Toronto Rocket

Last updated

Toronto Rocket
Toronto Rocket.JPG
Toronto Rocket subway train at Rosedale station
Toronto Rocket interior 2021.jpg
View along full length of train
In serviceJuly 21, 2011 – present
Manufacturer Bombardier Transportation
Built at Thunder Bay, Ontario
Family name Movia
Replaced H4, H5, H6
Constructed2009–2015 [1]
Number built480 (82 trainsets)
Formation
  • 6-car set (Line 1)
  • 4-car set (Line 4)
Fleet numbers5381–6196 [2]
Capacity
  • Seated
  • 400 (6-car set)
  • 264 (4-car set)
  • Crush load
  • 1,458 (6-car set)
  • 948 (4-car set) [3]
Operators Toronto Transit Commission
Depots
Lines served
Specifications
Car body constructionStainless steel [3]
Train length
  • 137.82 m (452 ft 2 in) [2] [3] (6-car set)
  • 92.1 m (302 ft 2 in) [3] (4-car set)
Car length
  • 23,190 mm (76 ft 1 in) [2] [3] (end cars)
  • 22,860 mm (75 ft 0 in) [3] (intermediate cars)
Width3,137 mm (10 ft 3+12 in) [4]
Height3,645 mm (11 ft 11+12 in) [4]
Floor height1,105 mm (3 ft 7+12 in) [4]
Doors8 sets (4 sets per side) per car
Wheel diameter711 mm (28 in) [4]
Wheelbase 2,083 mm (6 ft 10 in) [4]
Maximum speed
  • 88 km/h (55 mph) [2] train max
  • 75 km/h (47 mph) service revenue max
Weight205,500 kg (202.3 long tons; 226.5 short tons) (per trainset); 34,250 kg (33.71 long tons; 37.75 short tons) per car [4]
Traction systemBombardier MITRAC TC1420 IGBTVVVF [5]
Traction motors 155 kW (207.9 hp) 3-phase AC induction motor
Power output
  • 3.1 MW (4,157.2 hp) (6-car set)
  • 1.86 MW (2,494.3 hp) (4-car set)
Acceleration 0.9 m/s2 (3.0 ft/s2) (limited)
Deceleration
  • 1.35 m/s2 (4.4 ft/s2) (service)
  • 1.5 m/s2 (4.9 ft/s2) (emergency)
Auxiliaries120/208 V AC battery auxiliary
Electric system(s) Third rail,  600 V DC
Current collector(s) Contact shoe
UIC classification
  • 2′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′2′ (6-car set)
  • 2′Bo′+Bo′Bo′+Bo′Bo′+Bo′2′ (4-car set)
[5]
Minimum turning radius
  • 75 m (246 ft) (horizontal)
  • 610 m (2,000 ft) (vertical)
[4]
Braking system(s) Regenerative and pneumatic
Safety system(s)Emergency evacuation ramps at each end of trainset
Track gauge 4 ft 10+78 in (1,495 mm)

The Toronto Rocket (TR) is the fifth and latest series of rolling stock used in the Toronto subway system in Toronto, Ontario, Canada. Owned and operated by the Toronto Transit Commission (TTC), the trains were built by Bombardier Transportation in Thunder Bay, Ontario, to replace the last remaining H-series trains, as well as increase capacity for the Spadina subway extension to Vaughan that opened in 2017. They operate in a six-car configuration on Line 1 Yonge–University and a four-car configuration on Line 4 Sheppard. The sets are stored and maintained at the Wilson and Davisville Yards. The first six-car TR train entered passenger service on Line 1 in July 2011, and four-car TR trainsets entered service on Line 4 in May 2016.

Contents

The TR series is the newer of the two currently active series of rolling stock on the heavy-rail lines in the Toronto subway network, featuring a completely new design based on the Bombardier Movia family of trains. They are notable as the first subway trains in North America equipped with full-open gangways, which allows passengers to see and walk through the entire length of the train. They are currently the only ones in Toronto compatible with the communications-based train control (CBTC) system, which replaced the legacy fixed-block signalling system in several phases on Line 1 between 2017 and 2022 (starting with the Line 1 extension to Vaughan Metropolitan Centre station, which opened on December 17, 2017) and has used only one operator since November 2022, [6] [7] who plays the dual role of driving the train and of opening and closing the doors.

The trains were designated under the production name as T35A08 before the name "Toronto Rocket" was chosen through a contest open to the public. [8] [9] They are jointly funded by the City of Toronto (Toronto Transportation Services), the Government of Ontario (Ministry of Transportation), and the Government of Canada (Transport Canada).

History

The initial order was signed in 2006 for the delivery of 234 cars, making 39 six-car fixed trains, which allowed for the retirement of the H4 and H5 subway cars (the H6 cars, though primarily serving Line 2, were also later retired). Manufacturing of the TRs began in 2008. Delivery was expected to begin in late 2009, and they were scheduled to enter passenger service in early 2010. However, delivery was delayed by the bankruptcy of a key part manufacturer, Curtis Doors, which was to install door components for the TTC's TR subway trains. [2] [10] [11]

On May 6, 2010, the TTC voted to exercise a contract option with Bombardier for an additional 186 cars, making 31 six-car fixed train sets. This allowed for the retirement of the older H6 series trains, and to have enough TR trains to meet future ridership demands for the opening of the Spadina Subway extension to Vaughan Metropolitan Centre station (signed as "Vaughan" on the TR train's exterior destination signs for brevity), which was then scheduled for opening in mid-2015 (in time for the opening of that summer's Pan American Games). [12] [13] However, the opening of the extension was delayed until December 17, 2017. [14] [15]

On October 1, 2010, the first train set (5391–5396) was delivered to Wilson Yard. It was unveiled to the public and media at Downsview station (later renamed Sheppard West in mid-2017 in preparation for the opening of the extension to Vaughan) on October 14, 2010. [16]

Between October 2010 and July 2011, the TR trains underwent a series of testing and training runs on Line 1. The first TR trainset (5411–5416) entered passenger service on Line 1 with two-crew members on July 21, 2011. The purchase of ten additional train sets (60 cars) was authorized in March 2014, bringing the total number of TR stock to 80 six-car train sets and 480 cars. [17] In March 2015, the TTC reported that the T1 trains running on Line 4 would have to be replaced with TR trains before conversion of Line 1 to automatic train control (ATC) (which was initially to be fully rolled out by 2020, but was delayed until 2022) and that the TTC would report soon on the option of converting an existing six-car train to a four-car train to test one-person train operation (OPTO) (which had been in place on the S-series trains on Line 3 Scarborough from its inception in 1985 until its decommissioning in 2023). [18] They entered service on Line 4 on May 30, 2016, with two crew members, before switching over to OPTO on October 9, 2016. [19] OPTO was later rolled out on Line 1 in phases between 2021 and 2022. [20]

In mid-2016, some TR trains were used on Line 2 to address the shortage of T1s caused by faulty air-conditioning units after Toronto mayor John Tory accepted a challenge posted on Twitter to ride an overheated T1 train on Line 2 during a hot summer day. [21] [22]

Seat restricted sign used in the Toronto Rocket (and other TTC vehicles) during the COVID-19 pandemic TTC Seat Restricted Sign.svg
Seat restricted sign used in the Toronto Rocket (and other TTC vehicles) during the COVID-19 pandemic

During the COVID-19 pandemic, certain seats on the Toronto Rocket were prohibited from use to encourage social distancing; these seats were marked with large laminated signs stuck with adhesive to the upper velour-covered part of the fixed seats (including the half-seats) and either to the top or the bottom of the automatic folding seats, depending on the individual train. [23]

Design

The TR series trains are similar to that of the T-series cars, also built by Bombardier in the same facility, but have several new features that make them more accessible and user-friendly for passengers. They include:

Retrofits

Additional yellow plastic straps (placed underneath the HVAC units) along with audible door opening side announcements (based on direction of train travel), which is played after the "Arriving at" station announcement (except for terminal stations) to better assist visually impaired passengers, were installed in all TR trains as of January 2016. Additionally, all TR trains were retrofitted with external speakers, along with exterior side destination signs, that audibly announce the route and destination of the train. [3] [25] [26] [27] [28]

Lines serviced

Criticism

Tendering process

During the tendering process, Oakville-based Siemens Canada (see Siemens Modular Metro) was seen as a possible competitor to the Bombardier bid. [29] [30] Councillors Karen Stintz (who later also served as TTC chair), Denzil Minnan-Wong, and Rob Ford (who became mayor in late 2010) were opposed to sole-sourcing the contract to Bombardier. They alleged that many sole-source advocates had union ties and were thus not interested in getting the best financial deal available to the city. [31]

Mobility issues

Toronto subway riders holding on to an overhead ventilation unit at each end of the train car for stability TTC Rocket AC Unit.jpg
Toronto subway riders holding on to an overhead ventilation unit at each end of the train car for stability

In late September 2011, it was reported that some passengers with mobility devices were experiencing difficulties while boarding or alighting the then-new TR trains. TTC officials noted that this could either be because the train was sitting too high in relation to the level of the platform or be the result of the train's door threshold, which is not parallel with the platform and/or the number of passengers riding on the train. They were actively looking for ways to solve the problem. [32]

To increase mobility, the train does not have centre poles, leaving standing riders with fewer places to hold. There are swinging handles hanging from a lateral pole along the length of each car near the ceiling, except near car ends, where an overhead ventilation unit is located. [33]

"Teething issues"

In March 2012, TTC officials admitted that the door threshold incidents were the result of "teething issues". Another issue that was acknowledged involves a short delay in opening of the doors when the train pulls into a station. On the older train models, the door release interlock could be triggered just before or immediately after the vehicle comes to a complete stop. The TR trains must come to a complete stop with confirmation from the onboard computer before the door interlock can be released and the guard can open the doors. This causes a one- or two-second delay from the time the train appears stopped and the time the doors open. [34]

In December 2012, the TTC announced that it had demanded a high-level meeting with Bombardier regarding ongoing performance problems related to "teething issues" with the doors. TTC officials admitted at the time that the new TR trains cannot move until all doors are fully closed (as with the older trains) and if the doors fail to close thrice consecutively fully, the TR train would require a system reboot, meaning that the train would have to be pulled out of service until it was resolved. This has led to several delays on Line 1. [35]

See also

Related Research Articles

<span class="mw-page-title-main">Toronto Transit Commission</span> Agency responsible for local public transit in Ontario, Canada

The Toronto Transit Commission (TTC) is the primary public transport agency in Toronto, Ontario, Canada, operating the majority of the city's bus and rail services. It is the oldest and largest of the urban transit service providers in the Greater Toronto Area, with numerous connections to systems serving its surrounding municipalities.

<span class="mw-page-title-main">Line 3 Scarborough</span> Defunct light rapid transit line in Toronto, Canada

Line 3 Scarborough, originally known as Scarborough RT (SRT), is a defunct medium-capacity rapid transit line that was part of the Toronto subway system in Toronto, Ontario, Canada. The line ran entirely within the eastern district of Scarborough, encompassing six stations and 6.4 kilometres (4.0 mi) of mostly elevated track. It connected with Line 2 Bloor–Danforth at its southwestern terminus, Kennedy, and terminated in the northeast at McCowan. Until its closure in July 2023, the system had a ridership of 3,908,000 per year.

<span class="mw-page-title-main">Innovia Metro</span> Automated rapid transit system

Innovia Metro is an automated rapid transit system manufactured by Alstom. Innovia Metro systems run on conventional metal rails and pull power from a third rail but are powered by a linear induction motor that provides traction by using magnetic force to pull on a "fourth rail" placed between the running rails. However, newer versions of the technology are available with standard electric rotary propulsion.

<span class="mw-page-title-main">Line 4 Sheppard</span> Rapid transit line in Toronto, Ontario

Line 4 Sheppard is the newest and shortest rapid transit line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November 22, 2002, and has five stations along 5.5 kilometres (3.4 mi) of track, which is built without any open sections in the district of North York along Sheppard Avenue East between Yonge Street and Don Mills Road. All stations are wheelchair accessible and are decorated with unique public art.

<span class="mw-page-title-main">Toronto subway</span> Rapid transit system in Ontario, Canada

The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada, operated by the Toronto Transit Commission (TTC). The subway system is a rail network consisting of three heavy-capacity rail lines operating predominantly underground. As of October 2024, three new lines are under construction: two light rail lines and one subway line.

<span class="mw-page-title-main">Line 2 Bloor–Danforth</span> Rapid transit line in Toronto, Ontario

Line 2 Bloor–Danforth is a rapid transit line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 and again in 1980.

<span class="mw-page-title-main">Line 1 Yonge–University</span> Rapid transit line in the Greater Toronto Area, Ontario

Line 1 Yonge–University is a rapid transit line of the Toronto subway. It serves Toronto and the neighbouring city of Vaughan in Ontario, Canada. It is operated by the Toronto Transit Commission, has 38 stations and is 38.4 km (23.9 mi) in length, making it the longest line on the subway system. It opened as the "Yonge subway" in 1954 as Canada's first underground passenger rail line and was extended multiple times between 1963 and 2017. As of 2010, Line 1 was the busiest rapid transit line in Canada, and one of the busiest lines in North America. In 2022, it averaged over 670,000 riders per weekday.

<span class="mw-page-title-main">Bloor–Yonge station</span> Toronto subway station

Bloor–Yonge is a subway station on Line 1 Yonge–University and Line 2 Bloor–Danforth in Toronto, Ontario, Canada. Located in Downtown Toronto, under the intersection of Yonge Street and Bloor Street, it is the busiest subway station in the system, handling over 200,000 passengers on an average weekday. Wi-Fi is available at this station.

<span class="mw-page-title-main">Davisville Yard</span> Rail yard of the Toronto Transit Commission

The Davisville Subway Yard is a rail yard on the Toronto Transit Commission's Yonge subway line. The train maintenance and storage building is referred to as the Davisville Carhouse.

<span class="mw-page-title-main">Urban Transportation Development Corporation</span> Canadian rolling stock and rail transport manufacturer

The Urban Transportation Development Corporation Ltd. (UTDC) is a former Crown corporation owned by the Government of Ontario, Canada. It was established in the 1970s as a way to enter what was then expected to be a burgeoning market in advanced light rail mass transit systems. It developed significant expertise in linear propulsion, steerable trucks and driverless system controls which were integrated into a transit system known as the Intermediate Capacity Transit System (ICTS). It was designed to provide service at rider levels between a traditional subway on the upper end and buses and streetcars on the lower, filling a niche aimed at suburbs that were otherwise expensive to service.

<span class="mw-page-title-main">509 Harbourfront</span> Streetcar route in Toronto, Canada

509 Harbourfront is a Toronto streetcar route in Ontario, Canada, operated by the Toronto Transit Commission and connecting Union Station with Exhibition Loop.

<span class="mw-page-title-main">H series (Toronto subway)</span> Toronto subway rapid transit rolling stock

The H series is the third series of rapid transit rolling stock used in the subway system of Toronto, Ontario, Canada. They were built in six production sets, named H-1 to H-6, from 1965 to 1990 in Thunder Bay, Ontario, for the Toronto Transit Commission (TTC). The entire rolling stock was retired in 2014, though thirteen remaining cars still exist as work cars, including three H-1 cars.

<span class="mw-page-title-main">T series (Toronto subway)</span> Rapid transit rolling stock in service from 1995 to present

The T series, also known as the T-1, is the fourth series of rapid transit rolling stock used in the subway system of Toronto, Ontario, Canada. They were ordered by the Toronto Transit Commission (TTC) in 1992 and built in one production set between 1995 and 2001 by Bombardier Transportation in Thunder Bay, Ontario, Canada.

<span class="mw-page-title-main">Peter Witt (Toronto streetcar)</span> TTC version built from 1921 to 1923

The Toronto version of the Peter Witt streetcar was designed by Peter Witt, a commissioner of the Cleveland Street Railway in the United States. Between 1921 and 1923, the Toronto Transportation Commission ordered a total of 350 Peter Witt motor cars. 225 trailers would be ordered from three companies in Canada: Canada Car and Foundry of Montreal, Ottawa Car Company and Preston Car Company (Brill). The cars were designed for riders to "pay as you enter", and initially used two-person operation.

<span class="mw-page-title-main">Alstom Movia</span> Family of metro train cars built by Bombardier Transportation and later by Alstom

The Alstom Movia is a family of metro train cars designed by Adtranz and later built by Bombardier Transportation and Alstom. The structure and body shell are fully customisable for the needs of each system that orders it. Unlike most traditional metro trains, they usually have full-width gangways between carriages, allowing passengers to walk the entire length of the train. The design was developed by Adtranz, which was acquired by Bombardier in 2001. Since Alstom's acquisition of Bombardier in 2021, Alstom will be responsible for construction and delivery of future Movia metro train cars.

Accessibility for people with disabilities on the Toronto Transit Commission (TTC) system is incomplete but improving. Most of the Toronto subway system was built before wheelchair access was a requirement under the Ontarians with Disabilities Act (ODA). However, all subway stations built since 1996 are equipped with elevators, and elevators have been installed in 45 stations built before 1996. Over three-quarters of Toronto's subway stations are accessible. The original plan was to make all stations accessible by 2025; however, a few stations might not be accessible until 2026.

<span class="mw-page-title-main">Toronto subway rolling stock</span>

The Toronto subway system's rolling stock consists of 880 subway cars for Line 1 Yonge–University, Line 2 Bloor–Danforth, and Line 4 Sheppard. The rolling stock is owned and maintained by the Toronto Transit Commission (TTC).

<span class="mw-page-title-main">Gangway connection</span> Flexible passageway between train cars

A gangway connection is a flexible connector fitted to the end of a railway coach, enabling passengers to move between coaches without danger of falling from the train.

<span class="mw-page-title-main">Toronto streetcar system rolling stock</span>

In 1921, the Toronto Transportation Commission (TTC) was created to integrate and operate the Toronto streetcar system. The system has had numerous different rolling stock throughout its history.

<span class="mw-page-title-main">Toronto Transit Commission incidents</span> Major incidents involving the Toronto Transit Commission

This article lists major incidents of the Toronto Transit Commission (TTC) since 1954, such as accidents and other notable unplanned events.

References

  1. "TTC Service Summary – March 29,2015 to May 9, 2015" (PDF). Toronto Transit Commission. March 6, 2015. Archived (PDF) from the original on March 16, 2015. Retrieved March 22, 2015.
  2. 1 2 3 4 5 "New Subway Train – The Toronto Rocket". Toronto Transit Commission. May 2011. Archived from the original on December 2, 2022. Retrieved December 5, 2012.
  3. 1 2 3 4 5 6 7 "Metro Subway Train "Toronto Rocket" – Toronto, Canada". Bombardier Transportation. Archived from the original on January 13, 2018. Retrieved September 4, 2016.
  4. 1 2 3 4 5 6 7 "The Toronto Rockets Debut (Updated)". stevemunro.ca. Steve Munro. June 4, 2011. Archived from the original on February 8, 2022. Retrieved March 28, 2019.
  5. 1 2 "Bombardier Transportation Seminar" (PDF). October 11, 2016. Archived from the original (PDF) on March 28, 2022. Retrieved August 29, 2021.
  6. Murno, Steve (November 10, 2022). "TTC Service Changes Effective November 20, 2022 (Updated)". Steve Munro. Archived from the original on December 14, 2022. Retrieved December 13, 2022.
  7. Fox, Chris (September 27, 2016). "TTC switching to single-operator model for Line 4 subway as of Oct. 9". CP24. Archived from the original on September 27, 2016. Retrieved December 13, 2022.
  8. Bow, James (April 21, 2012). "The Toronto Rocket Cars (T35A08)". Transit Toronto. Archived from the original on September 14, 2012. Retrieved December 5, 2012.
  9. ""Toronto Rocket" A Train with a new Name". Marketwired . October 13, 2006. Archived from the original on August 13, 2012. Retrieved December 5, 2012.
  10. Alcoba, Natalie (January 14, 2010). "New TTC trains delayed after door company goes belly up". National Post . Retrieved January 15, 2010.[ dead link ]
  11. Bow, James (September 22, 2009). "TTC Looking For New Subway Cars in October". Transit Toronto. Archived from the original on September 30, 2012. Retrieved December 5, 2012.
  12. "TTC approves 186 more subway cars". TBNewsWatch.com. May 6, 2010. Archived from the original on July 16, 2011. Retrieved December 5, 2012.
  13. "Procurement Authorization Amendment – option to purchase 31 additional new subway train sets (for H6 subway car replacement and TYSSE)" (PDF). Toronto Transit Commission. May 6, 2010. Archived from the original (PDF) on June 17, 2012. Retrieved December 5, 2012.
  14. "Toronto-York Spadina Subway Extension – Schedule and Budget Change" (PDF). Toronto Transit Commission. March 26, 2015. Retrieved March 23, 2015.[ permanent dead link ]
  15. Westoll, Nick (September 5, 2017). "Toronto-York Spadina Subway Extension scheduled to open in mid-December". Global News . Archived from the original on September 6, 2017. Retrieved September 6, 2017.
  16. "TTC unveils new subway cars". CP24 . October 14, 2010. Archived from the original on March 5, 2012. Retrieved December 5, 2012.
  17. "Procurement Authorization Amendment to Purchase 10 Additional Toronto Rocket Train Sets – Purchase Order No. C31PD05761" (PDF). Toronto Transit Commission. March 26, 2015. Archived from the original (PDF) on March 4, 2016. Retrieved March 22, 2015.
  18. "Procurement Authorization – Procurement Authorization Change Directive to the Toronto Rocket (TR) Supplier for the Design Provisions for Train Door Monitoring (TDM) System" (PDF). Toronto Transit Commission. March 26, 2015. Retrieved March 22, 2015.[ dead link ]
  19. "Toronto Rocket trains take off on lightly-travelled Sheppard subway line". CBC News. Archived from the original on October 4, 2017. Retrieved October 19, 2018.
  20. "One-Person Train Operation on Line 1". Archived from the original on March 15, 2022. Retrieved February 1, 2022.
  21. "Feeling the heat, passengers? TTC working to fix its 'hot car' problem on Line 2". CBC News. Archived from the original on June 12, 2019. Retrieved September 16, 2016.
  22. McGillivray, Kate (August 29, 2016). "Mayor John Tory accepts Twitter challenge to ride in hot subway car". CBC News. Archived from the original on June 12, 2019. Retrieved December 18, 2019.
  23. "COVID-19: Staying safe on public transit". ttc.ca. Archived from the original on August 2, 2020. Retrieved August 3, 2020.
  24. "TTC Customer Service (@TTChelps)". twitter.com. Archived from the original on January 7, 2020. Retrieved January 13, 2020.
  25. TTC set to fix most annoying feature of Rocket trains | BlogTO Archived January 15, 2015, at the Wayback Machine . blogto.com. Retrieved on January 13, 2015.
  26. "Toronto Rocket: Overview and Key Features". Toronto Transit Commission. 2008. Archived from the original on May 14, 2012. Retrieved December 5, 2012.
  27. Kalinowski, Tess (January 31, 2013). "TTC tweaks its new Rocket trains". Toronto Star . Archived from the original on July 24, 2018. Retrieved October 19, 2018.
  28. Oakland, Ross (April 20, 2012). "New TTC train, the Rocket, takes away some of the 'fun factor'". Toronto Star . Toronto. Archived from the original on June 21, 2012. Retrieved December 5, 2012.
  29. "TTC approves Bombardier deal". CBC News . August 31, 2006. Retrieved December 5, 2012.
  30. Kalinowski, Tess (April 18, 2009). "A streetcar now for city of tomorrow". Toronto Star . Archived from the original on November 12, 2012. Retrieved December 5, 2012.
  31. "Made in Canada Matters! – Why the City of Toronto Should Purchase 'Made In Canada' Products" (PDF). Toronto & York Region Labour Council. October 3, 2006. Archived from the original (PDF) on September 12, 2009. Retrieved December 5, 2012.
  32. Kalinowski, Tess (September 25, 2011). "Wheelchair users can't always roll onto the Rocket". Toronto Star . Retrieved December 5, 2012.
  33. Matt Gurney: Fixing the doors on new TTC's subway cars an opportunity to change other things as well. National Post. Retrieved on July 26, 2013.
  34. Kalinowski, Tess (March 30, 2012). "TTC working out bugs on new subway trains". Toronto Star . Archived from the original on June 23, 2012. Retrieved December 5, 2012.
  35. Grewal, San (December 4, 2012). "Toronto's new Rocket subway trains malfunctioning". Toronto Star . Archived from the original on December 6, 2012. Retrieved December 5, 2012.

Commons-logo.svg Media related to Toronto Rocket at Wikimedia Commons