Dholera Solar Park

Last updated

Dholera Solar Park is a planned, large scale solar project in Dholera Special Investment Region (DSIR), Gujarat. [1] [2] It is categorised as an Ultra Mega Solar Power Project, by the Ministry of New and Renewable Energy of the Central Government of India; the capacity will be 5 GW by 2030. [3] [4]

Contents

History

Background

The Government of India has a target of increasing power generated from renewable energy sources to 175 GW by 2022. [5] The National Solar Mission (NSM) has a target of achieving 100GW of grid-connected power generation from solar energy by 2022. [6] India originally had a target of 20GW by 2022; this target was achieved with four years to go. Following this the Narendra Modi government increased the target to 100GW. [7]

The Chief Minister of Gujarat approved the Dholera Solar Park in April 2018. [8]

Auctions

Auctions have been held in 2020. [9] An excess response of 600 MW was seen. [10] The discovered tariff was between 2.78 (equivalent to 3.00or3.8¢ US in 2023) and 2.81 (equivalent to 3.00or3.8¢ US in 2023) per unit. Five companies were allotted 100-200MW each. However following lower tariffs of 1.99 (equivalent to 2.00or2.5¢ US in 2023) per unit during subsequent auctions, the original contracts were cancelled and new tenders were placed. [9] In 2018 and 2019 similar cancellations in Gujarat had taken place. [11] These cancelled contracts in Gujarat have resulted Uttar Pradesh also cancelling bids of a 500 MW solar auction. [12]

Related Research Articles

<span class="mw-page-title-main">Torrent Power</span> Indian energy and Power company

Torrent Power is an Indian energy and power company, having interests in power generation, transmission, distribution and manufacturing and supply of power cables. The company distributes power to over 38.5 lakh customers annually in its distribution areas of Ahmedabad, Gandhinagar, Surat, Dahej SEZ and Dholera Special Investment Region in Gujarat; Dadra and Nagar Haveli and Daman and Diu UT; Bhiwandi, Shil, Mumbra and Kalwa areas of Mumbai Metropolitan Region in Maharashtra and Agra in Uttar Pradesh; The T&D losses in license areas of the company is amongst the lowest in the country.

<span class="mw-page-title-main">Solar power by country</span>

Many countries and territories have installed significant solar power capacity into their electrical grids to supplement or provide an alternative to conventional energy sources. Solar power plants use one of two technologies:

<span class="mw-page-title-main">Solar power in Spain</span>

Spain is one of the first countries to deploy large-scale solar photovoltaics, and is the world leader in concentrated solar power (CSP) production.

<span class="mw-page-title-main">Wind power in India</span>

Wind power generation capacity in India has significantly increased in recent years. As of 31 August 2023, the total installed wind power capacity was 44.089 gigawatts (GW), the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the southern, western, and northwestern states.

<span class="mw-page-title-main">Solar power in India</span>

Solar power is a fast developing industry in India. The country's solar installed capacity was 71.61 GWAC as of 31 August 2023. Solar power generation in India ranks fourth globally in 2021.

<span class="mw-page-title-main">Solar power in the United Kingdom</span>

Solar power represented a very small part of electricity production in the United Kingdom until the 2010s when it increased rapidly, thanks to feed-in tariff (FIT) subsidies and the falling cost of photovoltaic (PV) panels.

<span class="mw-page-title-main">Solar power in China</span>

China is the largest market in the world for both photovoltaics and solar thermal energy. China's photovoltaic industry began by making panels for satellites, and transitioned to the manufacture of domestic panels in the late 1990s. After substantial government incentives were introduced in 2011, China's solar power market grew dramatically: the country became the world's leading installer of photovoltaics in 2013. China surpassed Germany as the world's largest producer of photovoltaic energy in 2015, and became the first country to have over 100 GW of total installed photovoltaic capacity in 2017.

<span class="mw-page-title-main">Renewable energy in India</span>

India is world's 3rd largest consumer of electricity and world's 3rd largest renewable energy producer with 40% of energy capacity installed in the year 2022 coming from renewable sources. Ernst & Young's (EY) 2021 Renewable Energy Country Attractiveness Index (RECAI) ranked India 3rd behind USA and China. In FY2023-24, India is planning to issue 50 GW tenders for wind, solar and hybrid projects. India has committed for a goal of 500 GW renewable energy capacity by 2030. In line with this commitment, India's installed renewable energy capacity has been experiencing a steady upward trend. From 94.4 GW in 2021, the capacity has gone up to 119.1 GW in 2023 as of Q4.

The National Solar Mission is an initiative of the Government of India and State Governments to promote solar power. The mission is one of the several policies of the National Action Plan on Climate Change. The program was inaugurated as the Jawaharlal Nehru National Solar Mission by former Prime Minister Manmohan Singh on 11 January 2010 with a target of 20 GW by 2022. This was later increased to 100 GW by Prime Minister Narendra Modi in the 2015 Union budget of India. India increased its utility solar power generation capacity by nearly 5 times from 2,650 MW on 26 May 2014 to 12,288.83 MW on 31 March 2017. The country added 9,362.65 MW in 2017–18, the highest of any year. The original target of 20 GW was surpassed in 2018, four years ahead of the 2022 deadline.

<span class="mw-page-title-main">Solar power in Greece</span>

Development of solar power in Greece started in 2006 and installations of photovoltaic systems skyrocketed from 2009 because of the appealing feed-in tariffs introduced and the corresponding regulations for domestic applications of rooftop solar PV. In 2019, 90% of the around 2.5 GWp capacity was installed in 2011, 2012 and 2013. However, funding the FITs created an unacceptable deficit of more than €500 million in the Greek "Operator of Electricity Market" RES fund. To reduce that deficit, new regulations were introduced in August 2012 including retrospective feed-in tariffs reduction, with further reductions over time. These measures enabled the deficit to be erased by 2017.

<span class="mw-page-title-main">Solar power in Gujarat</span> Overview of solar power in Gujarat

Solar power in Gujarat, a state of India, is a fast developing industry given that the large state is mostly arid. It was one of the first states to develop solar generation capacity in India.

<span class="mw-page-title-main">ReNew Power</span> Indian renewable energy company

ReNew is India's largest renewable energy company by operational capacity. Based in Gurgaon, Haryana, it has an asset base of over 10 GW, with around 5 GW operational. ReNew Power operates over 110 projects across 18 states in India, developing, building, owning and operating utility-scale wind and solar energy projects, including distributed solar energy production for commercial and industrial consumers.

Rewa Ultra Mega Solar is an operational ground mounted, grid-connected photovoltaic solar park spread over an area of 1,590 acres (6.4 km2) in the Gurh tehsil of Rewa district of Madhya Pradesh, India. It started producing power in 2018 and reached its full capacity of 750MW in January 2020. The project was dedicated to the nation by the Prime Minister of India Shri Narendra Modi on July 10, 2020. It was the first solar project in India to break the grid parity barrier. It achieved a first-year tariff of INR 2.97/unit, while the previous record was INR 4.34/unit.

Ultra Mega Solar Power Projects, also known as Ultra Mega Solar Parks, are a series of solar power projects planned by the Ministry of New and Renewable Energy of the Union Government of India. Each power project has a minimum capacity of 500 MW.

<span class="mw-page-title-main">Pavagada Solar Park</span> Solar park in Karnataka, India. Largest solar park in the world by nameplate capacity.

Pavagada Solar Park is a solar park covering an area of 53 square kilometres in Pavagada taluk, Tumkur district, Karnataka. Completed in 2019, the park has a capacity of 2,050 MW. As of April 2021, it is the World's third largest photovoltaic solar park after the 2,245 MW Bhadla Solar Park in Rajasthan and 2,200 MW Huanghe Hydropower Hainan Solar Park in China. It is the second largest in India.The total project cost was ₹14,800 crore.

<span class="mw-page-title-main">Kurnool Ultra Mega Solar Park</span> 3rd Largest Solar Park in India

Kurnool Ultra Mega Solar Park in Andhra Pradesh is a solar park spread over a total area of 24 square kilometres (9.3 sq mi) in Panyam mandal of Kurnool district, Andhra Pradesh, with a capacity of 1000 MW. It was inaugurated by then chief minister of Andhra Pradesh Nara Chandrababu Naidu in 2019 The park was built at an investment of around 70 billion (US$880 million) by solar power developers and the Central and State governments. Solar power developers invested 10 billion (US$130 million), while the remaining 60 billion (US$750 million) was funded by APSPCL supported by a 2 billion (US$25 million) grant from the Union Government.

<span class="mw-page-title-main">Adani Green Energy</span> Indian renewable energy company

Adani Green Energy Limited (AGEL) is an Indian renewable energy company headquartered in Ahmedabad, Gujarat. It is owned by Indian conglomerate Adani Group. The company operates Kamuthi Solar Power Project, one of the largest solar photovoltaic plants in the world.

The Gujarat Hybrid Renewable Energy Park is an under construction renewable energy park located near Vighakot village near Kutch district of Gujarat, India. It is expected to generate 30 gigawatt electricity from both solar panels and wind turbines when completed, over an area of 72,600 hectares (726 km2).

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) Yojana was launched by the Government of India to increase the income of farmers and provide sources for irrigation and de-dieselising the agricultural sector. The PM-Kusum scheme got administrative approval in March 2019 and guidelines were prepared in July 2019. The scheme was launched by the Ministry of New and Renewable Energy (MNRE) for setting up solar pumps and other new power plants across the country.

References

  1. "Dholera Solar Park, Gujarat". Power Technology. Retrieved 2021-05-16.
  2. Gupta, Uma (17 March 2021). "Gujarat retenders 700 MW in Dholera Solar Park and 100 MW in Raghanesda". pv magazine India. Retrieved 2021-05-16.
  3. "TATA Power lays foundation of 400 MW (AC) Solar Power Project at the 5000 MW Solar Park in Dholera Special Investment Region in Gujarat". EquityBulls. 2020-10-17. Retrieved 2021-05-16.
  4. "Gujarat's solar flip ups the risk of a larger flop". mint. 2021-02-09. Retrieved 2021-05-16.
  5. Dave, Kapil Dave (11 April 2018). "5,000MW solar park to come up in Dholera". The Times of India. Retrieved 2021-05-22.
  6. "Current Status | Ministry of New and Renewable Energy, Government of India". Ministry of New and Renewable Energy, Government of India. Archived from the original on 21 April 2021. Retrieved 2021-05-22.
  7. "Is India's solar power sector ready for its technology-driven metamorphosis?". ETEnergyworld. 3 February 2021. Retrieved 2021-05-22.
  8. "World's largest solar park to come up in Gujarat: CM Vijay Rupani". The Economic Times. PTI. 10 April 2018. Retrieved 2021-05-22.
  9. 1 2 Chandrasekaran, Kaavya (1 February 2021). "Gujarat cancels results of solar auctions, feels tariffs are high". ETEnergyworld. Retrieved 2021-05-22.
  10. Prateek, Saumy (1 August 2020). "Dholera Solar Park Tender Oversubscribed by 600 MW - Saur Energy International". Saur Energy. Retrieved 2021-06-03.
  11. Prasad, Nithin Thomas (2021-02-03). "In Another Bad Precedent, Gujarat Regulator Allows DISCOM to Scrap 700 MW Solar Auction". Mercom India. Retrieved 2021-06-03.
  12. Ranjan, Rakesh (2021-06-03). "Uttar Pradesh Scraps 500 MW Solar Auction, Plans to Re-Auction Hoping for Lower Bids". Mercom India. Retrieved 2021-06-03.