Causeway Street elevated

Last updated

Causeway Street elevated
Causeway Elevated and Boston Garden.jpg
An outbound Green Line train on the Causeway elevated in front of Boston Garden. The photo dates to between 1989 (Brigham Circle Line restored to Heath Street) and 1998 (Boston Garden demolished).
Overview
Statusdemolished
Locale Boston, Massachusetts, United States
Service
Type elevated railway
System Massachusetts Bay Transportation Authority
Services Green Line
History
OpenedJune 1, 1912 (1912-06-01)
ClosedJune 25, 2004 (2004-06-25)
Technical
Character streetcar services
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Causeway Street elevated was an elevated section of the MBTA Green Line light rail system in Boston, located in the area near North Station. It was in operation from 1912 until 2004, when it was replaced with a new tunnel and underground station on a slightly different alignment.

Contents

Description

The Causeway Street elevated began at the Canal Street incline in parallel with the Charlestown Elevated tracks, and after "splitting" away from it just south of Boston Garden, [1] turned southwest above Causeway Street with an elevated station at North Station in front of the Boston Garden, and then turned northwest above Lowell Street, before joining the Lechmere Viaduct at Leverett Circle. It was a two-track structure on steel girders, similar to the Charlestown Elevated, Atlantic Avenue Elevated, and Washington Street Elevated, which were opened between 1901 and 1909.

The Causeway Street elevated was one of the last pieces of elevated line constructed in Boston, and, except for a short section remaining at Lechmere, was the last section in service.

History

An inbound streetcar bound for Pleasant Street at the North Station elevated station in 1912, just after its opening Streetcar at elevated North Station, June 1912.jpg
An inbound streetcar bound for Pleasant Street at the North Station elevated station in 1912, just after its opening
The Causeway Street elevated tracks in the early 1960s, with the Lechmere Viaduct at lower left and Hotel Madison and Boston Garden and North Station at upper right. The recently cleared land of the West End can also be seen. North Station and West End redevelopment aerial view.jpg
The Causeway Street elevated tracks in the early 1960s, with the Lechmere Viaduct at lower left and Hotel Madison and Boston Garden and North Station at upper right. The recently cleared land of the West End can also be seen.
A Lechmere-bound PCC streetcar train on the Causeway Street elevated in May 1976, next to Central Artery ramps Green Line trolley next to Central Artery 2.jpg
A Lechmere-bound PCC streetcar train on the Causeway Street elevated in May 1976, next to Central Artery ramps

Opening

When the Tremont Street subway fully opened in 1898, surface cars entering the subway from East Cambridge had to cross Craigie's Bridge and proceed on surface streets to the Canal Street incline. The trip from Lechmere Point over the bridge was slow and prone to heavy traffic delays. On June 20, 1907, construction began on one mile of elevated track connecting the Canal Street incline to East Cambridge. The project's centerpiece was the 1,700-foot (520 m) arched Lechmere Viaduct crossing the Charles River; other sections included a short elevated in East Cambridge and an elevated line above Causeway Street connecting the viaduct to the Canal Street incline. [2] The first streetcars crossed the new bridge and the Causeway Street elevated in revenue service on June 1, 1912, shortening the ten-minute trip from Lechmere Square to the subway to just three minutes. [3] [4]

A single station was built on Causeway Street in front of the Boston and Maine Railroad's terminal, North Union Station, with connections to it as well as the Main Line Elevated station (which had opened in 1901) and the Causeway Street streetcar terminal (opened in 1898). [5] An additional platform at the station was built for Main Line trains running shuttle services between North Union Station and South Station on the Atlantic Avenue Elevated. [6] North Union Station was replaced in 1928 by North Station with the Boston Garden arena on top, prompting minor changes to the station's configuration.

When the Atlantic Avenue Elevated was closed in 1938, and subsequently demolished for scrap metal in 1942, the tracks that once served it were removed from the elevated station, but the abandoned stub trackbed remained part of the station for the remainder of its lifespan.

Closure

The Causeway Street elevated during deconstruction in September 2004 Causeway Street Elevated under deconstruction, September 2004.jpg
The Causeway Street elevated during deconstruction in September 2004

In 1995, Boston Garden was replaced by the FleetCenter (later renamed TD Garden), whose building was set further back from Causeway Street. Several years later, the Elevated was temporarily extended approximately 100 feet (30 m) east along Causeway Street, and the Causeway Street surface terminal closed on March 28, 1997, because Big Dig construction required several maintenance buildings to be constructed along the Elevated's original Causeway Street alignment. As part of environmental remediation to compensate for increased air pollution caused by the Big Dig, the Causeway Street elevated was replaced by a new tunnel under North Station to free up land and to lower noise levels associated with the trains' characteristic screech as they rounded the sharp elevated turns, as well as to remove the light-blocking elevated structure from Causeway Street. [7] The new tunnel is 4 tracks wide under the North Station building. Through trains run on the outer tracks, while the inner two tracks are used for temporarily storing Green line cars and to reverse trains that terminate at North Station. A short siding off the inbound track south of North Station is used for storing construction equipment. [8]

On June 25, 2004, the Causeway Street elevated was permanently closed. After a weekend of substitute bus service north of Government Center, Green Line service to the underground North Station "superstation" began on June 28. During the 2004 Democratic National Convention from July 24 to 29, 2004, the disused Elevated was used as a platform for security personnel. After a year of substitute bus service while the new portal and incline connecting the tunnel to the Lechmere Viaduct were finished, regular service to Lechmere resumed on November 12, 2005. [5] [9] The replacement of the Causeway Street elevated cost $310 million in 2005 dollars. [7]

Related Research Articles

<span class="mw-page-title-main">Green Line (MBTA)</span> Light rail system

The Green Line is a semi-metro system run by the Massachusetts Bay Transportation Authority (MBTA) in the Boston, Massachusetts, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in North America. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 137,700 in 2019, it is the third most heavily used light rail system in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston.

<span class="mw-page-title-main">Orange Line (MBTA)</span> Rapid transit line in Greater Boston

The Orange Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south on the surface from Oak Grove station in Malden, Massachusetts through Malden and Medford, paralleling the Haverhill Line, then crosses the Mystic River on a bridge into Somerville, then into Charlestown. It passes under the Charles River and runs through Downtown Boston in the Washington Street Tunnel. The line returns to the surface in the South End, then follows the Southwest Corridor southwest in a cut through Roxbury and Jamaica Plain to Forest Hills station.

<span class="mw-page-title-main">Government Center station (MBTA)</span> Subway station in Boston, Massachusetts, US

Government Center station is an MBTA subway station in Boston, Massachusetts. It is located at the intersection of Tremont, Court and Cambridge Streets in the Government Center area. It is a transfer point between the light rail Green Line and the rapid transit Blue Line. With the Green Line platform having opened in 1898, the station is the third-oldest operating subway station in the MBTA system; only Park Street and Boylston are older. The station previously served Scollay Square before its demolition for the creation of Boston City Hall Plaza.

<span class="mw-page-title-main">Haymarket station (MBTA)</span> Subway station in Boston, Massachusetts, US

Haymarket station is an underground Massachusetts Bay Transportation Authority (MBTA) rapid transit station located at Haymarket Square in Boston, Massachusetts. It is a transfer station between the Green Line and Orange Line of the MBTA subway system, as well as a terminal for MBTA bus routes serving northern and northeastern suburbs. The two lines run parallel to each other through the station, with two side platforms for the Orange Line and a single island platform for the Green Line. The station is fully accessible.

<span class="mw-page-title-main">Boylston station</span> Subway station in Boston, Massachusetts, US

Boylston station is a light rail station on the MBTA Green Line in downtown Boston, Massachusetts, located on the southeast corner of Boston Common at the intersection of Boylston Street and Tremont Street. A southbound street-level stop for the SL5 route of the bus rapid transit Silver Line is outside fare control. The station has two island platforms; each has one disused track, making them effectively side platforms. Boylston is not accessible for Green Line trains.

<span class="mw-page-title-main">Science Park station (MBTA)</span> Light rail station in Boston, Massachusetts, US

Science Park station is an elevated light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line in Boston, Massachusetts, United States. The station is located at the Boston end of the Charles River Dam Bridge at Leverett Circle. It is at the southeast end of the Lechmere Viaduct, which carries the Green Line over the Charles River. The station is named for the nearby Boston Museum of Science. With 873 daily boardings by a FY 2019 count, Science Park is the least-used fare-controlled station on the Green Line, and the second-lowest on the MBTA subway system after Suffolk Downs.

<span class="mw-page-title-main">Lechmere station</span> Light rail station in Cambridge, Massachusetts, US

Lechmere station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Monsignor O'Brien Highway near First Street, adjacent to the NorthPoint development. The accessible elevated station has a single island platform, with headhouses at both ends. It opened on March 21, 2022, as part of the Green Line Extension (GLX). Lechmere station is served by Green Line D branch and E branch service.

<span class="mw-page-title-main">Atlantic Avenue Elevated</span> Former elevated railway in Boston, Massachusetts, US

The Atlantic Avenue Elevated was an elevated railway around the east side of Downtown Boston, Massachusetts, providing a second route for the Boston Elevated Railway's Main Line Elevated around the Washington Street tunnel. It was in use from 1901 to 1938, when it was closed due to low ridership, later being demolished.

The Pleasant Street incline or Pleasant Street portal was the southern access point for the Tremont Street subway in Boston, Massachusetts, which became part of the Green Line after the incline was closed. The portal and the section of tunnel connecting it to Boylston served streetcars from 1897 to 1901, Main Line Elevated trains from 1901 to 1908, and streetcars again from 1908 to 1962. The Pleasant Street incline is now abandoned, but plans have been floated at various times to reuse it.

<span class="mw-page-title-main">Green Line E branch</span> Light rail line

The E branch is a light rail line in Boston, Cambridge, Medford, and Somerville, Massachusetts, operating as part of the Massachusetts Bay Transportation Authority (MBTA) Green Line. The line runs in mixed traffic on South Huntington Avenue and Huntington Avenue between Heath Street and Brigham Circle, in the median of Huntington Avenue to Northeastern University, then into the Huntington Avenue subway. The line merges into the Boylston Street subway just west of Copley, running to North Station via the Tremont Street subway. It then follows the Lechmere Viaduct to Lechmere, then the Medford Branch to Medford/​Tufts. As of February 2023, service operates on eight-minute headways at weekday peak hours and eight to nine-minute headways at other times, using 13 to 17 trains.

<span class="mw-page-title-main">Green Line C branch</span> Light rail line in Massachusetts, US

The C branch, also called the Beacon Street Line or Cleveland Circle Line, is one of four branches of the Massachusetts Bay Transportation Authority's Green Line light rail system in the Boston, Massachusetts metropolitan area. The line begins at Cleveland Circle in the Brighton neighborhood of Boston and runs on the surface through Brookline along the median of Beacon Street. Reentering Boston, the line goes underground through the St. Mary's Street incline and joins the B and D branches at Kenmore. Trains run through the Boylston Street subway to Copley where the E branch joins, then continue through the Tremont Street subway to downtown Boston. The C branch has terminated at Government Center station since October 2021.

<span class="mw-page-title-main">Green Line B branch</span> Light rail line in Boston, Massachusetts

The B branch, also called the Commonwealth Avenue branch or Boston College branch, is a branch of the MBTA Green Line light rail system which operates on Commonwealth Avenue west of downtown Boston, Massachusetts. One of four branches of the Green Line, the B branch runs from Boston College station down the median of Commonwealth Avenue to Blandford Street. There, it enters Blandford Street portal into Kenmore station, where it merges with the C and D branches. The combined services run into the Boylston Street subway and Tremont Street subway to downtown Boston. B branch service has terminated at Government Center since October 2021. Unlike the other branches, the B branch runs solely through the city limits of Boston. The Green Line Rivalry between Boston College and Boston University is named in reference to the B branch, which runs to both universities.

<span class="mw-page-title-main">Boston-area streetcar lines</span>

As with many large cities, a large number of Boston-area streetcar lines once existed, and many continued operating into the 1950s. However, only a few now remain, namely the four branches of the Green Line and the Ashmont–Mattapan High-Speed Line, with only one running regular service on an undivided street.

The Canal Street incline was a ramp connecting two transit tunnels in Boston with surface and elevated lines. It was located in the Bulfinch Triangle between North Station and Haymarket Square in two blocks bounded by Canal Street to the west, Causeway Street to the north, Haverhill Street to the east, and Market Street to the south. The incline was the north end of the Tremont Street subway and the Washington Street Tunnel. Built in 1898, it remained in use until 2004 when the last connecting line was moved underground.

<span class="mw-page-title-main">Washington Street Elevated</span> Former elevated railroad in Boston, Massachusetts

The Washington Street Elevated was an elevated segment of Boston's Massachusetts Bay Transportation Authority subway system, comprising the southern stretch of the Orange Line. It ran from Chinatown through the South End and Roxbury, ending in Forest Hills in Jamaica Plain, Boston.

<span class="mw-page-title-main">Charlestown Elevated</span> Former elevated railway in Greater Boston

The Charlestown Elevated was a segment of the MBTA Orange Line rapid transit line that ran from the Canal Street Incline in downtown Boston, Massachusetts through Charlestown to a terminal in Everett, Massachusetts. It opened in June 1901 and was replaced by the Haymarket North Extension in April 1975.

<span class="mw-page-title-main">Tremont Street subway</span> Boston subway tunnel

The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third oldest still in use worldwide to exclusively use electric traction, opening on September 1, 1897. It was originally built, under the supervision of Howard A. Carson as chief engineer, to get streetcar lines off the traffic-clogged streets, instead of as a true rapid transit line. It now forms the central part of the Green Line, connecting Boylston Street to Park Street and Government Center stations.

<span class="mw-page-title-main">MBTA subway</span> Boston region transit service

The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit, light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, or the T system.

<span class="mw-page-title-main">Lechmere Viaduct</span> Bridge over the Charles River in Boston

The Lechmere Viaduct is a concrete arch bridge connecting the West End neighborhood of Boston to East Cambridge, Massachusetts. Opened in 1912, the viaduct carries the MBTA's Green Line over the Charles River. It is adjacent to the Charles River Dam Bridge, but structurally separate.

<span class="mw-page-title-main">North Station (subway)</span> Rapid transit station in Boston, Massachusetts, US

North Station is an underground MBTA subway station in Boston, Massachusetts. Served by the Massachusetts Bay Transportation Authority (MBTA) Green Line and Orange Line, it is connected to the North Station surface terminal used by MBTA Commuter Rail and Amtrak. The station is fully accessible.

References

  1. BostonStreetcars.com's photo of the Causeway St. Elevated/Charlestown Elevated "track split" south of the Boston Garden
  2. "STATE AND CITY OFFICIALS INSPECT NEW ELEVATED: East Cambridge Extension For Surface Cars Will Reduce Running Time From North Station to Three Minutes". Boston Globe. May 28, 1912 via Newspapers.com. Open Access logo PLoS transparent.svg
  3. Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. pp. 39–49. ISBN   0938315048.
  4. "VIADUCT CARS ALL RUNNING: East Cambridge Folk Much Pleased. Seven Minutes Saved and End Put to Vexatious Delays. Few Paid Fares to Say They Were on First Cars". Boston Daily Globe. June 1, 1912 via Newspapers.com. Open Access logo PLoS transparent.svg
  5. 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  6. Cheney, Frank; Sammarco, Anthony M. (2000). When Boston Rode The El. Arcadia Publishing. p. 71. ISBN   9780738504629.
  7. 1 2 Daniels, Mac (November 11, 2005). "Lechmere, Science Park stations reopen: Extension project debuts tomorrow". Boston Globe. Archived from the original on March 6, 2007.
  8. "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  9. "Effective Saturday, November 12th, Green Line Service To Lechmere and Science Park Stations To Resume" (Press release). Massachusetts Bay Transportation Authority. November 4, 2005.
Template:Attached KML/Causeway Street Elevated
KML is from Wikidata

Commons-logo.svg Media related to Causeway Street Elevated at Wikimedia Commons