Canadian Light Rail Vehicle

Last updated

CLRV
CLRV 4059 Glamour Shot.jpg
A 506 Carlton CLRV car crosses the Main Street Bridge in 2008.
Inteirorstreetcar.JPG
Interior of the CLRV
In service1979–2019
Manufacturer
Constructed1977–1981 [1]
Entered serviceSeptember 30, 1979
Number built196
Number in service0 [1]
Number preserved11 in Canada, 4 in United States
Number scrapped~190
Successor Flexity Outlook
Fleet numbers
  • L-1: 4000–4005
  • L-2: 4010–4199
Capacity42–46 seated, [a] 74 at peak with standees [1]
Operators Toronto Transit Commission (former, all retired with a few cars to be restored for special occasions), Halton County Radial Railway (3 cars as work museum artifacts)
Lines served Toronto streetcar system
Specifications
Car length15.226 m (49 ft 11+716 in) [2]
Width
  • 2.540 m (8 ft 4 in)
  • (2.591 m or 8 ft 6 in over rub rails) [2]
Height3.625 m (11 ft 10+1116 in) [2]
Floor height1.125 m (3 ft 8+516 in) [2]
Platform height curb height or level with rail head
Entry4 steps (3 risers inside plus step up from outside)
Doors2 (1 dual bi-fold front door; 2 paired double leaf rear doorways)
Maximum speed80 km/h (49.7 mph) [3]
Weight22,685 kg (50,011 lb 14 oz)
Power output2 x 136  kW (182  hp) continuous
Acceleration 1.47 m/s2 (4.8 ft/s2) or 5.3 km/(h⋅s); 3.3 mph/s
Deceleration
  • 1.6 m/s2 (5.2 ft/s2) or 5.8 km/(h⋅s); 3.6 mph/s
  • Emergency: 3.46 m/s2 (11.4 ft/s2) or 12.5 km/(h⋅s); 7.7 mph/s
Electric system(s) 600 V DC overhead
Current collector(s) Trolley pole
Minimum turning radius 36 ft (10.973 m)
Braking system(s) Air (Westinghouse Air Brake Company)
Track gauge 4 ft 10+78 in (1,495 mm) – TTC gauge
ALRV
TTC Bombardier ALRV 4239.jpg
ALRV Interior, Long Branch 1932 (4706659547).jpg
Interior of the ALRV
In service1988–2019
Manufacturer
Constructed
  • 1982 (prototype)
  • 1987–1989 [4]
Entered serviceJanuary 19, 1988
Number built52 and 1 prototype
Number in service0
Number preserved2
Number scrapped50 and 1 prototype
Successor Flexity Outlook
Fleet numbers
  • 4900 (prototype)
  • 4200–4251 (standard) [4]
Capacity61 seated, 108 at peak with standees [4]
Operators Toronto Transit Commission (former, all retired; 1 car awaiting restoration), HCRR (1 car awaiting restoration)
Lines served Toronto streetcar system
Specifications
Car length23.164 m (75 ft 11+1516 in) [5]
Width
  • 2.540 m (8 ft 4 in)
  • (2.591 m or 8 ft 6 in over rub rails) [5]
Height3.626 m (11 ft 10+34 in) to roof; roof equipment additional [5]
Floor height1.125 m (3 ft 8+14 in) [2]
Platform height curb height or level with rail head
Entry4 steps (3 risers inside plus step up from outside)
Doors3
Articulated sections1 section with 2 articulations
Maximum speed80 km/h (49.7 mph) [3]
Weight36,745 kg (81,009 lb)
Power output4 × 65 kW (87 hp) continuous
Acceleration 1.2 m/s2 (3.9 ft/s2) or 4.3 km/(h⋅s); 2.7 mph/s
Deceleration 1.6 m/s2 (5.2 ft/s2) or 5.8 km/(h⋅s); 3.6 mph/s
Emergency: 3.13 m/s2 (10.3 ft/s2) or 11.3 km/(h⋅s); 7.0 mph/s
Electric system(s) 600 V DC overhead
Current collector(s) Trolley pole
Minimum turning radius 36 ft (10.973 m)
Braking system(s) Air (Westinghouse Air Brake Company)
Track gauge 4 ft 10+78 in (1,495 mm) – TTC gauge

The Canadian Light Rail Vehicle (CLRV) and Articulated Light Rail Vehicle (ALRV) were types of streetcars used by the Toronto Transit Commission (TTC) from the late 1970s until the late 2010s. They were built following the TTC's decision to retain streetcar services in the 1970s, replacing the existing PCC streetcar fleet.

Contents

Two variants were produced: the standard single-module CLRV (built between 1977 and 1981) and the longer articulated double-module ALRV (built between 1987 and 1989). The ALRVs were officially retired from regular TTC service on September 2, 2019, with the CLRVs officially retired on December 29, 2019. [6] [7] [8] Both were replaced by the Flexity Outlook, a low-floor streetcar first introduced in 2014.

History

CLRV

Starting at the end of the 1970s and into the 1980s, the TTC's fleet of PCC streetcars approached (or exceeded in some cases) the end of their useful lives. Many Toronto citizens, and especially a group known as "Streetcars for Toronto" led by transit advocate Steve Munro, had fought successfully against the TTC's plan to convert the remaining streetcar lines to buses, which necessitated a new streetcar model to replace the aging PCCs. The "Canadian Light Rail Vehicle" was an attempt at a new, standardized streetcar design to be used in Toronto and in other new streetcar developments throughout the country.

Hawker Siddeley Canada proposed their version of a streetcar in 1972 known as the Municipal Service Car, which had a bus-like chassis and a semi-low floor design with front and rear doors similar to that of the CLRV fleet. The project was abandoned the following year when the TTC selected the CLRV design. No Municipal Service Car prototypes were ever produced and only concept drawings remain of this vehicle.

A completed CLRV rolls off the production lines at SIG in Neuhausen. CLRV Streetcar at SIG Neuhausen Factory (SIK 03-078806).jpg
A completed CLRV rolls off the production lines at SIG in Neuhausen.

The first six CLRV cars (4000–4005) were manufactured by SIG of Zürich, Switzerland, and used as prototypes for Urban Transportation Development Corporation (UTDC) (now Bombardier) to manufacture subsequent CLRVs at the Thunder Bay works of Hawker Siddeley Canada (today also part of Bombardier). The original order was for 200 CLRVs, of which ten were to be built by SIG and 190 by Hawker Siddeley. However, the order was reduced by four vehicles to 196 in order to provide parts to construct a prototype Articulated Light Rail Vehicle (number 4900). The four CLRVs removed were from the SIG portion of the order; thus, there were no CLRVs numbered 4006–4009. The 190 Hawker Siddeley CLRVs were numbered 4010–4199. [9] [2] CLRV car 4000 had a pantograph when being tested by SIG on the Orbe-Chavornay railway and was converted to trolley pole before being delivered to Toronto. [2]

On December 29, 1977, the first CLRV, SIG-built 4002, arrived at the Hillcrest Complex aboard a railway flatcar. On September 30, 1979, after a year of testing and modification, CLRVs started service on route 507 Long Branch (today the western portion of route 501 Queen). [9]

Twenty-two CLRVs were to run on an open-track Scarborough LRT line (to be later built as an ICTS line). Thus, for suburban operation, the UTDC originally specified an outside-frame bogie that later proved problematic in street operation, [9] and designed the vehicles for speeds up to 110 kilometres per hour (70 mph). The bogies would derail at switches in street trackage and have noise and vibration problems. [10] Replacing the original Bochum wheels with SAB wheels (similar to PCC wheels) corrected these problems. The Bochum wheels had a rubber layer between the hub and the steel tire (rim), which would flex rather than pulling the opposite wheel through a single-point switch. [11]

The CLRV electronics include 1970s-era solid state power controls. In later years, the propulsion control system became unreliable and difficult to maintain as obsolete electronic and electrical parts became difficult to source. [11]

The CLRVs originally had sealed windows and no air conditioning. Later, the windows were modified to allow passengers to open them. [11]

The CLRVs were delivered with couplers for multiple-unit operation. Between 1984 and 1988, the couplers were removed, and a safety shield was placed over the front coupler pocket. [2]

ALRV

As with the CLRV prototypes, the ALRV prototype, numbered 4900, was tested with a pantograph on standard gauge tracks before delivery to the TTC. Built in 1982, prototype 4900 had features that were not implemented on either CLRVs or production ALRVs such as hand controls instead of foot controls, and electronic destination signs instead of linen rollsigns. [5] The prototype had couplers while subsequent production units did not. [12]

Prototype 4900 ran trials in Toronto from August 10, 1982, until February 25, 1983, with a break when it was displayed at the 1982 Canadian National Exhibition. After completion of the trial runs, car 4900 was stored at the St. Clair Carhouse until March 7, 1987, when it was shipped to the UTDC testing facility in Kingston, Ontario. On March 24, 1988, following a test run, it was rear-ended by another streetcar on the test track and suffered extensive damage. It was scrapped in 1997. [5]

The 52 production ALRV cars were built by UTDC using bogies and articulations supplied by MAN SE of Germany. Assembly of the first 11 cars took place in Thunder Bay, while that of the remaining 41 cars took place in Kingston. They are numbered 4200–4251.

The first production ALRV, number 4200, was shipped to Toronto on June 11, 1987. It underwent further testing and modifications after its arrival. Car 4204 was the first of the production ALRVs to go into revenue service, doing so on the 507 Long Branch route on January 19, 1988. [5]

Marketing

The UTDC had only one other buyer for its light rail products, the Santa Clara Valley Transportation Authority [13] (now known as the Santa Clara Valley Transportation Authority), in San Jose, California, which purchased 50 vehicles in 1987. [13] These cars were double-ended, articulated, and used pantograph collection, all of which were configurable options offered for the CLRV by the UTDC, as was high-platform boarding, which neither city used. [9]

In 1980, cars 4027, 4029 and 4031 were leased and tested by the Massachusetts Bay Transportation Authority (MBTA), in Boston, to run on the Green Line. [14] To operate in Boston, the streetcars had to be regauged and skipped Kenmore station when operating on the C and D branches as the CLRVs do not have any doors on the left side. During this time, the cars were occasionally operated as two- and three-car trains. Ultimately, the MBTA did not adopt the CLRV design for its light rail fleet. [2]

The US Standard Light Rail Vehicle program was largely unsuccessful, with the resulting cars proving unreliable and troublesome to both transit systems that had purchased them. While the CLRV gave relatively more reliable performance for the TTC and SCVTA, their large amount of components that became proprietary as a result would make the cars increasingly more difficult and costly to maintain as they aged.

In 2004, the Santa Clara VTA replaced their UTDC cars with low-floor LRVs and sold the former fleet to SacRT light rail in Sacramento and TRAX in Salt Lake City. [2] The cars were retired from service in both Salt Lake City and Sacramento in 2018 and 2022, respectively. [15]

Characteristics

The design and operation of the CLRVs and ALRVs carried over features from the highly successful PCCs that they replaced, having a similar interior layout, and the same two green bull's-eye lights in the upper corners of the front, above the destination sign, which uses back-lit roller boards. Braking and acceleration were controlled by the operator with the same pedal layout used on the PCC's, including the dead man's switch which was used to apply the parking brake when the vehicle was not in motion.

Other features include fluorescent lighting and chopper controls to save energy. [9]

Claude Gidman, the former chairman of industrial design at the Ontario College of Art & Design (now OCAD University), was involved in the design for the CLRV. He created the colour scheme for the streetcar, including its distinctive crimson red colour, to make the CLRV noticeable on the streets and to continue the "Red Rocket" tradition in colouring. He also proposed that the front seats of the streetcar be angled inward, an idea that was abandoned. [16]

Unlike the CLRVs, the ALRVs have a large box sitting on the roof of each of the two articulated sections. Each box houses an air intake to ventilate the larger ALRV interior. All of the TTC's ALRVs were delivered without couplers, and a safety shield covers both of the empty front and rear coupler pockets. [5] Compared with the CLRVs, the ALRVs had limited acceleration due to their extra weight and because trolley pole pickup limited the amount of power they could draw. [11]

When the CLRVs and ALRVs were delivered in the 1970s and 1980s respectively, they were equipped with gongs as the sole audible warning signal. Most cars were retrofitted with horns in the late 1990s to combat automobile accidents when the 510 Spadina right-of-way streetcar opened. Initially, the horns were salvaged from retired H1 and M1 subway cars which were replaced by the T1 subway cars. However, during the CLRV/ALRV streetcar fleet overhaul project between 2011 and 2012 the TTC reconfigured the streetcar horns with new air horns or automobile-type electric horns. [2]

CLRV 4041 with roof-mounted air conditioning unit CLRV 4041 EB at King & Yonge.jpg
CLRV 4041 with roof-mounted air conditioning unit

CLRV 4041 is the only member of the CLRV/ALRV fleet to have an air conditioning unit, which the TTC installed in 2006. The unit was a long roof-mounted box with beveled sides that gave 4041 a look distinct from that of other CLRVs. TTC operator Stanley Mamaraj[ who? ] described 4041's air conditioning as "The cool air comes down. You can feel it, it's nice and cool." [17] However, after a ride on 4041, transit advocate Steve Munro described the air conditioning as "nowhere near as aggressive as it is on some buses or on the T1 subway cars. Moreover, depending on where you are in the car, you may not feel the effect at all because the cool air does not blow out evenly. When I rode back north on a non-A/C car, I sat beside the open window and was actually cooler than I had been on 4041." [18]

Starting in 2006, the TTC installed a closed-circuit television (CCTV) security camera system on all surface vehicles including the CLRV/ALRV fleet as well as buses. The system is to deter crime on vehicles and help catch trouble-makers. It uses four cameras to make high-quality images stored in a 24-hour loop. [19]

Until at least 2014, CLRV/ALRV streetcars, as well as buses, used a 1970s, pager-like communication system for Transit Control to communicate with operators. It was essentially a text-based system that could send messages to 10 vehicles at a time, and each operator had to acknowledge the message before Transit Control could communicate with other operators. In 2014, the TTC requested funding for a new radio system. [20]

A promotional graphic published by the TTC in 2009 illustrated that an ALRV could replace 55 automobiles carrying 61 passengers (assuming 1.11 passengers per auto) during the AM rush. [21]

From December 2015, the CLRVs and ALRVs accepted fare payments by Presto card and have since been installed system-wide including all TTC buses and subway stations as of December 2016. [22]

To coincide with the Presto rollout on the CLRV/ALRV fleets, the TTC also introduced a proof-of-payment (POP) system across all streetcar routes in the TTC network (including the CLRV and ALRV streetcar fleets and the aforementioned replacement shuttle buses that operate in place of streetcars) in an effort to speed up services. The POP system allows riders with proof of payment—such as a paper transfer, TTC pass or Presto card—to board at any door of the vehicle. Riders are subject to random fare inspections, and riders paying by cash or token continue to have to board at the front door of the vehicle to pay at the farebox and are required to take a paper POP transfer from the driver to show when requested. [23]

Operator training

The TTC's LRV training simulator, located at the Hillcrest Complex Toronto LRV training mockup.jpg
The TTC's LRV training simulator, located at the Hillcrest Complex

A mockup of a CLRV which was used to train new streetcar operators is located at Hillcrest. The training simulator consisted of an operator cab, front steps and part of the front of a streetcar. [24]

Operators also train with a real streetcar. The signs on the vehicle identify it as a training car.

Later years

In 2014, the CLRV and ALRV streetcars began being retired and replaced by low-floor Flexity Outlook vehicles, the first of which were put into service on the 510 Spadina route. [25] The replacements were initiated on the basis of the older vehicles being inaccessible to those with disabilities as well as the age and declining reliability of the CLRV and ALRV fleets.

Accessibility

The CLRV/ALRV cars, like the PCCs, had high floors and steps at every doorway, and were therefore not wheelchair accessible, severely limiting their use by people with physical disabilities. Furthermore, the doors were separated by vertical stanchions in the centre of each doorway, making each opening too narrow to accommodate wheelchairs, making accessibility retrofits more difficult and costly. With the passage of the Accessibility for Ontarians with Disabilities Act (AODA) mandating all public transport to be fully accessible by 2025, the TTC saw the need to replace them with accessible vehicles as early as 2005. TTC staff explored a number of possible means to make the old fleet wheelchair-accessible, including constructing level boarding platforms, lowering the track level, installing wheelchair lifts, and attaching wheelchair-accessible trailers, but concluded that none of these options were practical, [26] [27] and replacing the cars was the best option.

In 2008, the TTC installed automatic stop announcements on all surface vehicles, including the CLRVs and ALRVs, to satisfy the requirements of the AODA. An LED device displays stop names in text, accompanied by a recorded voice announcing the stop names. This is to aid riders with hearing and vision problems. [27] [28] In 2016, the TTC announced it would also install external announcement systems on all of its surface vehicle fleet, again including the CLRVs and ALRVs, to announce the route and destination of the vehicle to passengers waiting to board. [29]

A TTC report in 2015 proposed that it may have continued to use some high-floor inaccessible CLRV/ALRV vehicles to supplement the low-floor Flexity Outlook streetcars during peak hours on selected routes either until approximately 2024, when projections indicated it would have enough of the Flexity vehicles available to provide accessible service on all streetcar routes or if they become impractical to maintain. [29] By May 2019, however, the TTC planned to retire the remainder of the CLRV/ALRV fleet by the end of 2019. [6]

Winter operational issues

During the polar vortex winter seasons of 2013/2014, 2014/2015, 2017/2018 and 2018/2019, many of the CLRV and ALRV streetcars broke down due to their age when operating in temperatures below −20 °C (−4 °F). On one of the worst days in January 2014, 48 streetcars failed to run for the morning rush hour. [30] On December 28, 2017, when the temperature was again 20 °C, 45 older streetcars could not leave the carhouse. [31] During an extreme cold snap from January 20 to 22, 2019, the TTC withdrew all CLRV/ALRV cars from service due to the high risk of the cars breaking down in the cold weather. Instead, only Flexity Outlook streetcars along with buses were used. [32] The ALRVs remained out of service for the rest of that winter season. [33]

The older streetcars use pressurized air passing through tubes and valves to operate such things as suspension, braking, windshield wipers, doors and the rail sander (for traction under icy conditions). Condensation can freeze and block the air tubes causing a variety of malfunctions. Over time, salt erodes the air tanks and the tubing gets brittle and leaks leading to less efficient air flow which may cause the compressor beneath the tail of the car to overheat and break down. [30]

To address these problems in December 2015, the TTC performed fixes taking 2–3 days per streetcar to implement. These included the installation of new air tanks and filters, the replacement of old tubing to the windshield wipers, repairs on the valves controlling air flow to the rail sanders, overhaul of the brake valves, and the correction of any suspension system deficiencies. [30]

Replacement parts

As the TTC's CLRV/ALRV streetcar fleet aged, many parts used by these older streetcars were no longer available from outside suppliers. If a CLRV or ALRV was damaged in a breakdown, collision or derailment, parts needed to be replaced or be bent back into shape. For this purpose, the TTC employed a blacksmith to craft and repair parts. The blacksmith also supplied tools such as switch irons and towing drawbars for streetcars. [34]

The use of salt brine to de-ice city streets corroded parts on the older streetcars so much that such parts often had to be cut off the car. The TTC Harvey Shops had to manufacture some of the replacements sections, such as the chevrons which attach bogies to the car body. The upholstery department constructed the bellows used between the articulated sections of the ALRV. Each set of bellows took 240 hours to construct from a vinyl-like material using electric sewing machines. [35]

Refurbishment

In 2006, the TTC was planning to refurbish 100 CLRVs to extend their life and possibly to add air conditioning. This plan was shelved by December 2016, and the only visible outcome was that CLRV 4041, effectively a prototype for refurbishment, became the only CLRV with air conditioning, sporting a visually distinct air conditioning unit on its roof. [17] [11]

In June 2015, the TTC started a program to rebuild and extend the life of 30 CLRVs and 30 ALRVs because of delays in delivery of the new Flexity streetcars. 56 employees were assigned to work on this program. Refurbishing each ALRV was expected to take about 55 days and cost $800,000. The cost for each CLRV was expected to be about $200,000. The total cost was budgeted at $33.1 million. The work was to be completed by 2017. [35] [36]

The refurbishment of 30 ALRVs alone was budgeted at $24.5 million, with an option to refurbish another 10. The remaining 12 ALRVs were to be stripped of useful parts and scrapped. The refurbishments included repairing corrosion, repainting, installing new energy-efficient LED lights, upgrading the floors, refreshing the seats, and overhauling the pneumatic, brake and traction systems. This was expected to extend the life of the cars until 2024. [37] [36] The first renovated ALRV (4217) entered service on October 15, 2015. [38] However, the TTC stopped the ALRV refurbishment program after completing 20 cars at a cost of $26 million. The TTC hoped to have 10 of the refurbished ALRVs in service on any given day, but found that only two or three were fit for service with the others awaiting repairs mainly due to electrical problems. Because of budget constraints, the refurbishing had excluded electrical work. [36]

Decline

Row of retired CLRVs and ALRVs at the Leslie Barns. Note that CLRV 4102 (retired 2017) is missing parts. Leslie Barns - retired CLRV & ALRV streetcars (including CLRV 4102).jpg
Row of retired CLRVs and ALRVs at the Leslie Barns. Note that CLRV 4102 (retired 2017) is missing parts.

The CLRV and ALRV cars began being retired from service as the Flexity low-floor streetcars arrived and began service. A TTC report in 2015 projected that the last of the older-model vehicles would be retired by 2024. [37] By January 2017, only 170 of the 200 CLRVs and ALRVs could be put into service because of the extra maintenance they required. [40]

In 2016, the TTC proposed using 30 to 40 ALRVs to supplement Flexity streetcars until 2024 to address increased ridership until 60 more low-floor streetcars could be ordered. [29] By September 2018, the CLRV fleet had so deteriorated that the TTC indicated they intended to use ALRVs to supplement some rush-hour services on the busier streetcar lines intended to be operated with CLRVs only. [41] The ALRV fleet was sidelined between February and April 2019. In May, the TTC ran the ALRV fleet for 926 km (575 mi), during which time one ALRV had a failure in its compressed air system. In mid-2019, the remaining ALRV fleet (about 6 or 7 vehicles) remained on standby as spare vehicles for supplemental service. [33] [42] [4]

By June 23, 2019, Flexity Outlook streetcars had fully replaced CLRVs on route 501 Queen between Neville Park Loop and Humber Loop. CLRVs continued to serve the route between Humber Loop and Long Branch Loop (operated as a separate branch of route 501) until Flexity streetcars had fully replaced them by September 1, 2019. [42] [4]

The last day of operation for the ALRVs was September 2, 2019. On that date, ALRVs 4204 and 4207 made commemorative last runs during the afternoon along Queen Street between Russell Carhouse (Queen and Greenwood) and Wolseley Loop (Bathurst and Queen) with free rides to mark the occasion. [7] [43]

In September 2019, 44 CLRVs were in service. [44] In that month, only routes 506 Carlton and 511 Bathurst were using them. [4]

CLRV 4178 (the Streetcar Named Toronto) on the last day of CLRV service CLRV 4178 at Queen & River on last day.jpg
CLRV 4178 (the Streetcar Named Toronto) on the last day of CLRV service

In September 2019, an artist group repainted CLRV 4178 at the Hillcrest Complex in bright colours, replacing its regular red and white livery. The repainting project was dubbed "A Streetcar Named Toronto" and is intended to make 4178 a moving artwork. Leaves in red and white were painted on the streetcar's floor and the ceiling was painted with a floral pattern. The artist group changed the colour of some seat covers and added photographs in the interior. The repainted streetcar ran until the end of the year on regular routes as well as for special events such as Nuit Blanche. The streetcar was expected to be scrapped after its retirement, [45] but was ultimately preserved by the Halton County Radial Railway. [46]

By October 2019, only 18 CLRVs were still in service. [47] By late November 2019, CLRV service seven days per week was planned only for 511 Bathurst. [48] The TTC announced that it would continue to run CLRVs on that route until December 28, but it would also use some CLRVs as extra vehicles on 501 Queen between Bathurst Street and Greenwood Avenue on weekends from November 24 to December 28. [8]

The last day of service for the CLRVs was December 29, 2019. On that day, the TTC offered free service on the CLRVs along Queen Street between 10am and 2pm to commemorate the occasion. [8] At 3 pm, three CLRVs made a last commemorative run carrying invited guests from the Wolseley Loop to the Russell Carhouse. [49] [50] Of the six CLRVs running that day, CLRV 4001 was the last to return to Russell Carhouse. [51]

The TTC has retained two CLRVs and an ALRV for special occasions and charters. Other CLRVs will be sold to various transit museums across North America or will be sold as scrap. [37] [8] In July 2020, the TTC indicated it will convert CLRVs 4081 and 4124 into work cars. [52]

The TTC sold CLRV 4187 at auction to a private individual [b] for static display at Glista Family Farms in Priceville, Ontario. As a condition of sale, the TTC stripped the car of its TTC logo. The buyer paid $3,400 for the car, the minimum allowed bid, but shipping increases that cost to an estimated $8,000. The new owner plans to preserve the streetcar's interior, and has constructed a short strip of track to mount the vehicle. [52]

Decommissioning

Some noteworthy retired vehicles that were scrapped include:

Decommissioning schedule as of February 2019 [53] [54]
YearCLRVALRVTotal
2013101
2014112
2015747
201616121
201730330
2018282859
201911314128
Total19652248

Preservation

TTC No.OwnerLocationStatusNotes
4001 Toronto Transit Commission Toronto, OntarioOperationalSIG-built CLRV; preserved as a heritage vehicle for future special events, such as charters and parades. [58]
4003 Halton County Radial Railway Rockwood, Ontario OperationalSIG-built CLRV; donated. [59]
4010Halton County Radial RailwayRockwood, OntarioOperationalUTDC-built CLRV; donated. [59]
4024American Industrial Mining Company Museum Brownsville, Pennsylvania OperationalUTDC-built CLRV; donated. [60]
4034 Illinois Railway Museum Union, Illinois OperationalUTDC-built CLRV; acquired by museum in November 2019; to be regauged for standard gauge trackage. [61]
4039Halton County Radial RailwayRockwood, OntarioOperationalUTDC-built CLRV; donated. [59]
4040Halton County Radial RailwayRockwood, OntarioOperationalUTDC-built CLRV; auctioned off via GovDeals. Used for storage. [62]
4068 Seashore Trolley Museum Kennebunkport, Maine OperationalUTDC-built CLRV; donated, to be regauged for standard gauge trackage. [63]
4081Toronto Transit CommissionToronto, OntarioOperationalUTDC-built CLRV; to be converted into a work car. [52]
4089Toronto Transit CommissionToronto, OntarioOperationalUTDC-built CLRV; preserved as a heritage vehicle for future events, such as charters and parades. [58] [39] [64]
4124Toronto Transit CommissionToronto, OntarioOperationalUTDC-built CLRV; to be converted into a work car [52]
4133 Seashore Trolley Museum Kennebunkport, MaineOperationalUTDC-built CLRV; to be used as a parts car for 4068 [63]
4170American Industrial Mining Company MuseumBrownsville, PennsylvaniaOperationalUTDC-built CLRV; donated. [60]
4178Halton County Radial RailwayRockwood, OntarioOperationalUTDC-built CLRV; specially repainted in September 2019; [45] donated. [46]
4187Glista Family Farms Priceville, Ontario StaticUTDC-built CLRV; purchased for preservation by a streetcar fan. [52] TTC logos removed.
4204Halton County Radial RailwayRockwood, OntarioOperationalUTDC-built ALRV donated [65]
4207Toronto Transit CommissionToronto, OntarioOperationalUTDC-built ALRV preserved as a heritage vehicle for future special events, such as charters and parades [43]

See also

Similar vehicles

Notes

  1. during rebuilds 4 seats removed
  2. Student and UrbanToronto member Alexander Glista

Related Research Articles

<span class="mw-page-title-main">Halton County Radial Railway</span> Railway museum / Heritage railway in Milton, Ontario

The Halton County Radial Railway is a working museum of electric streetcars, other railway vehicles, buses and trolleybuses. It is operated by the Ontario Electric Railway Historical Association (OERHA). It is focused primarily on the history of the Toronto Transit Commission (TTC) and its predecessor, the Toronto Transportation Commission, Its collection includes PCC, Peter Witt, CLRV and ALRV, and earlier cars from the Toronto streetcar system as well as G-series and M-series Toronto subway cars.

<span class="mw-page-title-main">Toronto streetcar system</span> Streetcar network in Ontario, Canada

The Toronto streetcar system is a network of eleven streetcar routes in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is the third busiest light-rail system in North America. The network is concentrated primarily in Downtown Toronto and in proximity to the city's waterfront. Much of the streetcar route network dates from the second half of the 19th century. Three streetcar routes operate in their own right-of-way, one in a partial right-of-way, and six operate on street trackage shared with vehicular traffic with streetcars stopping on demand at frequent stops like buses. Since 2019, the network has used low-floor streetcars, making it fully accessible.

<span class="mw-page-title-main">510 Spadina</span> Streetcar route in Toronto, Canada

510 Spadina is a Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission. The line started operating in 1990 and was extended in 1997; overnight service was reinstated in 2015.

<span class="mw-page-title-main">Urban Transportation Development Corporation</span> Canadian rolling stock and rail transport manufacturer

The Urban Transportation Development Corporation Ltd. (UTDC) is a former Crown corporation owned by the Government of Ontario, Canada. It was established in the 1970s as a way to enter what was then expected to be a burgeoning market in advanced light rail mass transit systems. It developed significant expertise in linear propulsion, steerable trucks and driverless system controls which were integrated into a transit system known as the Intermediate Capacity Transit System (ICTS). It was designed to provide service at rider levels between a traditional subway on the upper end and buses and streetcars on the lower, filling a niche aimed at suburbs that were otherwise expensive to service.

<span class="mw-page-title-main">509 Harbourfront</span> Streetcar route in Toronto, Canada

509 Harbourfront is a Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission and connecting Union Station with Exhibition Loop.

<span class="mw-page-title-main">512 St. Clair</span> Streetcar route in Toronto, Canada

The 512 St. Clair is an east–west streetcar route in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It operates on St. Clair Avenue between St. Clair station on the Line 1 Yonge–University subway and Gunns Road, just west of Keele Street.

<span class="mw-page-title-main">501 Queen</span> Streetcar route in Toronto, Canada

501 Queen is an east–west Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission (TTC). It stretches from Neville Park Loop in the east, running along Queen Street and in a reserved right-of-way within the median of the Queensway to Humber Loop in the west. In the late evenings, the 501 Queen route is extended west from Humber Loop, running on Lake Shore Boulevard to Long Branch Loop, replacing route 507 Long Branch. This route operates as part of the TTC's Blue Night Network service, operating in the early morning hours as the 301 Queen.

<span class="mw-page-title-main">511 Bathurst</span> Streetcar route in Toronto, Canada

The 511 Bathurst is a Toronto streetcar route operated by the Toronto Transit Commission in Ontario, Canada.

<span class="mw-page-title-main">504 King</span> Streetcar route in Toronto, Canada

504 King is an east–west Toronto streetcar route in Ontario, Canada. It serves King Street in Downtown Toronto as well as Broadview Avenue on the east end and Roncesvalles Avenue on the west end of the line. The route consists of two overlapping branches: 504A between Line 2 Bloor–Danforth's Dundas West station and Distillery Loop, and 504B between Broadview station – also on Line 2 – and Dufferin Gate Loop. The two branches overlap on King Street between Dufferin and Sumach streets, both passing St. Andrew station and King station on subway Line 1 Yonge–University.

<span class="mw-page-title-main">Peter Witt (Toronto streetcar)</span> TTC version built from 1921 to 1923

The Toronto version of the Peter Witt streetcar was designed by Peter Witt, a commissioner of the Cleveland Street Railway in the United States. Between 1921 and 1923, the Toronto Transportation Commission ordered a total of 350 Peter Witt motor cars. 225 trailers would be ordered from three companies in Canada: Canada Car and Foundry of Montreal, Ottawa Car Company and Preston Car Company (Brill). The cars were designed for riders to "pay as you enter", and initially used two-person operation.

<span class="mw-page-title-main">Presidents' Conference Committee (Toronto streetcar)</span>

The Presidents' Conference Committee Car was a streetcar used by the Toronto Transportation Commission and the Toronto Transit Commission. The PCC streetcar was designed by the Presidents' Conference Committee, a group of transit operators in the United States and Canada.

Accessibility for people with disabilities on the Toronto Transit Commission (TTC) system is incomplete but improving. Most of the Toronto subway system was built before wheelchair access was a requirement under the Ontarians with Disabilities Act (ODA). However, all subway stations built since 1996 are equipped with elevators, and elevators have been installed in 45 stations built before 1996. Over three-quarters of Toronto's subway stations are accessible. The original plan was to make all stations accessible by 2025; however, a few stations might not be accessible until 2026.

<span class="mw-page-title-main">Flexity Outlook (Toronto)</span> Toronto streetcar model operated by the TTC

The Flexity Outlook is the latest model of streetcar in the rolling stock of the Toronto streetcar system owned by the Toronto Transit Commission (TTC). Based on the Bombardier Flexity, they were first ordered in 2009 and were built by Bombardier Transportation in Thunder Bay and Kingston, Ontario, with specific modifications for Toronto, such as unidirectional operation and the ability to operate on the unique broad Toronto gauge.

<span class="mw-page-title-main">Humber Loop</span> Toronto Transit Commission streetcar station

Humber Loop is a multimodal transit station and a hub for streetcar routes. It consists of two streetcar turning loops and one bus loop. Humber Loop is located between the Gardiner Expressway and the Queensway just west of the Humber River in Toronto. The loop is accessed by a private right-of-way along the Queensway on the east side of the loop and by Lake Shore Boulevard on its west side. As of November 19, 2023, four Toronto Transit Commission (TTC) streetcar routes either pass through or terminate at Humber Loop.

<span class="mw-page-title-main">Russell Carhouse</span> Rail yard of the Toronto Transit Commission

The Russell Carhouse, located at Queen Street East and Connaught Avenue just east of Greenwood Avenue in Toronto, is the Toronto Transit Commission's second oldest carhouse.

<span class="mw-page-title-main">Toronto streetcar system rolling stock</span>

In 1921, the Toronto Transportation Commission (TTC) was created to integrate and operate the Toronto streetcar system. The system has had numerous different rolling stock throughout its history.

<span class="mw-page-title-main">Leslie Barns</span> Streetcar maintenance and storage facility in Toronto

Leslie Barns is a streetcar maintenance and storage facility at the southeast corner of Leslie Street and Lake Shore Boulevard in Toronto, Ontario, Canada. It has been built to house and service the majority of Toronto Transit Commission's fleet of Flexity Outlook light rail vehicles.

<span class="mw-page-title-main">Hillcrest Complex</span> Maintenance facility of the Toronto Transit Commission

Hillcrest Complex, the Toronto Transit Commission's largest facility, is responsible for most of the maintenance work on the system's surface vehicles, including heavy overhauls, repairs, and repainting. It is located adjacent to the intersection of Bathurst Street and Davenport Road. The site is also home to the TTC's Transit Control Centre, but the operational headquarters of the organization remains at the McBrien Building, at 1900 Yonge Street.

<span class="mw-page-title-main">514 Cherry</span> Former streetcar route in Toronto, Canada (closed 2018)

The 514 Cherry was a streetcar route of the Toronto streetcar system in Toronto, Ontario, Canada, that operated from June 19, 2016, until October 7, 2018. The 514 operated through the financial district and downtown Toronto between Dufferin Gate Loop and the Distillery Loop. It used to supplement with the 504 King service along King Street, specifically to the dense residential areas in Liberty Village, the Canary District and the Distillery District. The City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor through which this route would operate.

<span class="mw-page-title-main">St. Clair Carhouse</span> Streetcar depot facility in Toronto, Ontario

The St. Clair Carhouse was a streetcar facility in Toronto, Ontario, Canada. It was located south of St. Clair Avenue on a parcel of land bounded by Wychwood Avenue on the east, Benson Avenue on its north side and Christie Street on the west side. It was opened by the Toronto Civic Railways in 1913, taken over by the Toronto Transportation Commission in 1921 and closed by its successor, the Toronto Transit Commission, in 1998. The carhouse was subsequently transformed into a community centre called the Wychwood Barns.

References

Citations

  1. 1 2 3 "Service Summary – November 24, 2019 to January 4, 2020" (PDF). Toronto Transit Commission. November 23, 2019. Retrieved November 23, 2019.
  2. 1 2 3 4 5 6 7 8 9 10 11 Bow, James (December 3, 2017). "The Canadian Light Rail Vehicles (The CLRVs)". Transit Toronto. Archived from the original on December 27, 2017. Retrieved January 11, 2018.
  3. 1 2 TTC – The Coupler – Wheels of Progress Archived January 28, 2018, at the Wayback Machine . Toronto Transit Commission. Retrieved on March 16, 2015.
  4. 1 2 3 4 5 6 "Service Summary - September 1, 2019 to October 12, 2019" (PDF). Toronto Transit Commission. Archived from the original (PDF) on November 27, 2019.
  5. 1 2 3 4 5 6 7 Bow, James (January 30, 2017). "The Articulated Light Rail Vehicles (The ALRVs)". Transit Toronto. Archived from the original on January 12, 2018. Retrieved January 11, 2018.
  6. 1 2 "Chief Executive Officer's Report – May 2019 Update" (PDF). Toronto Transit Commission. May 8, 2019. p. 43. Archived (PDF) from the original on May 3, 2019. Retrieved May 3, 2019.
  7. 1 2 Bañares, Ilya (August 28, 2019). "Monday is your last chance to ride the TTC's old, articulated streetcars". Toronto Star . Retrieved August 30, 2019.
  8. 1 2 3 4 "TTC's legacy CLRV streetcars reach the end of the line on Dec 29". TTC. November 21, 2019. Archived from the original on November 22, 2019. Retrieved November 24, 2019.
  9. 1 2 3 4 5 Thompson, John (January 5, 2018). "The car that saved Toronto's streetcars". Railway Age. Archived from the original on January 12, 2018. Retrieved January 11, 2018.
  10. Munro, Steve (October 21, 2007). "A Short History of the CLRV". Steve Munro. Archived from the original on January 16, 2018. Retrieved January 15, 2018. Indeed, the original plans for the Scarborough line were based on CLRV operation. However, the engineers working on this had only a vague grasp of transit basics, and they determined that the new cars had to travel at up to 70mph (roughly 110kph) for suburban operations. ... Further problems ensued because the wheels chosen for these vehicles were incompatible with our track, notably at switches where cars tended to derail. This problem was fixed, eventually, along with the worst of the noise and vibration issues by a change to the type of wheel we now see on the CLRVs, itself a descendent of the PCC design.
  11. 1 2 3 4 5 Munro, Steve (December 29, 2006). "New Streetcars Sooner, Not Later?". Steve Munro. Archived from the original on January 18, 2018. Retrieved January 17, 2018.
  12. Munro, Steve (June 16, 2010). "Multiple Unit CLRV and ALRV Operation". Steve Munro. Archived from the original on January 15, 2018. Retrieved January 14, 2018.
  13. 1 2 Warner, David C. (April 1991). "San Jose: Guadalupe Corridor Line Completed". Passenger Train Journal . pp. 32–38. ISSN   0160-6913.
  14. "4029 and 4031 at Arborway Station in Boston, Massachusetts". Archived from the original on May 26, 2011. Retrieved February 22, 2009.
  15. Strack, Don. "UTA TRAX Light Rail Equipment". utahrails.net. Retrieved July 7, 2022.
  16. Moore, Oliver (June 12, 2022). "Creative thinker Claude Gidman designed a classic Toronto Red Rocket streetcar". The Globe and Mail .
  17. 1 2 "First Air Conditioned TTC Streetcar Unveiled". CityNews . July 26, 2006. Archived from the original on October 31, 2018. Retrieved October 30, 2018.
  18. Munro, Steve (July 21, 2006). "The Air Conditioned Streetcar". Steve Munro. Archived from the original on January 16, 2018. Retrieved January 15, 2018.
  19. "T.T.C. Starts Camera Installation On Buses & Streetcars". CityNews . October 30, 2006. Archived from the original on November 1, 2018. Retrieved October 31, 2018.
  20. Kupferman, Steve (December 17, 2013). "You'll never believe how ancient the TTC's technology actually is (there's a blacksmith involved)". Toronto Life. Archived from the original on February 3, 2014. Retrieved November 2, 2018.
  21. "2013 TTC Operating Statistics". Toronto Transit Commission. 2013. Archived from the original on November 27, 2018. Retrieved October 31, 2018. Unlocking Gridlock
  22. "TTC PRESTO Fare System". Toronto Transit Commission. 2018. Archived from the original on October 27, 2018. Retrieved November 5, 2018.
  23. "TTC Proof of Payment (POP)". Toronto Transit Commission. 2018. Archived from the original on October 23, 2018. Retrieved November 16, 2018.
  24. Bateman, Chris (September 29, 2014). "The TTC's new life-sized streetcar simulator is not a toy—but it looks like one". Toronto Life . Archived from the original on September 30, 2014. Retrieved November 1, 2018. Halfway down a long corridor inside the TTC's Hillcrest facility, on Bathurst Street, there's a room marked "streetcar simulator." Inside is a state-of-the-art training device on which the next generation of TTC streetcar drivers will earn their wheels.
  25. Kim Brown (August 31, 2014). "New TTC streetcars make their debut". Toronto Star. Archived from the original on September 1, 2014. Retrieved September 8, 2014. Torontonians taking the Spadina streetcar might have noticed something different when they stepped on board today. That's because the Toronto Transit Commission has finally launched the first of its new streetcars.
  26. "Accessible Transit Services Plan – 2006 Status Report". Toronto Transit Commission. February 22, 2006. Archived from the original on February 23, 2018. Retrieved February 22, 2018.
  27. 1 2 "Accessible Transit Services Plan: 2008 Status Report, and Status of Accessibility Standards". Toronto Transit Commission. February 18, 2009. Archived from the original on October 31, 2018. Retrieved October 30, 2018.
  28. Lostracco, Marc (December 28, 2007). "Hero: TTC Automated Announcements". The Torontoist. Archived from the original on October 31, 2018. Retrieved October 30, 2018.
  29. 1 2 3 Toronto Transit Commission (February 25, 2016). "2016 Accessibility Plan Status Report" (PDF). City of Toronto. Archived (PDF) from the original on October 31, 2018. Retrieved October 30, 2018.
  30. 1 2 3 Alex Ballingall (December 1, 2015). "Aging TTC streetcars rattle into winter". Toronto Star . Archived from the original on December 5, 2015. Retrieved December 4, 2015.
  31. Moore, Oliver (December 28, 2017). "Nearly one-third of old streetcars were unable to leave yard due to frigid weather: TTC". The Globe and Mail . Archived from the original on January 12, 2018. Retrieved January 17, 2018.
  32. Wilson, Codi (January 21, 2019). "Bitterly cold temperatures continue in Toronto". CP24. Archived from the original on March 17, 2019. Retrieved March 15, 2019.
  33. 1 2 "Chief Executive Officer's Report – July 2019 Update" (PDF). Toronto Transit Commission. July 10, 2019. Archived (PDF) from the original on July 6, 2019. Retrieved August 23, 2019.
  34. "Meet Pat Maietta, the TTC's last remaining blacksmith". CBC News. January 27, 2014. Archived from the original on December 24, 2016. Retrieved October 15, 2017.
  35. 1 2 Ben Spurr (May 13, 2016). "TTC staff 'perform miracles' keeping aging streetcar fleet on track". Toronto Star . Archived from the original on May 15, 2016. Retrieved May 13, 2016.
  36. 1 2 3 Spurr, Ben (November 12, 2018). "TTC spent $26 million to save 30 aging streetcars. But majority of the vehicles are still in the garage in need of more repairs". Toronto Star . Archived from the original on November 13, 2018. Retrieved November 13, 2018.
  37. 1 2 3 Bateman, Chris (June 16, 2015). "TTC upgrading some streetcars, crushing others". MetroNews. Archived from the original on June 20, 2015. Retrieved June 17, 2015.
  38. "Newly-restored TTC streetcar enters service". Toronto Transit Commission. October 15, 2015. Archived from the original on November 12, 2016. Retrieved October 22, 2015.
  39. 1 2 3 4 5 6 "Toronto Transit Commission 4000–4005, 4010–4199". Canadian Public Transit Discussion Board. Archived from the original on December 28, 2014. Retrieved July 26, 2013.
  40. Ben Spurr (January 9, 2017). "TTC blames service cuts on streetcar delays". Toronto Star . Archived from the original on January 9, 2017. Retrieved January 9, 2017.
  41. Munro, Steve (September 5, 2018). "The Decline of Service Capacity on 501 Queen". Steve Munro. Archived from the original on October 14, 2018. Retrieved November 2, 2018. See quoted reply from Brad Ross.
  42. 1 2 "Accessible streetcar service updates". TTC. July 2, 2019. Archived from the original on July 2, 2019.
  43. 1 2 "TTC's 'bendy streetcars' reach the end of the line". Toronto Transit Commission. August 29, 2019. Archived from the original on August 30, 2019. Retrieved August 30, 2019.
  44. "Toronto Transit Commission – CEO's Report – August 2019" (PDF). Toronto Transit Commission. August 2019. Archived (PDF) from the original on August 24, 2019. Retrieved August 23, 2019.
  45. 1 2 Spurr, Ben (September 23, 2019). "TTC marks the end of a streetcar era with a splash of colour". Toronto Star . Retrieved September 23, 2019.
  46. 1 2 Miller, Mira (February 19, 2020). "Toronto's colourful streetcar has found a new home". blogTO. Archived from the original on March 6, 2020. Retrieved March 6, 2020.
  47. "Chief Executive Officer's Report – December 2019 Update" (PDF). Toronto Transit Commission. December 12, 2019. Retrieved December 15, 2019. In October, there were 18 CLRVs remaining in service. The heavy rainfall and the 40-year life of the vehicles contributed to 14 propulsion related delays and five delays each for high voltage, brakes and doorrelated systems.
  48. "Service Summary – November 24, 2019 to January 4, 2020" (PDF). Toronto Transit Commission. November 24, 2019. Retrieved November 30, 2019.
  49. "Legacy TTC streetcars to make final trip down Queen street". Toronto Transit Commission. December 27, 2019. Archived from the original on December 29, 2019. Retrieved December 29, 2019.
  50. Mudhar, Raju (December 29, 2019). "One last ding. TTC riders savour final trip on 'iconic' streetcars". Toronto Star . Retrieved December 30, 2019.
  51. "Chief Executive Officer's Report – January 2020 Update" (PDF). Toronto Transit Commission. January 27, 2020. pp. 9, 10. Archived from the original (PDF) on February 17, 2020. Retrieved February 17, 2020.
  52. 1 2 3 4 5 Spurr, Ben (July 30, 2020). "Track of dreams: 24-year-old transit fan buys himself an old TTC streetcar". Toronto Star . Retrieved July 30, 2020.
  53. "Toronto Transit Commission – CEO's Report – November 2018" (PDF). Toronto Transit Commission. November 2018. Archived (PDF) from the original on December 22, 2018. Retrieved December 21, 2018.
  54. "Toronto Transit Commission – CEO's Report – February 2019" (PDF). Toronto Transit Commission. February 27, 2019. Archived (PDF) from the original on June 14, 2019. Retrieved March 12, 2018.
  55. "Toronto Transit Commission 4200–4251". Canadian Public Transit Discussion Board. Archived from the original on January 16, 2018. Retrieved January 15, 2018.
  56. "4 injured after crash between TTC bus and streetcar". Global News . December 27, 2014. Archived from the original on April 8, 2016. Retrieved March 21, 2016.
  57. Munro, Steve (December 10, 2017). "Early Days of the CLRVs (Updated)". Steve Munro. Archived from the original on February 9, 2018. Retrieved January 15, 2018.
  58. 1 2 Filey, Mike (December 28, 2019). "The Way We Were: End of the line for Toronto's iconic CLRVs". Toronto Sun . Archived from the original on December 29, 2019. Retrieved April 16, 2020.
  59. 1 2 3 @streetcarmuseum (November 4, 2019). "CLRV 4010 @streetcarmuseum" (Tweet) via Twitter.
  60. 1 2 "Timeline of contributions". American Industrial Mining Company Museum. Archived from the original on April 15, 2020. Retrieved April 15, 2020.
  61. "IRM acquires 1979 streetcar from Toronto". Illinois Railway Museum. November 14, 2019. Retrieved November 26, 2019.
  62. Streetcar & Subway at Halton County Radial Railway Museum , retrieved April 20, 2022
  63. 1 2 https://m.facebook.com/story.php?story_fbid=10158248181167932&id=8036307931 [ user-generated source ]
  64. "Iconic Toronto: A Transit Fan's History of the TTC's CLRV Streetcar". Tdot Shots. March 7, 2020. Retrieved April 16, 2020. Units 4001 and 4081 have been preserved by the TTC, along with 4089 being rumored but not confirmed as preserved by the TTC.
  65. Malcolm M [@TTC146Eminem] (October 21, 2019). "ALRV 4204" (Tweet) via Twitter.

General