South Station Bus Terminal

Last updated
South Station Bus Terminal
South Station bus terminal entrance on Atlantic Ave Jan 2025.jpg
Main entrance on Atlantic Avenue, Boston
General information
Location700 Atlantic Avenue
Boston, Massachusetts
United States of America
Coordinates 42°21′00″N71°03′21″W / 42.3500°N 71.0558°W / 42.3500; -71.0558
Owned by Massachusetts Bay Transportation Authority
Platforms29 bus bays
Bus operators10
Connections
Construction
Parking225 spaces
AccessibleYes
History
OpenedOctober 28, 1995
Rebuilt2020–2025
Location
South Station Bus Terminal

The South Station Bus Terminal is a bus station located at South Station in downtown Boston, Massachusetts, United States. It is Boston's main terminal for regional commuter bus and intercity bus service, with 29 bus berths used by 10 operators. The industrial-style structure is built on air rights above the South Station rail platforms. It has two full levels – a bus deck and a rooftop parking deck – plus several partial levels. South Station Bus Terminal is owned by the Massachusetts Bay Transportation Authority (MBTA). An expansion is under construction as part of the South Station Tower project. Expected to open in 2025, it will add 13 bus berths and a direct connection to the South Station concourse area.

Contents

Beginning in the late 1950s, city and state agencies proposed a large parking garage with a bus terminal at South Station. It was intended to replace two existing terminals in the Park Square area. The Boston Redevelopment Authority purchased South Station in 1965 with plans to redevelop the site. Planning continued over the following decades. The 1980 and 1981 environmental impact statements proposed a three-level terminal with a concourse deck, bus deck, and parking deck; a later phase would add commercial development on top.

The 1984–1989 reconstruction of South Station added footings to support the air rights project. Final design for the bus terminal was completed in 1990. Due to budget limitations, it had fewer bus berths and parking spaces than previously planned. Construction begin in September 1992 and the terminal opened on October 28, 1995. The ramps to the terminal were reconfigured in 2003–2005 by the Central Artery/Tunnel Project (Big Dig). As part of the South Bay Interchange, a new elevated connector road was built with direct ramps to/from I-93 and the Massachusetts Turnpike.

Expansion of the terminal was added to plan for the commercial air rights development (which became the South Station Tower) before the terminal even opened. Revisions to the plan were released in 1998 and 2002, but the project was delayed by the Great Recession. It was revived in 2016 with further modifications. Construction began in January 2020.

Design

Rotunda and skylight, surrounded by food concessions and ticket sales counters Boston south station bus terminal.JPG
Rotunda and skylight, surrounded by food concessions and ticket sales counters
The commuter platform South Station bus terminal gates September 2024.jpg
The commuter platform

South Station Bus Terminal is located on air rights over the platforms and tracks of the South Station rail terminal in the southeast portion of Downtown Boston. Measuring about 300 by 600 feet (100 m × 200 m), the terminal is on the east side of Atlantic Avenue between East Street and Kneeland Street. [1] [2] :55–58 The terminal has two full levels – the bus deck and the rooftop parking deck – plus several partial levels. [3] The main entrance is from Atlantic Avenue at Beach Street, with a secondary entrance from Platform 1 of South Station. Both lead to a concourse that runs above the train platforms and below the bus deck. [3] :70 [1]

At the north end of the bus deck is a 11,000-square-foot (1,000 m2) rotunda with ticketing, baggage handling, and retail facilities around its perimeter. [4] [3] :70 It is illuminated by a domed skylight more than 50 feet (15 m) across. [5] Escalators in the rotunda connect the entrance concourse to the bus deck. A mezzanine above the outside of the rotunda holds offices. [3] :70 [6] :156

The "commuter platform" concourse runs south from the rotunda. It contains 25 of the terminal's 29 gates: 13 pull-in bus bays on the west side, 10 bays on the east side, and two curb stops on the south side. [3] :70 [6] :156 [a] Four additional curb stops have access directly from the rotunda. [6] :32,156 Buses circulate clockwise around the deck; arriving and departing buses cross paths at the south end of the terminal. [6] :156 On the west side of the deck is a lane for staging buses. [7] :Fig. 1-14 [3] :70

The top of the terminal is a parking deck with about 225 spaces. [3] :71 [6] :33 It provides both paid daily parking and free short-term parking for passenger pick-up and drop-off. [6] :33 The deck is 56 feet (17 m) above the South Station platforms. [3] :70 A package express facility is located on the deck. [3] :71 The terminal is accessible. One elevator connects the ground floor and concourse; two connect the concourse, bus deck, mezzanine, and parking deck. [7] :Fig. 1-14,1–16 [8]

The exterior of the building is clad in aluminum. [5] The industrial-style interior finish includes aluminum, steel, concrete, and granite – durable materials chosen for ease of maintenance. [5] [3] :0 The rotunda has marble flooring. [4] On the curved walls of the rotunda mezzanine are two 30-foot (9.1 m)-long murals by Todd McKie. Entitled Are We There Yet?, the enamel-on-steel murals depict colorful abstract figures. [9]

Ramps connect the bus deck and parking deck to an elevated roadway, the South Station Connector, located southwest of the terminal. It has ramps connecting to the Boston surface street network at Kneeland Street, as well as to the Massachusetts Turnpike (Interstate 90) and Interstate 93. [6] :11,139 Additional direct ramps reserved for buses and high-occupancy vehicles (HOVs) provide access from northbound I-93 and both directions of I-90, and to southbound I-93 and eastbound I-90. [6] :11,139 [10]

When the terminal was built, all trains at South Station used diesel locomotives, necessitating a ventilation system to remove exhaust gases from the platform area. [b] [3] :72 The ductwork and fans fits into a 11-foot-8-inch (3.56 m) height between the top of trains and the bottom of the bus deck. [3] :74 They funnel exhaust to a set of ventilation shafts on the east side of the terminal. [3] :70 These shafts reach 75 feet (23 m) above the parking deck. [4] [3] :70

The under-construction expansion will extend the terminal north about 300 feet (91 m) to the base of the South Station Tower, adding 106,000 square feet (9,800 m2) to the bus deck. [2] :11,55–58 A second commuter platform will extend north from the rotunda with 13 additional pull-in bus bays. The north end of the new platform will connect to the main South Station concourse – just north of the rail platforms – with stairs, escalators, and elevators. [11] :10,16 [7] :Fig. 1-14,1–16 Atop the expanded bus deck will be five parking levels with 527 spaces. [11] :23 [7] :Fig. 1-10 Access will be from the existing parking deck and via a spiral ramp with entrance and exit on Atlantic Avenue. [2] :46 [7] :2–7

Service

Plymouth & Brockton bus at the terminal Plymouth & Brockton bus at South Station Bus Terminal July 2025.jpg
Plymouth & Brockton bus at the terminal

As of June 2025, the terminal is used by ten companies: [12]

South Station Bus Terminal is used by both commuter bus and intercity bus service. [6] :32 It is the main regional bus terminal for Boston, though six of the ten operators also serve Logan International Airport (often with South Station as an intermediate stop). [13] :104 [12] [c] The terminal is among the busiest intercity bus stations in the county. In 2010, it was the sixth-busiest terminal in the Greyhound network. [13] :103 The terminal averaged 12,200 daily total boardings and alightings in 2012. [6] :27 Scheduled service averaged between 500 and 650 daily arrivals and departures in 2011. [13] :103 [6] :32 [d] The terminal is open 24 hours, with arrivals and departures at all hours. [13] :107

The terminal is owned by the Massachusetts Bay Transportation Authority (MBTA), which contracts with a private firm to manage the terminal. Bus companies negotiate with the managing firm for gate access; they pay lease fees for gates and ticketing facilities plus a per-bus usage fee. [13] :102 [e] Some carriers pool gates between them for added operational flexibility. [13] :105

History

Previous terminals

Buses at the Trailways Bus Terminal in the 1970s Bus station in Park Square, circa 1970s.jpg
Buses at the Trailways Bus Terminal in the 1970s

Regional and intercity bus service from Boston began in the mid-1920s. A number of small terminals, most in the Park Square area, were used by different companies. [17] :7–14 These were gradually consolidated into two major terminals.

The Boston and Worcester Street Railway (B&W) opened a terminal at 10 Park Square by 1930. It was rebuilt in 1946 with off-street bus parking. [17] :29 At that time, it was also used by the Boston and Maine Transportation Company, New England Transportation Company, Quaker Stages, and Quaker City Bus Company. [18] New England Trailways began using the terminal by 1949. Trailways purchased the terminal in 1958 and renamed it Trailways Bus Terminal. [17] :29 Other companies that used the terminal over the following decades included Almeida Bus Lines, Concord Coach, the Eastern Massachusetts Street Railway, the MBTA, Medeiros Bus Company, Michaud Bus Lines, Peter Pan Bus Lines, Rhode Island Bus Company, and Trombly Motor Coach. [19]

Greyhound Lines opened a terminal at 10 St. James Avenue in 1950, replacing a 1935-built terminal at 222 Boylston Street (60/80 Park Plaza). [17] :69,71 The terminal was also used at various times by Bonanza Bus Lines, Plymouth and Brockton Street Railway (P&B), Short Line, and Vermont Transit. [17] :63 It was renovated in 1976. [20] The property was sold to a developer in 1985, and resold in 1987 and 1989, though the bus station remained open. [21] [22]

In 1975, the MBTA built a temporary busway on the west side of South Station at a cost of $300,000 (equivalent to $1.8 million in 2024). [15] [23] It was intended to serve MBTA Turnpike express buses while their usual downtown terminal was closed for redevelopment of the Jordan Marsh flagship store, as well as P&B buses from the South Shore. [24] However, MBTA buses did not initially use the busway. [25] P&B used it as an intermediate stop and as midday bus storage, but continued to use the Greyhound terminal. [26]

On May 19, 1980, the Trailways terminal was closed to allow street reconfiguration and construction of the State Transportation Building. Trailways and its affiliates (Concord, Michaud, Peter Pan, and Trombly) moved to a temporary facility at the South Station busway. [27] They moved again to a new terminal at 555 Atlantic Avenue in Dewey Square on November 7, 1980. It was built at a cost of $1.1 million (equivalent to $4.2 million in 2024). [15] [28] MBTA express bus service was cut back to use the South Station busway as a terminal from April 1981 to May 1982. [29] In 1986, Trailways discontinued most of its remaining service in New England. Peter Pan took over the routes and renamed the station as the Peter Pan Bus Terminal. [17] :146

Greyhound drivers went on strike on March 2, 1990. [30] Bonanza and P&B drivers did not want to cross picket lines, so the companies moved to curbside operations nearby. [17] :63 Bonanza bought a used van for use as a ticket office. That June, the company moved to Dartmouth Street in front of Back Bay station. [31] On November 10, 1992, Greyhound and Vermont Transit moved to a temporary terminal at the South Station busway. [17] :95 [32] [33]

Planning

City officials proposed a large parking garage with a bus terminal at South Station, the city's largest railroad terminal, in July 1958. At the time, the New York, New Haven and Hartford Railroad was sharply cutting service as new highways were opening. [34] That December, Mayor John Hynes proposed a 1,700-space garage and bus terminal over the western tracks of the station. [35] [36] Construction of a bus terminal and trucking terminal at South Station was again proposed by a state commission in 1961. [37]

In the mid-1960s, the proposed redevelopment of South Station – including a possible bus terminal – became mired in controversy. The Boston Terminal Company (a terminal railroad subsidiary of the New Haven and the New York Central Railroad that owned the station) filed in late 1964 to sell the property to the Boston Redevelopment Authority (BRA). [38] By that time, the railroads owed $2 million in back taxes (equivalent to $20 million in 2024) for the station. The city, the Massachusetts Turnpike Authority, and Boston Patriots owner Bill Sullivan sparred over who would redevelop the property – and crucially, whether the development would pay taxes to the city. [15] [39] [40] The BRA reached an agreement in August 1965 to purchase the station and took ownership on December 31, 1965. [41] [42]

By mid-1967, the BRA had chosen a proposal by the Massachusetts Port Authority over one from Maxwell M. Rabb. The Port Authority proposal, designed by Josep Lluís Sert, included a bus terminal, a 5,000-car garage, and heliport along with a hotel and commercial buildings. [43] The city and Port Authority signed a development pact in January 1970. [44] However, the Port Authority pulled out of the plan that September due to an Internal Revenue Service ruling that bonds for the project would be taxed. [45]

Cutaway view of a 1981 model of the bus terminal showing the bus deck with commuter (left) and intercity (right) platforms 1981 model of South Station showing bus deck.jpg
Cutaway view of a 1981 model of the bus terminal showing the bus deck with commuter (left) and intercity (right) platforms

In 1974, BRA plans switched to preserve the historic South Station building, with bus facilities still planned. [46] The new bus terminal was planned to be complete by the end of the decade. [24] In October 1977, the BRA and MBTA reached an agreement under which the MBTA would reconstruction the station while the BRA would manage commercial development. The deal removed the bus terminal from the plans because funding was not available. [47] [48] A revised agreement in 1979 re-added the bus terminal, which the MBTA would build along with a 600-car parking deck. [49] The MBTA took ownership of South Station that August, though the BRA retained air rights. [50]

The Federal Railroad Administration released the draft environmental impact statement for the South Station project, including the bus terminal, in 1980. [51] The final environmental impact statement was released the next year. It included a two-phase air rights development. The first phase would include three levels with a bus terminal and 800 parking spaces; the second would add commercial development and more parking. [52] The bus terminal was to have a ticketing concourse on the first level above the tracks and a bus deck on the second level. They would be connected by a rotunda with a large skylight. The bus deck would be divided into pull-in bus berths for intercity buses and pull-through platforms for commuter buses. [53]

In 1982, the Federal Transit Administration awarded the MBTA $14 million (equivalent to $46 million in 2024) for bus terminal construction and relocation of nearby Massachusetts Turnpike ramps. [15] [54] The renovation of South Station lasted from 1984 to 1989. [55] [56] During construction, footings were placed between the tracks to support the future development. [57] [58] [53] :107 Additional funding for the bus terminal came from an 1988 state bond bill. [59]

Construction and usage

In January 1989, the MBTA awarded a $4.67 million final design contract (equivalent to $11.8 million in 2024) to The Architects Collaborative and Howard, Needles, Tammen & Bergendoff. [15] [60] The MBTA approved the final design in December 1990. [61] Late-1980s plans had called for 45 bus berths and 550 parking spaces. [62] [60] However, the final design included only 29 bus berths and 215 spaces due to budget limitations. [61] [63] In 1991, the state agreed to build a set of transit projects as part of the settlement of a lawsuit by the Conservation Law Foundation (CLF) over auto emissions from the Central Artery/Tunnel Project (Big Dig). Among these projects was the bus terminal, to be complete by the end of 1994. [64] The agency awarded a construction contract for the $81 million project (equivalent to $181 million in 2024) in September 1992. [15] [65] [66]

The new bus terminal opened on October 28, 1995, though ticketing facilities were not completed until 1996. Its 29 bus berths were fewer than those available at the three terminals it replaced. [67] The companies using the Greyhound and Peter Pan terminals moved in immediately, while Bonanza did not begin using the terminal until December 3. [17] :182 Peter Pan recorded a 25% increase in ridership after moving to the terminal. [68] By early 2000, the terminal served 12,000 daily riders. [69] In 2005, its six pay phones were the busiest in the city. [70]

The terminal viewed from the South Station platforms in 2006 P7080004 Amtrak HHP-8 659 in South Station, Boston.jpg
The terminal viewed from the South Station platforms in 2006

In 1999, the MBTA installed a memorial plaque honoring John J. "Happy" Coombs", an ironworker who died in a June 1995 fall during construction. [71] [72] In August 2000, a state audit found that change orders added $14.7 million to the original $81.4 million construction cost of the terminal. It also noted that when the MBTA cancelled plans for a moving walkway between the bus terminal and rail station, the agency settled for $1.4 million – substantially less than the $6.6 million estimated cost. [f] [73] The moving walkway was to have been on the west side of the rail platforms next to Atlantic Avenue. [74] In 2006, the MBTA added an entrance into the bus terminal lobby from the westernmost rail platform, providing a covered path between the rail terminal and bus terminal. [75]

When opened, the ramps to the bus and parking decks connected only to Kneeland Street. [3] :70 They were reconfigured by the Big Dig project as part of the South Bay Interchange. A direct ramp from the eastbound Turnpike for buses and high-occupancy vehicles (HOVs) opened in December 2003. [76] The South Station Connector replaced the Kneeland Street ramps in 2005. It included additional direct bus/HOV ramps, which opened in stages over the second half of the year. [10]

The set of companies using the terminal has changed over time. Massport-managed Logan Dart service ran between the terminal and Logan International Airport from November 2000 to November 2001. [77] [78] Concord Coach subsidiaries Dartmouth Coach and Boston Express began service to the terminal in 2000 and 2007. [17] :128,132 [79] Bloom Bus ceased using the terminal in 2003. [13] :110 DATTCO took over American Eagle (successor to Medeiros) service in 2004. [17] :159 That year, Chinatown bus lines Lucky Star/Travel Pack and Fung Wah Bus Transportation switched from curbside stops in nearby Chinatown to South Station at the insistence of city officials. [80] [81] The city has required operators to use the terminal; in 2007, Vamoose Bus was not permitted to use curbside stops in Copley Square instead. [16] [c]

Low-cost carriers BoltBus and Megabus began using the terminal in 2008. [82] [83] Fung Wah was shut down by federal regulators in 2013 due to safety issues; its berth at South Station was redistributed to another operator. Its planned return to operation in 2015 was cancelled because the company could not obtain a new berth at the terminal. [84] [85] BoltBus ended all service in July 2021. [86] Capebus used the terminal from July 2021 to early 2022. [29] FlixBus began service to the terminal in April 2022 and took over Lucky Star service to Boston that November. [87] [88] DATTCO ended year-round service to Boston in 2023 but began operating seasonal service in 2024. [17] :161 [89]

Expansion

The expansion under construction in 2022 South Station Tower construction from Atlantic Avenue, September 2022.JPG
The expansion under construction in 2022

Plans for other air rights development initially proceeded in parallel to the bus terminal. The BRA issued a request for proposals in 1989. [90] [7] :1 Tufts University Development Corporation (TUDC) was selected as the developer in 1991. [7] :1 [91] [92] By early 1993, with the under-construction bus terminal scaled back to 29 berths, the TUDC planned to include a 15-berth expansion in its project. [57] Hines was added as a joint development partner in 1997. Plans released in 1998 called for an office tower, hotel, office/research building, and parking garage, as well as a bus terminal expansion of 130,000 square feet (12,000 m2) with 250 additional parking spaces (separate from the larger garage). [7] :3

In 2002, the developers made changes to the project as the result of objections by Amtrak, the Federal Aviation Administration (FAA), and state environmental officials. The tower's foundation was moved to avoid interference with rail traffic, while its height was reduced to comply with FAA height restrictions. The bus terminal expansion was modified to be one story instead of two. [93] [94] The revised project was approved by the BRA in June 2006. [95] [7] :3 The 70,000-square-foot (6,500 m2) expansion of the bus terminal was expected to cost $40 million (equivalent to $62 million in 2024). [15] [96] [97] The development was delayed by the Great Recession; TUDC withdrew in 2009. [7] :4 [98]

Hines and Gemdale Properties revived the project in 2016. [7] :1,4 [98] Revised plans released that July enlarged the bus terminal expansion to 106,000 square feet (9,800 m2). The number of additional bus berths was reduced from 16 to 12 to accommodate structural columns. [7] :11,13 At that point, the developers expected the South Station Tower, the bus terminal expansion, and the first portion of parking garage expansion to begin construction in 2017 and open in 2021. [7] :30 The Boston Planning & Development Agency (BPDA), successor to the BRA, approved the project in December 2016. [99]

Gemdale sold its interest to APG Asset Management and Dune Real Estate Partners in 2019. The new consortium purchased the site from the BPDA that year. They also received approvals from several agencies in 2019, including MBTA approval of the bus terminal plans. [100] Construction began in January 2020. The bus terminal expansion was planned for completion in July 2022, followed by the remainder of the project in June 2024. [11] :25 [101] Construction was delayed by the COVID-19 pandemic; by November 2022, completion had been delayed by about a year. The steel frame of the bus terminal was complete by that time and concrete decks were being poured. [58] As of August 2025, construction of the project is near completion, with opening expected by the end of the year. [102] [103]

References

  1. 1 2 "Chapter 1 – Introduction and Project Summary" (PDF). South Station Expansion Project – EEA No. 15028 Final Environmental Impact Report. Massachusetts Department of Transportation. June 2016. pp. 9–11.
  2. 1 2 3 "Transportation Access Plan Agreement entered into between The City of Boston Transportation Department And South Station Phase I Owner LLC for Phase 1 of the South Station Air-Rights Development 640-698 Atlantic Avenue". Boston Transportation Department. October 20, 2017. Archived from the original on August 12, 2025.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Shumway, Laurence W. (June 30, 2001). "Making the Most of Transportation Infrastructure: MBTA's South Station Intermodal Transportation Center" (PDF). Civil Engineering Practice. 16 (1): 67–74.
  4. 1 2 3 Palmer, Thomas C. Jr (June 19, 1995). "'Intermodalism' is the buzzword of future transit". The Boston Globe Student Newsline. p. 13 via Newspapers.com.
  5. 1 2 3 Campbell, Robert (August 16, 1996). "Catch this bus stop". The Boston Globe. pp. D1, D12 via Newspapers.com.
  6. 1 2 3 4 5 6 7 8 9 10 11 "Appendix 9 (Part 1) – Traffic Analysis Technical Report" (PDF). South Station Expansion Project – EEA No. 15028 Final Environmental Impact Report. Massachusetts Department of Transportation. June 2016.
  7. 1 2 3 4 5 6 7 8 9 10 11 12 13 Epsilon Associates, Inc. (July 29, 2016). "South Station Air Rights Notice of Project Change". Boston Redevelopment Authority.
  8. Yaekel, Tara (May 1, 2000). "Elevator at South Station is still grounded". The Boston Globe. p. B1 via Newspapers.com.
  9. Temin, Christine (September 3, 1997). "McKie's mural creatures enliven bus terminals". The Boston Globe. pp. C1, C5 via Newspapers.com.
  10. 1 2
  11. 1 2 3 "South Station Air Rights Project" (PDF). Hines. January 22, 2020.
  12. 1 2 3 "2025 System Map". Massachusetts Bay Transportation Authority. June 15, 2025.
  13. 1 2 3 4 5 6 7 8 9 10 11 Central Transportation Planning Staff (June 2013). "Boston Area Terminal Activity and Capacity" (PDF). Massachusetts Regional Bus Study. Boston Region Metropolitan Planning Organization.
  14. "Boston - Cambridge - Newton - New York". Go Buses NY. Archived from the original on June 24, 2025.
  15. 1 2 3 4 5 6 7 8 9 10 1634–1699: McCusker, J. J. (1997). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States: Addenda et Corrigenda (PDF). American Antiquarian Society. 1700–1799: McCusker, J. J. (1992). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States (PDF). American Antiquarian Society. 1800–present: Federal Reserve Bank of Minneapolis. "Consumer Price Index (estimate) 1800–" . Retrieved February 29, 2024.
  16. 1 2 Wong, Nicole C. (October 31, 2007). "Bus line's plan runs awry of cities' rules". The Boston Globe. pp. A13, A15 via Newspapers.com.
  17. 1 2 3 4 5 6 7 8 9 10 11 12 Humphrey, Thomas J. (November 2023). A History of Boston’s Regional, Intercity, and Interstate Bus Lines (PDF). Boston Street Railway Association.
  18. "B&W's New Union Bus Terminal [advertisement]". The Boston Globe. December 19, 1946. p. 1 via Newspapers.com.
  19. "Continental Trailways bus service is operating normally from Trailways Park Square terminal [advertisement]". The Boston Globe. March 1, 1970. p. 69 via Newspapers.com.
  20. Haynes, Walter (October 2, 1977). "It's fascinating and funny at Boston's bus terminals". The Boston Globe. pp. 25, 27 via Newspapers.com.
  21. Yudis, Anthony J. (September 24, 1987). "Greyhound terminal to be sold for $23m". The Boston Globe. p. 37 via Newspapers.com.
  22. King, John (May 23, 1989). "New owner, financing for Greyhound station". The Boston Globe. p. 32 via Newspapers.com.
  23. "S. Station face-lift under way". The Berkshire Eagle. October 18, 1975. p. 12 via Newspapers.com.
  24. 1 2
  25. Transportation Map, Massachusetts Bay Transportation Authority, Summer 1976 via Wikimedia Commons
  26. "Trailways dedicates terminal". The Boston Globe. November 8, 1980. p. 15 via Newspapers.com.
  27. 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  28. Rosenberg, Ronald (March 3, 1990). "Bus strike leaves travelers stranded". The Boston Globe. p. 13 via Newspapers.com.
  29. "Greyhound moving its terminal". The Boston Globe. November 6, 1992. p. 54 via Newspapers.com.
  30. Hohler, Bob (January 23, 1993). "South Station concerns arrive by bus". The Boston Globe. pp. 19, 21 via Newspapers.com.
  31. Plotkin, A.S. (July 3, 1958). "Bus Depot for South Station?". The Boston Globe. p. 21 via Newspapers.com.
  32. Keblinsky, Joseph A. (December 31, 1958). "Railroads May Abandon So. Station". The Boston Globe. p. 1 via Newspapers.com.
  33. Keblinsky, Joseph A. (January 1, 1959). "Foley Hits So. Station Garage Plan". The Boston Globe. pp. 1, 2 via Newspapers.com.
  34. "State Sets Tax Relief Plan For New Haven Railroad". The Berkshire Eagle. UPI. February 21, 1961. p. 31 via Newspapers.com.
  35. "So. Station Garage Eyed". The Boston Globe. December 30, 1964. p. 17 via Newspapers.com.
  36. Keblinsky, Joseph A. (March 14, 1965). "Why Mayor Collins Exploded". The Boston Globe. p. 4-A via Newspapers.com.
  37. Keblinsky, Joseph A. (April 11, 1965). "Mayor Sets Trap Play For Stadium Authority". The Boston Globe. p. 4-A via Newspapers.com.
  38. Hanlon, Robert (August 12, 1965). "$50 Million South Station Plan Set". The Boston Globe. pp. 1, 8 via Newspapers.com.
  39. "BRA Buys South Station For $6,950,000". The Boston Globe. December 31, 1965. p. 24 via Newspapers.com.
  40. Yudis, Anthony J. (June 4, 1967). "12 Months Later: South Station Plan Stalled Off Main Track". The Boston Globe. p. A-3 via Newspapers.com.
  41. "Port Authority, city sign development pact". The Boston Globe. January 20, 1970. p. 29 via Newspapers.com.
  42. Yudis, Anthony J. (September 19, 1970). "South Station plan in danger". The Boston Globe. p. 1 via Newspapers.com.
  43. Yudis, Anthony J. (December 15, 1974). "South Station eagle may retain his perch". The Boston Globe. p. A-47 via Newspapers.com.
  44. "White to air S. Station plan". The Boston Globe. October 6, 1977. p. 42 via Newspapers.com.
  45. Yudis, Anthony J. (May 21, 1978). "South Station bus terminal hopes grow". The Boston Globe. p. 12 via Newspapers.com.
  46. Yudis, Anthony J. (May 4, 1979). "MBTA approved as South Station developer". The Boston Globe. p. 20 via Newspapers.com.
  47. "MBTA gets S. Station transit land". The Boston Globe. August 12, 1979. p. 22 via Newspapers.com.
  48. Federal Railroad Administration (November 18, 1980). "Public Notice: Proposed Improvements to South Station". The Boston Globe. p. 29 via Newspapers.com.
  49. Final Environmental Impact Statement and 4(f) Statement: South Station Improvement Project. Federal Railroad Administration. June 15, 1981. p. i.
  50. 1 2 Nairn, Janet (July 1981). "In the center of downtown Boston: A revitalized South Station as transportation hub" (PDF). Architectural Record. pp. 100–107.
  51. "T gets $14m to build South Station bus terminal". The Boston Globe. August 12, 1982. p. 53 via Newspapers.com.
  52. Crocket, Douglas S. (June 10, 1984). "Ground broken for South Station center". The Boston Globe. p. 41 via Newspapers.com.
  53. Ackerman, Jerry (November 4, 1989). "Glory days: South Station ready to rise". The Boston Globe. p. 41 via Newspapers.com.
  54. 1 2 "Construction begins on bus terminal". The Naples Daily News. New York Times News Service. January 24, 1993. p. 79G via Newspapers.com.
  55. 1 2 Voorhis, Scott Van (November 23, 2022). "Delayed Tower Takes Shape Over Boston's South Station". ENR East. Archived from the original on April 1, 2025.
  56. "Dukakis signs transportation bill". North Adams Transcript. AP. April 7, 1988. p. 14 via Newspapers.com.
  57. 1 2 Ackerman, Jerry (January 19, 1989). "MBTA picks architect for South Station terminal". The Boston Globe. p. 84 via Newspapers.com.
  58. 1 2 Rosenberg, Ronald (December 10, 1990). "Building for buses at South Station". The Boston Globe. p. 16 via Newspapers.com.
  59. Howe, Peter J. (August 22, 1988). "Plan to develop South Station hits $35m snag". The Boston Globe. p. 22 via Newspapers.com.
  60. Blake, Andrew (March 7, 1992). "New transit chief comes home to kick off South Station project". The Boston Globe. p. 22 via Newspapers.com.
  61. United States Environmental Protection Agency (October 4, 1994). "Approval and Promulgation of Air Quality Implementation Plans; Massachusetts—Amendment to Massachusetts' SIP (for Ozone and for Carbon Monoxide) for Transit Systems Improvements and High Occupancy Vehicle Facilities in the Metropolitan Boston Air Pollution Control District)". Federal Register. 59 FR 50498.
  62. Studley, Shay (August 13, 1992). "MBTA gives final approval to $81m South Station bus terminal". The Boston Globe. p. 29 via Newspapers.com.
  63. "Perini to build new bus terminal". The Boston Globe. September 4, 1992. p. 28 via Newspapers.com.
  64. Palmer, Thomas C. Jr. (October 28, 1995). "Shiny new terminal holds fewer buses". The Boston Globe. p. 1 via Newspapers.com.
  65. Kelly, Ray (January 25, 1998). "Bus line prospers with new services". The Republican. p. G32 via Newspapers.com.
  66. Watson, Jamal E. (January 18, 2000). "Bus business is booming too much for South Station". The Boston Globe. pp. A1, A20 via Newspapers.com.
  67. Diaz, Johnny (May 15, 2005). "Hanging on by a wire". Boston Globe City Weekly. pp. 1, 7 via Newspapers.com.
  68. Palmer, Thomas C. Jr. (June 6, 1995). "Ironworker dies in fall on MBTA job site". The Boston Globe. p. 19 via Newspapers.com.
  69. "An Act Designating the South Station Transportation Center Bus Terminal as the John J. "Happy" Coombs Terminal". Massachusetts General Court. August 13, 1999.
  70. Augstums, Ieva (August 9, 2000). "Audit ID's $20m in cost overruns at S. Station complex". The Boston Globe. p. B2 via Newspapers.com.
  71. Daniel, Mac (November 6, 2005). "A nightmarish drive on Jamaicaway". The Boston Globe. p. B2 via Newspapers.com.
  72. Daniel, Mac (May 28, 2006). "Effect of T fare hikes to be tracked". The Boston Globe. p. B2 via Newspapers.com.
  73. Daniel, Mac (November 30, 2003). "Turnpike offers a fast lane to holiday giving". The Boston Globe. p. B2 via Newspapers.com.
  74. "Bus service begins between South Station Logan Airport". The Boston Globe. November 14, 2000. p. C17 via Newspapers.com.
  75. Palmer, Thomas C. Jr. (October 14, 2001). "Bus service scaled back following cuts". The Boston Globe. p. B2 via Newspapers.com.
  76. Long, Tom (January 21, 2007). "Wheels, but no rail, for commuters". The Boston Globe. p. NW 3 via Newspapers.com.
  77. Gross, Courtney (January 23, 2005). "Loyal riders now moved to choose". Boston Globe. Archived from the original on April 26, 2009.
  78. Steinberg, Avi (September 26, 2004). "Fung Wah goes uptown, and business down". Boston Globe City Weekly. p. 4 via Newspapers.com.
  79. Wong, Nicole C. (March 20, 2008). "MegaBus joins carriers offering cheap NYC trips". The Boston Globe. pp. E1, E5 via Newspapers.com.
  80. Wong, Nicole C. (April 1, 2008). "BoltBus to launch Boston to N.Y. service on April 24". The Boston Globe. p. C2 via Newspapers.com.
  81. Clauss, Kyle Scott (July 16, 2015). "Fung Wah Is Never, Ever, Ever Coming Back". Boston Magazine.
  82. Cush, Andy (July 16, 2015). "Pour One Out for Fung Wah Bus, Which May Never Return to the Road". Gawker. Archived from the original on September 19, 2015.
  83. Kiley, Brendan (July 1, 2021). "RIP, BoltBus — the affordable, trendy bus company has discontinued service; Greyhound will take over its routes". The Seattle Times . Archived from the original on July 1, 2021.
  84. "FlixBus launches South Station Boston stop for easy intercity travel on Northeast Corridor" (Press release). FlixBus. April 28, 2022.
  85. "Lucky Star Buses joins FlixBus network to expand Boston-New York City service" (Press release). FlixBus. November 15, 2022.
  86. "Discover Newport and DATTCO provide bus service between Boston & Newport" (Press release). DATTCO. June 6, 2024.
  87. Boston Redevelopment Authority (December 12, 1989). "Boston South Station Air Rights Request for Proposals". The Boston Globe. p. 49 via Newspapers.com.
  88. Ackerman, Jerry (February 19, 1990). "Developers unveil 3 plans for So. Station". The Boston Globe. p. 12 via Newspapers.com.
  89. Ackerman, Jerry (September 27, 1991). "BU medical complex plan gets backing". The Boston Globe. pp. 59, 60 via Newspapers.com.
  90. Bailey, Steve (June 14, 2002). "Imagine the possibilities". The Boston Globe. p. D1 via Newspapers.com.
  91. Palmer, Thomas C. Jr (November 1, 2002). "Plans revised for South Station project". The Boston Globe. p. E3 via Newspapers.com.
  92. Reidy, Chris (June 7, 2006). "BRA approves proposal for South Station air rights". The Boston Globe. p. D2 via Newspapers.com.
  93. "Development Plan for Planned Development Area No. 68: South Station Air Rights Project". Boston Redevelopment Authority. June 6, 2006. p. 5.
  94. Palmer, Thomas C. Jr (June 29, 2006). "South Station's mega-makeover". The Boston Globe. pp. D1, D4 via Newspapers.com.
  95. 1 2 Logan, Tim (April 8, 2016). "South Station tower is on again". The Boston Globe. pp. C1, C6 via Newspapers.com.
  96. Logan, Tim (December 17, 2016). "Base Station". The Boston Globe. p. A8 via Newspapers.com.
  97. Logan, Tim (December 28, 2019). "Work to start on South Station skyscraper next month". The Boston Globe. p. C6 via Newspapers.com.
  98. Logan, Tim (January 13, 2020). "Next at South Station: hard hats, detours". The Boston Globe. pp. A1, C3 via Newspapers.com.
  99. "Construction Update - August 1, 2025". South Station Air Rights Project. August 1, 2025.
  100. "Construction Schedule". South Station Air Rights Project. 2025. Retrieved August 20, 2025.

Notes

  1. The two south gates were originally intended for shuttle service to Logan International Airport. [3] :70
  2. Amtrak Northeast Corridor services were converted to electric power in the early 2000s after the Northend Electrification Project was completed, but the Lake Shore Limited and MBTA Commuter Rail service continue to use diesel locomotives.
  3. 1 2 Until 2020, several commuter carriers served other stops in Boston, mostly near Government Center or the Back Bay. Hampton Jitney and LimoLiner used stops in the Back Bay. [13] :109–113 As of June 2025, Yankee Line is the only private carrier to make Boston stops other than South Station and Logan Airport. [12] Go Buses stops at suburban MBTA subway terminals at Riverside and Alewife rather than in Boston. [13] :116 [14]
  4. During peak travel times such as holidays, some trips operate as multiple sections with two or more buses. [13] :106
  5. Annual lease fees were $24,000–$31,000 in 2007 (equivalent to $36,000–$47,000 in 2024). [15] [16] Per-bus usage fees were $8 in 2011 (equivalent to $11in 2024). [15] [13] :102
  6. Costs equivalent to $30 million, $168 million, $2.9 million, and $14 million in 2024. [15]

Commons-logo.svg Media related to South Station Bus Terminal at Wikimedia Commons