Four Major Rivers Project

Last updated

The Four Major Rivers Restoration Project is the multi-purpose green growth project on the Han River, Nakdong River, Geum River and Yeongsan River in South Korea. The project was spearheaded by former South Korean president Lee Myung-bak and was declared complete on October 21, 2011. It was first announced as part of the "Green New Deal" policy launched in January 2009, and was later included in the government's five-year national plan in July 2009. The government estimated its full investment and funding totaled 22.2 trillion won (approximately US$17.3 billion).

Contents

The overall project was broken into three project sets: revitalizing the four rivers, projects on their 14 tributaries and refurbishment for other smaller-sized streams. The project had five key objectives as well: securing abundant water resources to combat water scarcity; implementing comprehensive flood control measures; improving water quality and restoring river ecosystems, creating multipurpose spaces for local residents; and regional development centered on the rivers.

More than 929 kilometres (577 mi) of streams in Korea will be restored as part of the project, with a follow-up operation planned to restore more than 10,000 kilometres (6,200 mi) of local streams. More than 35 riparian wetlands will also be reconstructed.

The project was declared complete by President Lee on October 21, 2011. The project was a major recurring story in the media and with the public. It often drew ire and protests over the toll that construction projects could take on the environment, as well as being seen as an extension of Lee's persona as former CEO of Hyundai Engineering & Construction Co. Ltd, nicknamed "The Bulldozer," with his push for swift approval of the project in the National Assembly.

Background

The Four Rivers Restoration Project of Korea was designed to be a packaged project that aims to resolve water-related problems such as floods and droughts and revitalize Korean public spaces near the water. Its projects were carried out simultaneously with heavy investment from multiple government ministries over a 2-year period.

The Korean government estimated about 800 million m3 of water was needed to prevent water scarcity in 2011, and expected the need to grow to one billion m3 in 2016. It was also disclosed that while government recovery expenses due to flooding topped 4.2 trillion won over a decade, average annual investment in flood prevention was only 1.1 trillion won. The government also stated its objective to improve the rivers' water quality, by managing pollutants such as the increase of Biochemical oxygen demand and total phosphorus counts that can result in the waterways' eutrophication.

The government also outlined that existing spaces and programs along the rivers for watersports and cultural activities could not keep up with rising demand, a product of Koreans' rising income levels.

The Four Major Rivers Restoration Project is to contribute to recovering the real economy from the recession through job creation and local economic revitalization.

Policy direction

The Four Major Rivers Restoration Project has the following policy directions

Proactive response against climate change

Diversification of ways to secure water resources

Paradigm shift in river management policies

Utilization of river areas as multipurpose spaces for the co-existence of the people and environment

Main aspects

The Four Major Rivers Project implemented restoration initiatives that were focused on the installation of wastewater treatment and monitoring facilities as well as the construction of movable barriers (weirs) built across a river to control the flow of the water. [1] Direct interventions to restore rivers also included the construction of multi-purpose dams and heightening of banks for 96 existing agricultural reservoirs. [1] With the goal of maximizing the tourism benefits of the restoration project, the river banks and adjacent areas were also enhanced with bike lanes, green transportation network, and leisure facilities.

Implementation of five core challenges to achieve the goal of renewing the territory

Project time and cost

Twelve cities and provinces submitted 836 recommendations worth 98.3 trillion KRW

Expected benefits

An opportunity for Korea to position itself as a powerhouse in water resources in the international community

Fundamental resolution of floods and water scarcity

1.17 billion m3 of water secured will strengthen our capacity to respond to future water shortage and droughts. [2] Increased water storage thanks to dredging sediment and building reservoirs will equip us against droughts. And Ministry of Land, Transport and Maritime Affairs can be able to secure river maintenance water and strengthen flood control capacity even during droughts by building small sized multipurpose dams and expanding existing agricultural reservoirs.

Flood control capacity increased by 920 million m3 will enable us to fight climate change and keep our rivers safe even upon 200-year floods. Flood damage and recovery expenses will decrease by dredging sediment, and the down-streams will be protected by retention and riverside reservoirs. And the reinforcement of old levees will raise the safety in flood control.

Contribution to sound restoration of the ecosystem

Increased quality of cultural and leisurely activities, and lives

Local residents will enjoy culture, relaxation, and sports in redeveloped waterfronts. Also, the promotion of water sports and the construction of bicycle lanes will increase the opportunity for leisurely activities.

Local economies revitalized through the Green New Deal

The real economy will be recovered by stimulating domestic demand and creating new jobs. And as a part of the Green New Deal, the rivers restoration project will be utilized as a new growth engine. The benefits reaped from the project on the four major rivers areas which account for 70 percent of our territory will contribute to regional development. Also, regional growth will be accelerated through the rivers-oriented development. Overall, it is expected that the project will create 340,000 jobs and generate an estimated 40 trillion won (US$31.1 billion) of positive economic effects.

Promotion of green growth projects

  1. The development of remote sensors will enable real-time monitoring of water pollution, water level, vulnerable areas upon disasters, and facilities such as bridges and dams.
  1. Digital tours on the culture and historic sites of the four major rivers will be promoted. To this end, the government will support technological development, commercialization, and international standardization of wireless communication, and positioning system.
  1. Scientific management of resources and environment of the underwater which is difficult to access will become possible by using robots.
  1. Photovoltaic power generation facilities will be built in riversides that are not submerged.
  2. The government will construct small hydropower plants when expanding existing reservoirs and agricultural reservoirs.

Bicycles

1,757 km of bicycle road would be constructed during the project. In 2012, international bike race "Tour de Korea 2012" was held, and it contributed in promoting the project's aspects of green growth and nation brand. [3]

Companies from the People's Republic of China could benefit a potential sales hike of Made in China bicycles in South Korea, in which 85% of bicycles in South Korea are imported. [4] Other countries can also benefit from this river project as there will be more imports of bicycle parts for bicycle production facilities around South Korea. [5]

Criticism of the project

The earliest criticism to the Four Major Rivers Project was political in nature and, specifically, lodged by those who were more generally opposed to the South Korean President, Lee Myung-bak's administration. These bristled at the notion that the project has been carried out without proper democratic process or local input. The rehabilitation of the main South Korean waterways has been a major component of Lee Myung-bak's election platform, labeled as the Grand Korean Waterway. There was fierce political opposition to this proposal based on the economic viability of the project and its doubtful goals. A study conducted by the Korea Water Resources Corporation in 1998 outlined that the plan was technically and economically unfeasible. [6] Later, there was a heightened public unease over the plan, which prompted the newly installed Lee Myung-bak government to scrap it. When the Four Major Rivers Project was announced in early 2009, critics suspected that it was a mere name-change for the Grand Korean Waterway. [7]

The Four Major Rivers Project has also attracted significant criticism from environmental groups in South Korea and wider international groups such as Friends of the Earth.

Environmental problems

The World Wetland Network awards countries for their efforts in wetland management, with Blue Globe Awards to highlight good practices in wetland management and Grey Globe Awards to draw attention to poor practices in wetland management. [8] At their annual Conference of the Parties held on 7 July 2012, six Blue Globes and five Grey Globes were awarded; South Korea received one of the Grey Globes for the Four Major Rivers Project, particularly highlighting the project's implementation "... prior to proper environmental evaluation and the long term value of the wetlands destroyed". [8] [9]

Diverting rivers and constructing stepped artificial lakes

The 2010 March issue of Science Magazine outlined that one of the major plans of the project was to construct 16 dams in the main streams of the four major rivers. [10] Opposing voices said these dams would turn the rivers into artificially stepped lakes, rather than the relatively free flowing rivers they are at present. [11]

Environmental Impact Assessment without a plan

Opposition also claims that on top of the transformation into stepped lakes, the 4 Rivers Project is also suspected to be a backdoor operation towards President Lee's goal of constructing the Grand Korean Waterway, a canal from Seoul to Busan, by the end of his term in 2012. Lee proposed the idea before undertaking the 4 Rivers Project, and it was unpopular in the Assembly and with the public.

Another factor was Lee's announcement that an environmental impact study had been completed in October 2009 saying there would be no harmful impact to the rivers' ecosystems, however the project had just entered its turn-key bid phase a month prior, suggesting the legally required study was conducted without having fully realized plans. An example was the administration's holding a preliminary conference for constructing an ecological park on the Geum River almost a year after the study was completed. [12]

Its procedure about preliminary feasibility study or the preliminary environmental review was not rigorous or was skipped. Also it failed to secure the procedural validity of the project by conducting the survey of the cultural property index in two months, and the environmental impact assessment in four months. [13]

Pollutions

There was a report of polluted underground water in Changweon, Gyeongsangnam-do due to this construction project. [14]

The Ministry of Environmental Affairs announced on August 7, 2011, that it identified 12,660 tons of abandoned construction waste around the 11 main construction sites. [15]

Traces of asbestos were found along the bicycle roads in Andong Nakdong river area. [16] [17] New water clarity goals allow for much higher pollution levels than currently exist, especially around areas of Paldang organic farming operations. [18] A lawmaker claimed that 28 endangered species and natural monuments have disappeared from the Nakdong River, one of South Korea's four major rivers, due to the river project. [19]

The validity of the measures against flood and drought damage has not yet been verified. Also, BOD and T-N are improving, but COD and algal concentrations are deteriorating. [13]

Environmental Damage

Based on the logic that the Nakdong River is lacking water, it was planned to install eight dammed pools for irrigation in the Nakdong River to secure water. However, the construction of dammed pools for irrigation in rivers slows the flow of water and deteriorates the quality of the water, so that the water obtained is likely to become a huge rotten "water mass". In addition, there is no precedent in the world where water is secured by installing dammed pools for irrigation on the main stream. [20]

The project had two major detrimental impacts on the four major rivers that were improved as part of this project. As a result of substantially slowing the flow rate in rivers and changing flow regimes generally, cyanobacteria, also known as "blue-green algae," blooms have occurred annually every year since the project was declared complete. While algal blooms were not uncommon prior to the installation of the dams, weirs, and river dredging, the extent and duration of these blooms has greatly increased. Additionally, dredging the rivers had the unintended side effect of altering the typical depths of flow for the major rivers that were part of the project. This interrupted the natural ecosystem present in those rivers, and caused a shift in fish species from those that preferred shallow to medium depth flow to fish that thrive in deep water. [21]

Increased risk of flooding

Dredging was feared to increase water flow velocity and erosion in upper streams and flooding in their lower reaches. A collapsed bridge in eastern Korea has been blamed on dredging. [22]

The Sangju Weir on the Nakdong River is under the danger of collapsing despite it had been completed. [23]

The river bed around the Changnyeong Haman weir has been experiencing depressions that could harm the structure of the weir. [24]

Other claims were that the areas of high risk of flood and drought damage are located mainly in Gangwon Province and other eastern highlands, [25] however most of the project's operations were conducted in other provinces (Gyunggi, Gyungsang, Junra and Choongchung) and lowlands. [26]

Separation of the people from nature

Other protests were that the project would remove citizens from the natural wetland vegetation of the river systems and their traditional recreational usage, by deepening the rivers to beyond safe wading depth and replacing native river flora with garden flowers and oak trees. Thus, this "Disneyfication" of the rivers meant less unplanned recreation and more reliance on business-oriented recreation, such as cruise boats.

The birthplace of the organic farming movement in Korea was destroyed, despite the farmers winning court case against the government. With plans to turn the land into a riverside 'amusement park,' the farmers were evicted. Eventually, a group of Paldang farmers, academics, and activists won a second long-fought court battle to use the grounds as an organic farming and ecology education center, the only such successful case on record against the South Korean administrative branch regarding this project. [27] [28]

Fluvial geomorphologist, Matt Kondolf of University of California, Berkeley, criticized this project as an "obsolete" way of restoring rivers. [29]

River expert, Hans Bernhart of Karlsruhe Institute of Technology, criticized the Four Major Rivers Project for the wide destruction of natural riverine environment according to his investigation along the Nakdong river. [30] He mentioned the constructed areas around the Nakdong river as "typical constructions for canals" as well as mentioned European examples of restoring rivers that had modified similar to the Four Major Rivers Project. [31]

Dr. Yamamoto Hirodake of the Kyoto University criticized the Four Major Rivers Project as a failed government-sponsored project that discourages both enterprise and environmental purposes akin to the Isahaya Bay Polder. [32]

There are allegations of building extensive golf courses around the project areas, which could harm the original purpose of the project's goal. [33]

South Korean painter, Kang Haeng-weon (강행원), released to the public his three paintings that depict the hope of restoring the developed four rivers back to their natural state. [34]

Fraudulent goals

The amount of water secured by the four major rivers project is 1.30 billion m3, and plans to secure 1.02 billion m3 of water from the Nakdong River by 2012. Although the residual water in the Nakdong River area is already developed, it is not calculated by region. But it can be used in regions where there is not enough water remaining in the region in an appropriate way. Therefore, it is appropriate to calculate the amount of water deficit by area calculated on the assumption that surplus water quantity can be supplied to the adjacent area after calculation of oversize and abundance by 33 areas (33 subwatersheds) of Nakdong River. Therefore, in the Nakdong River area, it is estimated that 0.11 billion m3 of water will remain in 2011 and 201 billion m3 of water will be lacking in 2016. In this situation, the plan to secure 1.02 billion cubic meters of water from the Nakdong River area as a project to restore the four rivers should be fully reviewed. [35]

According to the Long-Term Comprehensive Plan for Water Resources, which is a top-level plan based on the Laws about River established in 2006, 0.11 billion tons of water is left over in the Nakdong River area. This means there is a problem with one of the main goals of the project, the water shortage resolution. [20]

Also cited is the lack of reference to other benefits of storing the water, other than water security. [36]

South Korean Christian pastor and environmentalist, Choi Byeong-seong (최병성), wrote a book The Republic of Korea Is Crumbling (대한민국이 무너지고 있다) that discusses the "purposeless" goals of the project. [37]

Impact on economic growth

In the case of the Four Rivers project, it was considered that it was difficult to give a high score on efficiency and economic growth because it was not clear about job creation and economic inducement effects. Also in terms of equity among the income classes, it was evaluated as a project that excluded the interests of small farmers. It was more concentrated to leisure activities for people who are higher than middle class and the profit structure of large construction companies, rather than the job creation of the ordinary people. [13]

Not Perfectly Finished

There is a suspicion that only 1% of the jobs required to finish the project were new jobs created by the planners, [38] thus casting Lee's insistence that the project would ease recession pressure in Korea as inaccurate. Also, according to government's report, it turned out that the project created 88,400 jobs, far less than they first expected. [39]

Financial risk

The Professors' Group for Opposing the River & Waterway Project (운하반대교수모임) opposes this project by stating that the annual maintenance budget after the constructions would cost very expensive, around one trillion won. [40] [41] Democratic Party politician Kim Jae-gyun (김재균) criticized that the government and other regional political groups illegally extorted 1 billion Korean won for the project. [42] The Korea Water Resources Corporation plans to increase the price of tap water every year to recover a huge loss of financial resources on the project. [43] There has been too much money spending on the opening ceremonies of the four main weirs, promoted by Lee Myung-bak. [44] South Korean philosopher, Do-ol had voiced his opinion in the online talk show Naneun Ggomsuda on October 29, 2011, by saying "The whole land is dug up. Even Yeonsangun didn't harm the land around this level. Does it make sense that collecting every taxpayers' money is to dig up the bottom of rivers? This project is a waste that doesn't create any money nor any national asset." [45] There is a concern that sediments such as sands are recollecting under the rivers, such as Nakdong River. [46] The government has allocated too much of the financial resources into the government-led promotion of the project. [47] The People's Institute of Economical & Social Studies (시민경제사회연구소) has predicted that 4900 billion Korean won would be needed every year to maintain the weirs and surrounding facilities. [48]

Illegal and undemocratic conventions

In spite of numerous environmental and socioeconomic problems, Certain environment agencies has said The Four Major Rivers Project carried out by the Lee Myung-bak government has ignored many legal and democratic procedures that were required for the project. [49] This is due to the fact that President Lee Myung-bak himself has deeper connections and business-friendly attitudes to big private construction businesses. In May 2011, a private contractor of the project, GS Construction, had illegally stopped civilian environmental inspectors. [50]

South Korean conservative legal professor, Lee Sang-don criticized conservative newspapers for censoring the plight and the problems of this projects as well as hinting many problems with the Lee Myung-bak government in his book Silent Revolution. [51]

The Suwon District Court ordered three farmers to pay fine for disrupting against this government-led project on late March 2011 - later the farmers protested. [52]

The Busan High Court declared that the government-led Four Major Rivers Project is illegal on February 10, 2012. [53]

PR issues

The project PR department had conducted field trips for SNU students and had ignored or deflect criticisms from them. [54] President Lee Myung-bak officially mentioned [55] how this project prevented flooding in 2011, however citizens groups centered in Daegu demanded to stop the opening ceremonies of the new river-based facilities and to compensate the flood damages caused by the project. [56]

Political Intentions

The official completion ceremony of the Four Major Rivers Project is later postponed to March 2012 as declared on November 29, 2011, due to "safety reasons"; this is alleged to be the Grand National Party's promotional strategy for the river project right before the 2012 presidential election in order to avoid the anti-KORUS Free Trade Agreement crowds (Democratic Party members, farmers, citizen groups). [57]

Audits

The Audit Office conducted three audits of the Four Major Rivers Project. The following is a summary of the audit report.

1st Audit - January 2011 Myung-bak Lee Government

In the first audit, it was found that the business was progressing smoothly on the whole. There is no particular problem with the controversy that rivers are managed more safely in the flood than in the past and that the legal process has not been implemented during the project process. However, there are some small examples, confirming the results of audit on January 21, 2011, and requested or dispose of 20 items in total, including 29 cases.

The main problems are that the scale of the river repair work can be changed to save the project cost, but it has not been changed, it is necessary to secure additional dimensional stability in some rivers, There was a case in which discrimination occurred and the amount of contract was increased and the stability period was shortened without securing sufficient stability and damages the stability of the dam.

Therefore, the Ministry of Land Development said that 10 items have already been completed for 20 items, 9 items are being implemented, or the action will be completed within 1 to 2 months.

2nd audit - January 2013 Myung-Bak Lee government

Until the completion of major projects of the 4 Rivers Project, the controversy about the stability of main facilities, water pollution, and appropriateness of maintenance method was continuously raised. We have been grateful for the quality and quality management of the main facilities of the 4 Rivers Project, and many problems have begun to be revealed. Inadequate water quality management method, Inadequate dredging management plan, Unsatisfactory management of water quality management plan, Inadequate management and inspection, Inadequate management and inspection, And so on.

3rd Audit - July 2013 Geun-hye Park Government

In June 2012, the Fair Trade Commission announced the results of bidding for the four-river rescue project, but it was delayed arbitrarily, and the Ministry of Land, Infrastructure and Transport refused to accept it. The Ministry of Land, and the Fair Trade Commission conducted audits focusing on 'appropriateness of first turnkey collusion processing and response', 'whether second and third person processing turnkey collusion', 'lowest price bidding absurdity' and so on.

As a result of the investigation, problems such as improper handling of the collusion case by the Fair Trade Commission and provision of a fixed bail in the Ministry of Land were found, and problems such as illegal fixing were also revealed in the second turnkey construction and the construction of the lowest bidder. [58] [59] [60]

4th Audit

On June 13, 2017, The Audit Office decided to conduct a fourth audit.

Related Research Articles

<span class="mw-page-title-main">San Joaquin River</span> Longest river of Central California, United States

The San Joaquin River is the longest river of Central California. The 366-mile (589 km) long river starts in the high Sierra Nevada, and flows through the rich agricultural region of the northern San Joaquin Valley before reaching Suisun Bay, San Francisco Bay, and the Pacific Ocean. An important source of irrigation water as well as a wildlife corridor, the San Joaquin is among the most heavily dammed and diverted of California's rivers.

<span class="mw-page-title-main">Nakdong River</span> Longest river in South Korea

The Nakdong River or Nakdonggang is the longest river in South Korea, which passes through the major cities of Daegu and Busan. It takes its name from its role as the eastern border of the Gaya confederacy during Korea's Three Kingdoms Era.

The Banqiao Reservoir Dam is a dam on the River Ru (汝河), a tributary of the Hong River in Zhumadian City, Henan province, China. The Banqiao dam and Shimantan Reservoir Dam are among 62 dams in Zhumadian that failed catastrophically in 1975 during Typhoon Nina. The dam was subsequently rebuilt.

<span class="mw-page-title-main">Oroville Dam</span> Dam in California

Oroville Dam is an earthfill embankment dam on the Feather River east of the city of Oroville, California, in the Sierra Nevada foothills east of the Sacramento Valley. At 770 feet (235 m) high, it is the tallest dam in the U.S. and serves mainly for water supply, hydroelectricity generation, and flood control. The dam impounds Lake Oroville, the second-largest reservoir in California, capable of storing more than 3.5 million acre-feet (1.1×10^12 US gal; 4.3×109 m3).

The Salt River Project (SRP) encompasses two separate entities: the Salt River Project Agricultural Improvement and Power District, an agency of the state of Arizona that serves as an electrical utility for the Phoenix metropolitan area, and the Salt River Valley Water Users' Association, a utility cooperative that serves as the primary water provider for much of central Arizona. It is one of the primary public utility companies in Arizona.

<span class="mw-page-title-main">Pine Flat Dam</span> Dam in California, U.S.

Pine Flat Dam is a concrete gravity dam on the Kings River in the Central Valley of Fresno County, California United States. Situated about 28 miles (45 km) east of Fresno, the dam is 440 feet (130 m) high and impounds Pine Flat Lake, in the foothills of the Sierra Nevada just outside the boundary of Kings Canyon National Park. The dam's primary purpose is flood control, with irrigation, hydroelectric power generation and recreation secondary in importance.

<span class="mw-page-title-main">Ilısu Dam</span> Dam in Mardin Province, Turkey

The Ilısu Dam is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020.

<span class="mw-page-title-main">Lee Myung-bak</span> President of South Korea from 2008 to 2013

Lee Myung-bak often referred to by his initials MB, is a South Korean businessman and politician who served as the 10th president of South Korea from 2008 to 2013. Before his presidency, he was the CEO of Hyundai Engineering and Construction, and the mayor of Seoul from 2002 to 2006.

<span class="mw-page-title-main">Saemangeum Seawall</span> Worlds longest man-made dyke

The Saemangeum Seawall, on the south-west coast of the Korean peninsula, is the world's longest man-made dyke, measuring 33 kilometres (21 mi). It runs between two headlands, and separates the Yellow Sea and the former Saemangeum estuary.

<span class="mw-page-title-main">Maharana Pratap Sagar</span> Reservoir in India

Maharana Pratap Sagar, also known as Pong Reservoir or Pong Dam Lake is a large reservoir in Fatehpur, Jawali and Dehra tehsil of Kangra district of the state of Himachal Pradesh in India. It was created in 1975, by building the highest earthfill dam in India on the Beas River in the wetland zone of the Siwalik Hills. Named in the honour of Maharana Pratap (1540–1597), the reservoir or the lake is a well-known wildlife sanctuary and one of the 49 international wetland sites declared in India by the Ramsar Convention. The reservoir covers an area of 24,529 hectares, and the wetlands portion is 15,662 hectares.

The Xiaowan Dam is an arch dam on the Lancang (Mekong) River in Nanjian County, Yunnan Province in southwest China. The primary purpose of the dam is hydroelectric power generation and it supports a 4,200 MW power station. Constructed between 2002 and 2010 by Huaneng Power International at a cost of ¥32 billion, it is the world's second highest arch dam at 292 m (958 ft). It is also third highest among dams of all types behind Jinping-I and Nurek and the third largest hydroelectric power station in China.

The Grand Korean Waterway, officially known as the Pan Korea Grand Waterway, was a proposed 540-kilometer-long (340 mi) canal connecting Seoul and Busan, South Korea's two largest cities. The canal would run diagonally across the country connecting the Han River, which flows through Seoul into the Yellow Sea, to the Nakdong River, which flows through Busan into the Korea Strait. The proposed canal would traverse difficult mountainous terrain.

<span class="mw-page-title-main">Shihmen Dam</span> Dam in Taoyuan City, Taiwan

Shihmen Dam is a major rock fill dam across the Dahan River in northern Taoyuan City. It forms the Shihmen Reservoir (石門水庫), Taiwan's third largest reservoir or artificial lake. It provides irrigation in Taoyuan, flood control for the Taipei Basin, and hydroelectricity and domestic water supply for more than three million people in northern Taiwan.

<span class="mw-page-title-main">Shuangjiangkou Dam</span> Dam in Sichuan Province

The Shuangjiangkou Dam, also referred to as Shuang Jiang Kou, is an embankment dam currently being constructed in a gorge on the Dadu River in Sichuan Province, China. When completed, the 312 m-tall (1,024 ft) dam will be the tallest dam in the world. Preliminary construction began in 2008 and the entire project was expected to be complete in 2018. By April 2011, over 200,000,000 m3 (261,590,124 cu yd) of material had been excavated from the construction site. In March 2013, China's Ministry of Environmental Protection approved construction on the dam's superstructure and associated facilities. The government acknowledged that the dam would have negative impacts on the environment but that developers were working to mitigate them. The dam is being built by the Guodian Group at a cost of US$4.02 billion. The entire construction period is expected to last 10 years. All turbines are expected to be commissioned by 2023.

The Jinping-I Dam also known as the Jinping-I Hydropower Station or Jinping 1st Cascade, is a tall arch dam on the Jinping Bend of the Yalong River in Liangshan, Sichuan, China. Construction on the project began in 2005 and was completed in 2014. Its power station has a 3,600 MW capacity to produce between 16 and 18 TW·h annually. Supplying the power station is a reservoir created by the 305-meter-tall arch dam, the tallest in the world. The project's objective is to supply energy for expanding industrialization and urbanization, improve flood protection, and prevent erosion.

<span class="mw-page-title-main">Imha Dam</span> Dam in Andong

The Imha Dam is an embankment dam on the Banbyeoncheon River, a tributary of the Nakdong River, 14 km (9 mi) east of Andong in Gyeongsangbuk-do province, South Korea. The purpose of the dam is flood control, water supply and hydroelectric power generation. Construction on the dam began in 1987 and it was complete in 1991. The 73 m (240 ft) tall rock-fill, central earth-core dam creates a reservoir with a capacity of 595,000,000 m3 (482,374 acre⋅ft) and supplies a 50 MW power station with water. It supplies water for both municipal and industrial uses to Gumi, Dagu, Masan, Changwon, Jinhae, Ulsan, and Busan.

<span class="mw-page-title-main">Andong Dam</span> Dam in Andong

The Andong Dam is an embankment dam on the Nakdong River, 4 km (2 mi) east of Andong in Gyeongsangbuk-do province, South Korea.

Mohmand Dam is an under construction multi-purpose concrete-faced rock-filled dam located on the Swat River approximately 37 km north of Peshawar and 5 km upstream of Munda Headworks in Mohmand District, Khyber Pakhtunkhwa, Pakistan.

Yeongju Dam is a multi-purpose dam located at the bend of Yonghyeol-ri, Pyeongeun-myeon, Yeongju-si, South Korea. The capacity and height of the dam are 106.4 million cubic meters and 55.5 meters. The total investment for the project is KRW 1.1 trillion.

South Korea has the highest level of environmental pollution among OECD countries. With a population density of 492 people per square kilometer, it ranks third in the world, with more than half of the population living in the Seoul metropolitan area, which accounts for 11.8% of the land area. Therefore, since the population density of the metropolitan area is 4,169, the environmental pollution problem has a characteristic proportional to the population, so it is natural that the environmental pollution level is high. In addition, it is calculated that urban land will take 3,838 km over the next 20 years, and 65 times the area of Yeouido will be developed as a residential or industrial complex every year. Accordingly, the forest area is decreasing by 78 km, and the tidal flat by 36 km every year, indicating how serious the environmental damage in Korea is.

References

  1. 1 2 OECD (2012). OECD Urban Policy Reviews OECD Urban Policy Reviews, Korea 2012. Paris: OECD Publishing. p. 146. ISBN   9789264174146.
  2. 4대강 살리기 사업-총론편(국토해양부, 2012) p.181
  3. 4대강 살리기 사업-총론편(국토해양부, 2012) pp.235~236
  4. Kwon (권), Min-cheol (민철) (2011-10-28). 4대강 사업 완료를 중국이 환영하는 까닭은?. No Cut News (in Korean). Retrieved 2011-11-19.
  5. Kwon (권), Min-cheol (민철) (2011-11-03). 세계3강 된다더니…MB표 자전거산업 일장춘몽 되나?. No Cut News (in Korean). Retrieved 2011-11-19.
  6. Chellany, Brahma (2013). Water: Asia's New Battleground. Washington, D.C.: Georgetown University Press. p. 234. ISBN   9781626160125.
  7. 펄펄 끓는 '대운하 논쟁' 2008-12-20 Maeil
  8. 1 2 "Wetland Globes shine spotlight on world's most vulnerable habitats". worldwetnet.org/. 7 July 2012. Archived from the original (doc) on 12 July 2012. Retrieved 16 July 2012.
  9. "World Wetland Network Wetland Globes : 4 Major Rivers Project, Republic of Korea" (PDF). worldwetnet.org/. Archived from the original (PDF) on 11 December 2013. Retrieved 16 July 2012.
  10. Dennis Normile. 2010. Restoration or Devastation. Science 1568-1570, March 26, 2010.
  11. Ministry of Land, Transport and Maritime Affairs. 2009. Masterplan for the Four Major Rivers Project.(in Korean) July 2009.
  12. Ministry of Land, Transport and Maritime Affairs. 2010. Plan for Constructing Senery along the Geum River. August 2010.(in Korean)
  13. 1 2 3 Kim(김), Chang-soo(창수) (2013). 4대강 살리기 사업의 지속가능성 평가. The Korean Journal of Local Government Studies, Vol.17 No.1
  14. Yoon (윤), Seong-hyo (성효) (2011-06-19). 15년 잘 먹던 지하수, 4대강사업 탓에 구정물됐어요. OhmyNews (in Korean). Retrieved 2011-07-03.
  15. Pyo (표), Ju-yeon (주연) (2011-08-07). 4대강 사업 쓰레기 5808t '방치'. Newsis (in Korean). Retrieved 2011-09-03.
  16. Kwon (권), Yeong-eun (영은) (2011-10-26). 4대강 공사 인근 논길서 석면 검출 후 철거없이 흙으로 감춰. Hankook Ilbo (in Korean). Archived from the original on 2011-10-26. Retrieved 2011-11-19.
  17. Park (박), Dae-han (대한) (2011-10-04). 4대강 사업 석면 자재 사용 논란. Yonhap News Agency (in Korean). Retrieved 2011-12-03.
  18. "South Korea's Four Rivers Project in Paldang". 5 September 2011.
  19. "28 endangered species gone due to 4-river project". The Korea Observer. 21 October 2013. Retrieved 21 October 2013.
  20. 1 2 Lee (이), Won-Young (원영); Park (박), Tae-Hyun (태현) (2009). 대의민주주의 원리로 본 ‘4대강사업’의 문제점. 국토계획, 44(7), 31-42.
  21. Jiwon, Seong (2017). "Water Resource Management in Korea". Oregon State University CEOAS Seminar.
  22. 환경운동연합 - 4대강사업이 더 키운 홍수피해. Archived from the original on 2011-07-22. Retrieved 2011-02-16.
  23. Kim (김), Yong-tae (용태) (2011-11-23). 물 새는 낙동강 상주보, 안전진단 없이 '땜질' 처방. Hankook Ilbo (in Korean). Archived from the original on 2011-11-24. Retrieved 2011-11-25.
  24. Kim (김), Seon-gyeong (선경) (2012-03-03). 환경단체 "창녕함안보 상류서도 '세굴'". Yonhap News Agency (in Korean). Retrieved 2012-03-06.
  25. Lee Myung-Bak. 2009. 국민과의 대화(Talk with Peoples) Aired on November 27, 2009, MBC(Korean broadcasting company)
  26. MBC. 착공 한 달 전 기로에 선 4대강 사업. Aired on September 8, 2009.
  27. "Around the World in Five Minutes | Sociecity". sociecity.com. Archived from the original on 2012-08-01.
  28. "Korean Four Rivers Project gets Organic Education". 19 October 2011.
  29. Yoo (유), Jeong-in (정인) (2010-09-28). 4대강 사업 미·유럽선 폐기된 방식… 한국정부에 물어볼 것 많다. The Kyunghyang Sinmun (in Korean). Retrieved 2011-10-28.
  30. Kim (김), Seon-gyeong (선경) (2011-08-15). 낙동강 찾은 獨 하천전문가 "4대강사업 중단해야". Yonhap News Agency (in Korean). Retrieved 2011-09-03.
  31. Kim (김), Seong-man (성만) (2011-11-10). 4대강 사업 성공했다고? 유럽판 4대강은 복원 중. The Hankyoreh Ecological Webzine, Mulbaramsup (in Korean). Retrieved 2011-11-20.
  32. Han (한), Mi-hui (미희) (2011-10-24). 4대강 조사한 외국 학자들 "복원 아닌 파괴". Yonhap News Agency (in Korean). Retrieved 2011-10-30.
  33. Kim (김), yong-tae (용태); Kang Ju-hyeon (강주형) (2011-10-22). 4대강 둔치에 너도나도 "골프장 건설". Hankook Ilbo (in Korean). Archived from the original on 2011-10-22. Retrieved 2011-10-22.
  34. Jeong (정), Sang-yeong (상영) (2011-11-20). 화폭에 아로새긴 독도·4대강의 '절규'. The Hankyoreh (in Korean). Retrieved 2011-11-27.
  35. Park Chang-geun. (2009). 녹색성장 정책과 4 대강 살리기 사업의 문제. 경제와사회, 117-142.
  36. Hong Hung-Pyo. 착공 한 달 전 기로에 선 4대강 사업. Aired on September 8, 2009. MBC.
  37. Lee (이), Bora (보라) (2011-10-20). 4대강 완공, 축제 아니라 애도할 때. Danbi News (in Korean). Retrieved 2011-10-27. 환경운동가 최병성 '대한민국이 무너지고 있다'
  38. Park (박), Yeong-ryul (영률) (2011-06-19). 4대강 공정률 70~80%… 작년 일자리는 목표치 1%대. The Hankyeoreh (in Korean). Retrieved 2011-07-13.
  39. 4대강 살리기 사업-총론편(국토해양부,2012) p.361
  40. "4대강 유지관리 年 1조 든다" 2011-03-28 Kyunghyang
  41. Park (박), Yeong-ryul (영률) (2011-06-15). 완공뒤에도 '돈먹는 4대강'…연 유지비 2400억~1조원. The Hankyeoreh (in Korean). Retrieved 2011-07-03.
  42. Lee (이), Yeong-cheol (영철) (2011-09-20). [2011국감] 4대강사업에 1000억원 불법 집행. Asia Economics (in Korean). Retrieved 2011-10-13.
  43. Choi (최), Jong-hun (종훈) (2011-09-22). 4대강 적자 메우려…수공, 수돗물값 '매년 3%씩' 인상 계획. The Hankyeoreh (in Korean). Retrieved 2011-10-15.
  44. Ryu (류), Ho-seong (호성) (2011-10-22). 공무원ㆍ학생 억지 동원에 TV 생중계까지. Hankook Ilbo (in Korean). Archived from the original on 2011-10-22. Retrieved 2011-10-22.
  45. 김용옥 "연산군도 이렇게 해를 끼치진 않았다". The Hankyoreh (in Korean). 2011-10-30. Retrieved 2011-11-19.
  46. 4대강 낙동강 일부 구간, 한달 만에 퇴적. MBC News (in Korean). 2011-12-10. Archived from the original on 2012-07-10. Retrieved 2011-12-10.
  47. Hong (홍), In-pyo (인표) (2011-04-26). 정부 4대강 홍보비 더 늘렸다. Kyunghyang Shinmun (in Korean). Retrieved 2011-12-17.
  48. Cho (조), Min-jeong (민정) (2012-02-02). "4대강사업 완료 후에도 매년 4천900억 들어". Yonhap News Agency (in Korean). Retrieved 2012-03-14.
  49. Jeung (정), Min Gull (민걸) (2010). "The Four Major Rivers Project: Destruction of East-asian Ecological Axis as an Example of Social Retrogression Derived from Anti-ecological Thought". Hwangyeong Cheolhak (환경철학). 10. Retrieved 2011-09-03.
  50. Park (박), Su-jin (수진) (2011-05-23). "GS건설 '4대강 조사단' 통행 불법적으로 막아". The Hankyeoreh (in Korean). Retrieved 2011-11-01.
  51. Park (박), Tae-gyeon (태견) (2011-06-14). 이상돈 "내 소원은 4대강사업 진상조사". Views&News (in Korean). Retrieved 2011-11-28.
  52. Park (박), Gyeon-man (경만) (2011-04-03). 4대강 농지이전 거부 괘씸죄? 두물머리 농민 3명 '벌금 폭탄'. The Hankyoreh (in Korean). Retrieved 2011-12-04.
  53. Seon (선), Myeong-su (명수); Park Gwan-gyu (박관규) (2012-02-10). 4대강 사업 첫 '위법' 판결…사업 취소는 못해. Pressian (in Korean). Retrieved 2012-02-10.
  54. Jeong (정), Hwan-bo (환보) (2010-11-09). 대학생 MT까지 '4대강 홍보' 이용. Kyunghyang Shinmun (in Korean). Retrieved 2011-05-15.
  55. Lee Myung-Bak. 2011. 제71차 라디오·인터넷 연설(71st radio·internet speech) Aired on October 8
  56. Choi (최), Seul-gi (슬기) (2011-10-17). 4대강 개방행사 중단, 홍수 피해부터 보상을. Kyunghyang Shinmun (in Korean). Retrieved 2011-10-17.
  57. Jeon (전), Jun-ho (준호); Park Gwan-gyu (박관규) (2011-11-30). 4대강 사업 준공 늦춘다. Hankook Ilbo (in Korean). Archived from the original on 2011-12-03. Retrieved 2011-12-08.
  58. 통합검색 | 기타.
  59. Korean Audit Office (2013-7-10) 보도자료(4대강 담합) (written by Korean) Retrieved 2017-11-29
  60. Korean Audit Office (2013-1-17) 보도자료(4대강 살리기) (written by Korean) Retrieved 2017-11-29