Chestnut Hill Avenue | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
An inbound train at Chestnut Hill Avenue station in 2016 | |||||||||||
General information | |||||||||||
Location | Commonwealth Avenue at Chestnut Hill Avenue Brighton, Boston, Massachusetts | ||||||||||
Coordinates | 42°20′17″N71°09′11″W / 42.33817°N 71.15310°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | ![]() | ||||||||||
Passengers | |||||||||||
2011 | 626 (weekday average boardings) [1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Chestnut Hill Avenue station is a light rail surface stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue just east of Chestnut Hill Avenue in the Brighton neighborhood of Boston, Massachusetts. Chestnut Hill Avenue has two low-level platforms, serving the B branch's two tracks; the stop is not accessible.
Just to the west of the station, there is a wye connecting the B branch to non-revenue tracks that run along Chestnut Hill Avenue to Reservoir Carhouse at Cleveland Circle. The tracks are used to supply the B branch with cars before rush hour, as the carhouse at Boston College has limited storage area. [1] The leg of the wye leading from the westbound B branch to the non-revenue tracks is out of service and paved over.
On May 14, 2008, an outbound train derailed at Chestnut Hill Avenue. It struck a nearby utility pole, which brought down the overhead wires, causing the light rail vehicle to catch fire. No injuries were reported, but the vehicle suffered significant damage. [2] [3]
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. [4] Design for Chestnut Hill Avenue and four other B Branch stops was 30% complete by December 2022. [5] A design shown in March 2024 called for Chestnut Hill Avenue station and South Street station to be consolidated, with a single station located between Chestnut Hill Driveway and Chestnut Hill Avenue. [6] In May 2024, the Federal Transit Administration awarded the MBTA $67 million to construct accessible platforms at 14 B and C branch stops including the combined Chestnut Hill Avenue/South Street station. [7]
Additional stops were added to the B branch project in 2024. [8] [9] As of February 2025 [update] , the MBTA plans to advertise the $74 million design-build contract for bidding in May 2025. [10] Construction is expected to take place from fall 2025 to mid-2027. [8]
Media related to Chestnut Hill Avenue station at Wikimedia Commons