Doka GmbH

Last updated
Doka
Company type GmbH
Industry Construction
Founded1958 (1868)
Headquarters Amstetten, Austria
Area served
Worldwide
Key people
Robert Hauser, Gerd Pechura, Dr. Hubert Mattersdorfer (Executive Board)
Products Formwork, Engineering
Revenue 1,853 million (consolidated revenues of the Umdasch Group AG, annual report 2023)
Number of employees
~9,000
Subsidiaries 180
Website www.doka.com

Doka is an international producer and supplier of formwork and scaffolding used in all fields of the construction sector. It is a branch of the Umdasch Group AG (JSC) based in Amstetten, Austria. Doka has a worldwide workforce of ~9,000, with 180 branches in 58 countries. [1] The consolidated revenues of the Umdasch Group AG amounted to 1,853 million euros in 2023.

Contents

History

Doka, umdasch The Store Makers and Umdasch Group Ventures make up the Umdasch Group AG with its headquarters located in Amstetten, Austria. In 1868 [2] Stefan Hopferwieser [3] founded the company St. & A. Hopferwieser as a carpenter in the town of Kollmitzberg. During the first 80 years of the company, the company had diversified into carpentry, sawmill wood and metal manufacturing, producing among others furniture, home appliances, metal hardware and packaging. In 1949, the engineer Josef Umdasch, who was married to Mathilde Hopferwieser (granddaughter of Stefan Hopferwieser) became the managing director of the company rebuilding and restructuring it. [4] Josef Umdasch had been a board member of the company since 1939. In the 1950s prefabricated formwork production and store fitting production arms of the company crystallized into the two modern branches within the corporate group. In 1961 the corporate group was renamed to Umdasch KG. After Josef Umdasch retired his children Hilde and Alfred Umdasch directed the company.

Doka

In 1958 the company branch Doka [2] was founded. The company founding and company name are interlinked with their first product and projects. In Austria in the 1950s, large infrastructural construction was underway including several hydro electrical dams. The dams were being built on the Danube river (Donau) and its tributaries by the Austrian utility "Donaukraftwerke" or DOKW for short, translating as 'Danube power stations'. Because of the great size of these structures, traditional timber beam formwork was too labor-intensive to form the large walls. Thus a large scale systematic and reusable formwork was developed, with the wooden formwork panels being produced and shipped from the Amstetten company. Originally the DOKW was the delivery address, but then became the product name (DOKW boards). Linguistic usage slurred DOKW into DOKA, which became the name of the newly founded company. In 1961 the first subsidiary was established in Germany, followed in 1977 by Brazil and Kuwait. Since then Doka has grown to service countries in all inhabited continents, particularly in Europe and the Middle East, and in the English speaking countries Great Britain, Ireland, New Zealand, Australia, Canada and the United States. Doka has a well established office in Qatar and Saudi Arabia. [5]

Criticism

From 2021 to 2023, the company continued to generate revenues in Russia, with no official announcement regarding changes to its operations or manufacturing presence. In June 2024, LPF CAPITAL LLC became the new owner of the organization, and references to UMDASH GROUP AG and DOKA GMBH LLC were removed from the Unified State Register of Legal Entities. On 18 June 2024, the company’s name changed from DOKA RUS LLC to REFORM LLC. [6]

Product and service overview

The formwork products, systems and design service include formwork panels, slab formwork, wall formwork, one-sided wall formwork, climbing formwork, tunnel formwork, dam formwork, bridge formwork (cast-in-place balanced cantilever bridge, concrete arch bridge and steel combination bridge formwork), shoring / falsework, tie systems and field support, software and training. Doka’s business is based on a combination of production, equipment sale & rental, engineering and maintenance. Most of the formwork production takes place at Doka's central plant in Amstetten. [7] The Doka three-ply sheets are made in the branch plant in Banská Bystrica in Slovakia.

Projects

Projects built using Doka Formwork

sixth form schoolhouse, Paspels Brutarchitekt, School Paspels.jpg
sixth form schoolhouse, Paspels

Footnotes

  1. About Doka
  2. 1 2 "Doka - Unternehmen - Meilensteine". Archived from the original on 2009-01-22. Retrieved 2009-01-24.
  3. "Umdasch Industrieges.m.b.H." www.aeiou.at. Retrieved Oct 28, 2020.
  4. "umdasch - We make successful STORES". www.umdasch.com. Retrieved Oct 28, 2020.
  5. "Doka - About the company - Sales Network". Archived from the original on 2007-10-15. Retrieved 2007-10-12.
  6. "Doka GmbH". Leave Russia. Retrieved 10 December 2024.
  7. ACI Formwork for Concrete (Seventh ed.). Figure 1-2.
  8. http://www.archipicture.eu/Architekten/Schweiz/Olgiati%20Valerio/Valerio%20Olgiati%20-%20Paspels%20School%201.html

Related Research Articles

<span class="mw-page-title-main">Leopoldstadt</span> 2nd District of Vienna in Austria

Leopoldstadt is the 2nd municipal district of Vienna in Austria. As of 1 January 2016, there are 103,233 inhabitants over 19.27 km2 (7 sq mi). It is situated in the heart of the city and, together with Brigittenau, forms a large island surrounded by the Danube Canal and, to the north, the Danube. It is named after Leopold I, Holy Roman Emperor. Due to its relatively high percentage of Jewish inhabitants before the Holocaust, Leopoldstadt gained the nickname Mazzesinsel. This context was a significant aspect for the district twinning with the New York City borough Brooklyn in 2007.

<span class="mw-page-title-main">Burj Al Arab</span> Luxury hotel in Dubai, United Arab Emirates

The Burj Al Arab is a luxury hotel in Dubai, United Arab Emirates. Developed and managed by Jumeirah, it is one of the tallest hotels in the world, although 39% of its total height is made up of non-occupiable space. Burj Al Arab stands on an artificial island that is 280 m (920 ft) from Jumeirah Beach and is connected to the mainland by a private curving bridge. The shape of the structure is designed to resemble the sail of a dhow. It has a helipad near the roof, at a height of 210 m (689 ft) above ground.

The year 1999 in architecture involved some significant architectural events and new buildings.

AMAG is the biggest company in the Austrian Aluminium industry sector. It is situated in the village of Ranshofen, which is in Braunau am Inn.

<span class="mw-page-title-main">Amstetten, Lower Austria</span> City in Lower Austria, Austria

Amstetten is a city in Lower Austria. It is the capital of the Amstetten District and the centre of the historical region Mostviertel.

The government of Dubai took a decision to diversify from a trade-based, oil-reliant economy to one that is service and tourism-oriented. This has made real estate and other developments more valuable, thus resulting in a property boom from 2004 to 2006. Construction on a large scale has turned Dubai into one of the fastest-growing cities in the world. There are a number of large-scale projects which are currently under construction or are to be constructed in the future. Due to the heavy construction which is taking place in Dubai, 30,000 construction cranes, which are 25% of cranes worldwide, are operating in Dubai. Due to the burst of construction, Dubai has acquired various building-related records, which include: the world's tallest tower, the world's largest shopping mall, the world's largest fountain and the world's tallest hotel. Also under construction is Dubailand, which will be almost twice the size of the Walt Disney World Resort.

<span class="mw-page-title-main">Donau City</span> Neighbourhood of Vienna

Donau City, or Vienna DC, is a new part of Vienna's 22nd District Donaustadt, next to both the Reichsbrücke and the left bank of the Danube's 21.1 km new channel, Neue Donau.

<span class="mw-page-title-main">Andritz AG</span> Austrian company

Andritz AG is an international technology group, offering plants, equipment, systems and services for various industries. The group's headquarters are in Graz, Austria. The group gets its name from the district of Andritz in which it is located and is listed on the Vienna Stock Exchange.

<span class="mw-page-title-main">Arabtec Holding PJSC</span> United Arab Emirates construction group

Arabtec Holding PJSC, Dubai's most heavily traded and largest construction group in GCC together with its subsidiaries, provided construction services for residential, commercial, oil and gas, infrastructure, power, facilities management, and property development sectors in the United Arab Emirates and internationally. It operated through Construction; Mechanical, Electrical and Plumbing; Oil & Gas, Infrastructure and Power; and other segments. The company was involved in the construction of high-rise towers, buildings, and residential villas, as well as drainage, electrical, mechanical, and plumbing contracting, and civil and infrastructure construction works. It also engaged in real estate investment, development, leasing, and management activities. In addition, the company manufactured precast panels and steel structures, as well as ready-mixed concrete

The Harsco Infrastructure Deutschland GmbH, with its headquarters located in Ratingen, Germany, is a subsidiary of the Harsco Corporation. The company develops, rents and sells formwork and scaffolding products for the main construction trade and civil engineering projects.

<span class="mw-page-title-main">Valerio Olgiati</span> Swiss architect (born 1958)

Valerio Olgiati is a Swiss architect. He initially studied architecture at ETH Zurich, a public research university in Zurich, Switzerland.

<span class="mw-page-title-main">George J. Efstathiou</span> American architect

George J. Efstathiou, FAIA, RIBA is an American architect of Greek descent. George joined Skidmore, Owings and Merrill, LLP (SOM) in 1974, where he served as Managing Partner and later Consulting Partner in the Chicago office until 2016. He is currently leading the consulting practice of Efstathiou Consulting LLC which serves clients in the architecture, planning, interiors design as well as others in the real estate and corporate communities.

Burj Azizi is a skyscraper to be built as a centrepiece of Sheikh Zayed Road, in Dubai, United Arab Emirates. It will have 133 floors for various purposes. Burj Azizi could be the world's second tallest building once completed, if it reaches the proposed height of 725 meters, which is 100 meters less than the height of the Burj Khalifa. the current world's tallest building which is located 2 kilometers away from Burj Azizi.

The Western Railway is a two-track, partly four-track, electrified railway line in Austria that runs from Vienna to Salzburg via St. Pölten and Linz Hauptbahnhof and is one of the major lines of Austria. It was originally opened as the Empress Elisabeth Railway in 1858 (Vienna–Linz). The line is owned and operated by Austrian Federal Railways (ÖBB).

Waagner Biro is a Vienna-based group of companies formerly part of the same group which have developed into separately owned, independent companies operating in steel and mechanical engineering. Collectively, the companies have about 1000 employees in various locations in Europe, Asia, and the Middle East.

<span class="mw-page-title-main">Azerbaijan Tower</span> Former planned megatall skyscraper

The Azerbaijan Tower was a planned megatall skyscraper intended to be constructed on the Khazar Islands, 25 km (16 mi) south of Baku, in Azerbaijan.

The following is a timeline of the history of the city of Dubai, United Arab Emirates.