Chippenham and Calne line

Last updated

Chippenham
& Calne Line
 
Great Western Main Line
BSicon lv-HST.svg
BSicon CONTg@Gq.svg
BSicon eABZq+r.svg
BSicon dCONTfq.svg
Chippenham
BSicon d.svg
BSicon exHST.svg
Stanley Bridge Halt
BSicon d.svg
BSicon exHST.svg
Black Dog Halt
BSicon d.svg
BSicon exKHSTe.svg
Calne

The Chippenham and Calne line was a five mile long single-track branch railway line that ran along the valley of the River Marden in Wiltshire, England, from Chippenham on the Great Western Main Line to Calne, via two intermediate halts. Built by the Calne Railway Company and opened in 1863, the line was sold in 1892 to the Great Western Railway company.

Contents

History

Origins

The Great Western Railway (GWR) opened its main line from London to Bristol in 1841, with a station at Chippenham. Calne was an important market and industrial town not far away, and at the time it had 16 mills within three miles, and moreover housed the largest bacon factory in England. [1]

Seeing themselves at a disadvantage by not being on the railway, a meeting of interested parties was held on 3 November 1859, and this led to a public meeting on 8 November 1859, proposing a railway connecting the town with Chippenham and the main line. This was supported with great enthusiasm; only James C Hale, proprietor of the Calne branch of the Wilts & Berks Canal, was not happy. £15,000 of share subscriptions were promised before the meeting closed. James Baird Burke was to be the engineer, and his estimate of the construction cost was £26,663.

The formal subscription proceeded and four members of the Harris family—proprietors of the bacon factory—subscribed over 50% of the capital. All seemed to be going well but a disturbing letter was soon received: [note 1] it had been understood that the GWR would be supportive, but the letter warned that income on the line might not cover the operating costs of the line for several years, and that any profits would fail to contribute to repaying the capital cost.

James Burke's authority as the company's engineer seems to have been in question, for on 19 November 1859 a "joint engineer" was appointed: James Samuel, formerly Resident Engineer for the Eastern Counties Railway was given the job. It is likely that he had been given a particular task, for on 14 December 1859 he reported that he estimated the construction cost of the line to be £32,000; on presenting this information he withdrew from involvement with the scheme. [1]

Difficulties making a start

The directors now had a serious problem in maintaining momentum; they wrote to Burke offering £1,950 as his fee if he could bring about construction of the line for £27,000, but only £1,000 if the sum was overrun. He accepted this arrangement, and it was apparently modified by negotiation later to £1,650 if he was successful, and £1,000 if not.

Burke found a contractor, Richard Hattersley, who undertook to complete the construction of the line for £27,000, and he would accept £5,000 of the payment in shares in the company. However he then discovered that he would be expected to construct the stations within the sum, and he withdrew. He was persuaded to undertake the construction for the reduced sum of £26,000 without stations: a local builder would construct the Calne station.

On 15 May 1860 the company obtained its authorising Act of Parliament; the capital was to be £35,000. Having got the Act, the directors resolved not to start actual construction until all the shares had been taken up. This dismayed Hattersley, who had been led to believe by Burke that work was to start immediately. The impasse remained until October when, on the 10th, Hattersley agreed to take £10,000 in shares himself if the contract price were restored to £27,000. [1]

Construction starts

This was agreed, and work could actually start at last.

At this period a working arrangement with the GWR was finalised, on 29 May, for a cash sum based on operation by a single locomotive, for two years; after that time the charge would be for a rising percentage of receipts.

On 6 June 1861 the directors discovered that an additional £10,000 was required to complete the line. A number of extra items had been required, not allowed for in Burke's original contract arrangements; this included bridge works, an engine house and goods accommodation etc. at Calne, and these alone amounted to £5,250. This shortfall at the margin dragged on and Hattersley's solicitor wrote to the company on 6 June 1863 demanding payment of moneys due to him.

On 17 June the chief engineer of the GWR, Michael Lane, inspected the works and found that many aspects were unsatisfactory; Burke had given assurances that certain matters would be put in hand and in many cases this seems not have been done.

Nonetheless, Captain Tyler of the Board of Trade was brought to the line to inspect it formally for passenger opening; he criticised the arrangements at Chippenham station, where branch trains would have to use the main line platform, and where there was inadequate telegraph communication between the junction signalman and the station signalman. He also was dissatisfied with the condition of the bridges, and he refused sanction for opening.

A second inspection by Tyler on 7 October 1863 ended with the same result. Finally on 27 October 1863 his inspection was successful: the line could open to passengers at last. [1]

Opening

The immediate result was an opening to a goods train on 29 October 1863; live pigs for Harris's factory were a major part of the load. Opening to passengers took place on 3 November 1863. [1] [2]

Finances

The company obtained an act increasing authorised capital by £14,000. Records of the purpose seem not to have survived, but it is likely that it was to pay off bank loans taken out to pay for the cost overrun at construction.

Profits for the half year to the end of 1864 were £53 11s 1d, with receipts from passengers and goods about equal. It was obvious that the warning by the GWR in 1859 that income would barely cover costs, was true.

At a directors' meeting on 21 December 1869 it was stated that all the debenture bank loans were overdue and that there were no resources to respond to the demands. It appears that the creditors realised that the company was unable to repay, and had few assets to seize in payment, and the impecunious Company struggled on. [1]

Sale to the Great Western Railway

On 2 June 1874 the GWR warned the company that conversion of the track to standard gauge was soon required; the GWR undertook to carry out this work at cost, and this was agreed to. It was carried out on 15 and 16 August 1874, [2] and opened on standard gauge on 17 August 1874; the cost had been £500.

As debts continued to mount, the directors negotiated with the Great Western Railway to sell the line to them. Terms were agreed on 29 December 1877; naturally the GWR did not offer much to buy a railway that was losing money; the shareholders refused to ratify the provisional sale agreement. Finally terms were agreed and the transfer was authorised by Act of Parliament on 28 June 1892; the sale took effect on 1 July 1892, and shareholders received their original outlay on the shares when first issued. [1]

Description of the line

At the time of construction of the line, Chippenham station had two platforms and an over-all roof. The line was 5 miles 25 chains (8.5 km) in length. The gradient fell at 1 in 60 for some distance, then rising at a ruling gradient of 1 in 86 to Calne.

Originally the line was operated under "one engine in steam" arrangements, but in the 20th century the electric train token system was used, with a signal box at Calne; this closed on 2 November 1964 when freight working was discontinued, and the working arrangement reverted to one engine in steam.

There were two intermediate stations:

Heyday

From 1900 to the 1930s the line handled much passenger and freight traffic, making Calne one of the busiest stations in Wiltshire. During the Second World War there was heavy passenger traffic for the RAF establishments at Lyneham, Compton Bassett and Yatesbury, which continued into the early 1950s. [3]

Closure

With the increase in road vehicle usage throughout the 20th century, use of the line by passengers and for freight purposes declined steadily, and in the 1960s it was clear that the future of the line was doubtful. Freight traffic had disappeared by the time the last passenger train ran on 18 September 1965. The track was lifted in 1967. [3]

The route today

Much of the line is now a cycle path. It is part of Sustrans National Cycle Route no. 403. [4]

Notes

  1. The letter was dated 2 November 1859, but presumably did not arrive until after the public meeting.

Related Research Articles

Great Western Railway British railway company (1833-1947)

The Great Western Railway (GWR) was a British railway company that linked London with the southwest and west of England, the West Midlands and most of Wales. It was founded in 1833, received its enabling Act of Parliament on 31 August 1835 and ran its first trains in 1838. It was engineered by Isambard Kingdom Brunel, who chose a broad gauge of 7 ft —later slightly widened to 7 ft 14 in —but, from 1854, a series of amalgamations saw it also operate 4 ft 8+12 in standard-gauge trains; the last broad-gauge services were operated in 1892.

Cornwall Railway Former railway company in southwestern England

The Cornwall Railway was a 7 ft 14 in broad gauge railway from Plymouth in Devon to Falmouth in Cornwall, England, built in the second half of the nineteenth century. It was constantly beset with shortage of capital for the construction, and was eventually forced to sell its line to the dominant Great Western Railway.

The Wellington to Craven Arms Railway was formed by a group of railway companies that eventually joined the Great Western Railway family, and connected Wellington, Shropshire and Shifnal, with Coalbrookdale, Buildwas, Much Wenlock and a junction near Craven Arms. Its objectives were dominated by the iron, colliery and limestone industries around Coalbrookdale.

The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.

The Denbigh, Ruthin and Corwen Railway was a standard gauge railway line that connected Corwen with Denbigh via Ruthin in North Wales.

The Cheddar Valley line was a railway line in Somerset, England, running between Yatton and Witham. It was opened in parts: the first section connecting Shepton Mallet to Witham, later extended to Wells, was built by the East Somerset Railway from 1858. Later the Bristol and Exeter Railway built their branch line from Yatton to Wells, but the two lines were prevented for a time from joining up. Eventually the gap was closed, and the line became a simple through line, operated by the Great Western Railway.

The Wilts, Somerset and Weymouth Railway (WS&WR) was an early railway company in south-western England. It obtained Parliamentary powers in 1845 to build a railway from near Chippenham to Salisbury and Weymouth. It opened the first part of the network but found it impossible to raise further money and sold its line to the Great Western Railway (GWR) in 1850.

The Bristol and North Somerset Railway was a railway line in the West of England that connected Bristol with Radstock, through Pensford and further into northern Somerset, to allow access to the Somerset Coalfield. The line ran almost due south from Bristol and was 16 miles (26 km) long.

The Abbotsbury Railway was a standard gauge railway line which ran in the west of the county of Dorset in England opening in 1885. Although great hopes of mineral traffic drove the original construction of the line, these failed to materialise and after a quiet existence carrying local passengers and agricultural produce, the line closed in 1952.

Pembroke and Tenby Railway

The Pembroke and Tenby Railway was a locally promoted railway in Pembrokeshire, Wales. It was built by local supporters and opened in 1863. The line, now known as the Pembroke Dock branch line, remains in use at the present day.

The Banbury and Cheltenham Direct Railway (B&CDR) was a railway company through the Cotswolds in England that built a line between points near Banbury and Cheltenham. Its principal objective, as well as a general rural rail service, was the conveyance of iron ore from the East Midlands to South Wales.

The Llantrisant and Taff Vale Junction Railway was a railway company that constructed a standard gauge line in South Wales, connecting Llantrisant and the Taff Vale Railway near Treforest. It ran through thinly populated country, and linked to a number of iron mines, collieries and other mineral sites. It opened in stages in 1863 and 1864. In 1865 through passenger trains from the Cowbridge Railway ran over the line, to Pontypridd, although for some time there were no passenger stations on its own network. At the Llantrisant end, it was reliant on broad gauge railway companies which were not always friendly to it. The company leased its line to the Taff Vale Railway in 1870.

The Oxford, Witney and Fairford Railway was a single track railway branch line, 22 miles (35 km) long, in Oxfordshire and Gloucestershire. It was opened in succession by two companies, the first in 1861 to connect the important woollen town of Witney to the main line network, and the second in 1873 as the rump of an ambitious scheme to connect to Cheltenham, but which ran only between Witney and Fairford. The junction with the main line was at Yarnton, north of Oxford.

The Hereford, Hay and Brecon Railway (HH&BR) was a railway company that built a line between Hereford in England and a junction with the Mid-Wales Railway at Three Cocks Junction. It opened its line in stages from 1862 to 1864. It never had enough money to operate properly, but the Midland Railway saw it as a means of reaching Swansea, and from 1869 the Midland Railway was given exclusive running powers over the HH&BR. There was then a long-running dispute over whether the Midland inherited rights of access previously granted to the HH&BR.

The Salisbury branch line of the Great Western Railway from Westbury to Salisbury in Wiltshire, England, was completed in 1856. Most of the smaller stations were closed in 1955 but the line remains in use as part of the Wessex Main Line.

The Whitland & Cardigan Railway was a 27.5 miles (44.3 km) long branch line in West Wales. It was built in two stages, at first as the Whitland and Taf Vale Railway from the South Wales Main Line at Whitland to the quarries at Glogue. It opened in 1873, at first only for goods and minerals and later for passengers. The line to Cardigan opened in 1886; reflected in the company name change.

The Watlington and Princes Risborough Railway was an independent English railway company that connected the Oxfordshire towns of Watlington and Chinnor to the main line railway network of the Great Western Railway (GWR) at Princes Risborough. It opened in 1872.

The Golden Valley Railway was a railway company that constructed a railway branch line from Pontrilas in Herefordshire, England, to Hay on Wye. Pontrilas was on the Great Western Railway main line between Newport and Hereford. The Golden Valley company opened the first part of its line from Pontrilas to Dorstone in 1881. It was constantly beset with shortage of money, but opened an extension to Hay in 1889. Its directors had grand ideas of extending further to Monmouth and forming part of a long distance trunk route. It issued misleading promotional material which secured significant investment from the public, but exposure of the falsehoods resulted in collapse.

The Malmesbury branch was a six and a half mile long single track branch railway line in Wiltshire, England; it ran from Dauntsey railway station on the Great Western Main Line to Malmesbury. Promoted locally, it opened with considerable assistance from the Great Western Railway in 1877, and it was standard gauge. There was only one intermediate station, Somerford.

Newtown and Machynlleth Railway

The Newtown and Machynlleth Railway was a railway company in Wales. It built a line from a junction with the Llanidloes and Newtown Railway near Caersws to the market town of Machynlleth; the line opened in 1862. Newtown had become the hub of railway lines in the district. Machynlleth was an important town, and extension from there to Aberystwyth and to the coast northward was in the minds of the promoters.

References

  1. 1 2 3 4 5 6 7 8 Maggs, Colin G (1990). The Calne Branch. Wild Swan Publications Ltd. ISBN   0906867894.
  2. 1 2 E T MacDermot, History of the Great Western Railway, volume II, published by the Great Western Railway, London, 1932
  3. 1 2 Oakley, Mike (2004). Wiltshire Railway Stations. Wimborne: The Dovecote Press. pp. 28–32. ISBN   1904349331.
  4. "Route 403". Sustrans. Retrieved 19 February 2016.