Readville station

Last updated

Readville
Readville station from Milton Street bridge, November 2015.JPG
Providence/Stoughton (left) and Franklin Line platforms at Readville
General information
Location1800 Hyde Park Avenue
Boston, Massachusetts
Coordinates 42°14′18″N71°08′01″W / 42.2382°N 71.1336°W / 42.2382; -71.1336
Line(s) Attleboro Line (Northeast Corridor)
Franklin Branch
Dorchester Branch
Dedham Branch (former)
Platforms1 side platform (Fairmount Line)
2 side platforms (Franklin Line)
2 side platforms (Attleboro Line; unused)
Tracks1 each (Franklin Line and Fairmount Line)
3 (Attleboro Line)
ConnectionsAiga bus trans.svg MBTA bus: 32,  33
Construction
Platform levels2
Parking353 spaces ($2.00 fee)
Bicycle facilitiesRacks available
AccessibleYes
Other information
Fare zone2
History
Opened1834
Rebuilt1898, 1992
Previous namesDedham Low Plain (lower level)
Blue Hills (upper level)
Passengers
2018426 (weekday average boardings) [1]
Services
Preceding station MBTA.svg MBTA Following station
Terminus Fairmount Line Fairmount
Endicott Franklin Line
Limited service
Franklin Line Hyde Park
Former services
Preceding station MBTA.svg MBTA Following station
East Dedham
toward Dedham
Dedham Branch
Closed 1967
Hyde Park
Preceding station New York, New Haven and Hartford Railroad Following station
Route 128
toward New Haven
Shore Line Hyde Park
toward Boston
Endicott
toward Blackstone
Midland Line Terminus
East Dedham
toward Dedham
Dedham Branch
Location
Readville station

Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by MBTA Commuter Rail Fairmount Line and Franklin Line. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin Line trains. The station is located at a multi-level junction, with the Northeast Corridor tracks at ground level and the Dorchester Branch (used by the Fairmount Line) above; Franklin lines use a connecting track with a separate platform. Platforms are available for the Providence/Stoughton Line on the Northeast Corridor tracks, but they are not regularly used. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.

Contents

Passenger service to Dedham Low Plain began in 1834 with the Boston and Providence Railroad (B&P). A branch line to Dedham was built in 1835, and the neighborhood and station were renamed Readville in 1847. The Boston and New York Central Railroad opened its Midland Branch (Dorchester Branch) through Readville in 1855, crossing over the B&P. Its station there was originally named Blue Hill, but later renamed Readville as well. Both railroads were consolidated under the New York, New Haven and Hartford Railroad in the 1890s.

The New Haven built a two-level union station at Readville as part of an 1897–98 grade separation project, then constructed its Readville Shops car repair facility just to the west in 1900–03. Dorchester Branch service ended in 1944, and Dedham Branch service in 1967 when the newly formed MBTA ended its subsidies. Dorchester Branch service returned in 1979 as a Southwest Corridor construction bypass and became permanent as the Fairmount Line in 1987. The disused station building burned in a suspicious fire in 1983. The MBTA built accessible platforms and a footbridge in 1990–92. Readville 5-Yard, the former location of the 1958-closed Readville Shops, underwent decontamination in 2011–12 for reuse to allow construction of an industrial and office development.

Station layout

Geographic schematic of Readville station Readville.svg
Geographic schematic of Readville station

Readville station is located at the crossing of two rail lines: the north–south Northeast Corridor and the northeast-southwest Dorchester Branch (Midland Division). The three-track Northeast Corridor is at grade, with the single-track Dorchester Branch on an embankment. On the west side of the station, a single track runs from the Northeast Corridor up to the Dorchester Branch, which continues as the Franklin Branch. [2] A single side platform is located on the north side of the Dorchester Branch east of its bridge over the Northeast Corridor. Two side platforms are located on the outside of the Northeast Corridor tracks, while the connector track has platforms on both sides. [2] West of the connector track, two stub tracks that formerly ran to the Dedham Branch and Readville 5-Yard are used for Amtrak equipment storage. [2]

Fairmount Line trains run on the Dorchester Branch; most terminate at Readville. Most Franklin Line trains use the connector track and run on the Northeast Corridor north of Readville, though some run on the Dorchester Branch as Fairmount Line trains to avoid congestion in the crowded Southwest Corridor. [3] Providence/Stoughton Line trains on the Northeast Corridor do not stop at Readville in regular service; the platforms are occasionally used during service disruptions when Fairmount Line service is not running or when trains cannot stop at Hyde Park. [4]

The station has entrances and parking lots at both levels off Hyde Park Avenue on the east side, and a ground-level entrance and parking lot off Milton Street on the west side. Readville station is accessible; all platforms (except one of the pair on the connector track) have a 1-car length ("mini-high") high-level platform. [2] [5] The platforms and east entrance are connected by a system of footbridges and accessible ramps; the west entrance is not accessible. In 2016, the MBTA considered the addition of elevators to supplement the ramps and add an accessible route to the Milton Street parking lot; however, this was not pursued. [6]

Readville station is bounded by several active and former railroad yards. East of the station on the Fairmount Line is the Readville Interim Repair Facility, an MBTA commuter rail maintenance facility and layover yard. [5] Readville 1-Yard is an active CSX freight yard located south of the station, connecting the Dorchester Branch to the Northeast Corridor. West of the station, the former Readville 5-Yard lies south of the former Dedham Branch on both sides of the Franklin Branch. [7]

Readville is served by two MBTA bus routes: route 32 runs on Hyde Park Avenue on the east side of the station, while route 33 runs on Readville Street just to the west. [8]

History

Early stations

The Boston and Providence Railroad (B&P) was chartered on June 22, 1831, to build a rail line between its two namesake cities. Construction began in late 1832, and the B&P opened from Park Square, Boston to Sprague Mansion in Dedham Low Plain (just south of the modern station) on June 4, 1834. [9] :29 A second daily round trip and a stagecoach connection from Sprague Mansion to Dedham began on July 28. [10] [9] :29 The line closed on August 25; it reopened on September 12 with an extension to Canton but only one daily round trip. The remaining section of the B&P main line from Canton to Providence opened the following year with the completion of the Canton Viaduct. [9] :29

The Dedham Branch from Dedham Low Plain to Dedham – the first branch line in Massachusetts – opened on February 5, 1835, with service allowing day trips to Boston. Dedham Branch service varied between through trains to Boston, and horse-drawn cars split from Providence trains at Dedham Low Plain, for the next seven years. Dedham Specials became permanent in June 1842, allowing commuting from Dedham and Dedham Low Plain to Boston. [11] [9] :29 Double track was built from Boston to Roxbury in 1839, and extended to Dedham Low Plain in 1845. [9] :30

The two Readville stations on an 1893 map Readville stations on 1893 bird's eye view map.jpg
The two Readville stations on an 1893 map

The neighborhood of Dedham Low Plain was renamed Readville after mill owner James Read in 1847. [12] Commuting from Readville was not possible for several years after the 1850 completion of the West Roxbury Branch rerouted Dedham service via West Roxbury. Commuter service from Stoughton began in 1855; it was replaced in 1858 by Dedham service via Readville, and supplemented by Providence commuter service in 1864. Readville became a short turn terminal in 1868. [9] :30 A new 30-by-80-foot (9.1 m × 24.4 m) one-story wooden station was built in 1873, with the old station converted to a freight house. [13] A third track opened from Boston to Readville in 1874. [9] :30

The Norfolk County Railroad opened from Blackstone to Dedham on April 23, 1849, using the B&P from Dedham to Boston. The Boston and New York Central Railroad (the 1853 successor to the Norfolk County) opened its Midland Branch (Dorchester Branch) from Islington to Boston via Readville on January 1, 1855, providing the railroad with its own entrance to Boston. [9] :43 The Midland Branch was intermittently operated over the next decade due to a lawsuit about grade crossings and financial issues of the parent railroad. Regular service did not resume until February 11, 1867, when it was sold to the Boston, Hartford and Erie Railroad (BH&E), which was in turn was acquired by the New York and New England Railroad (NY&NE) in 1875. [14] :362 [9] :44 The BH&E shops were located at Readville from 1867 until they burned in 1873; they were then moved to Norwood Central. [15]

The Midland Branch crossed the B&P on a bridge; there was no track connection between the two railroads. [16] The Midland Branch station, located on the upper level east of the B&P tracks, was originally called Blue Hills after the nearby range of hills. [17] It was renamed Readville in the 1870s or 1880s. [16] [18] The station served as a short turn terminal for Midland Branch trains from 1867 to 1880 and after 1899. [9]

Consolidation

A postcard of the 1898-built station Readville station postcard.jpg
A postcard of the 1898-built station

The B&P was leased in 1888 by the Old Colony Railroad, which was in turn leased by the New York, New Haven and Hartford Railroad (New Haven) in 1893; the B&P became the Providence Division. In 1896, the New Haven eliminated Readville short turns in favor of higher-frequency service north of Forest Hills on its newly elevated mainline. [9] :31 The NY&NE fell under control of the New Haven in 1895, and it was leased in 1898. [9] :44

On October 1, 1897, the New Haven began a $1.2 million project (equivalent to $34 million in 2021) to eliminate several grade crossings at Readville. New road bridges were built to carry Sprague Street and Milton Street over the tracks, and a new 5-track bridge for the Midland Branch over the Providence Division. A 165-foot (50 m)-wide stone arch with an 80-foot (24 m) span – the widest such bridge of that span in the country – was built to carry the Midland Branch over Hyde Park Avenue. Connecting tracks were built between the Midland Branch and the Providence Division. [19]

A two-story triangular union station, 120 by 180 feet (37 m × 55 m), was constructed at the northeast corner of the junction. It was made of yellow brick trimmed with Fitchburg granite. [19] An under-track passage provided access to the southbound Providence Division platform, platform on the Midland Branch connector track, and the Dedham Branch platforms. [20] The work was completed around October 15, 1898. [19] In September 1899, most service from the southwest on the Midland Branch was routed onto the Providence Division at Readville, allowing use of express tracks and the new Back Bay station. [9] :45

In 1900, the New Haven began construction of Readville Shops, a large coach repair yard complex located in the wedge-shaped space between the Midland and Dedham lines. [21] The shops were built to consolidate the scattered shops of the New Haven and its recent acquisitions (including the NY&NE and the Old Colony). [22] Upon opening in 1903, Readville Shops employed as many as 3,000 workers, and could repair 200 passenger cars and 1,000 freight cars monthly. [22] [23] The powerhouse of the shops was designed to also power a planned electric suburban service, which was to run from Dedham to the new South Station on two routes via Readville and via West Roxbury to compete with the new Washington Street Elevated. [24] [23] (The electric service was not implemented; it was again proposed in 1913, but never constructed.) [25] The addition of the shops increased residential development in Readville. [22] A 150-by-900-foot (46 m × 274 m) locomotive shop was added to the facilities in 1907. [26]

Decline

The disused station building in 1977 Readville station aerial 1977.jpg
The disused station building in 1977

Rail service in the Boston area peaked in the early 20th century and began to decline after World War 1. [9] :11 Between 1926 and 1938, trains operated on a loop using the Dedham Branch and the West Roxbury Branch (part of which is now part of the Needham Line) – the same loop previously proposed for electrification. [14] :180 Readville–Boston service on the Midland Branch (four daily round trips) was discontinued on July 18, 1938, as part of the 88 stations case; it was restored in 1940, but ended again on Mar 12, 1944. Midland Branch service southwest of Readville continued, though it was cut back from Hartford to Blackstone in 1955. [9] :46 The Midland Branch bridge over the Providence Division, originally five parallel spans, was reduced to two spans by 1930 and one by the 1980s. [27]

By the early 1960s, Readville was served only by peak-hour peak-direction trains on the Providence and Blackstone lines, plus the single weekday Dedham round trip. [28] The two-story depot served the lower level (Providence Division, later Northeast Corridor) tracks, while the elevated connector track to Franklin and beyond was served by a small shack with stairs to the lower level and to the Dedham Branch track. In August 1964, the Massachusetts Bay Transportation Authority (MBTA) was formed to subsidize suburban commuter rail service; initially, only trains that the Interstate Commerce Commission has approved for discontinuance were subsidized. [3]

On April 24, 1966, the MBTA began subsidizing some New Haven commuter service, including the Dedham and Blackstone lines (the later cut back to Franklin that day). [3] The lone Dedham round trip ended on April 21, 1967. [3] The MBTA purchased most of the New Haven's former commuter lines, including the Providence, Franklin, and abandoned Dedham routes, from Penn Central on 27, 1973. [3] :330 Subsidies began for Canton Junction and Sharon service in June 1973, and for Providence service on 1976. [3]

MBTA era

A Fairmount Line train at Readville in 2017 Fairmount Line train at Readville station, December 2017.jpg
A Fairmount Line train at Readville in 2017

Construction of the Southwest Corridor necessitated closure of the main line between Back Bay and Forest Hills. The MBTA purchased the then-freight-only Midland Branch in 1976 and modernized it for passenger use. [3] From November 3, 1979, until October 5, 1987, all Franklin Line and Providence/Stoughton Line service ran to Boston on the Midland Division via Readville. [3] The two-story station building was destroyed by a fire on June 11, 1983. The building had been vacant since the early 1970s and was a frequent target of vandalism; the fire was judged to be of suspicious origin. [29] From 1986 to 1988, Readville was an intermediate stop for Boston–Foxboro service for special events at Foxboro Stadium. [30] [31]

When Franklin and Providence/Stoughton service returned to the main line, service on the Midland had become popular enough to justify a continued shuttle service along the line from Boston to Fairmount. The Fairmount shuttle was extended to Readville on November 30, 1987, as the Fairmount Line. [3] Since 1987, Providence/Stoughton Line service has run through Readville without making a station stop, even though there are platforms in place to allow such use. [3] (Until 2004, a small number of Providence/Stoughton Line trains diverted to the Dorchester Branch at Readville without stopping at the station; such a diversion has also been used during service disruptions on the Northeast Corridor. [32] [33] [34] ) The MBTA renovated the station in 1990–92. The accessible platforms and footbridges were constructed, the parking lots and platforms paved, and the pedestrian underpass filled. [35] [36]

The 1898-built truss bridge over the Northeast Corridor, still used by Fairmount Line trains laying over plus Franklin Line trains running via Fairmount, needed replacement in the 2010s. The span was replaced with a prebuilt bridge in two weekends with minimal impact to Amtrak and MBTA service on the Corridor, with the old abutments left in place as retaining walls. The design contract was awarded in 2012, and a construction contract was awarded in September 2015. [37] The bridge was replaced in November 2016. [38]

Rail yard reuse

The former Readville Shops in 1977 Aerial view of Readville Shops (1), April 1977.jpg
The former Readville Shops in 1977

The New Haven Railroad closed Readville Shops in 1958, with its functions moved to Cedar Hill Yard in New Haven, Connecticut. The railroad intended to create an industrial park on the 124-acre (50 ha) site. [39] [40] The railroad was merged into Penn Central Railroad in 1968; the property was transferred to Conrail on March 30, 1976, and to Amtrak a day later. [7] The MBTA acquired the yard from Amtrak on November 11, 1987, and used it to store railroad-related materials. [7] In the late 1980s, the yard was used for final assembly of new Green Line vehicles. [41] A number of yard buildings, including the power station and several repair shops, remained extant. [22]

1-Yard remained in use as a freight yard by the New Haven, Penn Central, Conrail, and finally CSX Transportation. [42] The MBTA opened a track maintenance facility (Readville Interim Repair Facility) in 2-Yard in 1996, and a midday storage yard for commuter rail trains in August 1997. A 1999 proposal to expand the 12-track facility by 8-10 tracks (as Amtrak's Northend Electrification Project reduced MBTA midday storage at Southampton Street Yard) was opposed by then-mayor Thomas Menino, who lived several blocks away. [43]

In 1989–90, while analyzing 5-Yard for potential use as a commuter rail facility, the MBTA discovered high levels of environmental contamination including lead and petroleum hydrocarbons in the soil. [7] In October 2001, Massachusetts Attorney General Thomas F. Reilly sued the MBTA for failing to decontaminate the site. [44] The MBTA quickly agreed to a decontamination program. [7] Site remediation for contamination including lead, arsenic, and polycyclic aromatic hydrocarbons took place in 2011–12. [45] [46] [47]

In March 2012, the MBTA announced that the contamination had been fully removed, and revealed plans to place solar panels in the west part of 5-Yard. The panels would be installed and maintained for at least 20 years by an outside contractor. [48] Bidding began in May 2012, with the stipulation that the solar array would be operational by the spring of 2013. [49] The contract was chosen in September 2012, with a revised completion date of October 2013. [50] In July 2013, MassDOT (the MBTA's parent agency) announced that construction would not begin until at least 2014 due to a state solar program reaching capacity earlier than expected. [51] By January 2015, the installation was planned for that June, but it did not occur. [52]

Readville 5-Yard was considered for use as a midday layover yard in 2013 as part of South Station Expansion planning, but was rejected because the MBTA had committed to Boston that the site could be used for development. 1-Yard was rejected because it would interfere with CSX freight operations, while expanded use of 2-Yard was advanced for further planning. [42] Planning began in 2014 for a five-building industrial and office development on the Boston portion of 5-Yard; construction began in 2018. [53] [54] In May 2021, the MBTA issued a contract for planning and preliminary engineering of an expanded 2-Yard layover facility. [55] Construction of a southside maintenance facility at Readville is planned for 2023 to 2028, as the Grand Junction Branch will be closed for several years during the I-90 project, cutting off the southside from the MBTA Commuter Rail Maintenance Facility. A temporary layover yard will be constructed in the 1-Yard to allow construction on the existing layover site. [56]

Proposed Orange Line extension

Readville is located in a densely populated neighborhood just nine miles from downtown Boston, making it a strong candidate for rapid transit service rather than conventional low-frequency commuter rail service. The 1945 Coolidge Commission Report recommended that an extension of the Main Line Elevated (now the Orange Line) south from Forest Hills be built to Dedham via West Roxbury rather than Hyde Park and Readville. [57] The 1966 Program for Mass Transportation recommended a bifurcated Orange Line, with one branch to West Roxbury or Hersey and another to Readville or Route 128 via Hyde Park. [58] Various reports over the next two decades continued to recommend various combinations of the extensions; however, due to cost, the 1987 relocation of the Orange Line to the Southwest Corridor was terminated at Forest Hills. [59] The 2004 Program for Mass Transportation included an Orange Line extension to Route 128, with intermediate stops at Mount Hope, Hyde Park, and Readville at a cost of $342.8 million. The extension was listed as low priority due to environmental issues with crossing the wetlands south of Readville, and because the corridor already had commuter rail service. [60]

Related Research Articles

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Route 128 station</span> Rail station in Westwood, MA

Route 128 station is a passenger rail station located at the crossing of the Northeast Corridor and Interstate 95/US Route 1/Route 128 at the eastern tip of Dedham and Westwood, Massachusetts, United States. The station is shared by Amtrak and the Massachusetts Bay Transportation Authority (MBTA). It is served by most MBTA Commuter Rail Providence/Stoughton Line trains, as well as by all Amtrak Northeast Regional and Acela intercity trains. The station building, platforms, and parking garage are all fully accessible. It is the 23rd busiest Amtrak station in the country and the fifth busiest in New England.

<span class="mw-page-title-main">Forest Hills station (MBTA)</span> Transit station in Boston, Massachusetts, US

Forest Hills station is an intermodal transfer station in Boston, Massachusetts. It serves the MBTA rapid transit Orange Line and three MBTA Commuter Rail lines and is a major terminus for MBTA bus routes. It is located in Forest Hills, in the southern part of the Jamaica Plain neighborhood. Most Providence/Stoughton Line and Franklin Line trains, and all Amtrak Northeast Corridor trains, pass through the station without stopping.

<span class="mw-page-title-main">Fairmount Line</span> MBTA Commuter Rail line

The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014. Most trains reverse direction at the south end at Readville, but some Franklin Line trains use the Fairmount Line rather than the Northeast Corridor. On October 21, 2019, some Fairmount Line trains were extended over the Franklin Line to Foxboro as part of the Foxboro Line.

<span class="mw-page-title-main">Boston and Providence Railroad</span>

The Boston and Providence Railroad was a railroad company in the states of Massachusetts and Rhode Island which connected its namesake cities. It opened in two sections in 1834 and 1835 - one of the first rail lines in the United States - with a more direct route into Providence built in 1847. Branches were built to Dedham in 1834, Stoughton in 1845, and North Attleboro in 1871. It was acquired by the Old Colony Railroad in 1888, which in turn was leased by the New Haven Railroad in 1893. The line became the New Haven's primary mainline to Boston; it was realigned in Boston in 1899 during the construction of South Station, and in Pawtucket and Central Falls in 1916 for grade crossing elimination.

<span class="mw-page-title-main">Foxboro station</span> Train station in Foxborough, Massachusetts, US

Foxboro station is an MBTA Commuter Rail station in Foxborough, Massachusetts, located adjacent to Gillette Stadium and the Patriot Place shopping center. The station has a single side platform serving the main track of the Framingham Secondary. Previous passenger service on the line ran from 1870 to 1933, with several stations in Foxborough. Special service for New England Patriots games and other stadium events ran from 1971 to 1973, then resumed in 1986. Event trains run from Boston via the Franklin Line and from Providence via the Providence/Stoughton Line.

<span class="mw-page-title-main">Franklin Line</span> MBTA Commuter Rail line

The Franklin Line, also called the Franklin/Foxboro Line, is part of the MBTA Commuter Rail system. It runs from Boston's South Station in a southwesterly direction toward Franklin, Massachusetts, utilizing the Northeast Corridor before splitting off onto the namesake Franklin Branch. Most Franklin Line trains connect to the Providence/Stoughton Line at Readville, though some weekday trains use the Dorchester Branch to access South Station. Most weekday trains, and all weekend trains, bypass Hyde Park.

<span class="mw-page-title-main">Needham Line</span> MBTA Commuter Rail line

The Needham Line is a branch of the MBTA Commuter Rail system, running west from downtown Boston, Massachusetts through Roxbury, Jamaica Plain, Roslindale, West Roxbury, and the town of Needham. The second-shortest line of the system at just 13.7 miles (22.0 km) long, it carried 4,881 daily riders in October 2022. Unlike the MBTA's eleven other commuter rail lines, the Needham Line is not a former intercity mainline; instead, it is composed of a former branch line, a short segment of one intercity line, and a 1906-built connector.

<span class="mw-page-title-main">Providence/Stoughton Line</span> Line of the Boston MBTA Commuter Rail system

The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.

<span class="mw-page-title-main">Hyde Park station (MBTA)</span> Train station in Boston, Massachusetts, US

Hyde Park station is an MBTA Commuter Rail station in Boston, Massachusetts. It primarily serves the Providence/Stoughton Line, and also serves rush-hour Franklin Line trains. It is located on the Northeast Corridor in the Hyde Park neighborhood.

<span class="mw-page-title-main">Endicott station</span> Train station in Dedham, Massachusetts

Endicott is an MBTA Commuter Rail station in Dedham, Massachusetts. It serves the Franklin Line. It is located off Grant Avenue near East Street. The station is not accessible.

<span class="mw-page-title-main">Norwood Central station</span> Rail station in Massachusetts

Norwood Central station is an MBTA Commuter Rail Franklin Line station located near downtown Norwood, Massachusetts. The station has two side platforms serving the two tracks of the Franklin Branch, each with a mini-high section for accessibility. It serves as a park-and-ride location for Boston's southwest suburbs; with 1,041 daily riders it is the busiest station on the line outside Boston. The former station building, a one-story yellow brick structure, has been converted to commercial use.

<span class="mw-page-title-main">West Roxbury station</span>

West Roxbury station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Needham Line. It is located on an embankment above Lagrange Street in the West Roxbury neighborhood. The station is accessible with a short mini-high platform on the outbound end of the main platform.

<span class="mw-page-title-main">Fairmount station (MBTA)</span>

Fairmount station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located in the Hyde Park area, under the Fairmount Avenue overpass. It is the last stop outbound on the Fairmount Line before it joins the Franklin Line at Readville station. Fairmount station opened in 1979 during Southwest Corridor reconstruction; intended to be temporary, it eventually became a permanent stop.

<span class="mw-page-title-main">Morton Street station</span> Railway station in Boston, Massachusetts, US

Morton Street station is an MBTA Commuter Rail station on Fairmount Line located on Morton Street in the Mattapan neighborhood of Boston. With two full-length high-level platforms and ramps to the street, the station is fully wheelchair accessible. The station was reconstructed in 2006, with the official reopening in 2007.

<span class="mw-page-title-main">Uphams Corner station</span>

Uphams Corner station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line. It is located on Dudley Street in the Uphams Corner area of the Dorchester neighborhood. It was reopened in 1979 after the line had been closed for 35 years. The station is fully accessible with two full-length high-level platforms and ramps to the street, which were added during a construction project that finished in 2007.

<span class="mw-page-title-main">Newmarket station (MBTA)</span> Train station in Boston, Massachusetts, US

Newmarket station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line and has limited service on the Franklin Line. It is located off Massachusetts Avenue at Newmarket Square in the Dorchester neighborhood. The station has two 800-foot (240 m) high-level platforms and sloping walkways connecting it to Massachusetts Avenue. Originally planned to be in service in 2011, it opened on July 1, 2013, along with Four Corners/Geneva station.

<span class="mw-page-title-main">Mount Hope station</span>

Mount Hope station was a railroad station on the Northeast Corridor in Roslindale, Boston, Massachusetts. The station consisted of two separate depots on opposite sides of the tracks. The brick outbound depot was located just north of the Blakemore Street bridge, while the wooden inbound depot was located south of the overpass.

<span class="mw-page-title-main">Dedham Branch</span> Railroad in Massachusetts

The Dedham Branch was a spur line of the Boston and Providence Railroad, opened in 1835, which ran from the junction with the main line at Readville through to central Dedham; it was the first railroad branch line in Massachusetts. In 1966, it became part of the MBTA Commuter Rail system, but was abandoned the next year.

<span class="mw-page-title-main">History of rail in Dedham, Massachusetts</span>

The history of rail in Dedham, Massachusetts begins with the introduction of the first rail line in 1836 and runs to the present day. Multiple railroads have serviced Dedham since then, and current service is provided by the MBTA. The station in Dedham Square built in 1881 out of Dedham Granite was demolished in 1951 and the stones were used to put an addition on the Town's library. There are two active stations today, and multiple others in close proximity.

References

  1. Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  2. 1 2 3 4 Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. Archived from the original (PDF) on October 8, 2013.
  3. 1 2 3 4 5 6 7 8 9 10 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  4. "Service Alerts: Providence/Stoughton Line: Upcoming". Massachusetts Bay Transportation Authority. July 14, 2014. Archived from the original on July 15, 2014. The outbound platform at Hyde Park will be closed due to bridge work between Hyde Park & Readville Stations on the Prov/Sto Line... During the weekdays listed below, all outbound trains that normally stop at Hyde Park will instead stop at Readville Station on the Providence/Stoughton Line
  5. 1 2 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  6. Brelsford, Laura (December 5, 2016). "MBTA System-Wide Accessibility Initiatives: December 2016 Update" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 10.
  7. 1 2 3 4 5 Earth Tech AECOM (November 5, 2008). "Draft Supplemental Phase II/III and Revised Phase IV Remedy Implementation Plan (RIP)" (PDF). Massachusetts Bay Transportation Authority.
  8. "System Map". Massachusetts Bay Transportation Authority.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Humphrey, Thomas J. & Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. p. 44. ISBN   9780685412947.
  10. "Another Old Timer". Locomotive Engineering. Vol. 13, no. 11. November 1900. p. 465 via Internet Archive.
  11. "Dedham Branch Railroad". Boston Post. July 14, 1842. p. 4 via Newspapers.com.
  12. Chadwick, James Read (April 19, 1905). "A Brief Sketch of the Life of James Read". In Mowry, William A. (ed.). Hyde Park Historical Record. Vol. 5. Hyde Park Historical Society. p. 23.
  13. "Hyde Park". Boston Globe. August 12, 1873. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  14. 1 2 Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN   9780942147124.
  15. Tolles, Bryant Franklin, Jr. (1973). Norwood: the centennial history of a Massachusetts town. Norwood Centennial Committee. p. 81.{{cite book}}: CS1 maint: multiple names: authors list (link)
  16. 1 2 E. Robinson (1888). "Plate 9". Atlas of Norfolk County via Wikimedia Commons.
  17. Comstock & Cline (1876). "Southern Section of Hyde Park". Atlas of Norfolk County. pp. 34, 35 via Wikimedia Commons.
  18. O.H. Bailey (1879), View of Hyde Park, Mass. via Wikimedia Commons
  19. 1 2 3 "Spending $1,200,000". Boston Globe. October 16, 1898. p. 28 via Newspapers.com. Open Access logo PLoS transparent.svg
  20. "Plate 22: Part of Ward 26, City of Boston". Atlas of The City of Boston: Ward 26 Hyde Park. G.W. Bromley and Co. 1912 via Norman B. Leventhal Map Center.
  21. "Will Employ Nearly 3000 Skilled Mechanics". Boston Globe. November 26, 1900. p. 9 via Newspapers.com. Open Access logo PLoS transparent.svg
  22. 1 2 3 4 The Public Archaeology Laboratory, Inc (July 1997). MACRIS Inventory Form (Report) via Massachusetts Cultural Resource Information System.
  23. 1 2 "Will Employ 2000 to 3000 Men". Boston Globe. November 16, 1903. p. 4 via Newspapers.com. Open Access logo PLoS transparent.svg
  24. "Suburban Car Service". Boston Globe. February 6, 1901. p. 10 via Newspapers.com. Open Access logo PLoS transparent.svg
  25. Humphrey, Thomas J.; Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. p. 4. ISBN   9780938315025.
  26. "Annual Report of N.Y., N.H. & H." Hartford Courant. October 3, 1907. p. 11 via Newspapers.com.
  27. McGinley Hart & Associates; A.G. Lichtenstein & Associates; DMC Engineering; Jane Carolan (October 1988). Historic Structure Inventory Form. MBTA Historical Property Survey, Phase II (Report) via Massachusetts Cultural Resource Information System.
  28. Time Table No. 16 for Employees Only. The New York, New Haven and Hartford Railroad Company. April 28, 1963. pp. 42–47, 51.
  29. Hochman, Anndee (June 12, 1983). "Fire destroys Readville depot". Boston Globe via Newspapers.com. Open Access logo PLoS transparent.svg
  30. "MBTA provides Patriots' train". Boston Globe. September 3, 1986. p. 62 via Newspapers.com.
  31. "MBTA to run trains to Patriots' games". Boston Globe. September 2, 1988. p. 1 via Newspapers.com.
  32. "MBTA Commuter Rail Attleboro/Stoughton Line" (PDF). Massachusetts Bay Transportation Authority. April 26, 2004. Archived from the original (PDF) on July 16, 2004.
  33. "MBTA Commuter Rail Attleboro/Stoughton Line" (PDF). Massachusetts Bay Transportation Authority. November 1, 2005. Archived from the original (PDF) on March 1, 2005.
  34. "Electrical fire delays MBTA Commuter Rail, Amtrak: Fire at Forest Hills station goes to 2-alarms". WCVB. April 4, 2015. Retrieved April 7, 2015. Passengers using the Franklin and Providence lines to get into Boston are being diverted to the Fairmount line to get into the city, according to commuter rail officials.
  35. "MBTA Begins Upgrading Fairmount Line" (PDF). TRANSreport. Boston Metropolitan Planning Organization. May 2005. Archived from the original (PDF) on December 9, 2010.
  36. "Notice to Bidders". Boston Globe. June 29, 1990. p. 55 via Newspapers.com. Open Access logo PLoS transparent.svg
  37. "MBTA Shore Line Bridge Reconstruction Project". Massachusetts Bay Transportation Authority. Archived from the original on October 30, 2017.
  38. "Shore Line Bridge Replacement" (PDF) (Press release). Massachusetts Bay Transportation Authority. October 26, 2016.
  39. Plotkin, A. S. (May 4, 1958). "Industry to Replace Readville RR. Shops". Boston Globe. p. 39 via Newspapers.com. Open Access logo PLoS transparent.svg
  40. "Readville Car Shop On Way Out". Boston Globe. March 26, 1958. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  41. White, John R. (December 25, 1988). "Driving the ultimate electric car". Boston Globe. p. 129 via Newspapers.com. Open Access logo PLoS transparent.svg
  42. 1 2 "Layover Facility Alternatives Analysis". South Station Expansion. Massachusetts Department of Transportation. March 2013.
  43. Palmer, Thomas C., Jr. (April 12, 1999). "New MBTA proposal hits a little too close to home for Menino". Boston Globe. p. 18 via Newspapers.com.{{cite news}}: CS1 maint: multiple names: authors list (link) Open Access logo PLoS transparent.svg
  44. Lewis, Raphael (October 4, 2001). "AG sues T over pollution". Boston Globe. p. 42 via Newspapers.com. Open Access logo PLoS transparent.svg
  45. Mark Newell / AECOM (2011). "Phase IV Status Report #3 for Readville Yard 5" (PDF). Massachusetts Bay Transportation Authority.
  46. "Readville 5-Yard Assessment and Remediation". Massachusetts Bay Transportation Authority. Archived from the original on March 3, 2016.
  47. "Readville 5 Yard Facility: Public Involvement Plan Meeting, November 5, 2008" (PDF). Massachusetts Bay Transportation Authority. November 5, 2008.
  48. Young, Colin A. (March 27, 2012). "MBTA wants solar companies to build plants at Wonderland in Revere and Readville Yard 5 in Dedham". Boston Globe. Retrieved July 3, 2012.
  49. Eisenstadter, Dave (April 5, 2012). "MBTA to accept bids for solar array construction in Dedham". Wicked Local Dedham. Archived from the original on November 19, 2012.
  50. Eisenstadter, Dave (September 14, 2012). "Dedham property to be site of large MBTA solar array". Wicked Local Dedham. Archived from the original on October 25, 2012.
  51. Eisenstadter, Dave (July 19, 2015). "Solar array delayed in Dedham". Boston Globe. Archived from the original on December 22, 2015.
  52. Donaghy, Michael (January 7, 2015). "MBTA's Energy Management Program" (PDF). AEE New England.
  53. "Readville Yard 5". Boston Planning & Development Agency. Retrieved September 15, 2020.
  54. "Readville Yard 5" (PDF). First Highland. 2019.
  55. Rae, Nathan (May 24, 2021). "MBTA Professional Services Contract No. J19PS01: South-Side Commuter Rail Maintenance and Layover Facility Planning, Environmental Review, and Preliminary Engineering (0-30% Design) Contract Award" (PDF). Massachusetts Bay Transportation Authority.
  56. "Executive Summary" (PDF). South Side Maintenance and Layover Facility EENF. Massachusetts Bay Transportation Authority. November 2022.
  57. Boston Elevated Railway and Boston Department of Public Utilities (1945). "Boston Rapid Transit System & Proposed Extensions 1945 – Metropolitan Transit Recess Commission Air View". Wardmaps LLC. Retrieved 17 March 2013.
  58. "A Comprehensive Development Program for Public Transportation in the Massachusetts Bay Area: 1966". Massachusetts Bay Transportation Authority. May 3, 1966. p. V-9 via Internet Archive.
  59. Central Transportation Planning Staff (November 15, 1993). "The Transportation Plan for the Boston Region – Volume 2". National Transportation Library. Archived from the original on October 5, 2013.
  60. Central Transportation Planning Staff (January 2004) [May 2003]. "Chapter 5C: Service Expansion" (PDF). 2004 Program for Mass Transportation. Boston Metropolitan Planning Organization. p. 5C–83. Archived from the original (PDF) on February 20, 2012.