Quincy Center | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||
Location | 175 Thomas E. Burgin Parkway Quincy, Massachusetts | |||||||||||||||||||||||||
Coordinates | 42°15′07″N71°00′20″W / 42.25194°N 71.00556°W | |||||||||||||||||||||||||
Line(s) | Red Line Braintree Branch Old Colony Mainline | |||||||||||||||||||||||||
Platforms | 1 side platform (Commuter Rail) 1 island platform (Red Line) | |||||||||||||||||||||||||
Tracks | 1 (Commuter Rail) 2 (Red Line) | |||||||||||||||||||||||||
Connections | MBTA bus: 210, 211, 215, 216, 217, 220, 222, 225, 230, 236, 238, 245 | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Bicycle facilities | 20 spaces | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Fare zone | 1 | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | September 1, 1971 [1] | |||||||||||||||||||||||||
Closed | June 30, 1959 (former station) | |||||||||||||||||||||||||
Previous names | Quincy | |||||||||||||||||||||||||
Passengers | ||||||||||||||||||||||||||
FY2019 | 7,120 daily boardings [2] (Red Line) | |||||||||||||||||||||||||
2018 | 773 daily boardings [3] (Commuter Rail) | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
|
Quincy Center station is an intermodal transit station in Quincy, Massachusetts. It is a transfer station between the MBTA Red Line subway, MBTA Commuter Rail's Old Colony Lines and Greenbush Line, and a number of MBTA bus routes. It is located between Hancock Street and Burgin Parkway in the Quincy Center district. Opened in 1971, the station was covered by a large parking garage which was closed in 2012 due to structural problems and removed several years later. The station is accessible on all modes.
Quincy Center station has one island platform serving the two tracks of the Red Line, with a single side platform for the single commuter rail track on the west side of the station.
Quincy Center is the primary terminal for MBTA bus service in Quincy and nearby areas. It is served by twelve routes – 210 , 211 , 215 , 216 , 217 , 220 , 222 , 225 , 230 , 236 , 238 , and 245 – which use a dedicated busway on the Hancock Street side of the station. (There is no bus service on the Burgin Parkway side). [4] [5] Under plans for redeveloping the station site, the busway would be relocated to the Burgin Parkway side of the station.
The Old Colony Railroad opened its main line from South Boston to Plymouth on November 10, 1845. [6] Quincy station was located at Quincy Square behind the town hall. The original station was replaced in late 1868. [7] [8] New station buildings – low brick structures very similar to the extant building at Norwood Central – were built at Quincy and Atlantic in 1900, with shelters serving the line's two tracks. [9] [10] [11] Service on the former Old Colony lines, operated by the New Haven Railroad since 1893, ended on June 30, 1959. [6] The Quincy depot was later demolished.
The 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended the Cambridge–Dorchester line receive a branch to Braintree along the Old Colony right-of-way. [12] [13] In May 1966, the MBTA began construction on the South Shore Line branch of the Cambridge–Dorchester line (which was renamed the Red Line in 1967).
The line was intended to be completed to Braintree by May 1969. [10] [14] Although the South Shore Line was planned to extend to Braintree and possibly even to Holbrook or Brockton, it was temporarily terminated at Quincy Center due to disagreements about station locations and other issues. [15]
North Quincy, Wollaston, and Quincy Center stations opened on September 1, 1971. [1] The other two stations had large surface lots, but due to limited land availability, Quincy Center station included a 5-story parking garage located over the two tracks and single island platform, with 700 spots for Red Line riders and 200 spots for local shoppers. The $5.877 million station, located a block north of the Old Colony station site, was designed Samuel Glaser Associates and built by J.F. White. [1] The station signs included interpretive panels with historical images and information - a design soon copied at other MBTA stations. [16] The new stations required a double fare to be paid on entry and an exit fare upon leaving; this was also briefly put in place on the north end of the Haymarket North Extension.
Through the first half of the 20th century, Quincy was served by a number of Eastern Massachusetts Street Railway streetcar and bus lines, with both local routes and through service as far as Providence, Rhode Island. Some routes continued through Quincy to Fields Corner via Hancock Street and Neponset Avenue. After a legal battle, the MBTA acquired the remaining Eastern Mass lines on March 30, 1968. When Quincy Center opened in 1971, most of the Fields Corner routes were cut back to the new terminus. [14]
Further construction began in 1977, and the line was extended to Braintree on March 22, 1980. [14] The exit fare was abolished from Quincy Center north at this time, though Braintree and Quincy Adams had the double fare until 2007. [17]
In November 1987, the MBTA indicated plans to repair the parking garage. [18] In 1991, the MBTA installed two elevators, making the station accessible for the first time. [18] [19]
In 1990, the MBTA began construction on the restoration of parts of the former Old Colony system. A single commuter rail track was built through the west side of the station, with a full-length high-level side platform west of the track. Service began on the Middleborough/Lakeville Line and Kingston/Plymouth Line on September 29, 1997. The Greenbush Line opened on October 31, 2007, with some of its trains stopping at Quincy Center as well. [14]
Some seasonal CapeFLYER trains stopped at Quincy Center in 2013 and 2014, but did not starting with the 2015 season due to schedule changes. [20] In January 2018, Quincy Center was changed from Zone 1 to Zone 1A (with a subway-equivalent fare to South Station on commuter rail trains) as mitigation for the closure of Wollaston station for reconstruction. [21] This continued after Wollaston reopened in 2019, as parking was then limited at North Quincy station due to garage construction. With the North Quincy project near completion, Quincy Center reverted to Zone 1 on July 1, 2021. [22]
On July 4, 2012, the Quincy Center parking garage was closed indefinitely due to structural issues. Built in 1970-71, the garage was the oldest anywhere on the MBTA system prior to its demolition. Red Line, MBTA Commuter Rail, and MBTA bus service to the station continue as normal; however, the Burgin Parkway entrance is no longer handicapped accessible. [23]
In March 2016, the city released preliminary plans for a replacement structure, paid for by a $970,000 federal grant. [24] Three structures would be built: a new garage with the same number of spaces, a "justice center" with a new Quincy District Court, and an office building for the National Park Service and its bus shuttle to Adams National Historical Park. The garage would have street-level retail locations. [25] The busways would be relocated to the Burgin Parkway side and a roof added; the kiss-and-ride dropoff lane would remain on the Hancock Street side. The project is estimated to cost $52 million; the city proposes to use $10 million in state money approved in 2014, $20 million in federal grants, and $22 million from a private partner who would operate the facility for several decades. [26] No city money will be used to pay for the project. [24]
In July and August 2016, bracing was installed in the closed garage to stabilize it while the new structure was designed. [27] [28] During September 2016, the USDOT granted $4.2 million for planning the new station. [29] In October 2016, Quincy mayor Thomas Koch announced that the courthouse part of the proposal would be withdrawn due to local opposition and a lack of available state funds, but planning for the station and office building would continue. [28] The MBTA will remove the former garage, replace the existing elevator, and add an accessible entrance to Burgin Parkway as a $25 million project lasting from July 2017 to December 2018, with future air rights development to come later. [30] [31] A $67.867 million contract (which also included the full renovation of Wollaston station) was approved on June 19, 2017. [32]
The Massachusetts Bay Transportation Authority is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network includes the MBTA subway with three metro lines, two light rail lines, and a five-line bus rapid transit system ; MBTA bus local and express service; the twelve-line MBTA Commuter Rail system, and several ferry routes. In 2023, the system had a ridership of 239,981,700, or about 796,300 per weekday as of the second quarter of 2024, of which the rapid transit lines averaged 265,900 and the light rail lines 95,900, making it the fourth-busiest rapid transit system and the third-busiest light rail system in the United States. As of the second quarter of 2024, average weekday ridership of the commuter rail system was 107,500, making it the fifth-busiest commuter rail system in the U.S.
The Red Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and Cambridge, surfacing to cross the Longfellow Bridge then returning to tunnels under Downtown Boston. It continues underground through South Boston, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to Ashmont station, where the connecting light rail Mattapan Line continues to Mattapan station. The Braintree branch runs southeast through Quincy and Braintree to Braintree station.
Alewife station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the North Cambridge neighborhood of Cambridge, Massachusetts. It is the northwest terminal of the rapid transit Red Line and a hub for several MBTA bus routes. The station is at the confluence of the Minuteman Bikeway, Alewife Linear Park, Fitchburg Cutoff Path, and Alewife Greenway off Alewife Brook Parkway adjacent to Massachusetts Route 2, with a five-story parking garage for park and ride use. The station has three bike cages. Alewife station is named after nearby Alewife Brook Parkway and Alewife Brook, themselves named after the alewife fish.
JFK/UMass station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transfer station, located adjacent to the Columbia Point area of Dorchester, Boston, Massachusetts. It is served by the rapid transit Red Line; the Greenbush Line, Kingston/Plymouth Line, and Middleborough/Lakeville Line of the MBTA Commuter Rail system, and three MBTA bus routes. The station is named for the John F. Kennedy Presidential Library and Museum and the University of Massachusetts Boston, both located nearby on Columbia Point.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by three MBTA bus routes.
The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 318,100 per weekday as of the second quarter of 2024.
Malden Center station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in Malden, Massachusetts. Located on an elevated grade above Pleasant Street in downtown Malden, it serves the rapid transit Orange Line and the MBTA Commuter Rail Haverhill Line. The station has one island platform for the two Orange Line tracks and a single side platform for the single commuter rail track. Two busways are used by 12 MBTA bus routes.
Ashmont station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located at Peabody Square in the Dorchester neighborhood of Boston, Massachusetts. It is the southern terminus of the Ashmont branch of the rapid transit Red Line, the northern terminus of the connecting light rail Ashmont–Mattapan High-Speed Line, and a major terminal for MBTA bus service. Ashmont has two side platforms serving the below-grade Red Line and a single side platform on an elevated balloon loop for the Mattapan Line. The station is fully accessible for all modes.
The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin/Foxboro Line trains use the Fairmount Line rather than the Northeast Corridor.
Braintree station is an intermodal transit station in Braintree, Massachusetts. It serves the MBTA's Red Line and the MBTA Commuter Rail Old Colony Lines as well as MBTA buses.
Quincy Adams station is a rapid transit station in Quincy, Massachusetts. It serves the Braintree Branch of the MBTA's Red Line. Located in southern Quincy on Burgin Parkway near the Braintree Split, the station features a large park and ride garage, with space for 2,538 automobiles, built over the station tracks and platforms. It is fully accessible.
Savin Hill station is a rapid transit station in Boston, Massachusetts. It serves the Ashmont branch of the MBTA's Red Line. It is located at 121 Savin Hill Avenue adjacent to Sydney Street in the Savin Hill area of the Dorchester neighborhood. Opened in 1845 as a commuter rail station, Savin Hill was converted to rapid transit in 1927 and rebuilt in 2004–05 for accessibility. Averaging 2,199 daily boardings by a FY 2019 count, Savin Hill is the least-used station on the Red Line.
North Quincy station is an MBTA subway Red Line station in Quincy, Massachusetts. It is located in North Quincy, off Hancock Street. A major park-and-ride stop, it has over 1200 parking spaces for commuters. The station is fully accessible.
Wollaston station is a rapid transit station in Quincy, Massachusetts. Located in the Wollaston neighborhood, it serves the MBTA's Red Line. It was opened in September 1971 as the second of three stations in the original South Shore Extension, replacing a mainline rail station which had been located there from 1845 to 1959. Wollaston station was closed from January 8, 2018, to August 16, 2019, for renovations to the station, including flood mitigation and accessibility improvements.
The Old Colony Lines are a pair of branches of the MBTA Commuter Rail system, connecting downtown Boston, Massachusetts with the South Shore and cranberry-farming country to the south and southeast. The two branches operate concurrently for 10 miles (16 km) via the Old Colony Mainline from South Station to Braintree station. The Middleborough/Lakeville Line then winds south through Holbrook, Brockton, Bridgewater, Middleborough, and Lakeville via the Middleborough Main Line and Cape Main Line. The Kingston Line heads southeast to serve Weymouth, Abington, Whitman, Hanson, Halifax, and Kingston by way of the Plymouth branch. Limited service to Plymouth was provided prior to April 2021 but was cut due to low ridership and budget constraints. The Greenbush Line, which was also part of the Old Colony Division, was reactivated in 2007 as a separate project.
South Quincy is a neighborhood of Quincy, Massachusetts. Located in the south central portion of the city, South Quincy is bordered on the north by Quincy Center and West Quincy, on the east by Quincy Avenue and the Quincy Point neighborhood, on the south by Braintree and on the west by Interstate 93.
West Quincy is a neighborhood of Quincy, Massachusetts. It is bordered on the north by Wollaston, on the east by Quincy Center, on the south by South Quincy and on the west by the town of Milton and the Blue Hills Reservation.
Newmarket station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line and a small number of Franklin/Foxboro Line trains. It is located off Massachusetts Avenue at Newmarket Square in the Dorchester neighborhood. The station has two 800-foot (240 m) high-level platforms and sloping walkways connecting it to Massachusetts Avenue. Originally planned to be in service in 2011, it opened on July 1, 2013, along with Four Corners/Geneva station.