Chippenham & Calne Line | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Chippenham and Calne line was a five mile long single-track branch railway line that ran along the valley of the River Marden in Wiltshire, England, from Chippenham on the Great Western Main Line to Calne, via two intermediate halts. Built by the Calne Railway Company and opened in 1863, the line was sold in 1892 to the Great Western Railway company.
The Great Western Railway (GWR) opened its main line from London to Bristol in 1841, with a station at Chippenham. Calne was an important market and industrial town not far away, and at the time it had 16 mills within three miles, and moreover housed the largest bacon factory in England. [1]
Seeing themselves at a disadvantage by not being on the railway, a meeting of interested parties was held on 3 November 1859, and this led to a public meeting on 8 November 1859, proposing a railway connecting the town with Chippenham and the main line. This was supported with great enthusiasm; only James C. Hale, proprietor of the Calne branch of the Wilts & Berks Canal, was not happy. £15,000 of share subscriptions were promised before the meeting closed. James Baird Burke was to be the engineer, and his estimate of the construction cost was £26,663.
The formal subscription proceeded and four members of the Harris family—proprietors of the bacon factory—subscribed over 50% of the capital. All seemed to be going well but a disturbing letter was soon received: [note 1] it had been understood that the GWR would be supportive, but the letter warned that income on the line might not cover the operating costs of the line for several years, and that any profits would fail to contribute to repaying the capital cost.
James Burke's authority as the company's engineer seems to have been in question, for on 19 November 1859 a "joint engineer" was appointed: James Samuel, formerly resident engineer for the Eastern Counties Railway was given the job. It is likely that he had been given a particular task, for on 14 December 1859 he reported that he estimated the construction cost of the line to be £32,000; on presenting this information he withdrew from involvement with the scheme. [1]
The directors now had a serious problem in maintaining momentum; they wrote to Burke offering £1,950 as his fee if he could bring about construction of the line for £27,000, but only £1,000 if the sum was overrun. He accepted this arrangement, and it was apparently modified by negotiation later to £1,650 if he was successful, and £1,000 if not.
Burke found a contractor, Richard Hattersley, who undertook to complete the construction of the line for £27,000, and he would accept £5,000 of the payment in shares in the company. However he then discovered that he would be expected to construct the stations within the sum, and he withdrew. He was persuaded to undertake the construction for the reduced sum of £26,000 without stations: a local builder would construct the Calne station.
On 15 May 1860 the company obtained its authorising act of Parliament, the Calne Railway Act 1860 (23 & 24 Vict. c. xi); the capital was to be £35,000. Having got the act, the directors resolved not to start actual construction until all the shares had been taken up. This dismayed Hattersley, who had been led to believe by Burke that work was to start immediately. The impasse remained until October when, on the 10th, Hattersley agreed to take £10,000 in shares himself if the contract price were restored to £27,000. [1]
This was agreed, and work could actually start at last.
At this period a working arrangement with the GWR was finalised, on 29 May, for a cash sum based on operation by a single locomotive, for two years; after that time the charge would be for a rising percentage of receipts.
On 6 June 1861 the directors discovered that an additional £10,000 was required to complete the line. A number of extra items had been required, not allowed for in Burke's original contract arrangements; this included bridge works, an engine house and goods accommodation etc. at Calne, and these alone amounted to £5,250. This shortfall at the margin dragged on and Hattersley's solicitor wrote to the company on 6 June 1863 demanding payment of moneys due to him.
On 17 June the chief engineer of the GWR, Michael Lane, inspected the works and found that many aspects were unsatisfactory; Burke had given assurances that certain matters would be put in hand and in many cases this seems not have been done.
Nonetheless, Captain Tyler of the Board of Trade was brought to the line to inspect it formally for passenger opening; he criticised the arrangements at Chippenham station, where branch trains would have to use the main line platform, and where there was inadequate telegraph communication between the junction signalman and the station signalman. He also was dissatisfied with the condition of the bridges, and he refused sanction for opening.
A second inspection by Tyler on 7 October 1863 ended with the same result. Finally on 27 October 1863 his inspection was successful: the line could open to passengers at last. [1]
The immediate result was an opening to a goods train on 29 October 1863; live pigs for Harris's factory were a major part of the load. Opening to passengers took place on 3 November 1863. [1] [2]
The company obtained an act of Parliament, the Calne Railway Act 1864 (27 & 28 Vict. c. xvi), increasing authorised capital by £14,000. Records of the purpose seem not to have survived, but it is likely that it was to pay off bank loans taken out to pay for the cost overrun at construction.
Profits for the half year to the end of 1864 were £53 11s 1d, with receipts from passengers and goods about equal. It was obvious that the warning by the GWR in 1859 that income would barely cover costs, was true.
At a directors' meeting on 21 December 1869 it was stated that all the debenture bank loans were overdue and that there were no resources to respond to the demands. It appears that the creditors realised that the company was unable to repay, and had few assets to seize in payment, and the impecunious company struggled on. [1]
On 2 June 1874 the Great Western Railway (GWR) warned the company that conversion of the track to standard gauge was soon required; the GWR undertook to carry out this work at cost, and this was agreed to. It was carried out on 15 and 16 August 1874, [2] and opened on standard gauge on 17 August 1874; the cost had been £500.
As debts continued to mount, the directors negotiated with the Great Western Railway (GWR) to sell the line to them. Terms were agreed on 29 December 1877; naturally the GWR did not offer much to buy a railway that was losing money; the shareholders refused to ratify the provisional sale agreement. Finally terms were agreed and the transfer was authorised by the Great Western Railway Act 1892 (55 & 56 Vict. c. ccxxxiii) on 28 June 1892; the sale took effect on 1 July 1892, and shareholders received their original outlay on the shares when first issued. [1]
At the time of construction of the line, Chippenham station had two platforms and an over-all roof. The line was 5 miles 25 chains (8.5 km) in length. The gradient fell at 1 in 60 for some distance, then rising at a ruling gradient of 1 in 86 to Calne.
Originally the line was operated under "one engine in steam" arrangements, but in the 20th century the electric train token system was used, with a signal box at Calne; this closed on 2 November 1964 when freight working was discontinued, and the working arrangement reverted to one engine in steam.
There were two intermediate stations:
From 1900 to the 1930s the line handled much passenger and freight traffic, making Calne one of the busiest stations in Wiltshire. During the Second World War there was heavy passenger traffic for the RAF establishments at Lyneham, Compton Bassett and Yatesbury, which continued into the early 1950s. [3]
With the increase in road vehicle usage throughout the 20th century, use of the line by passengers and for freight purposes declined steadily, and in the 1960s it was clear that the future of the line was doubtful. Freight traffic had disappeared by the time the last passenger train ran on 18 September 1965. The track was lifted in 1967. [3]
Much of the line is now a cycle path. It is part of Sustrans National Cycle Route no. 403. [4]
The Cornwall Railway was a 7 ft 1⁄4 in broad gauge railway from Plymouth in Devon to Falmouth in Cornwall, England, built in the second half of the nineteenth century. It was constantly beset with shortage of capital for the construction, and was eventually forced to sell its line to the dominant Great Western Railway.
The Llanelly Railway and Dock Company was an early Welsh railway system. It opened its first short line and a wet dock at Llanelly in 1834, and soon went on to build a longer line from Llanelly to serve pits in the Amman Valley, and then on to Llandilo, reached in 1857. The Llanelly company leased and worked the Vale of Towy Railway on to Llandovery, from 1858.
The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.
The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.
The Carmarthen and Cardigan Railway was a 7 ft 1⁄4 in broad gauge railway line in Wales that was intended to connect Carmarthen on the South Wales Railway with Cardigan. In fact, it was unable to raise the necessary capital and was loss-making from the time of opening the first short section of its line in 1860, and it was in receivership for much of its life. It eventually reached Llandysul in 1864 but was not extended further during its independent existence.
The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.
The Wilts, Somerset and Weymouth Railway (WS&WR) was an early railway company in south-western England. It obtained Parliamentary powers in 1845 to build a railway from near Chippenham in Wiltshire, southward to Salisbury and Weymouth in Dorset. It opened the first part of the network but found it impossible to raise further money and sold its line to the Great Western Railway (GWR) in 1850.
The Bristol and North Somerset Railway was a railway line in the West of England that connected Bristol with Radstock, through Pensford and further into northern Somerset, to allow access to the Somerset Coalfield. The line ran almost due south from Bristol and was 16 miles (26 km) long.
The Pembroke and Tenby Railway was a locally promoted railway in Pembrokeshire, Wales. It was built by local supporters and opened in 1863. The line, now known as the Pembroke Dock branch line, remains in use at the present day.
The Portland Branch railway refers to a group of lines on the Isle of Portland in the English county of Dorset. The first was the Portland Railway, a tramway with a counterbalanced rope-worked incline. It opened in 1826. It was followed by the Weymouth and Portland Railway, which connected to the main line of the Great Western Railway at Weymouth. It opened in 1865. From the late 1840s until 1872, Portland Breakwater was built, a prodigious construction task that created a very large safe harbour. It was decided to provide a railway connection to the breakwater, which was used as a pier for bunkering ships. This was constructed by the LSWR and the GWR jointly and opened in 1876. The fourth line was the Easton and Church Hope Railway. This line was conceived as a simple descent to bring stone down from quarries to a new jetty at Church Ope, but after their line was authorised in 1867, the Company delayed useful construction, and a change of plan followed, with several Acts of Parliament authorising modifications to the route and extension of time. It finally opened in 1900.
The Banbury and Cheltenham Direct Railway (B&CDR) was a railway company through the Cotswolds in England that built a line between points near Banbury and Cheltenham. Its principal objective, as well as a general rural rail service, was the conveyance of iron ore from the East Midlands to South Wales.
The Newport, Abergavenny and Hereford Railway was a railway company formed to connect the places in its name. When it sought parliamentary authorisation, it was denied the southern section, and obliged to use the Monmouthshire Railway between Pontypool and Newport.
The Oxford, Witney and Fairford Railway was a single track railway branch line, 22 miles (35 km) long, in Oxfordshire and Gloucestershire. It was opened in succession by two companies, the first in 1861 to connect the important woollen town of Witney to the main line network, and the second in 1873 as the rump of an ambitious scheme to connect to Cheltenham, but which ran only between Witney and Fairford. The junction with the main line was at Yarnton, north of Oxford.
The Hereford, Hay and Brecon Railway (HH&BR) was a railway company that built a line between Hereford in England and a junction with the Mid-Wales Railway at Three Cocks Junction. It opened its line in stages from 1862 to 1864. It never had enough money to operate properly, but the Midland Railway saw it as a means of reaching Swansea, and from 1869 the Midland Railway was given exclusive running powers over the HH&BR. There was then a long-running dispute over whether the Midland inherited rights of access previously granted to the HH&BR.
The Whitland and Cardigan Railway was a 27.5 miles (44.3 km) long branch line in West Wales. It was built in two stages, at first as the Whitland and Taf Vale Railway from the South Wales Main Line at Whitland to the quarries at Glogue. It opened in 1873, at first only for goods and minerals and later for passengers. The line to Cardigan opened in 1886; reflected in the company name change.
The North Pembrokeshire and Fishguard Railway was a railway company in south-west Wales, incorporated to extend the moribund Narberth Road and Maenclochog Railway, with a view to developing a port on Fishguard Bay and ferry services to Rosslare in Ireland.
The Golden Valley Railway was a railway company which constructed a branch line from Pontrilas in Herefordshire, England, to Hay on Wye. Pontrilas was on the Great Western Railway main line between Newport and Hereford. The Golden Valley Railway Company opened the first part of its line from Pontrilas to Dorstone in 1881. It was constantly beset with shortage of money, but opened an extension to Hay in 1889. Its directors had grand ideas of extending further to Monmouth and forming part of a long-distance trunk route. It issued misleading promotional material which secured significant investment from the public, but exposure of the falsehoods resulted in collapse.
The Brentford branch line, also known as the Brentford Dock Line, is a freight-only branch railway line in west London, England. The route, which opened in 1859, was backed by the Great Western Railway and built by the Great Western & Brentford Railway Company. It ran 4 mi (6.4 km) from Southall to Brentford Dock. In 1964, the line to the wharves was closed. The branch now runs from the Great Western Main Line to a goods yard and waste transfer station in Brentford.
The Malmesbury branch was a six-and-a-half-mile-long single track branch railway line in Wiltshire, England; it ran from Dauntsey station on the Great Western Main Line to Malmesbury. Promoted locally, it opened with considerable assistance from the Great Western Railway in 1877, and used the standard gauge. There was one intermediate station, Somerford.
The Newtown and Machynlleth Railway was a railway company in Wales. It built a line from a junction with the Llanidloes and Newtown Railway near Caersws to the market town of Machynlleth; the line opened in 1862. Newtown had become the hub of railway lines in the district. Machynlleth was an important town, and extension from there to Aberystwyth and to the coast northward was in the minds of the promoters.