Buenos Aires Underground 200 Series

Last updated

200 Series
200 Series at San Jose de Flores.jpg
A 200 Series train at San Pedrito
Manufacturer China CNR Corporation
CITIC Construction
Constructed2012-2015
Entered service2013
Number built150
Number in service55+
Formation3M+2T
Capacity1,148 (seated)
Operator(s) Buenos Aires Underground
Line(s) served Linea A (SBASE) bullet.svg Linea C (SBASE) bullet.svg
Specifications
Car body construction Stainless steel
Doors4 per side
Maximum speed80 km/h
Traction system Alstom Optonix
IGBT-VVVF
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

The 200 Series is a set of underground cars manufactured by China CNR Corporation and CITIC Construction for use on Line A of the Buenos Aires Underground in Argentina. [1] The cars replace the 100-year-old La Brugeoise cars which operated on the line up until 2013. The Buenos Aires Underground ordered 45 of these units, followed by a further 105 which have been put into service on the line. [2]

Contents

Background and overview

The wooden La Brugeoise cars were ultimately replaced by the CITIC-CNR cars in 2013. La Brugeoise car at Plaza de Mayo.jpg
The wooden La Brugeoise cars were ultimately replaced by the CITIC-CNR cars in 2013.
Interior of one of the cars Img 2478 cr2 2.jpg
Interior of one of the cars

Since the opening of Line A in 1913, it had used the same La Brugeoise et Nicaise et Delcuve rolling stock (along with a small number of UEC Preston cars at one point). [3] Over the years, numerous attempts were made to replace the rolling stock on the line, though this proved challenging due to its tight curves and use of 1100 volts current instead of the 1500 volts used on the rest of the network.

One such attempt was the Alstom Metropolis cars purchased at the turn of the 21st century, however these ultimately ended up serving on Line D. [4] Before then, an attempt at creating a single, standardised rolling stock model for the entire network had been made in the 1980s in the form of the Fiat-Materfer cars produced in Argentina, which had also been designed to easily switch from 1500 V to 1100 V with Line A in mind. [5] The Materfer cars were not used on Line A at their time of production, although were allocated to the line later as stand-ins for the 200 Series units which had yet to arrive from China. [6]

In 2008, 45 of the CITIC-CNR cars (tailor-made for Line A) were ordered by the National Government for the network at a cost of $3 million per car. [7] However, this was still short of the 120 La Brugeoise cars operating on the line at that point and the addition of Puán and Carabobo stations in 2008 meant that the rolling stock was already stretched to full capacity. Furthermore, the opening of San José de Flores and San Pedrito stations was planned for 2013, which was also the date the CITIC-CNR trains were set to arrive along with the retirement of the La Brugeoise cars. [8]

The cars arrived in 2013 and the line was temporarily closed down at the start of that year in order to convert the voltage to 1500 V for their integration. At the same time, newer forced ventilation systems were installed to accommodate the hot air extracted by the air conditioning units of the new rolling stock. [6] The line re-opened in March 2013 with the 45 cars operational. They were praised for their quiet operating noise (the lowest in the network) and for their inclusion of newer features such as air conditioning, automated announcements and good lighting which were lacking in the 100-year-old La Brugeoise cars. [9] [10]

Shortages and new order

A 200 Series formation leaving San Pedrito station.

By 2013, Line A was 3 km longer, with four more stations than had been serviced by the 120 La Brugeoise cars. This caused a serious shortage of rolling stock and Fiat-Materfer cars were brought in, along with some Siemens-Schuckert Orenstein & Koppel cars taken out of retirement and remodelled, to make up for these shortages. [11]

In 2014, the City of Buenos Aires purchased another 105 of the 200 Series cars at a much lower cost of $1.53 million per unit. [12] This brought the total to 150 cars on the line, 30 more than the number of La Brugeoise cars serving on the line before its two extensions. [13] The first cars from the second order began to arrive in the port of Buenos Aires in early 2015, with the rest arriving through to early 2017. These new cars gradually replaced the Siemens and Materfer stock on the line until the line's rolling stock was made up entirely of the Chinese trains. [8] [14]

Nevertheless, the shortage experienced from the initial lack of a full fleet upon the line's re-opening led to a serious decline in passenger numbers on the line given its reduced frequencies, which then took some time to recover to previous levels. [14]

See also

Related Research Articles

<span class="mw-page-title-main">Buenos Aires Underground</span> Rapid transit railway in Buenos Aires, Argentina

The Buenos Aires Underground, locally known as Subte, is a rapid transit system that serves the area of the city of Buenos Aires, Argentina. The first section of this network opened in 1913, making it the 13th subway in the world and the first underground railway in Latin America, the Southern Hemisphere, and the Spanish-speaking world, with the Madrid Metro opening five years later, in 1919. As of 2022, Buenos Aires is the only Argentine city with a metro system.

<span class="mw-page-title-main">Line A (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line A is the oldest line of the Buenos Aires Underground. Opened to the public on 1 December 1913, the first underground line in South America, the Southern Hemisphere and the Spanish-speaking world. It made Buenos Aires the 13th city in the world to have an underground transport service. The line stretches 9.8 km from Plaza de Mayo and San Pedrito and runs under all of the Avenida de Mayo and part of the Avenida Rivadavia, and is used by 258,000 people per day.

<span class="mw-page-title-main">Line B (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line B of the Buenos Aires Underground runs 11.75 kilometres (7.30 mi) from Leandro N. Alem to Juan Manuel de Rosas in Villa Urquiza. Line B opened to the public on 17 October 1930.

<span class="mw-page-title-main">Line C (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line C of the Buenos Aires Underground, that runs from Retiro to Constitución terminus, opened on 9 November 1934, and it has a length of 4.3 km (2.7 mi). It runs under such streets as Lima Sur, Bernardo de Irigoyen, Carlos Pellegrini, Esmeralda, la Plaza San Martín and Avenida Ramos Mejia. It not only connects to every other line on the system, but its termini at Retiro and Constitución also connect it to some of the most important commuter rail networks in Buenos Aires, such as the Mitre and Roca lines and also long-distance passenger services. It is thus an important artery in Buenos Aires' transport system. At the same time, it is also the shortest line in both terms of length and number of stations.

<span class="mw-page-title-main">Line D (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line D of the Buenos Aires Underground runs from Catedral to Congreso de Tucumán. The line opened on 3 June 1937 and has been expanded to the north several times. The line is currently 11 km long and has 16 stations, while running approximately parallel to the city's coastline.

<span class="mw-page-title-main">Line H (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line H is a line of the Buenos Aires Underground. The first phase, between Plaza Once and Caseros, opened 18 October 2007, currently stretches over 8.8 km between Hospitales and Facultad de Derecho stations. It is the first entirely new line built in Buenos Aires since the opening of Line E on 20 June 1944.

<span class="mw-page-title-main">Line E (Buenos Aires Underground)</span> Rapid transit line of Buenos Aires

Line E of the Buenos Aires Underground, which runs from Retiro to Plaza de los Virreyes, currently extending a total distance of 12 km. Opened in 1944, the Line E was the last completely new line to be added to the Buenos Aires Underground, until 2007 when Line H was opened. The line has a history of being re-routed and extended due to having been historically the line with the lowest passenger numbers on the network.

<span class="mw-page-title-main">Premetro (Buenos Aires)</span> Light rail system in Buenos Aires

The Premetro is a 7.4-kilometer long (4.6 mi) light rail line that runs in the outskirts of Buenos Aires, connecting with the Buenos Aires Underground line E, at Plaza de los Virreyes station and runs to General Savio, with a short branch to Centro Cívico. It opened in 1987 and is operated by Metrovías. Originally, the Premetro was to include many more lines, but shortly after the privatisation of the railways the projects were postponed and never materialised and only "Premetro E2" was built.

<span class="mw-page-title-main">Belgrano Sur Line</span> Commuter rail service in Buenos Aires

The Belgrano Sur line is an Argentine 1,000 mmmetre gauge commuter rail service in the Greater Buenos Aires area, currently operated by state-owned enterprise Trenes Argentinos. The Belgrano Sur runs over tracks and through stations built by the Franco–Belgian-owned Compañía General de Buenos Aires and British Midland companies at the beginning of the 20th century.

<span class="mw-page-title-main">La Brugeoise cars (Buenos Aires Underground)</span> Buenos Aires Underground Line A rolling stock (1913–2013)

La Brugeoise cars were Buenos Aires Underground (Subte) Line A rolling stock since its inauguration in 1913 till 2013 when replaced by new Chinese stock. They were built by the Belgian railway rolling stock manufacturer La Brugeoise et Nivelles between 1911 and 1919 for the Anglo-Argentine Tramways Company's first underground line. They were originally designed to run both as metro and tramway cars, but they were refurbished in 1927 for underground use only. They became the oldest underground rolling stock in commercial service in the world as well as a tourist attraction and part of Buenos Aires cultural heritage.

<span class="mw-page-title-main">Materfer</span> Argentine rolling stock manufacturer

Materfer is an Argentine manufacturer of railway and road vehicles, located in the city of Ferreyra in Córdoba Province. The company was established by Fiat Concord in the late 1950s, being its subsidiary until 1980 when Sevel Argentina took over Fiat vehicles.

<span class="mw-page-title-main">Emepa Group</span> Argentine rolling stock manufacturer

Emepa Group S.A. is an Argentine manufacturer of railway vehicles and owner of Ferrovías, with headquarters located in the city of Buenos Aires. It had formerly owned Ferrocentral, which ran services from Buenos Aires to Córdoba and San Miguel de Tucumán on the Mitre Network, however the state-owned company SOFSE took over these services in 2014 and the subsidiary now remains inactive.

<span class="mw-page-title-main">Emprendimientos Ferroviarios</span> Argentine railway rolling stock manufacturer

Emprendimientos Ferroviarios S.A. (Emfer) was an Argentine rolling stock manufacturer based in San Martín, Buenos Aires. The company also remodeled and repaired rail vehicles and had previously manufactured rolling stock for the Sarmiento and Mitre commuter rail lines in Buenos Aires. The Emfer rolling stock ran on the two lines until 2014 when they were replaced with CSR Corporation Limited Electric Multiple Units.

<span class="mw-page-title-main">UEC Preston</span> Tram in Buenos Aires, Argentina

The UEC Preston is a tram/subway car built by the British manufacturer United Electric Car Company for the Anglo-Argentine Tramways Company (AATC) in 1912 for use on its then newly built underground tramway in Buenos Aires, which was later to become Line A of the Buenos Aires Underground. Only 4 trams were built and they served on the line up until their retirement in 1977.

<span class="mw-page-title-main">Fiat-Materfer (Buenos Aires Underground)</span> Trains used on the Buenos Aires Underground

The Fiat-Materfer Buenos Aires Underground rolling stock was built by the Argentine company Materfer - then a subsidiary of Fiat Ferroviaria - beginning in 1980 and continuing on through that decade. It was originally conceived to standardise the diverse rolling stock of the Buenos Aires Underground with the use of one model throughout all the lines. However, with the economic and political turmoil faced in the country during and following the collapse of the National Reorganisation Process junta in 1983, its production ended up being far more limited. During the 2010s, the cars were used as temporary stock for two lines, being phased out as newer models arrived from overseas.

<span class="mw-page-title-main">CSR EMU (Argentina)</span>

The CSR EMU is a series of electric multiple unit cars manufactured by CSR Corporation Limited for use on Buenos Aires' commuter rail network. The trains operate on three of the city's lines as of 2015 and 705 cars were manufactured, with each line using a different number of cars per train. They were created for use on lines electrified using both third rail and overhead lines.

<span class="mw-page-title-main">Siemens-Schuckert Orenstein & Koppel</span> Railway cars formerly used on the Buenos Aires Underground

The Siemens-Schuckert Orenstein & Koppel is an underground car formerly used on the Buenos Aires Underground first built by Siemens-Schuckert and Orenstein & Koppel in 1934, 1937 and 1944 with a smaller number of cars built in Argentina during the 1950s. The Siemens O&K rolling stock made up the entirety of the trains used on the three lines built by the Hispanic-Argentine Company for Public Works and Finances (CHADOPyF) and has since served on every line of the Underground from 1934 to 2016, with cars refurbished by the Emepa Group and Alstom continued to function on the network till 2017.

The Buenos Aires Underground has one of the most diverse metro fleets in the world, and has had some of the oldest models in operation on any network. The network began with a relatively standardised fleet, but throughout its over 100-year-long history, it has seen numerous purchases which have created cases where some lines operate numerous models. Recently there have been increased efforts to modernise and standardise the fleets, with large purchases from China CNR Corporation and Alstom.

<span class="mw-page-title-main">Buenos Aires Underground 100 Series</span> Rolling stock of the Buenos Aires Underground

The 100 Series are a series of underground railway cars manufactured by Alstom in Brazil and Argentina for use on the Buenos Aires Underground. They are used on Line D of the network, where they make up the vast majority of the fleet, serving alongside some 300 Series and Fiat-Materfer cars. Since 2019, some units have also been used on the Line E.

<span class="mw-page-title-main">Buenos Aires Underground 300 Series</span> Railcars used on the Buenos Aires Underground

The 300 Series are a set of underground cars manufactured by Alstom in Brazil for use on the Buenos Aires Underground. They are used on Line H of the network, and more have been introduced on Line D where they operate alongside the similar 100 Series.

References