Suffolk Downs station

Last updated

Suffolk Downs
Outbound train at Suffolk Downs station, August 2018.JPG
An outbound train at Suffolk Downs station in 2018
General information
Location1230 Bennington Street [1]
East Boston, Massachusetts
Coordinates 42°23′25″N70°59′49″W / 42.3904°N 70.9970°W / 42.3904; -70.9970
Line(s) Revere Extension
Platforms2 side platforms
Tracks2
Construction
Structure typeAt grade
Parking108 spaces ($2.50 fee) [1]
Bicycle facilitiesRacks available [1]
AccessibleYes
History
OpenedApril 21, 1952
RebuiltSeptember 17, 1982–January 3, 1984
June 25, 1994–June 24, 1995
Passengers
FY2019521 boardings (weekday average) [2]
Services
Preceding station MBTA.svg MBTA Following station
Orient Heights
toward Bowdoin
Blue Line Beachmont
toward Wonderland
Location
Suffolk Downs station

Suffolk Downs station is a rapid transit station on the Massachusetts Bay Transportation Authority (MBTA) Blue Line, located on the east side of Orient Heights in East Boston, Massachusetts, United States. It is named for the now-defunct Suffolk Downs racetrack, located just to the north. Suffolk Downs station has two side platforms, with a footbridge structure of brick, concrete, and steel connecting them. The station is accessible. With just 521 daily boardings in FY 2019, Suffolk Downs is the least-used fare-controlled station on the MBTA subway system.

Contents

Two previous stations at the site were operated by the Boston, Revere Beach and Lynn Railroad, which opened through East Boston in 1875. The railroad opened Waldemar station in 1894 to serve a nearby development; it was soon renamed Belle Isle. The station closed in the 1920s, but a new station named Suffolk Downs station opened on the site in 1935 to serve the new racetrack. Service on the line ended in 1940. Electric streetcar service on a parallel line operated from 1893 to 1952; a spur line directly to the racetrack was operated from 1935 to 1952.

The Metropolitan Transportation Authority (MTA) purchased the abandoned right-of-way in 1941 to extend the East Boston Tunnel rapid transit line. The MTA opened its Suffolk Downs station with a single platform in 1952; it was expanded with a second platform in 1954 as part of the second phase of the Revere Extension. After a 1976 fire, only the inbound platform remained open until a 1982–1984 renovation. The station was renovated further in 1994–95, and further improvements are planned as part of a redevelopment of the racetrack site.

Station design

The footbridge structure and inbound platform Inbound structure at Suffolk Downs station, August 2018.JPG
The footbridge structure and inbound platform

Suffolk Downs station is located at the east end of the Orient Heights neighborhood in East Boston. [3] The defunct Suffolk Downs racetrack is to the north, and Belle Isle Marsh Reservation to the south and east. [4] The surface-level station has two side platforms serving the two tracks of the Blue Line. [5]

The dominant architectural form of the station is the symmetrical footbridge structure designed by architect Eduardo Lozano. [6] :77 The structure has a hierarchy of three materials: "neutral" concrete supports the footbridge and provides shelter for passengers, warmer brick covers exterior faces and some interior walls, and the blue-painted steel footbridge "echoes the metallic technology of the railroad". [6] :78 The bridge is divided into separate paid and unpaid corridors; both halves have ramps (but no elevators) for accessibility, while the paid half also has stairs to the platforms. [7] [6] :77

The station was designed as a "transparent fortress", as the MBTA's primary design consideration was security. [6] :77 Open forms provide cover for passengers, but allow the single station agent or a police officer outside to surveil the whole station. The architect called it "a proxy for a building". [6] :77 The design was inspired by medieval fortified churches, with battered walls to discourage climbing and iron palisades to separate paid and unpaid areas. [6] :77 The brick arches were partially medieval in design – and partially just the architect's preference. [6] :77

The station has entrances from Bennington Street and Walley Street. Due to low ridership, there are only fare gates on the Walley Street (inbound) side; the outbound side only has a high exit turnstile. Passengers must use the unpaid portion of the footbridge to enter from Bennington Street, and the paid portion to reach the outbound platform. [8] A 108-space parking lot is located on the Bennington Street side north of the entrance. [1] [3]

History

BRB&L and streetcars

Gladstone Loop and the junction for the Suffolk Downs spur in the 1930s Suffolk Downs junction and Gladstone loop.jpg
Gladstone Loop and the junction for the Suffolk Downs spur in the 1930s

The narrow gauge Boston, Revere Beach and Lynn Railroad (BRB&L) opened from East Boston to Lynn through Breed's Hill (later part of East Boston) on July 29, 1875; there was initially no station between Winthrop and Beachmont. [9] Waldemar station opened in 1894 to serve a new housing development on Orient Heights. [10] [11] [12] :102 It was renamed Belle Isle within several years. [13] [14] The development failed in 1907, but the station remained open. [12] :102 The station closed in the mid-1920s. [15] [16] [17] The wooden structure suffered a number of fires in 1925 and 1926 caused by sparks from passing locomotives. [18] [15]

On July 4, 1889, the Boston and Revere Electric Street Railway opened a new electric streetcar line from Winthrop Junction to Crescent Beach, running on a private right-of-way that paralleled the BRB&L tracks on the north side. It was initially only used for seasonal service to the Great Ocean Pier, which closed in 1893; the Lynn and Boston Street Railway began operating the line full-time on July 17, 1893. [19] :229 The line passed through several successor companies; by the 1930s, the Eastern Massachusetts Street Railway and the Boston Elevated Railway (BERy) jointly operated Maverick–Revere Beach through service. [19] :231 In 1930, the BERy constructed a small yard, Gladstone Loop, north of Waldemar Avenue near the former Belle Isle station. It served as the terminal for Maverick–Gladstone Loop short turns and had a small shelter for inbound passengers. [20] :29

In 1928, the BRB&L was electrified with pre-pay stations, making it more like a rapid transit line than a conventional railroad. [17] A new station, Suffolk Downs, was built at the former Belle Isle site when the horse-racing track opened in July 1935. The Boston Elevated Railway also opened a streetcar spur from Gladstone Loop to the track. [21] On June 10, 1936, the Eastern Massachusetts Street Railway sold its remaining streetcar lines in Chelsea, Everett, and Revere to the BERy. [19] :230 Due to the Great Depression, the BRB&L shut down on January 27, 1940. [22] Suffolk Downs station was sold to a private owner after the closure. [12] :102

Rapid transit

An outbound train at Suffolk Downs in 1967 MBTA train at Suffolk Downs, 1967.jpg
An outbound train at Suffolk Downs in 1967

In 1941, the Boston Elevated Railway bought the BRB&L right of way from Day Square to Revere Beach for use as a high-speed streetcar line similar to the Ashmont-Mattapan High Speed Line. These plans were delayed by the onset of World War II. [12] :8 However, the 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the BRB&L right-of-way, rather than using the right-of-way for a streetcar line. [23] [24]

In 1947, the newly formed Metropolitan Transit Authority (MTA) decided to build the extension to Lynn as a rapid transit line. Construction began in October 1948. [12] :8 The first part of the Revere Extension opened to Orient Heights on January 5, 1952. The remaining streetcar lines in East Boston, Chelsea, and Revere were replaced with trackless trolleys at that time. The new Orient Heights–Revere Beach Loop line ran on Bennington Street south of the former BRB&L alignment. There was no replacement for the Suffolk Downs streetcar spur. [20]

A one-stop rapid transit extension to Suffolk Downs station opened on April 21, 1952 – the first day of the racing season. The station initially had only one track and one platform, and was only open during the racing season. [25] [12] :103 A rapid transit spur directly to the racetrack was considered, but was rejected due to cost. [12] :104 However, the MTA reactivated the Suffolk Downs spur, running a streetcar shuttle to the track until the racing season ended on June 28. This shuttle was not resumed for the 1953 season. [20] :31 Most of the streetcar trackage was later removed, though the switches to the Suffolk Downs spur and a short segment on Walley Street remain extant. [20] :29 The former BRB&L station was demolished in May 1952. [12] :104

The second phase of the Revere Extension (cut short due to limited funds) opened to Wonderland on June 19, 1954, with a second track and platform added to Suffolk Downs station for full-time service. [25] [26] [12] :103 Because Suffolk Downs station was expected to be used primarily during the short racing season, the platforms were constructed of wood rather than the concrete used in the other stations. [12] :104 The Orient Heights–Revere Beach trackless trolley line was rendered redundant by the extension to Wonderland and was discontinued on June 18, 1955, ending bus service to the station. [19] :231 The Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in August 1964. The subway lines were given colored identifying names in 1965, with the East Boston Tunnel route becoming the Blue Line. [26]

Renovations

Construction of the new station in 1983 Suffolk Downs station construction, 1983.jpg
Construction of the new station in 1983

A fire on February 14, 1976 destroyed much of the wooden station. [27] Only the inbound platform remained open after the fire, which hurt attendance at races. [26] [28] From February 1 to December 16, 1981, Sunday service between Orient Heights and Wonderland was replaced by shuttle buses due to budget cuts. [26] The MBTA received a $1.9 million grant from the Urban Mass Transportation Administration to fund a new station, and a $2.5 million construction contract was awarded on August 27, 1982. [28] [29] Construction began on September 17, but was soon suspended until March 1983 due to winter conditions. [30] The station closed for reconstruction in 1983, and the new station fully opened on January 3, 1984. [31] It was designed for security and easy surveillance, with nonflammable materials to avoid a repeat of the 1976 fire. [6] :77 Suffolk Downs was the first accessible station on the Blue Line, and the only accessible station on the line until renovations to State finished in 1987. [26] [7] [32]

Wooden bracing under the closed footbridge in 2022 Bracing for footbridge at Suffolk Downs station, March 2022.JPG
Wooden bracing under the closed footbridge in 2022

The station was closed for one year starting on June 25, 1994 as Suffolk Downs, Beachmont, Revere Beach, and Wonderland stations were rebuilt as part of the Blue Line Modernization Program. Blue Line service temporarily ended at Orient Heights and buses served the closed outer stations during the project. [26] [33] Because Suffolk Downs station had been completely rebuilt just decade before, it needed just $3 million worth of work, compared to $9 million each at Revere Beach and Wonderland and $27 million for a completely new station at Beachmont. [34] The inbound platform was extended 100 feet (30 m) to the south, and the outbound platform an equal length to the north. [35] The stations reopened on June 24, 1995. [34]

Unlike most MBTA rapid transit stations, Suffolk Downs has no direct MBTA bus connections; the nearest route is the 120 about 700 feet (210 m) to the southwest. [36] However, during the 2013 reconstruction and closure of Orient Heights, Suffolk Downs was used as the terminus of the replacement shuttle bus service. [26] The footbridge was closed on March 22, 2021, due to structural deterioration, but the station remained open. Passengers needing to cross between platforms had to take a train one stop to Orient Heights or Beachmont. [37] The footbridge deck was replaced during closure of the outer portion of the Blue Line from May 22 to June 8, 2022. [38] The footbridge reopened in October 2022. [39]

Averaging just 521 daily boardings in FY 2019, Suffolk Downs is the least-used fare-controlled station on the MBTA subway system. [2] The redevelopment of the Suffolk Downs site is expected to substantially increase ridership to Suffolk Downs and Beachmont stations. The developer, HYM Investment Group, has committed $20 million for transit projects including modifications to both stations. [40] [41] Reconstruction of the station is expected to begin between FY 2023 and FY 2027. [42] Conceptual design began in mid-2022. [43]

Related Research Articles

<span class="mw-page-title-main">Blue Line (MBTA)</span> Rapid transit line in Boston

The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority (MBTA). It runs from Bowdoin station in downtown Boston under Boston Harbor to East Boston and Revere on the inner North Shore, where it terminates at Wonderland. The stop at Airport Station, by way of a free shuttle bus, is one of two rapid transit connections to Logan International Airport. In 1967, during a systemwide rebranding, the line was assigned the blue color because it passes under the Boston Harbor. With an end-to-end travel time of less than twenty minutes, the Blue Line is the shortest of Boston's heavy-rail lines and the only line to have both third rail and overhead catenary sections.

<span class="mw-page-title-main">Airport station (MBTA)</span> Rapid transit station in Boston, Massachusetts, US

Airport station is a rapid transit station in Boston, Massachusetts. It serves the MBTA Blue Line and the SL3 branch of the Silver Line. It is located in East Boston under the interchange between Interstate 90 and Massachusetts Route 1A. The station provides one of two mass transit connections to the nearby Logan International Airport, as well as serving local residents in East Boston. Shuttle buses connect the station with the airport terminals and other facilities.

<span class="mw-page-title-main">Charles/MGH station</span> Rapid transit station in Boston, Massachusetts, US

Charles/MGH station is a rapid transit station on the MBTA Red Line, elevated above Charles Circle on the east end of the Longfellow Bridge in the West End neighborhood of Boston, Massachusetts. The station is named for Charles Circle and the adjacent Massachusetts General Hospital (MGH) campus. It has two side platforms, with a glass-walled headhouse structure inside Charles Circle. Charles/MGH station is fully accessible.

<span class="mw-page-title-main">JFK/UMass station</span> Transit station in Boston, Massachusetts, US

JFK/UMass station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transfer station, located adjacent to the Columbia Point area of Dorchester, Boston, Massachusetts. It is served by the rapid transit Red Line; the Greenbush Line, Kingston/Plymouth Line, and Middleborough/Lakeville Line of the MBTA Commuter Rail system, and three MBTA bus routes. The station is named for the John F. Kennedy Presidential Library and Museum and the University of Massachusetts Boston, both located nearby on Columbia Point.

<span class="mw-page-title-main">State station</span> Subway station in Boston, Massachusetts, US

State station is an underground Massachusetts Bay Transportation Authority (MBTA) rapid transit station located in downtown Boston, Massachusetts. It is the transfer point between the Orange Line and the Blue Line, and one of four "hub stations" on the MBTA subway system. The Orange Line has two side platforms on two levels, while the Blue Line has two side platforms on a single level. The station is fully accessible.

<span class="mw-page-title-main">Aquarium station (MBTA)</span> Subway station in Boston, Massachusetts, US

Aquarium station is an underground rapid transit station on the MBTA Blue Line in Boston, Massachusetts, United States. It is located under State Street at Atlantic Avenue on the eastern edge of Boston's Financial District near Boston Harbor. The station is named for the nearby New England Aquarium. It is adjacent to Long Wharf, which is used by two MBTA Boat lines. The station has two side platforms serving the two tracks of the Blue Line; an arched ceiling runs the length of the platform level. With the platforms 50 feet (15 m) below street level, it is the second-deepest station on the MBTA system.

<span class="mw-page-title-main">Boston, Revere Beach and Lynn Railroad</span>

The Boston, Revere Beach and Lynn Railroad was a 3 ft narrow-gauge passenger-carrying shortline railroad between East Boston and Lynn, Massachusetts, from 1875 to 1940. Part of the railroad's right of way now forms the outer section of the Massachusetts Bay Transportation Authority's Blue Line rapid transit service.

<span class="mw-page-title-main">Science Park station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Science Park station is an elevated light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line in Boston, Massachusetts, United States. The station is located at the Boston end of the Charles River Dam Bridge at Leverett Circle. It is at the southeast end of the Lechmere Viaduct, which carries the Green Line over the Charles River. The station is named for the nearby Boston Museum of Science. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after Suffolk Downs.

<span class="mw-page-title-main">Maverick station</span> Subway station in Boston, Massachusetts, US

Maverick station is a rapid transit station in Boston, Massachusetts. It serves the MBTA's Blue Line and is located at Maverick Square in East Boston. It is the easternmost underground station on the Blue Line and a transfer point to various buses. A center island platform provides access to the surface in the middle of Maverick Square. In the station, a track map lined with light bulbs shows the position of the trains on the Blue Line between Bowdoin and Orient Heights. It was one of the last stations to be converted to 6-car train service as part of the MBTA's Blue Line Renovation Project. Maverick is a terminal for MBTA bus routes 114, 116, 117, 120, and 121.

<span class="mw-page-title-main">Sullivan Square station</span> Rapid transit station in Boston, Massachusetts, US

Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.

<span class="mw-page-title-main">Mattapan station</span> Light rail station in Boston, Massachusetts, US

Mattapan station is an MBTA light rail station in Boston, Massachusetts. It is the southern terminus of the Ashmont–Mattapan High-Speed Line, part of the Red Line, and is also an important MBTA bus transfer station, with eight routes terminating there. It is located at Mattapan Square in the Mattapan neighborhood. At the station, streetcars use a balloon loop to reverse direction back to Ashmont station. Mattapan station is fully accessible, with mini-high platforms.

<span class="mw-page-title-main">Bowdoin station</span> Subway station in Boston, Massachusetts, US

Bowdoin station is a Massachusetts Bay Transportation Authority (MBTA) rapid transit station in Bowdoin Square in Boston, Massachusetts. The station is the downtown terminus of the Blue Line, part of the MBTA subway system. It has a single wedge-shaped island platform located inside a balloon loop. Bowdoin is the only Blue Line station that is not accessible.

<span class="mw-page-title-main">Revere Beach station</span> Rapid transit station in Revere, Massachusetts, US

Revere Beach station is a rapid transit station in Revere, Massachusetts. Located between Beach Street and Shirley Avenue, it serves the MBTA Blue Line. It serves Revere Beach, a popular summer destination with a substantial year-round resident population. It opened in January 1954 on the site of a former Boston, Revere Beach and Lynn Railroad station, as part of an extension to Wonderland. Revere Beach station was closed and rebuilt from 1994 to 1995.

<span class="mw-page-title-main">Wonderland station</span> Rapid transit station in Revere, Massachusetts, US

Wonderland station is a transit station in Revere, Massachusetts located adjacent to Revere Beach. It is the northern terminus of the MBTA Blue Line rapid transit line, as well as a major bus transfer station for Revere and the North Shore area, serving MBTA bus routes 110, 116, 117, 411, 424, 426W, 439, 441, 442, 450W, and 455. The station is fully accessible.

<span class="mw-page-title-main">Wood Island station</span> Rapid transit station in Boston, Massachusetts, US

Wood Island station is an MBTA Blue Line rapid transit station located off Bennington Street in the Day Square section of East Boston, Boston, Massachusetts. The station is adjacent to and named for the former Wood Island Park, a once heavily used recreational area for East Boston residents. Most of the park was destroyed in the mid 1960s to expand Logan International Airport. It was built in 1952, replacing a pair of Boston, Revere Beach and Lynn Railroad stations that served the area.

<span class="mw-page-title-main">Massachusetts Avenue station</span> Rapid transit station in Boston, Massachusetts, US

Massachusetts Avenue station is a rapid transit station in the South End and Symphony neighborhoods of Boston, Massachusetts. It serves the MBTA Orange Line, and is located at 380 Massachusetts Avenue. The station opened in 1987 as part of the renovation and relocation of the southern Orange Line into the Southwest Corridor. The Orange line runs parallel to the Northeast Corridor, which carries Amtrak trains and several MBTA commuter rail lines.

<span class="mw-page-title-main">Broadway station (MBTA)</span> Subway station in Boston, Massachusetts, US

Broadway station is a subway station in Boston, Massachusetts. It serves the MBTA's Red Line. It is located at the intersection of Dorchester Avenue and Broadway in South Boston. It was opened on December 15, 1917, as part of the Dorchester Extension from Downtown Crossing to Andrew. The station has a single island platform to serve the two tracks.

<span class="mw-page-title-main">Beachmont station</span> Rapid transit station in Revere, Massachusetts, US

Beachmont station is an elevated rapid transit station in Revere, Massachusetts. It serves the MBTA Blue Line, and is located above Winthrop Avenue in the Beachmont neighborhood. Beachmont station is fully accessible, with elevators from the lobby to the platforms.

<span class="mw-page-title-main">Orient Heights station</span> Rapid transit in Boston, Massachusetts, US

Orient Heights station is a rapid transit station in Boston, Massachusetts. The station serves the MBTA Blue Line. It is located off Bennington Street in East Boston's Orient Heights neighborhood. Formerly a Boston, Revere Beach and Lynn Railroad station under various names from 1875 to 1940, it reopened in 1952. The 1952-built station was closed in March 2013 for a complete rebuilding to provide full accessibility and reopened on November 26, 2013.

<span class="mw-page-title-main">River Works station</span> Commuter rail station in Lynn, Massachusetts

River Works station is an MBTA Commuter Rail station on the Newburyport/Rockport Line in West Lynn, Massachusetts. The only private station on the system, it is only open to GE Aviation employees who work at the adjacent River Works plant. The station has minimal facilities – two small sections of platform and several shelters – and is not accessible.

References

  1. 1 2 3 4 "Suffolk Downs". Massachusetts Bay Transportation Agency. Retrieved April 27, 2021.
  2. 1 2 "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 8.
  3. 1 2 "Neighborhood of East Boston". Boston Planning and Development Agency. November 2016.
  4. "Suffolk Downs Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2010. Archived from the original (PDF) on October 28, 2017.
  5. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  6. 1 2 3 4 5 6 7 8 Brenner, Douglas (January 1987). "In transit" (PDF). Architectural Record. pp. 67–83.
  7. 1 2 TranSystems and Planners Collaborative (August 24, 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report" (PDF). Massachusetts Bay Transportation Agency. p. 189.
  8. Cox, Jeremiah (July 2, 2011). "Suffolk Downs". The SubwayNut. Retrieved April 11, 2021.
  9. Bradlee, Francis Boardman Crowninshield (1921). The Boston, Revere Beach and Lynn Narrow Gauge Railroad. Essex Institute. pp. 4–5 via Google Books.
  10. "Real Estate". Boston Globe. June 3, 1894. p. 10 via Newspapers.com.
  11. "Crowds Increase [Advertisement]". Boston Globe. June 7, 1894. p. 5 via Newspapers.com.
  12. 1 2 3 4 5 6 7 8 9 10 Cheney, Frank (2003). Boston's Blue Line. Arcadia Publishing. ISBN   9780738535760.
  13. "Streets of Beachmont Blocked". Boston Globe. February 14, 1899. p. 3 via Newspapers.com.
  14. Bromley, George W.; Bromley, Walter S. (1901). "Plate 30". Atlas of the city of Boston : East Boston : from actual surveys and official plans. G.W. Bromley & Co.
  15. 1 2 "East Boston District". Boston Daily Globe. August 2, 1926. p. A10 via Newspapers.com.
  16. "East Boston District". Boston Globe. July 23, 1924. p. 10 via Newspapers.com.
  17. 1 2 ""Narrow Gage" Electrified for Economy". Electric Railway Journal . 72 (23): 991–998. December 8, 1928 via Internet Archive.
  18. "East Boston District". Boston Daily Globe. August 26, 1925. p. A11 via Newspapers.com.
  19. 1 2 3 4 Humphrey, Thomas J. (August 2020). "Origin and Development of the Fixed-Route Local Bus Transportation Network in the Cities and Towns of the Massachusetts Bay Transportation Authority District as of December 31, 1973: Revised Edition" (PDF). NETransit.
  20. 1 2 3 4 Clarke, Bradley H. (2015). Streetcar Lines of the Hub: Boston's MTA Through Riverside and Beyond. Boston Street Railway Association. ISBN   9780938315070.
  21. "Modern Magic Has Transformed Dumping Ground Into Suffolk Downs, One of Country's Finest Race Tracks". Boston Globe. July 6, 1935. p. 3 via Newspapers.com.
  22. Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 268–272. ISBN   0942147022.
  23. Central Transportation Planning Staff (November 15, 1993). "The Transportation Plan for the Boston Region - Volume 2". National Transportation Library. Archived from the original on October 5, 2013.
  24. Boston Elevated Railway and Boston Department of Public Utilities (1945), Boston Rapid Transit System & Proposed Extensions 1945 - Metropolitan Transit Recess Commission Air View via Wikimedia Commons
  25. 1 2 "Rapid Transit Line to Revere to Open June 19". Boston Globe. June 9, 1954. p. 9 via Newspapers.com.
  26. 1 2 3 4 5 6 7 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  27. "Fire damages MBTA station". Boston Globe. February 15, 1976. p. 42 via Newspapers.com.
  28. 1 2 Temple, Robert (2009). The Pilgrims Would Be Shocked: The History of Thoroughbred Racing in New England. Robert Temple. ISBN   978-1-4415-1428-8.
  29. 1982 Annual Report. Massachusetts Bay Transportation Authority. 1983. p. 25 via Internet Archive.
  30. "Ask The Globe". Boston Globe. February 14, 1983. p. 43 via Newspapers.com.
  31. "Suffolk Downs station open". Boston Globe. January 4, 1984. p. 21 via Newspapers.com.
  32. 1986 Annual Report. Massachusetts Bay Transportation Authority. 1986. p.  23 via Internet Archive.
  33. Blake, Andrew (March 20, 1994). "MBTA to begin $467 million Blue Line project". Boston Globe via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  34. 1 2 Blake, Andrew (June 18, 1995). "Blue Line stations set to reopen after $467m upgrade". Boston Globe via Newspapers.com. (second page) Open Access logo PLoS transparent.svg
  35. Fay, Spofford & Thorndike (October 1993). Blue Line Station Modernization Project Final Environmental Impact Report. Massachusetts Bay Transportation Authority. p. 1-4.
  36. "2023–24 System Map". Massachusetts Bay Transportation Authority. December 17, 2023.
  37. "Alerts: Subway". Massachusetts Bay Transportation Authority. March 22, 2021. Archived from the original on March 23, 2021.
  38. "Work Completed on Pedestrian Bridge at Suffolk Downs Station" (Press release). Massachusetts Bay Transportation Authority. June 9, 2022.
  39. "Suffolk Downs Pedestrian Bridge". Massachusetts Bay Transportation Authority. October 2022. Archived from the original on November 1, 2022.
  40. HYM Investment Group (September 16, 2019). "Suffolk Downs Redevelopment: Additional Information Document". Boston Planning and Development Authority. p. 14.
  41. "Suffolk Downs Redevelopment: Boston Zoning Commission Hearing". Boston Planning and Development Authority. October 21, 2020. p. 29.
  42. "Massachusetts Bay Transportation Authority FY23-27 Capital Investment Plan (CIP): Proposed" (PDF). Massachusetts Bay Transportation Authority. March 2022. p. 38.
  43. "Suffolk Downs Station Improvements". Massachusetts Bay Transportation Authority. Archived from the original on October 18, 2022.