East Bayfront LRT

Last updated

East Bayfront LRT
Overview
StatusPlanned
Locale Toronto, Ontario
Termini
Service
Type Streetcar
System Toronto streetcar system
Operator(s) Toronto Transit Commission
Technical
Track gauge 4 ft 10+78 in (1,495 mm) – TTC gauge
Route map

Contents

BSicon utKINTa.svg
Union
TTC - Line 1 - Yonge-University-Spadina line.svg BSicon CLRV.svg VIA Rail Canada simplified.svg GO Transit logo.svg
BSicon utHST.svg
Queens Quay
BSicon uextSTR+GRZq.svg
BSicon utCONTgq.svg
BSicon uxtABZgr+xr.svg
509/510 to Spadina
BSicon PORTALg.svg
BSicon uexHST.svg
Freeland Street
BSicon uexHST.svg
Richardson Street
BSicon uexHST.svg
Lower Sherbourne Street
BSicon uexHST.svg
Parliament Street
BSicon uexSTR+GRZq.svg
Queens Quay
Cherry Street
BSicon uexABZgl+l.svg
BSicon uexCONTfq.svg
BSicon lhSTRa@f.svg
BSicon uexHST.svg
Queens Quay
BSicon lWHST-M.svg
BSicon MSTR.svg
BSicon uexhSTR.svg
BSicon lWHST-M.svg
BSicon lWHST-M.svg
Keating Channel
BSicon lhSTRe@g.svg
BSicon uexHST.svg
Centre Street
BSicon uexSTR+GRZq.svg
Cherry Street
Commissioners Street
BSicon uexHST.svg
New Munitions Street
BSicon uexWSLl.svg
Villiers Island Loop

East Bayfront LRT, also known as the Waterfront East LRT, is a planned [1] [2] Toronto streetcar line that would serve the East Bayfront and Port Lands areas in Toronto, Ontario, Canada. It would run from Union station under Bay Street and along Queens Quay and Cherry Street to a new Villiers Loop along Commissioners Street east of Cherry Street on Villiers Island. [3] It would complement the existing 509 Harbourfront service that connects Union Station to Queens Quay west of Bay Street. Longer-term plans are to extend the East Bayfront line from Cherry and Commissioners Streets to the planned East Harbour Transit Hub along GO Transit's Lakeshore East line and the planned Ontario Line. [4] :55

The Waterfront East LRT Extension is a City of Toronto project to develop the East Bayfront LRT. The project involves both Waterfront Toronto and the Toronto Transit Commission. The proposed line is part of the Waterfront Transit Network which also includes the Waterfront West LRT. [4]

By April 2023, the project's design was nearing 30 percent completion. [5] :10 If the design is approved, the line could partially open along Queens Quay East between 2030 and 2033 but with Union Station bypassed. The project could fully open sometime between 2032 and 2035. [5] :73

Route

The proposed line would start at the underground loop at Union Station and proceed underground in the existing streetcar tunnel under Bay Street to Queens Quay. The line would then turn east and emerge from the tunnel on Queens Quay just west of Yonge Street. The line would continue east to a relocated Cherry Street, [6] :55 where it would turn south to Commissioners Street then east on Commissioners Street to terminate at a new Villiers Loop running via New Munitions, Centre and Villiers Park Streets all new streets to be constructed on Villiers Island. All tracks for the new line east of the Bay Street tunnel would be in a dedicated right-of-way. [3]

Platform and track configurations
Searchtool.svg Existing Union station platform
Searchtool.svg Proposed Union station platforms

As part of the project, the underground streetcar stations at Union Station and Queens Quay would be expanded. At Union Station, the existing streetcar platform at the head of the loop would be replaced by four new platforms, more specifically two platforms along each side of the loop's neck under Bay Street. Also along the neck, there would be two bypass tracks and switchwork so that any streetcar entering the station or leaving a platform could bypass any other streetcar waiting at a platform. [5] :11–16 On the south side of Queens Quay station, there would be a double-track wye junction to replace the existing curve. From Queens Quay station, southbound streetcars would be able to branch either east or west along Queens Quay. Streetcars could also continue along Queens Quay, bypassing Queens Quay station. [5] :26 A new tunnel portal would be constructed on Queens Quay on the west side of Yonge Street. [5] :30 Both the eastbound and westbound tracks would be in a dedicated right-of-way along the south side of Queens Quay so as to reduce the need for rail vehicles to stop for road traffic as there are fewer street intersections on the south side of Queens Quay than on its north side. [7]

Waterfront Toronto is constructing Villiers Island in the Port Lands by creating a new channel for the Don River south from the Keating Channel then turning west to run between Commissioners Street and the Ship Channel into Toronto Harbour. The island is to be redeveloped from industrial to mixed commercial and residential use. [8] :25 Streetcar service for the island is planned on reserved right-of-ways which may initially be used by buses. [8] :62 The streetcar right-of-way would be on the east side of a relocated Cherry Street. [8] :63

Bridge to Villiers Island, designed to carry streetcars on a relocated Cherry Street TTC bridge over the Keating Channel, 2021 01 23 -c (50868044106).jpg
Bridge to Villiers Island, designed to carry streetcars on a relocated Cherry Street

As of April 2023, the plan was to implement the new line in two stages. The first stage would be to build the line along Cherry Street and Queens Quay East and connect the tracks to those on Queens Quay West at Bay Street. Streetcars would run from the Port Lands to possibly Exhibition Loop. The streetcar tunnel under Bay Street would then be closed to enlarge the Union Station loop and Queens Quay station. When the tunnel reopens, streetcars would run from Union Station to the Port Lands. [8] :53

Besides building the streetcar line along Queens Quay East, the city ultimately wants to connect Villiers Island to the 504 King streetcar route via its Cherry Street branch. As a first phase, the city feels it could either build along Queens Quay or connect to the 504 King, but not both simultaneously. Thus, the city prefers to build the Queens Quay trackage first before making the 504 King connection. [5] :73

Cost

In 2015, the estimated cost to build the East Bayfront LRT from Union Station to Small Street was $520 million. The breakdown was as follows: [10] [11]

By June 2019, the estimated cost of the line had grown to $700 million. [12] The above costs do not reflect design changes to Queens Quay station or the planned extension of the line from Parliament Street to Villiers Island, changes which were proposed in 2021. [6]

By October 2023, the cost had risen to $2.57 billion broken down as: $932 million for Union Station Loop, $1.3 billion to connect Union Station to Villiers Island, and $337 million to connect lower Cherry Street to Distillery Loop in a separate phase. [13] :16,17

Challenges

The underground streetcar loop at Union Station does not have the capacity to accommodate the extra light rail vehicles needed to service the new line. Thus, a new eastbound platform must be added. [14]

A sewer at Queens Quay and Bay Street will make it difficult to build an eastern portal to bring the tracks to the surface. [14]

One of the issues which has delayed progress of constructing the line is the proposed redevelopment of the waterfront properties between Jarvis Street and Parliament Street, which lie south of Queens Quay. The plans called for two access streets, which would cross the proposed light rail line at signalized intersections. However, the developer has designed a third street into the plan, likely due to the expected traffic volumes from the development, which would require an additional signalized intersection with the light rail line. Some councillors have stated this would negatively affect service along the proposed route, possibly adding as much as an extra three minutes travel to a line that would only require ten minutes to traverse.

Demand

George Brown College's campus in the East Bayfront has opened and there are development plans for several apartment and condominium complexes on Queens Quay East and, in future years, in the West Don Lands. Thus, there will be roughly 20,000 residential units in the area, plus 8,000 jobs and 3,500 students. [14]

According to transit advocate Steve Munro, developers in the area, particularly for commercial properties, are concerned that without good transit, a better connection to the core area than the Sherbourne and Bay buses, developments are not marketable. [15]

A project called the Waterfront Transit Reset was set up to study possible streetcar system upgrades along the waterfront from Long Branch to Leslie Street. That study included the East Bayfront. A WTR report dated November 13, 2017, stated that:

While three bus routes currently serve the area, adding higher-quality, higher-capacity streetcar service is an urgent priority for the TTC, the City, and Waterfront Toronto. Projected peak demand in 2041 on this section is approximately 2400 people per hour, and serving this very high level of demand requires high-quality streetcar service in a dedicated right of way. [16]

In January 2019, the Waterfront BIA (a neighbourhood business group) estimates a $1.2 billion loss of productivity and a $20 billion loss of federal, provincial and local tax revenue if the opening of the East Bayfront LRT were delayed from 2025 to 2045. The BIA hopes that the line will open by 2025 which according to the BIA would stimulate commercial and residential development providing 135,000 new jobs and housing 67,000 residents along the proposed line. [17]

Alternatives to streetcar operation

The City of Toronto considered a bus service running in the former streetcar's dedicated right-of-way. The challenge for such a service to the eastern waterfront is the connection at Union Station for transferring passengers. There is limited sidewalk space for both pedestrians and transit stops along Bay Street. Buses would have to compete with other traffic through the Bay Street underpass and mixed traffic south to Queens Quay. [18]

The City also considered replacing the streetcar track in the 400-metre (1,300 ft) tunnel under Bay Street between Union Station and Queen's Quay with a driverless people-mover system; this option also included changing the streetcar routing so it only ran along Queen's Quay.

In April 2019, staff recommended continuing streetcar operation under Bay Street to Union Station, along with extending platforms and adding extra tracks along the Union Station streetcar loop. [19]

History

On April 5, 2006, the first Public Forum for the Environmental Assessment for the Eastern Waterfront transit proposals was held. [20]

In February 2012, Emily Jackson of the Toronto Star reported that budget over-runs on the Queens Quay West line had not left enough funds to start the Queens Quay East line. [18] [21]

On August 29, 2014, The Globe and Mail reported that senior City of Toronto officials had gone over the head of City Council, and made an appeal for funding for the line right to more senior levels of government. [22] [23] TTC General Manager Andy Byford and City Manager Joe Pennachetti had made their proposal to their opposite numbers in the Provincial bureaucracy. According to The Globe and Mail, they had not yet approached provincial and federal politicians.[ citation needed ]

In September 2015, the TTC Budget Committee passed the following motion regarding the Capital Budget:

Request TTC staff, working with the City of Toronto manager, and Waterfront Toronto, to prioritize the East Bayfront LRT project, and to report back to the TTC's Budget Committee on how to expedite the work, starting with the planning and engineering work. [15]

In May 2016, condominium developers expressed concern about a lack of activity on the East Bayfront LRT project. Sam Crignano, president of Cityzen, a developer with three projects along the eastern waterfront, said that having two or three bus lines in the area won't be enough to handle the future influx of new residents and employees. Niall Haggart, executive vice-president of the Daniels Corp., urged action on the LRT project. Daniels has started a $700-million mixed-use development which will add about 7,300 people to the area by day and 2,500 at night. The Toronto Star reported that the project had been stalled because of a lack of funding and piecemeal transportation planning. [24]

A report about the Waterfront Transit Reset project dated November 13, 2017, stated that: "The City, Waterfront Toronto, and the TTC would carry out the approved plans for a new streetcar line along Queens Quay East [to Parliament Street] in the East Bayfront area." [16]

Since the provincial election of June 2018, when there was a change in government, the province has made no promise to fund the Easy Bayfront LRT. In January 2019, the provincial Ministry of Transportation said it had not received a formal request for funding from the City; thus, the province remains uncommitted. [17]

In June 2019, Sidewalk Labs offered $100 million in "credit support" to build a portion of the East Bayfront LRT between Cherry Street and Broadview Avenue, which would pass through its proposed development in Toronto's Portland area. The estimated cost of that portion of the line was $406 million and would be in addition to the $700 million estimated cost to build the line from Union Station to Small Street. [12]

On June 17, 2020, the TTC Board approved spending $15,000,000 over three years on design work for the expansion of streetcar platforms at Union and Queens Quay stations as well for a new tunnel and portal for the East Bayfront line. The TTC was also considering connecting the line to Distillery Loop. [25]

At a virtual public meeting held on June 21, 2021, it was announced that in phase 1, the LRT line would terminate in the Port Lands at a new Polson Loop near Cherry and Polson Streets. A new loop at Parliament Street was rejected as a terminus because of crowding by existing buildings. Distillery Loop was problematic because of construction of the Ontario Line and because grading problems would require a temporary loop elsewhere. A Polson Loop would also support development in the Port Lands, while a Parliament Loop or Distillery Loop would not. [6] :56

In January 2023, Waterfront Toronto announced design changes so that a new on-street loop on Villiers Island would be the eastern terminal of the line instead of Polson Loop. The streetcar line would be extended a short distance on Commissioners Street and then loop on a dedicated right-of-way via New Munitions Street, Centre Street and Villiers Park Street all new streets to be constructed. A Villiers Loop would help serve the planned mixed-use community and future parks to be built on the island. A new Polson Loop would remain in plans for future expansion. [3]

An October 2023 city report recommended that a streetcar connection along Cherry Street between Lakeshore Boulevard East and Distillery Loop be delivered as a separate contract in a later phase because constructing such a link may conflict with Ontario Line construction and the planned Gardiner Expressway realignment. [26] :4,14

Future expansion

In a later phase, there could be a branch running east from Cherry Street along Commissioners Street that, halfway to Leslie Street, would turn north to the planned East Harbour Transit Hub, with connections to GO Transit trains, the planned Ontario Line and a possible southerly extension of the streetcar line along Broadview Avenue. [4] :28 [8] :63 [6] :55 A November 2017 report about the Waterfront Transit Reset project stated that projected demand east to Leslie Street (150 people per hour in 2041) was too low to justify streetcar service further east. [16]

See also

Related Research Articles

<span class="mw-page-title-main">Harbourfront, Toronto</span> Neighbourhood in Toronto, Ontario, Canada

Harbourfront is a neighbourhood on the northern shore of Lake Ontario within the downtown core of the city of Toronto, Ontario, Canada. Part of the Toronto waterfront, Harbourfront extends from Bathurst Street in the west, along Queens Quay, with its ill-defined eastern boundary being either Yonge Street or York Street. Its northern boundary is the Gardiner Expressway. Much of the district was former water lots filled in during the early 1900s to create a larger harbour district. After shipping patterns changed and the use of the Toronto harbour declined, the area was converted from industrial uses to a mixed-use district that is mostly residential and leisure.

<span class="mw-page-title-main">Union station (TTC)</span> Toronto subway station

Union is a subway station on Line 1 Yonge–University of the Toronto subway in Toronto, Ontario, Canada. It opened in 1954 as one of twelve original stations on the first phase of the Yonge line, the first rapid transit line in Canada. It was the southern terminus of the line until the opening of the University line in 1963, and is today the inflection point of the U-shaped line. Along with Spadina station, it is one of two stations open overnight to support late-night streetcar routes.

<span class="mw-page-title-main">Toronto streetcar system</span> Streetcar network in Ontario, Canada

The Toronto streetcar system is a network of ten streetcar routes in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is the third busiest light-rail system in North America. The network is concentrated primarily in Downtown Toronto and in proximity to the city's waterfront. Much of the streetcar route network dates from the 19th century. Most of Toronto's streetcar routes operate on street trackage shared with vehicular traffic, and streetcars stop on demand at frequent stops like buses. Since 2019, the network has used low-floor streetcars, making it fully accessible.

<span class="mw-page-title-main">510 Spadina</span> Streetcar route in Toronto, Canada

510 Spadina is a Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission.

<span class="mw-page-title-main">509 Harbourfront</span> Streetcar route in Toronto, Canada

509 Harbourfront is a Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission and connecting Union Station with Exhibition Loop.

<span class="mw-page-title-main">512 St. Clair</span> Streetcar route in Toronto, Canada

The 512 St. Clair is an east–west streetcar route in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It operates on St. Clair Avenue between St. Clair station on the Line 1 Yonge–University subway and Gunns Road, just west of Keele Street.

<span class="mw-page-title-main">Queens Quay (Toronto)</span> Street in the Harbourfront neighbourhood of Toronto, Canada

Queens Quay is a prominent street in the Harbourfront neighbourhood of Toronto, Ontario, Canada. The street was originally commercial in nature due to the many working piers along the waterfront; parts of it have been extensively rebuilt in since the 1970s with parks, condominiums, retail, as well as institutional and cultural development.

<span class="mw-page-title-main">504 King</span> Streetcar route in Toronto, Canada

504 King is an east–west Toronto streetcar route in Ontario, Canada. It serves King Street in Downtown Toronto as well as Broadview Avenue on the east end and Roncesvalles Avenue on the west end of the line. The route consists of two overlapping branches: 504A between Line 2 Bloor–Danforth's Dundas West station and Distillery Loop, and 504B between Broadview station – also on Line 2 – and Dufferin Gate Loop. The two branches overlap on King Street between Dufferin and Sumach streets, both passing St. Andrew station and King station on subway Line 1 Yonge–University.

<span class="mw-page-title-main">Queens Quay station</span> Streetcar station in Toronto, Canada

Queens Quay is an underground streetcar station of the Toronto streetcar system in Toronto, Ontario, Canada. It is the only underground streetcar station that is not part of or connected to a Toronto subway station. It was opened in 1990 as part of the former Harbourfront LRT route. The station is now served by the 509 Harbourfront, 510 Spadina daytime routes and the 310 Spadina night route.

<span class="mw-page-title-main">Exhibition Loop</span> Toronto Transit Commission streetcar terminus

Exhibition Loop is the terminus for the 509 Harbourfront and 511 Bathurst streetcar routes, the 174 Ontario Place-Exhibition, and the 307 Blue Night Bathurst bus routes. Exhibition Loop serves Exhibition Place, Coca-Cola Coliseum, BMO Field and connects with GO Transit at the Exhibition GO Station.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

<span class="mw-page-title-main">Port Lands</span> Neighbourhood in Toronto, Ontario, Canada

The Port Lands of Toronto, Ontario, Canada are an industrial and recreational neighbourhood located about 5 kilometres south-east of downtown, located on the former Don River delta and most of Ashbridge's Bay.

The Waterfront West LRT (WWLRT) is a proposed streetcar line in Toronto, Ontario, Canada. The WWLRT is currently part of a City project called the Waterfront Transit Reset which also includes the East Bayfront LRT. The WWLRT was initially proposed as part of the Transit City plan to expand transit services offered by the Toronto Transit Commission that was announced March 16, 2007. The new line was to use existing parts of the Toronto streetcar system, extending from Union station to Long Branch Loop via Exhibition Place.

<span class="mw-page-title-main">Toronto streetcar system loops</span>

Turning loops of the Toronto streetcar system serve as termini and turnback points for streetcar routes in Toronto, Ontario, Canada. The single-ended streetcars require track loops in order to reverse direction. Besides short off-street track loops these can also be larger interchange points, having shelters and driver facilities, or be part of a subway station structure for convenient passenger interchange.

<span class="mw-page-title-main">Dufferin Gate Loop</span> Bus station and streetcar turning loop in Toronto, Ontario, Canada

Dufferin Gate Loop, also known as Dufferin Loop, is a Toronto Transit Commission (TTC) bus station and turning loop for streetcars near the southern end of Dufferin Street in Toronto, Ontario, Canada. During the Canadian National Exhibition (CNE), the loop becomes a primary access point for visitors entering Exhibition Place via the Dufferin Gates. This west entrance to the CNE can be reached by the Dufferin Street bridges across the Lakeshore West railway corridor and Gardiner Expressway.

<span class="mw-page-title-main">East Bayfront</span> Neighbourhood in Toronto, Ontario, Canada

East Bayfront, or the East Bayfront Precinct, is an emerging neighbourhood in Toronto, Ontario, Canada. It is currently undergoing a transformation from industrial use to mixed-use as part of Waterfront Toronto's plans to create a residential and commercial district urban core near the lake.

<span class="mw-page-title-main">Cherry Street (Toronto)</span> Thoroughfare in Toronto, Ontario

Cherry Street is a north-south arterial roadway in the eastern downtown of Toronto, Ontario, Canada. It is situated in a former industrial area, that is now the site of redevelopment. It connects Eastern Avenue south to Lake Shore Boulevard, then to the Toronto Port Lands district, and terminates at Lake Ontario at Cherry Beach.

<span class="mw-page-title-main">514 Cherry</span> Former streetcar route in Toronto, Canada (closed 2018)

The 514 Cherry was a streetcar route of the Toronto streetcar system in Toronto, Ontario, Canada, that operated from June 19, 2016, until October 7, 2018. The 514 operated through the financial district and downtown Toronto between Dufferin Gate Loop and the Distillery Loop. It used to supplement with the 504 King service along King Street, specifically to the dense residential areas in Liberty Village, the Canary District and the Distillery District. The City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor through which this route would operate.

<span class="mw-page-title-main">Villiers Island</span> Island in Toronto, Ontario, Canada

Villiers Island is a 22-hectare (54-acre) area in Toronto's Port Lands being converted to an island. The project is a part of Port Lands Flood Protection Project by Waterfront Toronto. To prevent flooding from the Don River, a channel is being created to extend the river south and then west into Toronto Harbour providing another outlet and a more natural mouth for the Don River. The new channel effectively creates the island, which is also bounded by the Keating Channel and Toronto Harbour. Mixed-use residential development is planned for Villiers Island.

<span class="mw-page-title-main">Distillery Loop and Cherry Street branch</span> Streetcar loop and branch line in Toronto

Distillery Loop is a streetcar loop in the Toronto streetcar system in Toronto, Ontario, Canada that lies at the south end of the Cherry Street branch – originally dubbed the Cherry Street streetcar line – that runs from a streetcar junction on King Street East south along Sumach and Cherry Streets. The loop opened in June 2016 and is some of the newer streetcar infrastructure in the city. The Cherry Street branch is currently served by the 504A King streetcar route which has its eastern terminus at Distillery Loop.

References

  1. "Waterfront East Light Rail Transit". City of Toronto. October 12, 2021. Archived from the original on April 19, 2023. Retrieved April 19, 2023.
  2. "Extending the Waterfront East LRT to Villiers Island | Waterfront Toronto". www.waterfrontoronto.ca. Archived from the original on February 8, 2023. Retrieved April 19, 2023.
  3. 1 2 3 "Extending the Waterfront East LRT to Villiers Island". Waterfront Toronto. January 25, 2023. Archived from the original on January 27, 2023.
  4. 1 2 3 "Waterfront East LRT Extension Transit Network Update" (PDF). City of Toronto. February 17, 2021. Archived (PDF) from the original on February 4, 2021. Retrieved February 19, 2021.
  5. 1 2 3 4 5 6 "Waterfront East LRT Extension Virtual Public Consultation #3" (PDF). City of Toronto. April 2023. Archived (PDF) from the original on April 7, 2023.
  6. 1 2 3 4 "Waterfront East LRT Virtual Consultation Summer 2021" (PDF). City of Toronto. June 21, 2021. Archived (PDF) from the original on June 21, 2021. Retrieved June 22, 2021.
  7. Mackenzie, Robert (April 10, 2010). "Queens Quay Transit Project: Will Help Renew Toronto's Waterfront". Transit Toronto. Archived from the original on October 21, 2011. Retrieved December 24, 2011. Transit is a key component — or quay component — of the plan. Two lanes of streetcar tracks will separate the pedestrian and cycling area from the roadway. Since these tracks will line the southern side of the traffic portion of Queens Quay, streetcars will cross fewer side streets and stop only at intersections, with signals prioritizing streetcars over other vehicles. And streetcars will also start to serve eastern harbour — the area between Bay and Parliament Streets.
  8. 1 2 3 4 5 "Villiers Island Precinct Plan" (PDF). Waterfront Toronto. September 2017. Archived (PDF) from the original on October 31, 2020. Retrieved October 28, 2020.
  9. Ian Harvey (September 25, 2020). "Big steel bridges now floating towards Toronto's waterfront". Daily Commercial News . Archived from the original on May 16, 2021. Retrieved February 22, 2021. The bridges are the first of up to seven eventually planned for the east Toronto waterfront area around Cherry Street where the Don River mouth diversion is well underway. The single span Cherry Street North bridge is engineered to handle LRT loads but since there's no transit line there yet, it will easily handle buses.
  10. Simcoe, Luke (October 28, 2015). "Toronto hits the 'reset' button on waterfront transit planning". Metro News. Archived from the original on March 5, 2016. Retrieved October 31, 2015.
  11. Munro, Steve (October 14, 2015). "A "Reset" For Waterfront Transit Plans?". Archived from the original on October 14, 2015. Retrieved November 1, 2015.
  12. 1 2 Spurr, Ben (June 24, 2019). "Sidewalk Labs says it won't pay upfront costs for new LRT critical to 'smart city' waterfront development". Toronto Star . Archived from the original on June 24, 2019. Retrieved June 24, 2019.
  13. "Advancing Waterfront East Light Rail Transit" (PDF). City of Toronto. October 17, 2023. Archived (PDF) from the original on November 4, 2023.
  14. 1 2 3 Morrow, Adrian (May 25, 2012). "A tiny perfect streetcar line is being laid along Cherry Street". The Globe and Mail . Archived from the original on June 30, 2012. Retrieved July 19, 2012.
  15. 1 2 Munro, Steve (September 17, 2015). "TTC Budget 2016: Confused Priorities Make For A Confusing Budget (Part I)". Archived from the original on September 17, 2015. Retrieved September 17, 2015.
  16. 1 2 3 "Waterfront Transit Update" (PDF). Toronto Transit Commission. November 13, 2017. Archived from the original (PDF) on January 28, 2018. Retrieved November 13, 2017.
  17. 1 2 Spurr, Ben (January 30, 2019). "Delaying Waterfront LRT would cost billions in lost tax revenue, productivity: BIA report". Toronto Star . Archived from the original on January 30, 2019. Retrieved January 30, 2019.
  18. 1 2 Munro, Steve (February 8, 2013). "Waterfront East Update: February 2013 (Updated)". Steve Munro. Archived from the original on March 4, 2015. When a transit line to the eastern waterfront was first proposed, the cost estimate was considerably lower than today. Waterfront Toronto has only $90-million left in the account for this project because some of the originally intended funds have been redirected to the Queens Quay West project now underway.
  19. "Waterfront Transit Network - Union Station-Queens Quay link and east Bayfront LRT" (PDF). City of Toronto. April 19, 2019. Archived (PDF) from the original on April 20, 2019. Retrieved April 19, 2019. Based on the analysis described in this attachment, the recommended preferred option is the Streetcar (Loop Expansion) Option.
  20. Munro, Steve (April 6, 2006). "East Waterfront Update". Archived from the original on March 4, 2016. Retrieved November 1, 2015.
  21. Jackson, Emily (February 14, 2012). "Toronto LRT transit plan stalling on Queens Quay East". Toronto Star . Archived from the original on March 4, 2016. But the LRT project meant to connect Union Station with the burgeoning lakefront community to its east seems to have gone off the rails just a year and a half after the government gave it a stamp of approval.
  22. Moore, Oliver; Hains, David (August 29, 2014). "Toronto bureaucrats bypass politicians to make waterfront transit pitch". The Globe and Mail . Archived from the original on August 29, 2014. Retrieved August 29, 2014. Two of Toronto's top bureaucrats are pushing for a new light-rail line right across the city's waterfront, taking to higher levels of government their pitch for a route expected to cost hundreds of millions.
  23. Sweet, Sarah (August 29, 2014). "Bureaucrats Take the Fight for Waterfront LRT Straight to Higher Levels of Government". Torontoist . Archived from the original on August 29, 2014. The route they're championing would involve the East Bayfront LRT—mentioned in the last provincial budget but by no means a done deal—and the Waterfront West LRT, part of former mayor David Miller's now-defunct Transit City plan. It would create an east-west transit option that could relieve congestion on the Gardiner Expressway and Lake Shore Boulevard and provide an easier way for those in Liberty Village to get downtown.
  24. Spurr, Ben (May 23, 2016). "Amid development boom, Queens Quay East LRT running late". Toronto Star . Archived from the original on May 23, 2016. Retrieved May 23, 2016.
  25. "Waterfront East LRT, Union Station and Queens Quay Link" (PDF). Toronto Transit Commission. June 17, 2020. Archived from the original (PDF) on June 20, 2020. Retrieved June 20, 2020.
  26. "Waterfront East LRT: Constructability Assessment Summary Attachment 3" (PDF). City of Toronto. October 17, 2023. Archived (PDF) from the original on November 4, 2023.