Chester–Birkenhead | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Chester–Birkenhead line runs from Chester to Birkenhead via Hooton. Today, it forms part of the Wirral Line network, a commuter rail system operated by Merseyrail. The line was built by the Chester and Birkenhead Railway and opened on 23 September 1840. [1] On 22 July 1847 the railway merged with the Birkenhead, Lancashire and Cheshire Junction Railway which was later renamed to Birkenhead Railway.
The directors of the Grand Junction Railway had originally intended to reach Birkenhead, as a means of connecting to the docks on the River Mersey that was cheaper than getting directly to Liverpool, which would have involved an expensive crossing of the Mersey. The schemes to do so were turned down by Parliament, and the Grand Junction settled for connecting to the Liverpool and Manchester Railway via the Warrington and Newton Railway at Earlestown instead. That was achieved in 1837.
In 1836 two schemes for a railway from Chester to Birkenhead gained support, and they went to the 1837 session of Parliament. The Chester and Birkenhead Railway would run from a junction with the Chester–Crewe line (as yet unbuilt) at Chester and would serve the several ferry terminals in Birkenhead, and it survived the parliamentary process. [2]
Chester and Birkenhead Railway Act 1837 | |
---|---|
Act of Parliament | |
Citation | 7 Will. 4 & 1 Vict. c. cvii |
Dates | |
Royal assent | 12 July 1837 |
Other legislation | |
Repealed by | Birkenhead, Lancashire and Cheshire Junction Railway Act 1852 |
Status: Repealed |
The Chester and Birkenhead Railway was authorised on 12 July 1837, with capital of £250,000. It was to be a single line; no intermediate stations had been planned at this stage. George Stephenson was the engineer. [3] [4] [5]
The line was built as a single line with structures made suitable for later doubling of the line. The track gauge was to be 4 ft 9 in (1,448 mm), in common with the Crewe line. By the end of 1843 Stephenson' estimate of £250,000 was obviously going to be inadequate: the new estimate was now £512,973.
A directors' inspection train ran over the line on 10 September 1840 and the official opening took place on 22 September 1840. In the morning a staff and contractors' train made the round trip from Birkenhead to Chester; there were no passing places and no electric telegraph, so the official party of honoured guests had to wait at Birkenhead with no knowledge of whether the other train was returning on time. The ordinary public service started the next day, 23 September, with five passenger trains each way daily, three on Sundays. From 15 December some passing loops had been installed, and the train service frequency could be improved, to two-hourly. [6]
The Chester and Birkenhead Railway had assumed friendly relations with the Chester and Crewe Railway (C&CR), and it depended on the C&CR for access to the railway network. During the construction phase of the C&CR it simply ran out of money, and on 1 July 1840 it was taken over by the Grand Junction Railway. The GJR was in close partnership with the Liverpool and Manchester Railway, and were discouraged from collaborating with the Chester and Birkenhead, which the L&MR regarded as a competitor, so this was a serious setback; a number of collaborative schemes at Chester between the two companies were now unlikely to be possible. Each company would have its own station at Chester, although there would be a connecting line by-passing both. [7] After the Chester–Crewe line was opened on 1 October 1840, the GJR train times at Chester were contrived to avoid any convenient change of trains to the C&BR, and this went as far as the Irish mails having to be carried across the street in Chester from one station to the other, even though there was a through track.
In the first year the company did not do well financially; this was partly due to very large interest payments on loans and ferry terminal rental, and disappointing income. The share price fell, and the company had to engage in some financial manipulation to generate necessary cash. [8] It was obvious that large scale railways were going to be successful, and a merger of the Chester and Birkenhead Railway with the Chester and Holyhead Railway was proposed. The share transfer would have valued the Chester and Birkenhead Company at £496,762. This was less than the line had cost to construct, and other events drew the disparity to the attention of shareholders, so that the deal was suddenly rejected on 30 March 1845. and several board members resigned. [9] Instead, the company was taken over by the Birkenhead, Lancashire and Cheshire Junction Railway in 1847.
The directors of the line were heavily involved with ferries at Birkenhead, and much energy was expended now in trying to get control of existing ferry companies, and securing the best railway access to the ferry terminals. The original Grange Lane terminus at Birkenhead had to be equidistant from the three ferry piers.
In October 1843 a contract was let to make a line in tunnel, diverging from just south of the terminus to the Monks Ferry, It opened to passenger trains on 23 October 1844, and the Grange Lane terminus closed to passengers the same day, being developed later as a mineral depot. [10] [4]
During the early history of the line extensive enlargement of the docks at Birkenhead was now being planned, and as there was crossover in directorships between the railway and maritime interests, the Chester and Birkenhead Railway proposed an extension, which became known as the Docks Extension Line, to a locality known as Bridge End. The necessary Act for the work received the Royal Assent on 21 July 1845. The line was about a mile long, and was disproportionately expensive as it ran in newly developed residential areas required extensive bridging and retaining wall construction.
The docks extension opened on 5 April 1847. Because of the considerable extra traffic expected, double track was laid on the main line, and was completed in the same year. [11] [4]
Ferry arrangements which had seemed satisfactory in the earlier years were now seen to be commercially adverse, and the diversion of Chester to Liverpool passengers via Runcorn unsettled the Birkenhead commissioners. Following their pressure, an extension of the line to a new Woodside station in Birkenhead with direct access to the Woodside ferry was opened on 31 March 1878. The half mile line was known as the Birkenhead New Line; it was mostly in tunnel and deep cutting. The Monks Ferry branch (and the ferry itself) were closed on the next day, but the branch was later reopened to serve private sidings on it. [12] [4]
The line was seriously congested and it was decided to quadruple the tracks from Ledsham Junction to Birkenhead. This was completed in the period 1902 to 1908. [13] [14] Today the line has two tracks only.
The ordinary through trains from Birkenhead to London ceased on 5 March 1967, and on 4 November 1967 Birkenhead Woodside station was closed, the line being cut back to Rock Ferry for change to the Mersey Railway route. [15]
From 1972 there were plans to extend the Merseyrail system, which was electrified in the central area, to Chester. Provision of funding and decision making took several years, but on 30 September 1985 electric operation took place from Rock Ferry to Hooton. This was extended to run between the Liverpool Loop and Chester on 4 October 1993. [16]
Services are operated by Merseyrail as part of the Wirral Line network with trains running every 15 minutes between Birkenhead and Chester. Additionally trains run between Birkenhead and Hooton every 30 minutes and continue to Ellesmere Port on the Hooton–Helsby line. [17]
Merseyrail is a commuter rail network which serves Merseyside and adjacent areas of Cheshire and Lancashire. Merseyrail serves 69 stations, 67 of which it manages, across two lines – the Northern Line and the Wirral Line. The network uses 750 V DC third rail electrified lines having 75.0 miles (120.7 km) of routes, of which 6.5 miles (10.5 km) are underground. Since January 2023, Merseyrail commenced replacing its train fleet, withdrawing the Class 507 and 508 trains and introducing 53 new Class 777 trains. The network carried 25.5 million passengers in the 2022/2023 statistical period.
The Wirral Railway was a railway network in the northern part of the Wirral Peninsula, England. Its route was from Birkenhead Park in the east of the Wirral to West Kirby in the west. A branch off this line at Bidston went north to Secombe and New Brighton. It was incorporated in 1863 as the Hoylake Railway, running from Hoylake to Birkenhead Docks. After changes of name and of ownership, it was purchased by the Wirral Railway Company Limited in 1884. The network was extended to West Kirby, New Brighton, and Seacombe, and to Birkenhead Park station where it joined the Mersey Railway, enabling through trains through the Mersey Railway Tunnel to Liverpool. In the 1923 grouping the Wirral company became part of the London, Midland and Scottish Railway, which electrified the line in 1938, allowing passenger services to be integrated with the Liverpool urban system. Most of the Wirral Railway network is still in use today as part of the Wirral Line of the Merseyrail rail network.
Liverpool James Street is a railway station located in the centre of Liverpool, England; it is situated on the Wirral Line of the Merseyrail network. James Street is an underground station, with access to the platforms via lifts from the booking hall. At certain times, the platforms are accessed via a pedestrian tunnel from the India Buildings on Water Street. As of 2013/14, James Street was the fifth-busiest station on the Merseyrail network.
Birkenhead Hamilton Square railway station serves the town of Birkenhead, in Merseyside, England, on the Wirral Line of the Merseyrail network. The station is close to Hamilton Square in Birkenhead.
The Wirral line is one of two commuter rail routes operated by Merseyrail and centred on Merseyside, England, the other being the Northern line.
West Kirby railway station serves the town of West Kirby in Merseyside, England. The station is the terminus of the West Kirby branch line, which is one of the two branches of the Wirral Line on the Merseyrail network. There is a central island platform between two terminus tracks and two parallel sidings for out-of-use electric multiple units. A second station, which was the terminus of a branch line from Hooton, lay to the east of the Wirral Line station; it was closed in 1962.
Bidston railway station serves the village of Bidston, Merseyside, England. The station is situated at a junction of the West Kirby branch of the Wirral line, which is part of the Merseyrail network; it also serves as the northern terminus for the Borderlands line from Wrexham Central, with services operated by Transport for Wales.
Birkenhead Park railway station is a station serving the town of Birkenhead, in Merseyside, England. It lies on the Wirral Line of the Merseyrail network.
Birkenhead North railway station serves the town of Birkenhead, in Merseyside, England. The station is situated on the Wirral Line of the Merseyrail network, close to the junction of the New Brighton and West Kirby branches. Birkenhead North TMD, situated just to the west of the station, is the main traction maintenance depot for the Merseyrail fleet.
Hooton railway station is situated in the south of the Wirral Peninsula, Cheshire, England. It lies on the Wirral Line 8 miles (13 km) north of Chester and 9+1⁄2 miles (15.3 km) south west of Liverpool Lime Street on the Merseyrail network, and is the junction of the branch from the Chester line to Ellesmere Port. It serves the villages of Hooton and Willaston.
Birkenhead Woodside was a railway station at Woodside, in Birkenhead, on the Wirral Peninsula, Cheshire. It was served by local services in Cheshire as well as long-distance services to southern England, including London.
Woodside is an area of Birkenhead in the Metropolitan Borough of Wirral in Merseyside, England. It is situated opposite Liverpool Pier Head across the River Mersey.
Green Lane railway station serves the Tranmere area of Birkenhead, Merseyside, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, part of the Merseyrail network.
Rock Ferry railway station is situated in the Rock Ferry area of Birkenhead, Merseyside, England. The station lies 4.5 miles (7 km) south west of Liverpool Lime Street on the Chester and Ellesmere Port branches of the Wirral Line of the Merseyrail network. The station has an island platform with four platforms in total and four tracks.
Bromborough railway station is one of two stations serving the town of Bromborough in Merseyside, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, part of the Merseyrail network.
Bromborough Rake railway station is one of two stations serving the town of Bromborough in Merseyside, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, part of the Merseyrail network.
Birkenhead Town railway station is a disused railway station in Birkenhead, Wirral, England. It was located near the current entrance to the Queensway Tunnel on Grange Road.
Birkenhead Monks Ferry railway station was a railway station in Birkenhead, Wirral, England. It was situated very close to the River Mersey named after the monks at Birkenhead Priory. For most of its life, the station was part of the Chester and Birkenhead Railway, a joint railway.
Birkenhead Dock Branch is a disused railway line running from the South junction of Rock Ferry, to the site of the former Bidston Dock on the Wirral Peninsula, England. The branch is approximately 4+1⁄2 miles (7.2 km) in length. Although called a branch, the line was accessible from both ends, from Bidston East junction and from Rock Ferry railway station. The former Mollington Street Rail Depot was branched into the line. A section of the line runs through Haymarket Tunnel and a low-level cutting through the centre of Birkenhead; visible from the road flyovers. The former Canning Street North signal box has now been demolished following fire damage, and the rails across the level crossing there have been removed due to the provision of cycle lanes on the roadway. The non-standard gates remain on the east side, but a fence has been erected on the other side despite the railway being officially out of use, rather than closed. Level crossings are also located at Duke Street and Wallasey Bridge Road. The railway lines are still partially intact.
The Birkenhead Railway was a railway company in North West England. It was incorporated as the Birkenhead, Lancashire and Cheshire Junction Railway (BL&CJR) in 1846 to build a line connecting the port of Birkenhead and the city of Chester with the manufacturing districts of Lancashire by making a junction near Warrington with the Grand Junction Railway. The BL&CJR took over the Chester and Birkenhead Railway in 1847, keeping its own name for the combined company until it shortened its name to the Birkenhead Railway in 1859. It was taken over jointly, on 1 January 1860, by the London and North Western Railway (LNWR) and the Great Western Railway (GWR). It remained a joint railway until nationalisation of the railways in 1948.