Crush load

Last updated

Crush load on a crowded train in Japan Crowded train (160928169).jpg
Crush load on a crowded train in Japan

A crush load is a level of passenger loading in a transport vehicle which is so high that passengers are "crushed" against one another. It represents an extreme form of passenger loading, and normally considered to be representative of a system with serious capacity limitations. [1] Crush loads result from too many passengers within a vehicle designed for a much smaller number. Crush loaded trains or buses are so heavily loaded that for most passengers physical contact with several other nearby passengers is impossible to avoid.

Contents

Definition

Crush load on a crowded Indian Railways train India crowded train.jpg
Crush load on a crowded Indian Railways train

In the context of transport economics and planning, crush load refers to the maximum level of passenger load for a particular vehicle or rail carriage. Crush loads are calculated for the number of passengers per unit area, standing up.

Crush loads are not an issue for passengers that are seated, as passengers will not normally sit on one another.

Crush loads are most common on city buses and rail metro systems, where passenger loading is high, and most passengers stand. Airlines almost never have crush loads, nor do high speed and/or long-distance rail or long-distance bus routes, where all passengers are generally seated.

Crush loads are normally measured using number of standing passengers per 1 square metre (1.2 sq yd). [2] Six passengers per square metre is often considered the practical limit on what can be accepted without serious discomfort to passengers. However, severe crush loads can be much in excess of this. [3] Before the 1965–1982 Commuting Five Directions Operation (ja:通勤五方面作戦) project undertaken by Japanese National Railways (JNR) on five trunk railway lines serving the Greater Tokyo Area, crush load peak ridership on said lines regularly exceeded 200% to 300% [a] of each line's optimal route capacity. During the same period of time, many of Japan's subway lines in operation also saw similar overcrowding levels, which was similarly only ameliorated by building new extra lines. [4] Similar issues continue to persist on the Seoul Metropolitan Subway system in South Korea, in particular Line 2, Line 9 [5] and Gimpo Goldline, where, especially due to the shorter train formations operated on the latter two lines, they are popularly nicknamed "hell trains". [6]

In India, the term "super dense crush load" [7] has been coined by railway officials to describe passenger loads on peak-hour trains operating on the Mumbai Suburban Railway when carriages built for 200 passengers carry over 500, translating to 14–16 people per square metre; not accounting for the many passengers who have no choice but to hitch onto overcrowded moving trains out of necessity. [8]

Effects

Crush loads in transport vehicles can result in many secondary issues, such as petty theft and pickpocketing, extreme discomfort for passengers, sexual harassment, and an inability for passengers to board and alight vehicles in a timely manner.

For a rail vehicle which has a crush load, passengers are touching and there is no space for another passenger to enter without causing serious discomfort to the passengers on board. [9] According to Hoel et al. in Transportation Infrastructure Engineering, operating at crush load increases dwell time (the length of time the transport vehicle remains in the station or stop) and reduces overall vehicle capacity per unit of time. [3]

Large dense concentrations of passengers can create dangerous conditions, both within transit vehicles and at overcrowded stations. In 2014, a news service in Mumbai, India reported several serious platform gap mutilation incidents and a death within a few months, mostly attributed to crowded conditions. [10]

See also

Notes

a. ^ Crowding levels defined by the Ministry of Land, Infrastructure, Transport and Tourism: [11] [12]

100% — Commuters have enough personal space and are able to take a seat or stand while holding onto the straps or hand rails.
150% — Commuters have enough personal space to read a newspaper.
180% — Commuters must fold newspapers to read.
200% — Commuters are pressed against each other in each compartment but can still read small magazines.
250% — Commuters are pressed against each other, unable to move.

Related Research Articles

<span class="mw-page-title-main">Commuter rail</span> Passenger rail transport services primarily within metropolitan areas

Commuter rail, or suburban rail, is a passenger rail transport service that primarily operates within a metropolitan area, connecting commuters to a central city from adjacent suburbs or commuter towns. Commuter rail systems are considered heavy rail, using electrified or diesel trains. Distance charges or zone pricing may be used.

<span class="mw-page-title-main">Rail transport</span> Mode of transport

Rail transport is a means of transport using wheeled vehicles running in tracks, which usually consist of two parallel steel rails. Rail transport is one of the two primary means of land transport, next to road transport. It is used for about 8% of passenger and freight transport globally, thanks to its energy efficiency and potentially high speed.

<span class="mw-page-title-main">Transportation in Boston</span> Overview of transportation in Boston, Massachusetts, United States

Transportation in Boston includes roadway, subway, regional rail, air, and sea options for passenger and freight transit in Boston, Massachusetts. The Massachusetts Port Authority (Massport) operates the Port of Boston, which includes a container shipping facility in South Boston, and Logan International Airport, in East Boston. The Massachusetts Bay Transportation Authority (MBTA) operates bus, subway, short-distance rail, and water ferry passenger services throughout the city and region. Amtrak operates passenger rail service to and from major Northeastern cities, and a major bus terminal at South Station is served by varied intercity bus companies. The city is bisected by major highways I-90 and I-93, the intersection of which has undergone a major renovation, nicknamed the Big Dig.

<span class="mw-page-title-main">Light rail</span> Form of passenger urban rail transit

Light rail transit (LRT) is a form of passenger urban rail transit characterized by a combination of tram and rapid transit features. While its rolling stock is similar to that of a traditional tram, it operates at a higher capacity and speed and often on an exclusive right-of-way. In many cities, light rail transit systems more closely resemble, and are therefore indistinguishable from, traditional underground or at-grade subways and heavy-rail metros.

<span class="mw-page-title-main">Newark Light Rail</span> Light rail system

The Newark Light Rail (NLR) is a light rail system serving Newark, New Jersey and surrounding areas, owned by New Jersey Transit and operated by its bus operations division. The service consists of two segments, the original Newark City Subway (NCS), and the extension to Broad Street station. The City Subway opened on May 16, 1935, while the combined Newark Light Rail service was officially inaugurated on July 17, 2006.

<span class="mw-page-title-main">Dublin Area Rapid Transit</span> Commuter rail network in Dublin, Ireland

The Dublin Area Rapid Transit system is an electrified commuter rail railway network serving the coastline and city of Dublin, Ireland. The service makes up the core of Dublin's suburban railway network, stretching from Greystones, County Wicklow, in the south to Howth and Malahide in north County Dublin. The DART serves 31 stations and consists of 53 route kilometres of electrified railway, and carries in the region of 20 million passengers per year. In a similar manner to the Berlin S-Bahn, the DART blends elements of a commuter rail service and a rapid transit system.

<span class="mw-page-title-main">Loading gauge</span> Maximum dimensions for railway vehicles and their loads

A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and keep clear of platforms, trackside buildings and structures. Classification systems vary between different countries, and gauges may vary across a network, even if the track gauge is uniform.

<span class="mw-page-title-main">Rush hour</span> Time of day with peak traffic congestion

A rush hour or peak hour is a part of the day during which traffic congestion on roads and crowding on public transport is at its highest. Normally, this happens twice every weekday: once in the morning and once in the afternoon or evening, the times during which most people commute. The term is often used for a period of peak congestion that may last for more than one hour.

<span class="mw-page-title-main">Urban rail transit</span> Train service intended for city-dwellers

Urban rail transit is a wide term for various types of local rail systems providing passenger service within and around urban or suburban areas. The set of urban rail systems can be roughly subdivided into the following categories, which sometimes overlap because some systems or lines have aspects of multiple types.

Various terms are used for passenger railway lines and equipment; the usage of these terms differs substantially between areas:

Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, with headquarters in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry. Bombardier Transportation had many regional offices, production and development facilities worldwide. It produced a wide range of products including passenger rail vehicles, locomotives, bogies, propulsion and controls. In February 2020, the company had 36,000 employees, and 63 manufacturing and engineering locations around the world. Formerly a division of Bombardier Inc., the company was acquired by French manufacturer Alstom on 29 January 2021.

<span class="mw-page-title-main">Rail transport in Japan</span> Railway transport in Japan

Rail transport in Japan is a major means of passenger transport, especially for mass and high-speed travel between major cities and for commuter transport in urban areas. It is used relatively little for freight transport, accounting for just 0.84% of goods movement. The privatised network is highly efficient, requiring few subsidies and running with extreme punctuality, though since privatisation several unprofitable but socially valuable lines have been closed by private operators.

An airport rail link is a service providing passenger rail transport from an airport to a nearby city by mainline or commuter trains, rapid transit, people mover, or light rail. Direct links operate straight to the airport terminal, while other systems require an intermediate use of people mover or shuttle bus.

<span class="mw-page-title-main">Transport in Greater Tokyo</span> Overview of the transportation network in Greater Tokyo

The transport network in Greater Tokyo includes public and private rail and highway networks; airports for international, domestic, and general aviation; buses; motorcycle delivery services, walking, bicycling, and commercial shipping. While the nexus is in the central part of Tokyo, every part of the Greater Tokyo Area has rail or road transport services. There are also a number of ports offering sea and air transport to the general public.

<span class="mw-page-title-main">Rail replacement bus service</span> Substitution of rail traffic by buses

A rail replacement bus service uses buses to replace a passenger train service on a temporary or permanent basis. The train service that is replaced may be of any type such as light rail, tram, streetcar, commuter rail, regional rail or heavy rail, intercity passenger service. The rail service may be replaced if the line is closed because of rail maintenance, a breakdown of a train, a rail accident or a strike action or to simply provide additional capacity or if the rail service is not economically viable.

A through service is a concept of passenger transport that involves a vehicle travelling between lines, networks or operators on a regularly specified schedule, on which the passenger can remain on board without alighting. It may be in form of either the following:

<span class="mw-page-title-main">Rapid transit</span> High-capacity public transport commonly found in urban areas

Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport that is generally built in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be called a subway, tube, or underground. Unlike buses or trams, rapid transit systems are railways, usually electric, that operate on an exclusive right-of-way, which cannot be accessed by pedestrians or other vehicles. They are often grade-separated in tunnels or on elevated railways.

<span class="mw-page-title-main">Public transport</span> Shared transportation service for use by the general public

Public transport is a system of transport for passengers by group travel systems available for use by the general public unlike private transport, typically managed on a schedule, operated on established routes, and that may charge a posted fee for each trip. There is no rigid definition of which kinds of transport are included, and air travel is often not thought of when discussing public transport—dictionaries use wording like "buses, trains, etc." Examples of public transport include city buses, trolleybuses, trams and passenger trains, rapid transit and ferries. Public transport between cities is dominated by airlines, coaches, and intercity rail. High-speed rail networks are being developed in many parts of the world.

<span class="mw-page-title-main">Circle route</span> Type of route in a public transport system

A circle route is a public transport route following a path approximating a circle or at least a closed curve.

<span class="mw-page-title-main">Route capacity</span> Maximum occupancy of a route in a given time

Route capacity is the maximum number of vehicles, people, or amount of freight than can travel a given route in a given amount of time, usually an hour. It may be limited by the worst bottleneck in the system, such as a stretch of road with fewer lanes. Air traffic route capacity is affected by weather. For a metro or a light rail system, route capacity is generally the capacity of each vehicle, times the number of vehicles per train, times the number of trains per hour (tph). In this way, route capacity is highly dependent on headway. Beyond this mathematical theory, capacity may be influenced by other factors such as slow zones, single-tracked areas, and infrastructure limitations, e.g. to useful train lengths.

References

  1. "Transit Capacity and Quality of Service Manual" (PDF). Transportation Research Board. 6 February 2014. Retrieved 1 April 2016.
  2. "Railway passenger vehicle capacity" (PDF). Railway technical web pages. Archived from the original (PDF) on 17 January 2017. Retrieved 7 April 2016.
  3. 1 2 Hoel, Lester; Garber, Nicholas; Sadek, Adel (2010). Transportation Infrastructure Engineering: A Multimodal Integration, SI Version, p. 177. Cengage Learning. ISBN   0495667897
  4. "How Japan Saved Tokyo's Rail Network from Collapse (Part 1, 1945-1982)". seungylee14.substack.com.
  5. "'Hell Line': Lessons from Seoul's controversial privatized subway line".
  6. "[WHY] Why 'hell trains' still exist on Seoul subways". koreajoongangdaily.joins.com. 10 June 2023. Retrieved 9 January 2024.
  7. "Super-Dense Crushload". 8 April 2009.
  8. Bellman, Eric (18 April 2007). "Super Dense Crush Load". The Wall Street Journal . Retrieved 8 February 2014.
  9. Sacramento Regional Transit District. Glossary of Transit Terms Archived 2 May 2017 at the Wayback Machine . Retrieved 8 February 2014.
  10. "'Killer' gap between platform, train claims another life". The Indian Express. 6 February 2014. Retrieved 26 May 2014.
  11. "混雑率の推移".
  12. Kikuchi, Daisuke (6 July 2017). "Tokyo plans new effort to ease commuter hell on rush-hour trains". The Japan Times . Archived from the original on 6 July 2017.