Buk Bijela Hydroelectric Power Station

Last updated

The Buk Bijela Hydro Power Plant is proposed hydroelectric power plant (HPP) on the Drina River in Bosnia and Herzegovina.

Contents

Buk Bijela Hydro Power Plant
Country Bosnia and Herzegovina
Location Municipality of Foča, Republika Srpska
Coordinates 43°25′38″N18°45′54″E / 43.42722°N 18.76500°E / 43.42722; 18.76500
StatusProposed
Construction cost€195 million
Owner(s)Republika Srpska
Operator(s)Hidroelektrana Buk Bijela
Dam and spillways
Type of dam Gravity dam
Impounds Drina river
Height (thalweg)57 m
Power Station
Turbines 3 x 31 MW
Installed capacity 93.5 MW
Annual generation 332 GW·h

If built, the 57 m high concrete gravity dam will be one of the largest hydropower plants in the country, with an installed electric capacity of 93 MW and an expected annual generation of 322 GWh. [1] [2]

Location

The dam and its associated power station will be built on the upper course of the Drina River, in the municipality of Foča, about 12 km upstream the town of the same name, in Republika Srpska. [3] The site is just 10 km from the border with Montenegro, and 21 km downstream the existing 360 MW Mratinje dam, built on a headwater of the Drina.

Description

Buk Bijela HPP is part of a broader plan to use the hydropower potential of the Drina river and its tributary Sutjeska river, the Upper Drina hydropower project, that also includes three smaller plants (44 MW Foča, 43 MW Paunci, and 44 MW Sutjeska), for a total capacity of 224 MW, annual power generation of 871 GWh and an overall cost of €390 million. [4] [3]

The project is being developed by Elektroprivreda Republike Srpske (ERS), to which the Republika Srpska government has granted a 50 year concession.

As of 2018, the estimated cost of the project was close to €200 million. [1] Construction could last 5 or 6 years. [5]

Timeline

A first project for the site was presented in 1974, in order to address the persistent electric shortfall in fastly-growing Yugoslavia. In 1975, the public electric utility company Elektroprivreda Bosne i Hercegovine submitted a $70 million loan demand to the International Bank for Reconstruction and Development, to help finance the $242.5 million project. It should be emphasized that the Buk Bijela hydropower project was at that time much larger than the current one, with an installed capacity of 450 MW. [6]

In May 2019, Banja Luka District Court cancelled the environmental permit for Buk Bijela HPP, ruling on a complaint filed by CEE Bankwatch Network. [7]

Despite this decision, Republic Srpska's Prime Minister Radovan Višković stated in January 2020 that the official start of preparatory works would soon be announced. [5] Project implementation could be accelerated thanks to a cooperation with Serbia, which committed in July 2019 to invest €153.5 million in several hydropower projects including Buk Bijela. [8]

Environmental concerns

The project has been under harsh scrutiny of local and national communities and various NGO's from Bosnia and Herzegovina, Montenegro and abroad, due which is postponed and could eventually be abandoned.

This project was a matter of inter-state agreement between Bosnia and Herzegovina and Montenegro. It would certainly destroy one of the last remaining and most important habitats of Danube salmon (Hucho hucho) in the world, along with the magnificent canyon of the Tara River, which is why this project encountered major opposition in both countries.

Related Research Articles

<span class="mw-page-title-main">Huchen</span> Species of fish

The huchen, also known as Danube salmon or redfish, is a large species of freshwater fish in the family Salmonidae native to the Danube basin in Central and Eastern Europe. It is the type species of genus Hucho, being closely related to salmon, trout, char and lenoks.

<span class="mw-page-title-main">Tara (Drina)</span> River in Montenegro, Bosnia and Herzegovina

The Tara is a river in Montenegro and Bosnia and Herzegovina. It emerges from the confluence of the Opasnica and Veruša rivers in the Komovi Mountains, part of the Dinaric Alps of Montenegro. The total length is 143 km (89 mi), of which 141 km (88 mi) are in or on the border of Montenegro, it also forms the border between the two countries in several places. The Tara flows from south to north - north-west and converges with the Piva at the Bosnia and Herzegovina and Montenegro border between the villages of Šćepan Polje (Montenegro) and Hum to form the Drina river.

<span class="mw-page-title-main">Sutjeska National Park</span> National park in Bosnia and Herzegovina

The Sutjeska National Park is a national park located in Bosnia and Herzegovina. Established in 1962, it is Bosnia and Herzegovina's oldest national park. It includes the country's highest peak of Maglić, at over 2,386 metres (7,828 ft), on the border with Montenegro. The Montenegrin part of Maglić massif in the park has also formed the Trnovačko Jezero. The Strict Nature Reserve "Perućica", one of the last two remaining primeval forests in Europe, is part of the park. The park is also famous as being the location of the Battle of the Sutjeska in 1943 during World War II. It is an affiliated member of EUROPARC Federation.

<span class="mw-page-title-main">Ugljevik Power Plant</span>

The Ugljevik Power Plant is a coal-fired power plant in Ugljevik, Bosnia and Herzegovina. It is owned and operated by Rudnik i termoelektrana Ugljevik, a subsidiary of Elektroprivreda Republike Srpske. RiTE Ugljevik is an integrated coal mining and power generating company.

<span class="mw-page-title-main">Tara River Canyon</span> Canyon on the Tara River in Montenegro and Bosnia and Herzegovina

The Tara River Canyon, also known as the Tara River Gorge, is the river canyon of the Tara river. It is for the most part located in Montenegro, and to a smaller extent in Bosnia and Herzegovina. The most attractive part of the canyon are the high rocks of the mountain range of Ljubišnja, which are located in the UNESCO World Heritage Site of Durmitor National Park.

JP Elektroprivreda HZHB d.d. is a public power utility company based in Mostar, Bosnia and Herzegovina.

<span class="mw-page-title-main">Drina</span> River in the Balkans

The Drina is a 346 km (215 mi) long river in the Balkans, which forms a large portion of the border between Bosnia and Herzegovina and Serbia. It is the longest tributary of the Sava River and the longest karst river in the Dinaric Alps which belongs to the Danube River drainage basin. Its name is derived from the Roman name of the river which in turn is derived from Greek.

<span class="mw-page-title-main">Maglić (mountain)</span> Highest mountain of Bosnia and Herzegovina

Maglić is a transboundary mountain in the Dinaric Alps, on the border of Bosnia and Herzegovina and Montenegro.

<span class="mw-page-title-main">Rama Hydroelectric Power Station</span> Dam in Prozor-Rama

The Rama Dam is a concrete-face rock-fill dam on the Rama river, a tributary of the Neretva river, about 4 km (2.5 mi) southwest of the town of Prozor in the Herzegovina-Neretva Canton of Bosnia and Herzegovina.

Boškov Most Hydro Power Plant, referred to as Boškov Most HPP, is a derivation plant planned to be built in Mala Reka valley, in the southernmost part of the Mavrovo National Park, in North Macedonia. It will have a total capacity of 71,5 MW. Construction is expected to last 4 years.

<span class="mw-page-title-main">Khudoni Hydro Power Plant</span> Dam in Samegrelo-Zemo Svaneti

Khudoni Hydro Power Plant, hereinafter referred to as Khudoni HPP, is a projected power plant on Enguri River, in Samegrelo-Zemo Svaneti, Georgia that has 3 turbines with a nominal capacity of 233.3 MW each having a total capacity of 700 MW. The power plant is associated with a planned 200.5-metre (658 ft) tall concrete double-arch-gravity dam. According to the Georgian government-commissioned and the World Bank-supported study the construction of Namakhvani, Paravani and Khudoni hydro power plants are the most attractive scenarios for the development of Georgia's energy sector.

Elektroprivreda Crne Gore AD is an integrated electricity company located in Niksić, Montenegro. The company is listed at Montenegro Stock Exchange with majority of shares owned by the government. Rest of the shares are traded at the Montenegro Stock Exchange.

Šćepan Polje is the name of a small settlement and the region in Plužine Municipality, northwestern Montenegro. It is the border crossing point between Montenegro and Bosnia and Herzegovina, where the Tara river forms the border between the two countries. Right across the river and the state border is the village of Hum.

<span class="mw-page-title-main">Trebinje-1 Hydroelectric Power Station</span> Dam in Gornje Grančarevo, Trebinje

Trebinje I Hydroelectric Power Station or Trebinje-1 Hydroelectric Power Station is hydroelectric power plant (HPP) on the Trebišnjica River near Gornje Grančarevo in the municipality of Trebinje in Bosnia and Herzegovina. Trebinje-1 HPP is accumulation with dam toe powerhouse type of facility with a large Grančarevo arch dam. At the height of 123 m (404 ft), Grančarevo dam is the tallest dam in the country. Its reservoir, Bileća Lake, is the largest by volume in Bosnia and Herzegovina as well. The dam provides for flood control and hydroelectric power generation at Trebinje-1 HPP. The dam was completed in 1967 and its 180 MW power station, A smaller 8 MW power station, Treblinje-2, was completed downstream in 1979.

Dariali Hydropower Plant, referred to as Dariali HPP, is a 108 MW run-of-the-river hydropower plant built in 2017 in Georgia. It is located on the Tergi River in Kazbegi Municipality, at less than 1 km from the Russian-Georgian border, 160 km far from Tbilisi.

The Shuakhevi Hydro Power Plant is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs, allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 17.8 km Shuakhevi headrace and pressure tunnel. It is estimated that the project will cost US$417 million. For the purposes of developing, constructing and operating the Shuakhevi HPP, ADB and EBRD extended a loan to Adjaristsqali Georgia LLC of up to $86.5 million and IFC a loan of 80m USD. Adjaristsqali Georgia LLC is owned by the Norwegian Clean Energy Invest AS (40%), India's Tata Power (40%) and IFC Infraventures (20%), an investment fund created by the International Finance Corporation. Alstom was chosen to supply the electromechanical equipment for the project.

<span class="mw-page-title-main">Jablanica Dam</span> Dam in Jablanica, Herzegovina-Neretva Canton

The Jablanica Dam is an arch-gravity dam on the Neretva River about 4 km (2.5 mi) northwest of Jablanica in the Herzegovina-Neretva Canton of Bosnia and Herzegovina. The dam was constructed between 1947 and 1955 with the primary purpose of hydroelectric power production. The power station was commissioned in two stages, from 1955 until 1958. The first generator was commissioned in February 1955. An upgrade in 2008 increased the installed capacity of the power station from 150 MW to 180 MW. The dam's power station is located about 4.4 km (2.7 mi) to the southeast near Jablanica and discharges back into the Neretva River. It contains six 30 MW Francis turbine-generators for an installed capacity of 180 MW. The difference in elevation between the reservoir and power station affords a hydraulic head of 111 m (364 ft). The dam is 85 m (279 ft) tall and creates Jablanica lake. The dam and power station are owned and operated by Elektroprivreda Bosne i Hercegovine.

<span class="mw-page-title-main">Vorotan Cascade</span> Dam in Syunik Province

The Vorotan Cascade, or the ContourGlobal Hydro Cascade, is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia.

Nenskra Hydro Power Plant is a proposed hydroelectric power station to be located on the southern slopes of the Central Caucasus mountains in Svaneti, Georgia.

CEE Bankwatch Network is a global network which operates in central and eastern Europe. There are 17 member groups, multiple non-governmental organizations based in different locations; the network is one of the largest networks of environmental NGOs in central and eastern Europe. Bankwatch's headquarters rest in Prague, Czech Republic.

References

  1. 1 2 "Construction of HPP Buk Bijela on Drina river starts in 2018". Balkan Green Energy News. 2018-01-15. Retrieved 2020-04-23.
  2. "Buk Bijela and Foca hydropower schemes | Gruner AG". www.gruner.ch. Retrieved 2020-04-23.
  3. 1 2 "HPPs Foča, Paunci, Buk Bijela to be built as part of a EUR 390 million investment". EnergyWorld Magazine. 2018-11-15. Archived from the original on 2018-11-15. Retrieved 2020-04-23.
  4. "Buk Bijela dam and the Upper Drina cascade". Bankwatch. Retrieved 2020-04-23.
  5. 1 2 "Bosnia and Herzegovina: Construction of HPP Buk Bijela to start soon". Serbia SEE Energy Mining News. 2020-01-31. Retrieved 2020-04-23.
  6. "Report and recommandation of the president to the executive directors on a proposed loan to Elektroprivreda Bosne i Herzegovine, Sarajevo, with the guarantee of the Socialist Federal Republic of Yugoslavia for a hydropower project" (PDF). World Bank. 12 May 1975. Retrieved 23 April 2020.
  7. "Bosnia-Herzegovina: Environmental permit for Buk Bijela hydropower plant cancelled". Bankwatch. Retrieved 2020-04-23.
  8. Editor (2019-07-18). "Serbia gets loan for renewable energy power plants". Oil&Gas Eurasia. Retrieved 2020-04-23.{{cite web}}: |last= has generic name (help)