The Evansville & Eastern Electric Railway was put into operation on 10 June 1906 was one of the very few electric lines in the United States which did not parallel a steam railroad. [1]

Contents

Route

Picturesque spot on the Evansville and Eastern Electric Railway Pituresque spot on the Evansville and Eastern Electric Railway.jpg
Picturesque spot on the Evansville and Eastern Electric Railway

The railroad extended a distance of 21 miles (34 km) from Newburgh, Indiana, which had a population of about 1500 people, to Rockport, having about 3500 inhabitants, with a 3 miles (4.8 km) spur north to Richland, Indiana. However, traffic arrangements had been made with the Evansville Suburban & Newburgh Railroad, whereby railcars were operated into Evansville over the tracks of the latter company.

The railroad passed through a rich farming country. Corn was raised on the river bottom farms on one side, while the land to the north was devoted to wheat raising. Wheat, which took one of the first prizes at the Chicago World's Fair, was cultivated on land near the line in Warrick County.

Previously, farmers of the region traversed have been compelled to haul their grain distances up to 10 miles (16 km) to Rockport, Boonville and Newburgh. Those near the river made shipments by way of unreliable river boats. Practically all these shipments from the territory 6 miles (9.7 km) from the line were subsequently carried over it. Before the railroad was completed the farmers made such insistent demands that arrangements were made to haul car-load lots of grain by means of the construction locomotive and about two hundred car loads were hauled.

The railroad was practically a farmers' line, and the greater portion of the receipts were derived from the farmers. There was, however, considerable through passenger traffic between Evansville and Rockport. The steam-railroad route between the two cities was 51 miles (82 km) long as against 31 miles (50 km) by the electric line. The time over the steam road was not to be considered, since very unreliable connections were made at Rockport Junction. During the first month's operation of the railroad an investigation showed that only five through steam-road tickets had been sold between Rockport and Evansville, and in three instances business along the line compelled the purchasers to take this route.

Owensboro, Kentucky, a city of about 15,000 people, located on the Ohio River, 8 miles (13 km) below Rockport, was also served by the line through boats which made connections with trains at Rockport. Other than the terminals the only towns on the main line were Yankeetown and Hatfield, with about 400 people each. Eureka, Indiana, with probably 600 people, lied about 1 mile (1.6 km) south of the line, and Richland, on the spur already referred to, had a population of about 800 inhabitants. [1]

Track and roadway

Trestle over a ravine near Yankeetown Trestle of the Evansville and Eastern Electric Railway over a ravine near Yankeetown.jpg
Trestle over a ravine near Yankeetown

All of the route, but particularly the western portion, was very picturesque. For about 2 miles (3.2 km) after leaving Newburgh the track was laid over bluffs on the bank of the Ohio River. The railroad then crossed behind the hills and passed over Cypress Creek on truss steel construction 115 feet (35 m) long. The only other steel structure on the line was that over Pigeon Creek, which was 130 feet (40 m) in length. Both rested on concrete abutments. Near Yankeetown the tracks were carried over a ravine on a wood trestle which was planned to be displaced later by a fill.

The heaviest grading was necessary near Yankeetown where some 22-ft. cuts were made. East of Yankeetown the country is comparatively level. All cuts were made 22 ft. wide at the bottom and fills are 14 ft. at the top.

The track is laid with 70-lb/yard (35 kg/m) rails on oak ties, obtained largely from the neighboring country. The entire railroad was bonded with brazed bonds, the work being done by the Electric Railway Improvement Company, of Cleveland, Ohio.

Sidings varied in length from 100 feet (30 m) to 300 feet (91 m) and were located at about 3-mile intervals. All passing sidings were double end; others are stub end. The sidings were placed more frequently than otherwise to provide for the simultaneous operation of freight trains and passenger cars.

Throughout its length the road was ballasted with gravel taken from the bed of the Ohio River, just above Newburgh. The gravel was dug up and loaded into barges by a dredge boat, and a tug towed the barges down the river to a coalmine incline, which extended over the tracks of the electric line. The coal-mine engines were used to pull small cars of gravel up the incline, and these cars were dumped, either directly into the ballast cars or into a hopper underneath the incline. The gravel was almost entirely free from sand and makes an excellent roadbed.

As the road was built partly for freight traffic, heavy grades were eliminated wherever possible. There was, however, one short grade of 2.4 per cent near Yankeetown. [1]

Overhead lines

A long tangent on the Evansville and Eastern Railway A long tangent on the Evansville and Eastern Electric Railway.jpg
A long tangent on the Evansville and Eastern Railway

The trolley poles, which were of chestnut, 30 feet (9.1 m) and 35 feet (11 m) long, were spaced 100 feet (30 m) apart on tangents and as close as 75 feet (23 m) on curves. The poles were always placed on the outside of curves and are braced, either by deadmen, as shown in one of the accompanying illustrations, or by guy anchors. As no high-tension wires were carried on the poles, unnecessary height of poles was avoided by using a tubular steel bracket braced on the under side. A single trolley of No. 000 round wire was used. Telephone wires and feeders were carried on a cross-arm just below the bracket. Shaw nonarcing lightning arresters grounded to steel rods were placed three to the mile. All of the overhead material with the exception of the lightning arresters was furnished by the Ohio Brass Company. [1]

Power station and feeder system

The power station was located about midway of the length of the line, at Hartfield. It was a brick structure, divided into a boiler and engine room by a transverse wall. The boiler room contained two 300 hp B. & W. boilers served by one steel stack. In the engine room are installed two 375 kW units each, consisting of a Westinghouse compound non-condensing engine and a Westinghouse 600-volt generator. The switchboard was of Western Electric Company manufacture and consisted of two generator and two feeder panels. Water for the boilers was obtained from wells sunk near the power house, and coal was hauled in the company's cars from mines at Newburgh.

A 500,000 circ. mil feeder left the power house in each direction. The feeders continued at this size to points 5 miles (8.0 km) from the station where they are reduced in size to 350,000 circ. mil. These smaller feeders were carried to within 1 mile (1.6 km) of the ends of the line. [1]

Repair shops

A brick repair shop adjacent to the power house at Hatfield contained three storage tracks and space along one wall for the installation of requisite machinery. [1]

Rolling stock

The road was equipped with five passenger cars built by the American Car Company. The cars were 46 feet (14 m) long over all, 9 feet (2.7 m) wide and seated forty-eight people. The inside finish was dark oak. All were built with a small baggage compartment at one end and were intended for double-end operation. They were equipped with four Westinghouse 101-J motors of 50 hp each, and these were mounted on 21 E-1 Brill trucks. K-14 controllers were used. The cars were provided with Westinghouse Traction Brake Company straight air brakes, and Peter Smith hot-water heaters. They were painted a Big Four yellow, which color has been adopted by the company as a standard and is being used wherever possible.

Package freight was hauled in an express car of practically the same dimensions as the passenger cars. For handling heavy freight a steam locomotive and twelve standard steam-railroad freight cars were employed.

Passenger cars were operated between Evansville and Rockport on an hourly schedule. The run required 1 hour and 20 minutes and three cars were employed. The express car made two round trips per day.

At Rockport an agent was employed who gave all of his time to the company. In the other towns the agent was employed on a commission basis. Tickets were sold at approximately 2 cents per mile. An extra charge of 25 cents per piece was made for baggage.

The operating offices, which were now located in Evansville, were planned to be ultimately moved to Hatfield.

The road was constructed and partially financed by the Tennis Company, of Cincinnati, with C. H. Battin as engineer in charge.

The officers of the Evansville & Eastern Traction Company were initially:

The company and the Evansville & Mt. Vernon Electric Railway were held and operated by the Evansville Railways Company. [1]

Traffic

Including the two terminal towns the population along the line was not more than 400 per mile (640 per km), taken 2+12 miles (4 km) back on each side of the track. In the Northern portion of Indiana very few lines have been built through territories not showing a population of twice or three times as great. However, in estimating the possible earnings of the Evansville & Eastern Traction Company it must be remembered that the territory was entirely dependent on the line both for passenger and freight service, and that this exclusive territory extended back from the line in some places as great a distance as 6 miles (9.7 km). Moreover, it must be remembered that Evansville, though not on the line proper, must, under the initial operating conditions, be regarded as a terminal.

During the first few months operation the receipts have been such as to justify the belief that in electric railway construction there has been too great a tendency to parallel already existing steam lines, rather than to push out through thickly settled farming country, remote from steam roads. [1]

The operation of the railroad was discontinued in 1938. [2]

Related Research Articles

<span class="mw-page-title-main">Locomotive</span> Self-propelled railway vehicle

A locomotive or engine is a rail transport vehicle that provides the motive power for a train. If a locomotive is capable of carrying a payload, it is usually rather referred to as a multiple unit, motor coach, railcar or power car; the use of these self-propelled vehicles is increasingly common for passenger trains, but rare for freight trains.

<span class="mw-page-title-main">Baldwin Locomotive Works</span> American manufacturer of railroad locomotives from 1825 to 1956

Baldwin Locomotive Works (BLW) was an American manufacturer of railway locomotives from 1825 to 1951. Originally located in Philadelphia, Pennsylvania, it moved to nearby Eddystone in the early 20th century. The company was for decades the world's largest producer of steam locomotives, but struggled to compete when demand switched to diesel locomotives. Baldwin produced the last of its 70,000-plus locomotives in 1951, before merging with the Lima-Hamilton Corporation on September 11, 1951, to form the Baldwin-Lima-Hamilton Corporation.

<span class="mw-page-title-main">Panama Canal Railway</span> Railway line across Panama linking the Atlantic and Pacific Oceans

The Panama Canal Railway is a railway line linking the Atlantic Ocean to the Pacific Ocean in Central America. The route stretches 47.6 miles (76.6 km) across the Isthmus of Panama from Colón (Atlantic) to Balboa. Because of the difficult physical conditions of the route and state of technology, the construction was renowned as an international engineering achievement, one that cost US$8 million and the lives of an estimated 5,000 to 10,000 workers. Opened in 1855, the railway preceded the Panama Canal by half a century; the railway was vital in assisting the construction of the canal in the early 1900s. With the opening of the canal, the railroad's route was changed as a result of the creation of Gatun Lake, which flooded part of the original route. Following World War II, the railroad's importance declined and much of it fell into a state of neglect until 1998, when a project to rebuild the railroad to haul intermodal traffic began; the new railroad opened in 2001.

<span class="mw-page-title-main">Interurban</span> Type of electric railway which runs within and between cities or towns

The interurban is a type of electric railway, with tram-like electric self-propelled rail cars which run within and between cities or towns. The term "interurban" is usually used in North America, with other terms used outside it. They were very prevalent in many parts of the world before the Second World War and were used primarily for passenger travel between cities and their surrounding suburban and rural communities. Interurban as a term encompassed the companies, their infrastructure, their cars that ran on the rails, and their service. In the United States, the early 1900s interurban was a valuable economic institution, when most roads between towns, many town streets were unpaved, and transportation and haulage was by horse-drawn carriages and carts.

<span class="mw-page-title-main">Pennsylvania Railroad class GG1</span> Class of American electric locomotives

The Pennsylvania Railroad GG1 is a class of streamlined electric locomotives built for the Pennsylvania Railroad (PRR), in the northeastern United States. The class was known for its striking art deco shell, its ability to pull trains at up to 100 mph, and its long operating career of almost 50 years.

<span class="mw-page-title-main">St. Clair Tunnel</span>

The St. Clair Tunnel is the name for two separate rail tunnels which were built under the St. Clair River between Sarnia, Ontario and Port Huron, Michigan. The original, opened in 1891 and used until it was replaced by a new larger tunnel in 1995, was the first full-size subaqueous tunnel built in North America. It is a National Historic Landmark of the United States, and has been designated a civil engineering landmark by both US and Canadian engineering bodies.

<span class="mw-page-title-main">Chicago – New York Electric Air Line Railroad</span>

The Chicago – New York Electric Air Line Railroad (CNY) was a proposed high-speed electric air-line railroad between Chicago and New York City in the early 20th century. At roughly 750 miles (1,210 km) it would have been over 150 miles (240 km) shorter than the two primary steam railroads on that route, the New York Central Railroad and Pennsylvania Railroad. The promoters' vision proved wildly optimistic and, in the end, only a short interurban route in the vicinity of Gary, Indiana was built and operated. It was the most ambitious of several such proposals at the dawn of electric railroading, all of which ended in failure.

Railroad electrification in the United States began at the turn of the 20th century and comprised many different systems in many different geographical areas, few of which were connected. Despite this situation, these systems shared a small number of common reasons for electrification.

<span class="mw-page-title-main">Butte, Anaconda and Pacific Railway</span>

The Butte, Anaconda and Pacific Railway is a short line railroad in the U.S. state of Montana. The BA&P was founded in 1891 and operated as such until sale in 1985, when it was renamed the Rarus Railway. The railway was again sold in May 2007 to the Patriot Rail Corporation, and the name returned to the Butte, Anaconda and Pacific Railway in July 2007. The railway was the main conduit for ore transport between Butte and Anaconda, and was used for filming of portions of the 1985 Golden Globe nominated movie Runaway Train.

<span class="mw-page-title-main">Pacific Coast Railway</span> Narrow-gauge railway in California, United States

The Pacific Coast Railway was a 3 ft narrow gauge railway on the Central Coast of California. The original 10-mile (16 km) link from San Luis Obispo to Avila Beach and Port Harford was later built southward to Santa Maria and Los Olivos, with branches to Sisquoc and Guadalupe.

The Arkansas Valley Interurban Railway (AVI) was an interurban railway that operated in Kansas, United States, from 1910 to 1938 for passengers and to 1942 for freight, running between Wichita, Newton, and Hutchinson. It operated a small fleet of electrically powered passenger and freight equipment. Service was suspended during World War II and never resumed, except on a small portion owned the Hutchinson and Northern Railroad which is still in operation. (2020)

The Youngstown and Ohio River Railroad, or Y&OR, was one of the smaller interurban railways in the state of Ohio. Along with the Youngstown and Southern Railway, the Y&OR formed a traction link between Youngstown, Ohio and the Ohio River at East Liverpool. It served several coal mines in the area and it was distinguished by the unusual feat of electrifying a section of a steam railroad, the Pittsburgh, Lisbon and Western Railroad, as part of a trackage rights agreement. The Y&OR operated for 24 years.

<span class="mw-page-title-main">Visalia Electric Railroad</span>

The Visalia Electric Railroad, a wholly owned subsidiary of the Southern Pacific Railroad (SP), began as an electric interurban railroad in Tulare County, in the U.S. State of California. The railroad was incorporated on April 22, 1904. Passenger service was discontinued in 1924, and the electrification was removed in 1944. Subsequent operation was by diesel locomotive. The railroad was closed in 1992.

<span class="mw-page-title-main">Rockport train wreck</span>

The Rockport train wreck occurred in Rockport in Mansfield Township, New Jersey, United States, about three miles outside of Hackettstown, on June 16, 1925. A violent storm washed debris onto a grade crossing, derailing a Lackawanna Railroad (DL&W) train. The crash killed 42 passengers and five crewmen and injured twenty-three others.

<span class="mw-page-title-main">Baldwin–Westinghouse electric locomotives</span>

Baldwin, the locomotive manufacturer, and Westinghouse, the promoter of AC electrification, joined forces in 1895 to develop AC railway electrification. Soon after the turn of the century, they marketed a single-phase high-voltage system to railroads. From 1904 to 1905 they supplied locomotives carrying a joint builder's plate to a number of American railroads, particularly for the New Haven line from New York to New Haven, and other New Haven lines. Westinghouse would produce the motors, controls, and other electrical gear, while Baldwin would produce the running gear, frame, body, and perform final assembly.

The Cincinnati, Bluffton and Chicago Railroad (CB&C) was a short-lived United States shortline railroad that operated in Indiana from 1903 until 1917. Although the railroad aspired to trunk-line status, it was unable to achieve sufficient financing to provide service to two of the three municipalities mentioned in its corporate name. It operated a 52 mile route on a northwest to southeast alignment from Huntington to Portland, via Bluffton and Pennville.

<span class="mw-page-title-main">Elmira and Seneca Lake Railway</span>

The line of the Elmira & Seneca Lake Railway Co. from Horseheads, New York to Seneca Lake was opened for operation on June 19, 1900.

<span class="mw-page-title-main">Electric railway of the White Knob Copper Co.</span>

The electric railway of the White Knob Copper Co., Ltd. was operated by the White Knob Copper Co. at White Knob near Mackay, Idaho, in connection with its mines, having 7.1 miles (11.4 km) of railroad, two electric locomotives and 40 ore cars. The difference in level over the seven miles was 2,100 feet (640 m), an average of 6 per cent. Eighty tons of ore were handled by each train.

<span class="mw-page-title-main">Everett–Snohomish Interurban</span>

The Everett–Snohomish Interurban was a 9 miles (14 km) long interurban electric railroad between Everett and Snohomish, Washington. It was inaugurated by the Everett Railway & Electric Co. of Everett, on December 1, 1903.

References

  1. 1 2 3 4 5 6 7 8 Street Railway Journal, Vol. 30, No. 13, 28 September 1907, p. 446-448. PD-icon.svg This article incorporates text from this source, which is in the public domain .
  2. Bill Vandervoort: Interurban Railways in Indiana (excluding Chicago/Northwest Indiana area). Archived 2016-08-02 at the Wayback Machine