South Station Tower

Last updated
South Station Tower
South Station Tower
General information
StatusUnder construction, funded [1]
TypeOffice, residential [2]
LocationAtlantic Avenue, Boston, Massachusetts, United States
Construction startedJanuary 2020 [1]
Estimated completion2024
Height
Roof690 ft (210 m) [3]
Technical details
Floor count51
Design and construction
Architect(s) César Pelli [4]
Developer Hines Interests [4]

South Station Tower is a skyscraper under construction in Boston, Massachusetts, the high-rise portion of a three-building development. Construction on Phase 1 of the project, a 51-story, 678-foot tower with offices and condominiums, started in January 2020 and is expected to take four years. [1] It will be built atop Boston's historic South Station complex, an example of transit-oriented development. The overall project will include condominium units, office space, a parking structure, and possibly hotel space. [5] The property was initially proposed by Hines Interests and TUDC, a subsidiary of Tufts University.

Contents

Part of Phase I, an expanded bus station, will use a foundation put in place when the station was last renovated in the late 1980s. [6] The high-rise tower will be supported by a new foundation constructed in the area between the existing station and the tracks. Foot traffic will be rerouted around construction areas. [7]

History

Construction in December 2022 Arch construction for South Station Tower (1), December 2022.jpg
Construction in December 2022

South Station Tower was planned to break ground in 2008, with completion scheduled to occur in 2010, but the project stalled. Approval has been obtained for a project totaling 2,190,000 square feet (203,000 m2). [8] As of March 2016 the developer's website was updated stating the tower would begin construction early in 2017; [9] the FAA had given approval in February for a tower reaching 677 feet (206 m)}. [10] The developer's rights to build on the site were scheduled to expire in April 2017, [11] but the state extended them until the end of the year. [12] Construction was halted due to MBTA concerns,[ citation needed ] but Hines did not stop the project.

Foundation piers for a future high-rise building, with posts spaced 35 feet (11 m) apart, were installed between each pair of tracks during reconstruction of South Station in the mid-1980s. These will support the bus station expansion. New foundation piers will be constructed in the area between the current station and the tracks. Silver Shore at South Station.agr.jpg
Foundation piers for a future high-rise building, with posts spaced 35 feet (11 m) apart, were installed between each pair of tracks during reconstruction of South Station in the mid-1980s. These will support the bus station expansion. New foundation piers will be constructed in the area between the current station and the tracks.

Development of the airspace above the southbound tracks has been delayed several times. The building was conceived by Tufts president Jean Mayer, who foresaw an "epicenter of high-profile medical research" in downtown Boston. In 1991, Tufts created a for-profit development subsidiary, TUDC LLC, and acquired the rights to the airspace. Development over the past decade has been complicated by Boston waterfront zoning restrictions, which require pedestrian access to the waterfront. In 1997, TUDC brought on Hines Interests LP as a development partner. In 2006, TUDC and Hines filed a Development Plan for the project. [13]

Questions were raised in 2007 about the university's role in the project, [14] and Tufts withdrew in 2009. [15]

South Station Tower was originally designed with a height of 759 feet (231 m), which included a decorative spire. [2] However, the project was downscaled in 2006. [2]

In July 2016, the developer filed a "Notice of Project Change" [16] with the Boston Planning and Development Agency (BPDA), proposing a number of changes in the project, including the addition of more residential space. [5] The notice included a timeline calling for construction of the project's first building, the high-rise tower, to begin in 2017. In December 2016, the board of the BPDA approved construction of the project. [17] It was delayed to December 2017, then delayed again to 2018 due to MBTA rights.[ clarification needed ] Construction officially began in February 2020, with a five year completion timeline.

2024 Construction Accident

On March 21, 2024, a steel beam fell from the top of the tower, damaging several windows, before coming to rest on the ninth floor. [18] Some equipment from the worksite also fell, landing at street-level. The MBTA, who owns South Station and the South Station Bus Terminal, suspended commuter services and ordered work to halt in the time after the incident. No injuries were reported, but construction company Suffolk agreed to pause work while investigations proceeded. [19]

Construction work resumed March 27, 2024 following the conclusion of the stop-work order and subsequent investigations by OSHA. [20]

Design

Preliminary design was done by architect Cesar Pelli, whose designs are reminiscent of his Wells Fargo Center in Minneapolis. The structure has been LEED pre-certified "silver" and won the EPA's "Green design" award. [21] [22]

See also

Related Research Articles

<span class="mw-page-title-main">Silver Line (MBTA)</span> Bus rapid transit system in Massachusetts, US

The Silver Line is a system of bus routes in Boston and Chelsea, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA). It is operated as part of the MBTA bus system, but branded as bus rapid transit (BRT) as part of the MBTA subway system. Six routes are operated as part of two disconnected corridors. As of 2019, weekday ridership on the Silver Line was 39,000.

Cabot, Cabot & Forbes (CC&F) is a real estate development firm in Alewife, Massachusetts. It was founded by Francis Murray Forbes of the Boston Brahmin Forbes family in 1897 as a real estate management firm. Jay Doherty purchased the company in 2004 from its previous owners, the Marshall Field Family and is serving as the present CEO of the firm.

<span class="mw-page-title-main">South Station</span> Rail station in Boston, Massachusetts, US

South Station, officially The Governor Michael S. Dukakis Transportation Center at South Station, is the largest railroad station and intercity bus terminal in Greater Boston and New England's second-largest transportation center after Logan International Airport. Located at the intersection of Atlantic Avenue and Summer Street in Dewey Square, Boston, Massachusetts, the historic station building was constructed in 1899 to replace the downtown terminals of several railroads. Today, it serves as a major intermodal domestic transportation hub, with service to the Greater Boston region and the Northeastern and Midwestern United States. It is used by thousands of commuter rail and intercity rail passengers daily. Connections to the rapid transit Red Line and bus rapid transit Silver Line are made through the adjacent subway station.

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">Prudential Tower</span> Skyscraper in Boston

The Prudential Tower, also known as the Prudential Building or, colloquially, The Pru, is an international style skyscraper in Boston, Massachusetts. The building, a part of the Prudential Center complex, currently stands as the 2nd-tallest building in Boston, behind 200 Clarendon Street, formerly the John Hancock Tower. The Prudential Tower was designed by Charles Luckman and Associates for Prudential Insurance. Completed in 1964, the building is 749 feet (228 m) tall, with 52 floors, and is tied with others as the 114th-tallest in the United States. It contains 1.2 million sq ft (110,000 m2) of commercial and retail space. Including its radio mast, the tower's pinnacle height reaches 907 feet (276 m).

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

<span class="mw-page-title-main">Maverick station</span> Subway station in Boston, Massachusetts, US

Maverick station is a rapid transit station in Boston, Massachusetts. It serves the MBTA's Blue Line and is located at Maverick Square in East Boston. It is the easternmost underground station on the Blue Line and a transfer point to various buses. A center island platform provides access to the surface in the middle of Maverick Square. In the station, a track map lined with light bulbs shows the position of the trains on the Blue Line between Bowdoin and Orient Heights. It was one of the last stations to be converted to 6-car train service as part of the MBTA's Blue Line Renovation Project. Maverick is a terminal for MBTA bus routes 114, 116, 117, 120, and 121.

<span class="mw-page-title-main">Wood Island station</span> Rapid transit station in Boston, Massachusetts, US

Wood Island station is a MBTA Blue Line rapid transit station located off Bennington Street in the Day Square section of East Boston, Boston, Massachusetts. The station is adjacent to and named for the former Wood Island Park, a once heavily used recreational area for East Boston residents. Most of the park was destroyed in the mid 1960s to expand Logan International Airport. It was built in 1952, replacing a pair of Boston, Revere Beach and Lynn Railroad stations that served the area.

<span class="mw-page-title-main">North Quincy station</span> Rapid transit station in Quincy, Massachusetts, US

North Quincy station is an MBTA subway Red Line station in Quincy, Massachusetts. It is located in North Quincy, off Hancock Street. A major park-and-ride stop, it has over 1200 parking spaces for commuters. The station is fully accessible.

<span class="mw-page-title-main">Boston Planning & Development Agency</span> Municipal planning and development agency for Boston

The Boston Planning & Development Agency (BPDA), formerly the Boston Redevelopment Authority (BRA), is a Massachusetts public agency that serves as the municipal planning and development agency for Boston, working on both housing and commercial developments.

<span class="mw-page-title-main">Trans National Place</span> Office, Garden, Observation, Restaurant, Retail in Boston, Massachusetts

Trans National Place, also known as 115 Winthrop Square, was a proposed supertall skyscraper in Boston, Massachusetts, US. Original designs were completed by architect Renzo Piano who later left the project in March 2007. Trans National Place was intended to stand as the tallest building in Boston, Massachusetts, and New England, surpassing the 60-story John Hancock Tower by 15 stories and at least 210 feet to become the tallest building in the city. The developer was local businessman Steve Belkin, who also owns an adjoining mid-rise building, which would have been torn down as part of the project.

<span class="mw-page-title-main">Russia Wharf</span> Office, Residential, Hotel in Massachusetts, United States

Russia Wharf is a completed high-rise building in downtown Boston, Massachusetts. The building rises 436 feet (133 m) and contains 32 floors. Construction began in 2006 and was finished in early 2011; as such, the structure is one of the most recently completed high-rises in the city. Russia Wharf now stands as the 35th-tallest building in the city. The architectural firm that designed the building is Childs Bertman Tseckares Inc., of Boston, Massachusetts. The civil engineer, also responsible for managing permitting was Vanasse Hangen Brustlin, Inc. of Watertown, Massachusetts. The mixed use project includes approximately 709,000 square feet (65,900 m2) of class-A commercial office space and 65 residential units. The site consists of approximately 2.2 acres (8,900 m2). From about 1897 to 2007, the site contained three low-rise mercantile buildings called the Russia, Graphic Arts, and Tufts Buildings. The office tower is being constructed on the site of the Graphic Arts and Tufts Buildings. As of 2009, Boston Properties has begun to refer to the building as Atlantic Wharf.

<span class="mw-page-title-main">Lansdowne station (MBTA)</span> Railway station in Boston, Massachusetts, US

Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.

<span class="mw-page-title-main">Boston Harborwalk</span> Public walkway that follows the edge Boston Harbor

Boston Harborwalk is a public walkway that follows the edge of piers, wharves, beaches, and shoreline around Boston Harbor. When fully completed it will extend a distance of 47 miles (76 km) from East Boston to the Neponset River.

<span class="mw-page-title-main">Morrissey Boulevard</span> Coastal road in Boston, Massachusetts

Morrissey Boulevard is a six-lane divided coastal road in the Dorchester neighborhood of Boston, Massachusetts, United States. It is owned and maintained by the Massachusetts Department of Conservation and Recreation (DCR).

<span class="mw-page-title-main">Back Bay station</span> Railway station in Boston, Massachusetts, US

Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.

<span class="mw-page-title-main">Assembly station</span> Rapid transit station in Somerville, Massachusetts, US

Assembly station is a rapid transit station in Somerville, Massachusetts. It serves the MBTA's Orange Line. It is an infill station, located on a section of the Orange Line that has been active since 1975. The station, which opened on September 2, 2014, was the first new rail station on the MBTA subway system since 1987. Assembly station is meant to provide convenient access to Assembly Square - a major retail and residential development located on the site of a former Ford assembly plant - and the adjacent Assembly Square Marketplace.

<span class="mw-page-title-main">Millennium Tower (Boston)</span> Skyscraper in Boston, Massachusetts, US

Millennium Tower is a 60-story, 684-foot-tall (208 m) residential skyscraper in Boston, Massachusetts, United States. Construction began in 2013 at the site of the former flagship store for Filene's in Downtown Crossing and was completed in 2016. As of 2022, it is the fifth tallest building in Boston. The building contains 442 condominiums, a Roche Bros. grocery store and Class A office space. Limited occupancy by residents began in July 2016.

<span class="mw-page-title-main">Winthrop Center</span>

Winthrop Center, is a skyscraper in Boston, Massachusetts, United States. It is currently the fourth-tallest building in Boston, Massachusetts. The tower is built on the site of the defunct Winthrop Square Garage in the Financial District.

References

  1. 1 2 3 Logan, Tim (December 27, 2019). "A skyscraper is headed for South Station in downtown Boston. Work starts next month". The Boston Globe.
  2. 1 2 3 "South Station Tower". SkyscraperPage.com. Retrieved 2007-12-27.
  3. "Obstruction Evaluation / Airport Airspace Analysis (OE/AAA)".
  4. 1 2 "South Station Tower". Emporis.com. Archived from the original on February 21, 2007. Retrieved 2007-12-27.
  5. 1 2 Carlock, Catherine (1 August 2016). "Developers plan more residential at massive South Station tower project". Boston Business Journal. Retrieved 2 August 2016.
  6. Palmer, Thomas C. (2006-06-29). "South Station's mega-makeover". The Boston Globe . Retrieved 2007-12-27.
  7. 1 2 Logan, Tim (January 11, 2020). "Construction zones coming soon to South Station platforms". The Boston Globe.
  8. Boston Redevelopment Authority project listing
  9. "South Station".
  10. "Obstruction Evaluation / Airport Airspace Analysis (OE/AAA)".
  11. Logan, Tim (8 April 2016). "The South Station tower plan lives . . . again". Boston Globe. Retrieved 12 April 2016.
  12. Logan, Tim (30 June 2017). "South Station could get upgrade". Boston Globe. Retrieved 1 July 2017.
  13. "South Station Air Rights Project Development Plan". Boston Redevelopment Authority. Retrieved 2 August 2016.
  14. Schmidt, Kat (2007-03-16). "Long-awaited South Station tower project progresses". The Tufts Daily . Retrieved 2007-12-27.
  15. Logan, Tim. "Another Tower for Boston!". Boston Globe. No. 8 April 2016. Retrieved 2 August 2016.
  16. Hines Interests. "South Station Air Rights Notice of Project Change". Boston Redevelopment Authority. Retrieved 2 August 2016.
  17. Logan, Tim (16 December 2016). "South Station tower wins city approval, but hurdles remain". Boston Globe. Retrieved 21 January 2017.
  18. "'It would've been a nightmare': Steel beam falls hundreds of feet on Boston's South Station Tower". Boston 25 News. 2024-03-21. Retrieved 2024-03-29.
  19. Niezgoda, Abbey; Klein • •, Asher (2024-03-21). "After steel beam falls from Boston tower, construction work is halted". NBC Boston. Retrieved 2024-03-29.
  20. "Work resumes at South Station Tower one week after steel beam fell hundreds of feet from upper floor". Boston 25 News. 2024-03-27. Retrieved 2024-03-29.
  21. "South Station, Boston, MA". Hines Interests Limited Partnership. Retrieved 2007-12-27.
  22. "South Station Tower earns EPA green design award". 2008-05-16.

42°21′05.7″N71°03′17.9″W / 42.351583°N 71.054972°W / 42.351583; -71.054972