDOT announced that the CapeFLYER would be a permanent seasonal service, with a study to be made of year-round weekend service. [9]
For the 2015 season, the CapeFLYER operated with a dedicated trainset on Fridays (rather than continuing an existing local commuter train), thus allowing a more convenient departure time and fewer stops on that train. Also in 2015, all CapeFLYER trains began to stop at the Brockton commuter rail station to provide a one-seat ride between Brockton and Cape Cod. [45]
In August 2019, after a train ran out of seats, MassDOT added another bi-level passenger car to the train. This was done at the request of the Cape Cod Regional Transit Authority before the weekend of August 9. [46]
Operations in the 2020 season were delayed by the COVID-19 pandemic, with seasonal service not beginning until June 26, 2020, over a month later than planned. [47]
The CapeFLYER does not currently stop at the Cape Cod Central Railroad stations in Sandwich or West Barnstable in an effort to get the train to Hyannis in a reasonable amount of time. [48]
A new first-class car was implemented during the 2021 season, featuring reclining leather seats with footrests, as well as a seat-side food and beverage services, for a $10 surcharge. [49] The extra services and surcharge were discontinued for the 2022 and 2023 seasons, with the car simply used as a regular coach, but was brought back for the 2024 season. [50]
Less than a week after the service launched Thomas Cahir, the Administrator of the CCRTA, announced that the CapeFLYER would stop at the station in Wareham starting in 2014. [51]
The MassDOT announcement included confirmation of the addition of the Wareham stop in 2014, though Cahir backtracked on his previous statement saying the stop was not "fiscally prudent." [52] However, CCRTA and MassDOT proceeded with plans for the Wareham stop. Construction of a high-level platform at Wareham began in April 2014, and the CapeFLYER began stopping there in late June. [53]
In September 2014 it was announced that MassDOT was considering a new CapeFLYER station stop in Bourne for the 2015 season. [54] The new 400-foot station platform, as proposed, would be built at the railroad right of way below the Bourne Bridge approach. [55] MassDOT also announced plans to restore a siding on the north side of the Cape Cod Canal Railroad Bridge and to install a new double-ended 4,000-foot passing siding just south of the canal. The new track work, and associated switches and signals, would facilitate multiple train moves during a single bridge drop. [55]
In February 2015, it was announced that the opening of the station would be delayed one year, due to the amount of snow received during the winter and local unease over the project. [56] After the conclusion of the season in 2015, it was announced that current plans for building a station in Bourne had been suspended. [57] Following several years of uncertainty, the station subsequently opened in 2019, when a prefabricated section of high-level platform was installed in lieu of a fully-constructed station.
The relative success of the CapeFLYER has brought new attention to the possibility of extending the Middleborough/Lakeville Line. The possibility was seriously discussed before the end of its first summer season. [10] In September 2013, the Wareham Chamber of Commerce announced that based on the success of the CapeFLYER, the Chamber supported commuter rail extension to Buzzards Bay. [58] The Buzzards Bay town selectmen similarly supported the idea later that year, and a public forum was held in January 2014. [59] [60]
Bourne's Transportation Advisory Committee began studying the possibility in mid-2014, with the addition of work by MassDOT's Central Transportation Planning Staff (CTPS) in November 2014. [61] A Local Impact Report released in April 2015 proposed an 800 foot (240 m) high-level platform and two parking alternatives: a 120-space modification of the existing lot, and a 400-to-600-space structure including a realignment of Academy Drive. The CTPS data estimated ridership at 875 daily riders if all Middleborough trains were extended to Buzzards Bay, or slightly fewer with a limited number of trains. [61]
Bourne voted to join the MBTA district in 2015 and began paying an assessment in mid 2016 (for FY 2017), although there was no guarantee that commuter rail service would be provided in the fiscally constrained environment. [62] For FY 2017, Bourne paid $41,707 to the MBTA plus an existing $88,429 to the CCRTA for existing bus service. [63] MassDOT began planning a possible commuter rail trial service in October 2015. In February 2016, state representatives and CCRTA administrator Thomas Cahir said that the state wishes to begin trial service during FY 2017. [63]
While the various proposals for commuter rail service in the mid-2010s were not realized, the MBTA began a study in fall 2020 to evaluate the feasibility of implementing Buzzards Bay commuter rail service in conjunction with the currently under-construction South Coast Rail. [64] [65] Upon completion of the study in spring 2021, two different alternatives for service were presented, one of which would terminate at Buzzards Bay station and the other of which would continue to Bourne station. [66]
In September 2023, State Representative Dylan Fernandes introduced a bill which would require at least three weekday round trips per day between Boston and Buzzards Bay within twelve months, and order a feasibility study for further extensions to Falmouth, Bourne, Barnstable, Yarmouth, and Sandwich. [67]
CapeFlyer tickets are not priced using the MBTA Commuter Rail's numbered fare zone system. Instead, the route is divided into three sections (Boston–Brockton, Middleborough/Lakeville–Bourne, and Hyannis), with ticket prices varying depending on origin and destination. [14]
Mile (km) [68] | Location | Station | Connections and notes |
---|---|---|---|
0.0 (0) | Boston | South Station | Amtrak: Acela , Lake Shore Limited , Northeast Regional MBTA Commuter Rail: Fairmount, Framingham/Worcester, Franklin/Foxboro, Needham, Greenbush Line, Old Colony, and Providence/Stoughton lines MBTA subway: Red Line; Silver Line (SL1 , SL2 , SL3 , SL4) MBTA bus: 4 , 7 , 11 Intercity buses at South Station Bus Terminal |
10.9 (17.5) | Braintree | Braintree | MBTA subway: Red Line MBTA Commuter Rail: Middleborough/Lakeville Line, Kingston/Plymouth Line MBTA bus: 226 , 230 , 236 |
20.0 (32.2) | Brockton | Brockton | MBTA Commuter Rail: Middleborough/Lakeville Line Brockton Area Transit Authority: 1, 2, 3, 4, 5, 6, 8, 9, 10/11, 12, 13, 14, BSU 28 |
35.6 (57.3) | Lakeville | Middleborough/Lakeville | MBTA Commuter Rail: Middleborough/Lakeville Line GATRA: Downtown Middleborough Shuttle, Link 4 |
49.1 (79.0) | Wareham | Wareham Village | GATRA: Link 1 |
54.7 (88.0) | Buzzards Bay | Buzzards Bay | Cape Cod Central Railroad GATRA: Link 2, Link 4 CCRTA: Bourne Run, Sandwich Line Peter Pan |
56.4 (90.8) | Bourne | Bourne | CCRTA: Falmouth shuttle Steamship Authority Shuttle |
79.1 (127.3) | Hyannis | Hyannis Transportation Center | Cape Cod Central Railroad CCRTA: Barnstable Villager, H2O, Hyannis Crosstown, Hyannis Trolley, Sandwich Line, Sealine Peter Pan , Plymouth & Brockton |
Wareham is a town in Plymouth County, Massachusetts, United States. As of the 2022 census, the town had a population of 23,303.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
The Old Colony Railroad (OC) was a major railroad system, mainly covering southeastern Massachusetts and parts of Rhode Island, which operated from 1845 to 1893. Old Colony trains ran from Boston to points such as Plymouth, Fall River, New Bedford, Newport, Providence, Fitchburg, Lowell and Cape Cod. For many years the Old Colony Railroad Company also operated steamboat and ferry lines, including those of the Fall River Line with express train service from Boston to its wharf in Fall River where passengers boarded luxury liners to New York City. The company also briefly operated a railroad line on Martha's Vineyard, as well as the freight-only Union Freight Railroad in Boston. The OC was named after the "Old Colony", the nickname for the Plymouth Colony.
The Cape Cod Central Railroad is a heritage railroad located on Cape Cod, Massachusetts. It operates on a rail line known as the Cape Main Line which is owned by Massachusetts Department of Transportation. The line was previously owned and operated by the Cape Cod Railroad, the Old Colony Railroad, and later the New Haven Railroad, each of which operated passenger trains on the line from 1854 to 1959. Although its namesake is the former Cape Cod Central Railroad (1861–1868), the two companies are unrelated.
The Cape Cod Railroad is a railroad in southeastern Massachusetts, running from Pilgrim Junction in Middleborough across the Cape Cod Canal Railroad Bridge, where it splits towards Hyannis in one direction and Falmouth in the other. It was incorporated in 1846 as the Cape Cod Branch Railroad to provide a rail link from the Fall River Railroad line in Middleborough to Cape Cod.
Braintree station is an intermodal transit station in Braintree, Massachusetts. It serves the MBTA's Red Line and the MBTA Commuter Rail Old Colony Lines as well as MBTA buses.
The Cape Codder was a seasonal passenger train operated by Amtrak between New York City and Hyannis, Massachusetts, on Cape Cod. It operated during the summer between 1986 and 1996. It was the first regular service from New York to the Cape since 1964. The New York, New Haven and Hartford Railroad previously had operated a train under this name until 1958.
Cape Cod Regional Transit Authority (CCRTA) operates a bus transit system of fixed and flexible routes, seasonal rail service to Boston, and a paratransit service in the Cape Cod region of Massachusetts. The CCRTA was created under the provisions of Chapter 161B of the Massachusetts General Laws in 1976. Its main hub and base of operations is the Hyannis Transportation Center on Main Street in Hyannis, Massachusetts.
The Old Colony Lines are a pair of branches of the MBTA Commuter Rail system, connecting downtown Boston, Massachusetts with the South Shore and cranberry-farming country to the south and southeast. The two branches operate concurrently for 10 miles (16 km) via the Old Colony Mainline from South Station to Braintree station. The Middleborough/Lakeville Line then winds south through Holbrook, Brockton, Bridgewater, Middleborough, and Lakeville via the Middleborough Main Line and Cape Main Line. The Kingston Line heads southeast to serve Weymouth, Abington, Whitman, Hanson, Halifax, and Kingston by way of the Plymouth branch. Limited service to Plymouth was provided prior to April 2021 but was cut due to low ridership and budget constraints. The Greenbush Line, which was also part of the Old Colony Division, was reactivated in 2007 as a separate project.
The Middleboro Secondary is a railroad line owned by MassDOT in the U.S. state of Massachusetts. The line runs from Attleboro to Middleborough via Taunton.
Holbrook/Randolph station is an MBTA Commuter Rail station on the border of Holbrook and Randolph, Massachusetts. It is served by the Middleborough/Lakeville Line.
Brockton station is an MBTA Commuter Rail station in Brockton, Massachusetts. It serves the MBTA Middleborough/Lakeville Line and is a stop on the seasonal CapeFLYER service. The station has a single accessible full-length high-level platform that serves the line's two tracks. It is located adjacent to the BAT Centre, the primary hub for Brockton Area Transit Authority local bus service.
Bridgewater station is an MBTA Commuter Rail station in Bridgewater, Massachusetts, served by the Middleborough/Lakeville Line. It is located on the east end of the Bridgewater State University campus along the Middleborough Main Line.
Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.
Plymouth station is a closed MBTA Commuter Rail station in Plymouth, Massachusetts. It served the Plymouth/Kingston Line and was located in the Cordage Park complex of North Plymouth. Plymouth was one terminus of the MBTA's Kingston/Plymouth Line, along with Kingston/Route 3 station in nearby Kingston, Massachusetts. Plymouth station provided non-peak service to Boston's South Station, as well as some peak service, which ran in addition to peak trips to Kingston. Most trains on the line served only Kingston station; service to and ridership from Plymouth were thus very limited. Due to this limited ridership and service, as well as due to the fact that trains had to reverse in and out of the station in order to serve it, Plymouth station was indefinitely closed in April 2021.
Buzzards Bay station is a train station located on Main Street in Buzzards Bay, Massachusetts. The site also contains an interlocking tower. The Cape Cod Canal Railroad Bridge is adjacent.
The Cape Cod & Hyannis Railroad was a railroad that provided tourist and seasonal passenger services in Southeastern Massachusetts in the 1980s. Its primary service operated from the Braintree MBTA station to Hyannis on Cape Cod; branches to Attleboro and Falmouth also operated in some years. The service ended after the 1988 summer season amid early-1989 state budget cuts in Massachusetts; much of the same trackage is being used for the seasonal CapeFLYER service.
Wareham Village station is a train station that is located on Merchants Way in Wareham, Massachusetts. Service to Wareham formerly ran from 1848 until 1959. A shelter, built in 1985 for short-lived Amtrak and commuter service, is currently unused. A new platform constructed nearby for the CapeFLYER summer weekend service opened for the CapeFLYER on June 27, 2014.
Bourne station is a train station in Bourne, Massachusetts, served by the CapeFlyer.
Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in May 2025 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.
{{cite news}}
: Missing or empty |title=
(help)