Green Line B branch

Last updated
Green Line B branch
Outbound Green Line B train between Amory Street and Babcock Street 2.jpg
An outbound train between Amory Street and Babcock Street in 2024
Overview
Locale Boston, Massachusetts, United States
Termini
Stations23
Service
Type Light rail
System Green Line
Daily ridership26,310 (weekday average boardings from surface stops only in 2010–2011) [1]
History
Opened1896 (Kenmore–Packards Corner, Lake StreetChestnut Hill Avenue)
1900 (Packards Corner–Chestnut Hill Avenue)
Technical
CharacterUnderground (Kenmore and eastward)
Center median running (west of Kenmore)
Track gauge 4 ft 8+12 in (1,435 mm)
Electrification 600 V DC overhead
Route map
Green Line B branch
BSicon utCONTg.svg
D and E branches
BSicon utCONTgq.svg
BSicon lACC.svg
BSicon utKRZt.svg
BSicon utCONTfq.svg
Government Center
MBTA white T logo.svg
BSicon POINTERg@fq.svg
BSicon utSTR.svg
BSicon utCONTgq.svg
BSicon lINTACC.svg
BSicon utKRZt.svg
BSicon utCONTfq.svg
Park Street
MBTA white T logo.svg MBTA white T logo.svg MBTA white T logo.svg
BSicon utBHF.svg
Boylston
MBTA white T logo.svg
BSicon POINTERg@fq.svg
BSicon utSTR.svg
BSicon utACC.svg
Arlington
BSicon utACC.svg
Copley
BSicon utABZg2.svg
BSicon utSTRc3.svg
Copley Junction
BSicon utSTRc1.svg
BSicon utSTR.svg
BSicon utCONT4.svg
BSicon utBHF.svg
Hynes Convention Center
BSicon utACC.svg
Kenmore
BSicon utdABZg2.svg
BSicon utdSTRc3.svg
BSicon utdSTRc1.svg
BSicon utdSTR.svg
BSicon utvSTR+4-.svg
BSicon ulCONTf2.svg
BSicon utSTR2+4.svg
BSicon utSTR~L.svg
BSicon utCONTf.svg
BSicon utSTR~R.svg
BSicon MASKa.svg
BSicon utSTRe.svg
BSicon vRP2.svg
Blandford Street portal
BSicon uHST.svg
BSicon vRP2HST.svg
Blandford Street
BSicon uACC.svg
BSicon vRP2BHF.svg
Boston University East
BSicon uACC.svg
BSicon vRP2BHF.svg
Boston University Central
BSicon uACC.svg
BSicon vRP2BHF.svg
Amory Street
BSicon uACC.svg
BSicon vRP2HST.svg
Babcock Street
BSicon uexSTRc2.svg
BSicon ueABZg3.svg
BSicon vRP2.svg
BSicon uexCONT1.svg
BSicon ueSTR+c4.svg
BSicon vRP2y-RP2.svg
BSicon uBHF.svg
BSicon v-RP2.svg
Packards Corner
BSicon ueHST.svg
BSicon v-RP2.svg
Fordham Road (closed 2004)
BSicon uACC.svg
BSicon v-RP2.svg
Harvard Avenue
BSicon uHST.svg
BSicon v-RP2.svg
Griggs Street/Long Avenue
BSicon uHST.svg
BSicon v-RP2.svg
Allston Street
BSicon uHST.svg
BSicon v-RP2yRP2.svg
Warren Street
BSicon ueHST.svg
BSicon vRP2HST.svg
Summit Avenue (closed 2004)
BSicon uACC.svg
BSicon vRP2BHF.svg
Washington Street
BSicon ueHST.svg
BSicon vRP2HST.svg
Mount Hood Road (closed 2004)
BSicon uHST.svg
BSicon vRP2HST.svg
Sutherland Road
BSicon uHST.svg
BSicon vRP2HST.svg
Chiswick Road
BSicon uHST.svg
BSicon vRP2HST.svg
Chestnut Hill Avenue
BSicon uHST.svg
BSicon vRP2HST.svg
South Street
BSicon ueHST.svg
BSicon vRP2y-RP2.svg
Greycliff Road (closed 2004)
BSicon uACC.svg
BSicon v-RP2.svg
Boston College
BSicon uWSLr.svg
BSicon v-RP2.svg
Commonwealth Avenue

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, B branch service runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

Contents

As of February 2023, service operates on 8-minute headways at weekday peak hours and 8- to 12-minute headways at other times, using 9 to 15 trains (18 to 30 light rail vehicles). [2]

History

Initial construction

Passengers waiting near Chestnut Hill Avenue around 1910 Passengers waiting at Braemore Road, circa 1910.jpg
Passengers waiting near Chestnut Hill Avenue around 1910

The first sections of what is now the B branch to open were built for what became the Watertown Line and Beacon Street Line. In 1889, the West End Street Railway opened the Beacon Street Line, including a branch that ran from Coolidge Corner to Oak Square along Harvard Avenue, Brighton Avenue, Cambridge Street, and Washington Street. [3] :58 While this route provided service to the fast-growing suburbs of Allston and Brighton, a more direct route was desirable. When Commonwealth Avenue was improved between Governors Square and the junction with Brighton Avenue in the mid-1890s, a 33-foot (10 m)-wide median was included for use by a streetcar line to support real estate development. [4] Service began from Governors Square to Brighton Avenue, and along Brighton Avenue to connect with the older trackage at Union Square, on May 18, 1896. [5] [6] [3] :48 (That line was extended to near Nonantum Square on June 13, 1896.) [3] :48

Further west, between Chestnut Hill Avenue and the Boston–Newton boundary at Lake Street, a 25-foot (7.6 m)-wide streetcar median was built. [4] Service between Lake Street and downtown Boston began on August 15, 1896. [7] Streetcars ran on Chestnut Hill Avenue, the existing Beacon Street line, Washington Street, and Huntington Avenue. [3] :58 At Lake Street, the line connected with the Commonwealth Avenue Street Railway, which had opened to Auburndale on March 26, 1896. [8] :38

East of Governors Square, the Beacon Street line originally ran on Beacon Street, Massachusetts Avenue, and Boylston Street to Park Square. [3] :54 By the time the Commonwealth Avenue segments opened, streetcars continued along heavily congested tracks on Tremont Street (electrified in 1891) to reach the northern railroad terminals. [3] :61 Both the Nonantum Square and Lake Street lines were rerouted into the Tremont Street subway to terminate at Park Street station soon after the tunnel's September 1, 1897 opening. [3] :21

The Boston Elevated Railway (BERy) leased the West End Street Railway on October 1, 1897, and continued its system expansion. [3] :35 The BERy opened new tracks on Commonwealth Avenue from Chestnut Hill Avenue to Brighton Avenue on May 26, 1900, allowing direct service from Lake Street to downtown via Commonwealth Avenue. Even though much of the land surrounding Commonwealth Avenue in Brighton was not yet developed, the new line was heavily patronized. [3] :58 For most of its length, the 1900-built trackage was not in a center median, but in a reservation between the southbound travel lane and southbound carriage lane. Between Warren Street and Wallingford Road, the reservation was significantly wider than the tracks. [9]

Growing service

A passenger waiting at Leamington Road, circa 1915-1930 Passenger waiting at Leamington Road, circa 1915-1930.jpg
A passenger waiting at Leamington Road, circa 1915–1930

The Commonwealth Avenue Street Railway opened the popular Norumbega Park on June 17, 1897. [3] (That line merged into the Newton and Boston Street Railway (N&B) in 1904 and the Middlesex and Boston Street Railway (M&B) in 1909.) Through service between Norumbega Park and Park Street station, operated by BERy east of Lake Street, begun on January 17, 1903. [3] :39 The Newton Street Railway (also merged into the N&B in 1904) began through service between Park Street and Waltham via the Watertown Line on February 23, 1903. When the Cambridge Tunnel opened in April 1912, the Waltham service was rerouted to Central Square station in Cambridge instead. [3] :39 On May 1, 1912, the M&B began a second through service over the Commonwealth Avenue route – this one running to Newton Highlands. [3] :39 The next month, two men were charged with a planned "conspiracy to blow up the tracks of the Elevated Company in Commonwealth av" using ten sticks of stolen dynamite. [10]

The Boylston Street subway opened on October 3, 1914, acting as an extension of the Tremont Street subway to just east of Governors Square, with intermediate stops at Copley Square and Massachusetts Avenue. [3] :40 (A third station, Arlington, was not built until 1921.) Lake Street service via Washington Street was cut back to Washington Square except at rush hours. [11] The Newton Highlands through service was cut back to Lake Street, where it connected with BERy streetcar service. [3] :39 Norumbega Park through service continued to use the surface route, as the older M&B streetcars could not match the speed of the newer BERy streetcars in the subway. It took was split at Lake Street on November 1, with a connecting BERy line using the surface route; that was cut to a Kenmore–Park Street route on November 21. [11] [12] [13] [3] :58

On November 21, rush hour Washington Street service was cut back to Reservoir, leaving only Beacon Street cars using the Chestnut Hill Avenue tracks. [12] Beacon Street service was cut to Reservoir on November 6, 1915, with Washington Street service extended back to Lake Street. [14] Beginning on February 6, 1922, all Washington Street service was operated as a Brookline Village–Lake Street shuttle as part of service changes on the Huntington Avenue line. [15] The Washington Street shuttle was converted to bus on April 24, 1926. [16] :197 It was redirected to Brighton Center on June 23, 1928, and eventually became route 65. [16] :52 [17]

Streetcars at Braves Field on the first game there in 1915 Crowds at Braves Field Loop, opening day, 1915.jpg
Streetcars at Braves Field on the first game there in 1915

The Commonwealth Avenue line served two major baseball stadiums: Fenway Park (opened 1912) near Governors Square, and Braves Field (opened 1915) in Allston. The BERy opened a prepayment surface station (where riders paid their fares at the stop, rather than on board the streetcar) at Kenmore Street in Governors Square in 1915. [3] :58 The new Braves Field opened on August 18, 1915; it included a loop track between Gaffney Street and Babcock Street with a prepayment station to allow streetcars to directly serve the ballpark. [18] The loop was also used to turn trains for Red Sox games at Fenway Park, and for rush-hour short turns; after November 1945, these short turns also operated during midday and on Saturdays. [19] :108 The loop was heavily used during games; for the 1948 World Series, streetcars ran between Park Street and Braves Field on 45-second headways. [19] :109

Further changes

Around 1916, the BERy built a storage yard for streetcars north of Commonwealth Avenue at Lake Street. [20] [21] [22] Remaining M&B service to Lake Street was replaced by buses in 1930; the BERy replaced the old transfer station in the median with a new platform and waiting room in the yard on September 12, 1930. [3] :59 An expansion of Reservoir Yard (south of Beacon Street near Chestnut Hill Avenue), completed in May 1940, supplemented Lake Street Yard and eliminated the need to base some Commonwealth Avenue streetcars at Bennett Street Carhouse in Cambridge. [19] :102

Map of the 1926 proposal Map of 1926 proposal for Boston rapid transit lines.png
Map of the 1926 proposal

In June 1922, the BERy proposed to operate the inner part of the Commonwealth Avenue line as a rapid transit service. Three-car trains of recently acquired center-entrance cars, which had higher capacity and shorter dwell times than older streetcars, would run on headways as low as two minutes at rush hour and four minutes at other times. [23] [3] :59 A terminal stations would be built at Linden Street (near Harvard Avenue) in Allston, where passengers would transfer between the subway trains and surface streetcar lines. [23] The Lechmere Square in East Cambridge (already under construction) opened that July, but local opposition to the forced transfer caused the Linden Street terminal plan to be scrapped. [3] :59

The congestion at busy Governors Square caused numerous delays to the streetcar lines. In May 1924, the state legislature directed the Metropolitan District Commission to plan an expanded rapid transit system in Boston, including an extension of the Boylston street Subway under Governors Square. [24] The report, released in December 1926, called for the existing streetcar tunnels in Boston to be reorganized into two rapid transit lines with high-floor rolling stock. [25] One line was to run from East Boston to Brighton, with the East Boston Tunnel (which had been converted from streetcars to rapid transit in 1924) realigned to connect with the Tremont Street subway near Park Street station. The Boylston Street subway would have been extended to Commonwealth Avenue, with a new station under Governors Square. A transfer station between the rapid transit line and the truncated Watertown and Lake Street surface lines was to be located at Warren Street between Commonwealth Avenue and Cambridge Street, near Brighton Center. [25] :5 Intermediate surface stops were to be located at Saint Mary's Street, Gaffney Street, Packards Corner, Harvard Avenue, and Allston Street. [25] :VI Several busy grade crossings also were to be eliminated, and the report noted that the then-rapid growth along Commonwealth Avenue in Brighton might later justify extension of rapid transit to Lake Street. [25] :32

The newly opened subway between Kenmore station and Blandford Street in 1932 Interior view of Commonwealth Avenne subway, 1932.jpg
The newly opened subway between Kenmore station and Blandford Street in 1932

The subway under Governors Square was projected to cost $5 million (equivalent to $86 million in 2023). The BERy and the city objected to this cost and proposed a $1.4 million plan where flyover ramps would separate Beacon Street auto and streetcar traffic from other traffic in the square. [26] The tunnel was eventually chosen but construction did not begin until 1930, after the legislature lowered the cost that the BERy would pay to rent the subway from the city. [27] Kenmore station and the new subway, which split to separate portals at Saint Mary's Street on Beacon Street and Blandford Street on Commonwealth Avenue, opened on October 23, 1932. [28] [3] :59 The extension was built to support future rapid transit conversion of the Commonwealth Avenue line, including extension of the underground section further west. [27] [3] :44

Interest in converting the Commonwealth Avenue line to rapid transit declined as focus shifted to expanding the subway to further suburbs. The 1945 and 1947 Coolidge Commission reports (the next major planning effort after the 1926 report) instead recommended a parallel rapid transit line along the Boston and Albany Railroad corridor, with local streetcar service retained on Commonwealth Avenue. [29] [19] :16 However, several smaller improvements were made to the line. A siding was opened at Washington Street on October 27, 1926, allowing trains to be short turned when necessary. [3] :59 On February 7, 1931, the Beacon Street and Commonwealth Avenue lines were extended to Lechmere, replacing shuttle services between Lechmere and various points in the subway. [30] [31] On June 30, 1931, the existing crossover west of Blandford Street was replaced by a pocket track, allowing temporary storage of streetcars there. It replaced the former surface cutback at Kenmore for subway short turns, which began on September 24, 1934. [3] :59 Around 1940, the Lake Street line was assigned route number 62 as part of a systemwide renumbering. [19] :27 On May 6, 1940, the line was reassigned from Bennett Street Carhouse (near Harvard Square) to Reservoir Carhouse, eliminating the need for deadhead moves on Cambridge Street. [19] :115

Postwar years

A streetcar bound for Braves Field exiting the Blandford Street portal in 1943 Braves Field-bound streetcar exiting the Blandford Street portal, 1943.jpg
A streetcar bound for Braves Field exiting the Blandford Street portal in 1943

In the early 1940s, the BERy began replacing its older streetcars with the PCC streetcar. PCCs were first used on the Lake Street line in May 1944, and they fully replaced center-entrance cars on the line in regular service on December 10, 1945. [19] :100 The short length of trackage on Chestnut Hill Avenue – which had not been used in revenue service since 1926 – was modified as part of trackwork related to the introduction of the PCCs. A connecting track from Commonwealth Avenue westbound to Chestnut Hill Avenue southbound was opened on May 31, 1947, completing the wye between the two avenues. [19] :102 On May 21, 1947, in recognition of the expansion of Boston College, the BERy changed the "Lake Street" designation to "Boston College". [19] :99 On August 29, 1947, the privately owned BERy was succeeded by the publicly owned Metropolitan Transit Authority (MTA). [19] :17

The little-used siding at Washington Street was removed in January 1953, leaving only a crossover. [32] :202 In April 1959, all Boston and Albany Railroad Worcester Line stops between Back Bay and Newtonville were closed for the construction of the Turnpike Extension, leaving the Watertown and Boston College lines as the only rail transit serving Allston and Brighton. [33] Boston University purchased Braves Field in 1953 when the Braves moved to Milwaukee, and soon wished to use the loop area for other purposes. After several years of requests, the MTA abandoned the loop on January 15, 1962. [32] :214

In 1960, the wide streetcar reservation between Warren Street and Wallingford Road was narrowed to add additional travel lanes to Commonwealth Avenue, leaving the streetcar tracks in a relocated median between the travel lanes. [34] [35] :45 On November 25, 1961, the Boston College was cut back to Park Street station, while the 1959-opened Riverside Line was extended to Lechmere in its stead. [32] :203 In 1963–65, the Commonwealth Avenue bridge over the Boston and Albany Railroad was rebuilt to accommodate the Turnpike Extension. Streetcar service was maintained using a temporary parallel bridge. [36] [32] :203

MBTA era

In August 1964, the Massachusetts Bay Transportation Authority (MBTA) replaced the MTA. As part of systemwide rebranding efforts, the remaining streetcar routes feeding the Tremont Street subway became the Green Line on August 26, 1965. [17] In 1967, the five branches were given letters to distinguish them; the Boston College line became the B branch. (The Watertown line became the A branch, while the Beacon Street line became the C branch.) [17] The MBTA experimented with changing the downtown terminals of the Green Line branches (unlike its predecessors, which had changed the downtown terminal of the Boston College line just twice.) The B branch was extended to the new loop at Government Center opened on November 18, 1964 – the first service to regularly use the loop. [17] Over the next two decades, the downtown termini were frequently changed; the B branch variously terminated at Park Street, Government Center, Haymarket, North Station, and Lechmere. On July 30, 1983, the terminus was finally changed to Government Center station, where it would stay until 2004. [17]

On June 21, 1969, the A branch was replaced with Watertown–Kenmore buses, halving streetcar service on Commonwealth Avenue east of Packard's Corner. [17] [3] :48 In 1970, the median was moved slightly south between Chestnut Hill Avenue and Lake Street. [37] [38] The westbound roadway was lowered several feet below the median between South Street and Greycliff Road, with the Foster Street stop moved 500 feet (150 m) west to the Greycliff Road grade crossing. [35] Around 1975, the stop at University Road was discontinued, while the stop at Alcorn Street was moved 500 feet east to Babcock Street. [35]

The downtown terminus was extended to North Station on June 25, 2004, but cut back to Government Center on January 1, 2005. It was cut back further to Park Street on March 22, 2014, when Government Center closed for reconstruction. When the station reopened in 2016, Park Street remained the B branch terminus. [17] The B branch was re-extended to Government Center on October 24, 2021, as part of changes in preparation for the opening of the Green Line Extension the next year. [39] The B branch extension was intended to improve access to the Blue Line and better distribute downtown service. [40] B branch service was replaced by buses from June 20 to July 1, 2022, to allow for trackwork and installation of train protection system equipment. [41]

Accessibility and stop consolidation

Mount Hood Road stop (outbound platform pictured) was closed in 2004. Inbound train passing former Mount Hood Road station, August 2016.JPG
Mount Hood Road stop (outbound platform pictured) was closed in 2004.

The introduction of low-floor LRVs in 2000 allowed for accessible service on the Green Line. In the early 2000s, the MBTA modified key surface stops with raised platforms as part of the Light Rail Accessibility Program. Portable lifts were installed at Boston College and Boston University Central around 2000. [42] [43] Four surface stops – Boston University East, Boston University Central, Harvard Avenue, and Washington Street – were modified with raised platforms in 2002–03; Boston College was similarly modified in 2009. [44] [42]

The B branch is frequently criticized by riders for its slow service, with a high number of stops and level crossings. Until 2004, the line had 22 stops on the surface section, while the C and D branches had 13 each and the E branch just 9. [45] In late 2003, the MBTA proposed eliminating five surface stops (Greycliff Road, Chiswick Road, Mount Hood Road, Summit Avenue, and Fordham Road) as part of a project to improve the line. The five stops were chosen because they had low ridership and were located very close to other stations. [46] No stops east of Packards Corner were chosen, although they would affect the largest number of riders; despite their close spacing, they had higher ridership, and their proximity to traffic lights lowered the travel time savings from elimination. After a public comment period, Chiswick Road was removed from the proposal, as it served a nearby elderly housing community. [46] On April 20, 2004, the other four stops were closed as a 6-to-8-month pilot program. [45] On March 15, 2005, after a survey showed that 73% of 1,142 riders surveyed approved of the closures, the MBTA board voted to make the closures permanent. [46]

In 2014, the MBTA began planning to consolidate four stops – Boston University West, Saint Paul Street, Pleasant Street, and Babcock Street – located near Boston University's West Campus. [47] [48] The four stops, which were not accessible, were replaced by two fully accessible stops as part of a reconstruction of Commonwealth Avenue between the BU Bridge and Packard's Corner. The MBTA awarded a $17.8 million construction contract on March 23, 2020. [49] Construction was to last from February 2021 to early 2022, with night and weekend bustitution for much of 2021. [50] Stop names of "Babcock Street" and "Amory Street" were announced in February 2021. [51] Buses replaced rail service between Washington Street and Kenmore from April 17–May 9 and May 17–June 13, 2021, for construction of the platforms and canopy steelwork. [52] [53] Track replacement was also conducted between Blandford Street and BU Central during the closure. [54] The two new stations, Babcock Street and Amory Street, opened on November 15, 2021. [55]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [56] Design work for Packards Corner, Sutherland Road, Chiswick Road, Chestnut Hill Avenue, and South Street was 30% complete by December 2022. [57] Designs shown in March 2024 called for Chestnut Hill Avenue station and South Street station to be consolidated into a single station as part of the project. [58] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at the 14 B and C branch stops. [59] As of June 2024, construction is expected to begin in fall 2025. Four stations not originally included (Blandford Street, Griggs Street, Allston Street, and Warren Street) are also to be modified. [60]

In 2021, the MBTA indicated that a longer-term project may replace side platforms with wider island platforms at some or all surface stops. [61] That full project of station consolidation and renovations, as well as track realignment and traction power improvements, is expected to cost $221 million. [62] :47 It may also include consolidation of Boston University East and Blandford Street. [58] A $29.3 million reconstruction and expansion of Lake Street Yard, including relocation of Boston College station, to support new Type 10 LRVs is planned for the late 2020s. [62] :66 [58]

Station listing

Boston University Central, one of the seven accessible surface stations on the line BU Central from median.JPG
Boston University Central, one of the seven accessible surface stations on the line
Chestnut Hill Avenue, a typical non-accessible station on the line Chestnut Hill Avenue station facing outbound, August 2016.JPG
Chestnut Hill Avenue, a typical non-accessible station on the line
LocationStationOpenedNotes and connections
East Cambridge Wheelchair symbol.svg Lechmere March 21, 2022Original surface station was open from July 10, 1922 to May 23, 2020; it had not served the B branch since March 21, 1980. Current station for D and E branches.
West End Wheelchair symbol.svg Science Park August 20, 1955Current station for D and E branches; has not served B branch since March 21, 1980.
North End Wheelchair symbol.svg North Station June 28, 2004Current station for D and E branches; has not served B branch since December 31, 2004
Wheelchair symbol.svg Haymarket September 3, 1898Current station for D and E branches; has not served B branch since December 31, 2004
Downtown Boston Wheelchair symbol.svg Government Center MBTA.svg MBTA subway:  Blue 
Aiga bus trans.svg MBTA bus: 354
Wheelchair symbol.svg Park Street September 1, 1897 MBTA.svg MBTA subway:  Red   Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
At Downtown Crossing: MBTA.svg  Orange  ; Aiga bus trans.svg 7 , 11 , 501 , 504 ,  505
Boylston MBTA.svg MBTA subway:  Silver  (SL5)
Aiga bus trans.svg MBTA bus: 43
Back Bay Wheelchair symbol.svg Arlington November 13, 1921Aiga bus trans.svg MBTA bus: 9 , 501 ,  504
Wheelchair symbol.svg Copley October 3, 1914Aiga bus trans.svg MBTA bus: 9 , 10 , 39 , 55 , 501 ,  504
Hynes Convention Center Aiga bus trans.svg MBTA bus: 1 ,  55
Fenway–Kenmore Wheelchair symbol.svg Kenmore October 23, 1932Aiga bus trans.svg MBTA bus: 8 , 19 , 57 , 60 ,  65
At Lansdowne: MBTA white T logo.svg Framingham/Worcester
Boston University Blandford Street c.1894Aiga bus trans.svg MBTA bus: 57
Wheelchair symbol.svg Boston University East Aiga bus trans.svg MBTA bus: 57
Wheelchair symbol.svg Boston University Central Aiga bus trans.svg MBTA bus: 47 , 57 ,  CT2
University Road Closed c.1975
Wheelchair symbol.svg Amory Street November 15, 2021Aiga bus trans.svg MBTA bus: 57
Allston Wheelchair symbol.svg Babcock Street Aiga bus trans.svg MBTA bus: 57
Packards Corner c.1895Aiga bus trans.svg MBTA bus: 57
Fordham Road May 26, 1900Closed April 20, 2004
Wheelchair symbol.svg Harvard Avenue Aiga bus trans.svg MBTA bus: 66
Griggs Street
Allston Street
Brighton Warren Street
Summit Avenue Closed April 20, 2004
Wheelchair symbol.svg Washington Street Aiga bus trans.svg MBTA bus: 65
Mount Hood Road Closed April 20, 2004
Sutherland Road
Leamington Road Closed June 21, 1980
Chiswick Road
Chestnut Hill Avenue August 15, 1896Aiga bus trans.svg MBTA bus: 86
South Street
Greycliff Road c.1970Moved from Foster Street around 1970; closed April 20, 2004
Brighton/Newton Wheelchair symbol.svg Boston College August 15, 1896

Related Research Articles

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it is among the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Kenmore station</span> Subway station in Boston, Massachusetts, US

Kenmore station is an underground light rail station on the MBTA Green Line, located under Kenmore Square in the Fenway/Kenmore neighborhood of Boston, Massachusetts, United States. It is served by the B, C, and D branches of the Green Line. The station has two island platforms, one for each direction. Kenmore is the primary station for Fenway Park, which is 1,000 feet (300 m) to the south. The station opened on October 23, 1932 as a one-station extension of the Boylston Street subway to relieve congestion in the square. It was renovated for accessibility in 2005–2010.

<span class="mw-page-title-main">Boston College station</span> Light rail station in Boston, Massachusetts, US

Boston College station is a light rail station on the MBTA Green Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue and Lake Street, on the border between the Brighton neighborhood of Boston and the Chestnut Hill neighborhood of Newton, Massachusetts. Originally opened in 1896, it has been the terminus of the Commonwealth Avenue line since 1900. The current station is planned to be replaced by a new station located in the median of Commonwealth Avenue just east of Lake Street.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Hynes Convention Center station</span> Subway station in Boston, Massachusetts, US

Hynes Convention Center station is an underground light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line. It is located at the intersection of Newbury Street and Massachusetts Avenue near the western end of the Back Bay neighborhood of Boston, Massachusetts. The station is named for the Hynes Convention Center, which is located about 700 feet (210 m) to the east along Boylston Street. It has two side platforms serving the two tracks of the Boylston Street subway, which are used by the Green Line B branch, C branch, and D branch. The main entrance to the station from Massachusetts Avenue leads to a fare lobby under the 360 Newbury Street building.

<span class="mw-page-title-main">Green Line E branch</span> Light rail line

The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.

<span class="mw-page-title-main">Green Line C branch</span> Light rail line in Massachusetts, US

The C branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in the Brighton neighborhood of Boston and runs on the surface through Brookline along the median of Beacon Street. Reentering Boston, the line goes underground through the Saint Mary's Street incline and joins the B and D branches at Kenmore. Trains run through the Boylston Street subway to Copley where the E branch joins, then continue through the Tremont Street subway to downtown Boston. The C branch has terminated at Government Center station since October 2021.

<span class="mw-page-title-main">Green Line A branch</span> Former streetcar line in Massachusetts, US

The A branch or Watertown Line was a streetcar line in the Boston, Massachusetts, area, operating as a branch of the Massachusetts Bay Transportation Authority Green Line. The line ran from Watertown through Newton Corner, Brighton, and Allston to Kenmore Square, then used the Boylston Street subway and Tremont Street subway to reach Park Street station.

<span class="mw-page-title-main">Boston-area streetcar lines</span>

As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.

<span class="mw-page-title-main">86 (MBTA bus)</span> Bus route in Greater Boston

Route 86 is a local bus route in Boston, Cambridge, and Somerville, Massachusetts, operated by the Massachusetts Bay Transportation Authority (MBTA) as part of MBTA bus service. It operates on a circumferential route between Sullivan Square station and Reservoir station via Union Square, Somerville, Harvard Square, and Brighton Center. In 2018, it had the 18th-highest weekday ridership on the system, though it ranked 37th by number of weekday trips. A 2018–19 MBTA review of its bus system found that route 86 had infrequent and unreliable service, including irregular scheduled headways, despite its high ridership and significance as a crosstown connecting route.

<span class="mw-page-title-main">Blandford Street station</span> Light rail station in Boston, Massachusetts, US

Blandford Street station is a surface-level light rail station on the MBTA's Green Line B branch located in Boston, Massachusetts. The station is located in the center median of Commonwealth Avenue at Silber Way and Blandford Mall, about 2 blocks west of Kenmore Square, near the east end of Boston University. The station consists of two low side platforms, which serve the B branch's two tracks. The station is the first station outbound on the B branch after it splits off from the C and D branches at Kenmore.

<span class="mw-page-title-main">Babcock Street station</span> Light rail station in Boston, Massachusetts, US

Babcock Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Babcock Street and Pleasant Street.

<span class="mw-page-title-main">Packards Corner station</span> Light rail station in Boston, Massachusetts, US

Packards Corner station is a light rail stop on the MBTA's Green Line B branch located at Packard's Corner—the intersection of Commonwealth Avenue and Brighton Avenue—in Allston, Boston, Massachusetts. The station is located in a median between the westbound travel lanes and frontage road of Commonwealth Avenue.

<span class="mw-page-title-main">Amory Street station</span> Light rail station in Boston, Massachusetts, US

Amory Street station is a light rail stop on the Massachusetts Bay Transportation Authority (MBTA) Green Line B branch, located in the median of Commonwealth Avenue in the west part of the Boston University campus. The accessible station has two side platforms serving the line's two tracks, with access at Amory Street and Saint Paul Street.

<span class="mw-page-title-main">Warren Street station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Warren Street station is a light rail station on the MBTA Green Line B branch, located on Commonwealth Avenue at Warren Street in Allston, Boston, Massachusetts. The station is not accessible. It has two side platforms, located on the near sides of the Warren Street grade crossing, to serve the line's two tracks.

<span class="mw-page-title-main">Washington Street station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Washington Street station is a surface stop on the Massachusetts Bay Transportation Authority (MBTA)'s Green Line B branch, located in Brighton, Boston. The station is located in the median of Commonwealth Avenue northeast of Washington Street. Washington Street station consists of two side platforms, which serve the B branch's two tracks. The station is fully accessible.

<span class="mw-page-title-main">Sutherland Road station</span> Light rail station in Boston, Massachusetts, US

Sutherland Road station is a light rail stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue at its intersection with Sutherland Road, in Brighton, Boston, Massachusetts. The stop consists of two side platforms, which serve the B branch's two tracks. The platforms are at track level and the stop is not accessible.

<span class="mw-page-title-main">Chiswick Road station</span> MBTA subway station

Chiswick Road station is a light rail station on the MBTA's Green Line B branch, located in the median of Commonwealth Avenue north of Chiswick Road in the Brighton neighborhood of Boston, Massachusetts. Chiswick Road consists of two side platforms, which serve the B branch's two tracks.

<span class="mw-page-title-main">Newton Corner station</span> Transit hub in Newton, Massachusetts, US

Newton Corner is an MBTA bus transfer point in the Newton Corner neighborhood of Newton, Massachusetts, located on the rotary where Washington Street crosses the Massachusetts Turnpike. The Newton Corner station, known simply as Newton for much of its lifetime, served commuters on the Worcester Line from 1834 to 1959. A streetcar stop, located on the surface streets, served a number of routes beginning in 1863, including the Green Line A branch until 1969. Newton Corner is now a stop and transfer point for MBTA routes 52, 57, 501, 504, 553, 554, 556, and 558, which include express routes to downtown Boston as well as local routes, with stops on the north and south sides of the rotary.

<span class="mw-page-title-main">Ipswich Street line</span> Former streetcar line in Boston and Brookline, Massachusetts

The Ipswich Street line was a streetcar line in Boston and Brookline, Massachusetts. The line ran on Boylston Street and Ipswich Street in the Fenway–Kenmore neighborhood, and on Brookline Avenue through what is now the Longwood Medical Area to Brookline Village.

References

  1. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 10.
  3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN   0938315048.
  4. 1 2 Annual Report of City Engineer (28 ed.). 1895. pp. 131–137.
  5. Ninth Annual Report of the West End Street Railway Company for the Year Ending September 30, 1896. Walker, Young & Co. 1896. p. 5 via Internet Archive.
  6. "New Electric Line". Boston Globe via Newspapers.com. Open Access logo PLoS transparent.svg
  7. "Newton". Boston Globe. August 15, 1896. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  8. "Commonwealth Av. Street Railway Company". Boston Globe. March 27, 1896. p. 5 via Newspapers.com. Open Access logo PLoS transparent.svg
  9. "Atlas of the City of Boston: Ward 25, Brighton". G.W. Bromley and Co. 1909 via Ward Maps.
  10. Durso, Holly Bellocchio (June 2011). Subway Spaces as Public Places: Politics and Perceptions of Boston's T (MCP). Massachusetts Institute of Technology. p. 136. hdl:1721.1/66801.
  11. 1 2 "Changes Made by New Subway". Boston Globe. October 1, 1914. p. 3 via Newspapers.com. Open Access logo PLoS transparent.svg
  12. 1 2 "Some of Old Lines are Discontinued". Boston Globe. November 20, 1914. p. 11 via Newspapers.com. Open Access logo PLoS transparent.svg
  13. "Newton". Boston Globe. October 28, 1914. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  14. "Lake St and Reservoir Car Changes". Boston Globe. November 6, 1915. p. 10 via Newspapers.com. Open Access logo PLoS transparent.svg
  15. "New 2-Car Trains on Huntington Av Feb 6". Boston Globe. January 24, 1922. p. 18 via Newspapers.com. Open Access logo PLoS transparent.svg
  16. 1 2 Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit.
  17. 1 2 3 4 5 6 7 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  18. "Handling Traffic at Largest Baseball Park". Electric Railway Journal . Vol. 46, no. 13. September 25, 1915. p. 621 via Internet Archive.
  19. 1 2 3 4 5 6 7 8 9 10 Clarke, Bradley H. (2003). Streetcar Lines of the Hub – The 1940s. Boston Street Railway Association. ISBN   0938315056.
  20. "Sheet 10". Track Lengths of Surface Lines and Subway. Boston Elevated Railway. 1921 via Ward Maps.
  21. "Part of Ward 6, City of Newton". Atlas of the City of Newton, Massachusetts. G.W. Bromley and Company. 1917 via Ward Maps.
  22. "Part of Brighton, Ward 25, City of Boston". Atlas of the City of Boston, Wards 25 & 26, Brighton. G.W. Bromley and Company. 1916 via Ward Maps.
  23. 1 2 "New Prepayment Station in Boston". Electric Railway Journal. Vol. 59, no. 23. June 10, 1922. p. 951.
  24. "Chapter 45: Resolve providing for an investigation by the Division of Metropolitan Planning relative to the extension and development of rapid transit service in Boston, Somerville and surrounding cities and towns". Acts and resolves passed by the General Court of Massachusetts in the year 1924. May 24, 1924. pp.  602–603 via Internet Archive.
  25. 1 2 3 4 Report on Improved Transportation Facilities in Boston. Division of Metropolitan Planning. December 1926. hdl:2027/mdp.39015049422689.
  26. "Planning Board Agrees with Boston Elevated". Electric Railway Journal. Vol. 68, no. 20. November 13, 1926. p. 899.
  27. 1 2 Annual Report of the Transit Department of the City of Boston. Boston Transit Department. 1930. pp.  1–4 via Internet Archive.
  28. Annual report of the public trustees of the Boston Elevated Railway (14 ed.). Boston Elevated Railway. p.  14 via Internet Archive.
  29. Boston Elevated Railway; Massachusetts Department of Public Utilities (April 1945), Air View: Present Rapid Transit System – Boston Elevated Railway and Proposed Extensions of Rapid Transit into Suburban Boston via Wikimedia Commons
  30. Chasson, George Jr. (1987). Lonto, Arthur J. (ed.). "Boston's Main Line El: The Formative Years 1879-1908". Headlights. 49. Electric Railroader's Association: 25–26.
  31. "Lake St, Reservoir, to Lechmere trains". Boston Globe. February 5, 1931. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  32. 1 2 3 4 Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN   9780938315070.
  33. Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. p. 24. ISBN   9780685412947.
  34. Keblinsky, Joseph A. (September 1, 1960). "Commonwealth Avenue Gets a Face-Lifting Job". Boston Globe. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  35. 1 2 3 Sindel, David A. (June 2017). Strategies for meeting future capacity needs on the light rail MBTA Green Line (Thesis). Massachusetts Institute of Technology. hdl:1721.1/111263.
  36. "Commonwealth Avenue Bridge Replacement". Rollsign. Vol. 54, no. 7/8. Boston Street Railway Association. July–August 2017. p. 11.
  37. "Ask the Globe". Boston Globe. February 18, 1970. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  38. Rosa, Francis (April 17, 1970). "Korea's Kim looms challenge in Marathon". Boston Globe. p. 29 via Newspapers.com. Open Access logo PLoS transparent.svg
  39. "Alerts: Subway". Massachusetts Bay Transportation Authority. October 14, 2021. Archived from the original on October 14, 2021.
  40. DeCosta-Klipa, Nik (October 22, 2021). "A 'subtle' but permanent change is coming to the Green Line this weekend". Boston Globe. Retrieved October 24, 2021.
  41. "Work to Accelerate Green Line Safety Improvements Begins Monday" (Press release). Massachusetts Bay Transportation Authority. June 16, 2022.
  42. 1 2 "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. p. 2-9. Archived from the original (PDF) on February 20, 2012.
  43. "Subway Map" (PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original (PDF) on July 1, 2001.
  44. Rocheleau, Matt (28 September 2012). "MBTA to hold meeting on $20m project to rebuild Boston College Station". Boston Globe. Archived from the original on October 1, 2012.
  45. 1 2 "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on November 26, 2010.
  46. 1 2 3 Daniel, Mac (March 16, 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on March 18, 2005.
  47. "Comm. Ave. Green Line Improvements Public Meeting" (Press release). Massachusetts Bay Transportation Authority. October 16, 2014.
  48. O'Rourke, John (October 23, 2014). "T May Eliminate Two Green Line B Stops". BU Today. Retrieved October 31, 2014.
  49. "FMCB Awards $17.8 Million for B Branch Station Consolidation Work" (Press release). Massachusetts Bay Transportation Authority. March 23, 2020.
  50. "B Branch Station Consolidation Project: Virtual Public Meeting" (PDF). Massachusetts Bay Transportation Authority. January 28, 2021.
  51. "MBTA Announces Names of New Stations as Part of Green Line B Branch Station Consolidation Project" (Press release). Massachusetts Bay Transportation Authority. February 11, 2021.
  52. "Building a Better T: Green Line B Branch Station Consolidation Project Work Taking Place for Seven Weeks, Washington Street – Kenmore Work Begins April 17" (Press release). Massachusetts Bay Transportation Authority. March 31, 2021.
  53. "B Branch Accelerated Work 100% Complete" (Press release). Massachusetts Bay Transportation Authority. June 14, 2021.
  54. "Report from the General Manager" (PDF). Massachusetts Bay Transportation Authority. April 26, 2021. p. 11.
  55. "New Babcock Street and Amory Street Stations Open November 15" (Press release). Massachusetts Bay Transportation Authority. November 12, 2021.
  56. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
  57. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
  58. 1 2 3 "Green Line B Branch Improvements and Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 22, 2024.
  59. "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 5.
  60. Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  61. 1 2 "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. pp. 47, 66, 78.
Template:Attached KML/Green Line B branch
KML is from Wikidata