Goodsprings Waste Heat Recovery Station

Last updated

Goodsprings Waste Heat Recovery Station is a 7.5MW heat recovery system located in Goodsprings, Nevada. The plant uses the waste heat generated by the Goodsprings Compressor Station on the Kern River Pipeline to generate electricity. The plant is owned and operated by NV Energy and is the first renewable energy plant owned by the company. [1] [2] [3]

The plant which cost $22 million was constructed by Ormat Technologies construction began in March 2010 and began operations in November. [1] [2] [4] [5] [6]

Notes

  1. 1 2 "Goodsprings Waste Heat Recovery Plant" (PDF). Nevada Power. Retrieved November 3, 2012.
  2. 1 2 "Waste Heat Recovery Gains Attention in the US" (PDF). January 12, 2011. Retrieved November 3, 2012.
  3. "Thermal Energy Recovery Project enough to Supply 4500 Homes". Solar Thermal Magazine. Archived from the original on October 30, 2012. Retrieved November 3, 2012.
  4. "Waste Heat Recovered at Goodsprings". RenewableEnergyWorld.com. November 30, 2010. Retrieved November 4, 2012.
  5. Jennifer Robison (September 5, 2010). "NV Energy plant repurposes heat from natural-gas compression to yield energy". Las Vegas Review-Journal . Retrieved November 4, 2012.
  6. Jennifer Robison (November 19, 2010). "NV Energy dedicates first company-owned renewable project". Las Vegas Review-Journal. Retrieved November 4, 2012.

Coordinates: 35°48′36″N115°24′45″W / 35.81000°N 115.41250°W / 35.81000; -115.41250


Related Research Articles

Goodsprings, Nevada Unincorporated community in Nevada, United States

Goodsprings is an unincorporated community in Clark County, Nevada, United States. The population was 229 at the 2010 census.

Solar Energy Generating Systems

Solar Energy Generating Systems (SEGS) is a concentrated solar power plant in California, United States. With the combined capacity from three separate locations at 354 megawatt (MW), it was once the world's second largest solar thermal energy generating facility, after the commissioning of the even larger Ivanpah facility in 2014. It consisted of nine solar power plants in California's Mojave Desert, where insolation is among the best available in the United States.

NV Energy Public utility in the United States

NV Energy is a public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno–Sparks metropolitan area of northern Nevada. Based in Las Vegas, Nevada, it serves about 1.3 million customers and over 40 million tourists annually.

Kern River Pipeline

Kern River Pipeline is a 1,679-mile (2,702 km) long natural gas pipeline line extending from southwestern Wyoming to its terminus near Bakersfield, California. The pipeline supplies local gas distribution companies, power plants, and heavy industry in Utah, Nevada, and California. It is owned and operated by the Kern River Gas Transmission Company, a subsidiary of Berkshire Hathaway Energy. Its FERC code is 99.

Solar power plants in the Mojave Desert Supplies power to the electricity grid using excellent solar radiation

There are several solar power plants in the Mojave Desert which supply power to the electricity grid. Insolation in the Mojave Desert is among the best available in the United States, and some significant population centers are located in the area. These plants can generally be built in a few years because solar plants are built almost entirely with modular, readily available materials. Solar Energy Generating Systems (SEGS) is the name given to nine solar power plants in the Mojave Desert which were built in the 1980s, the first commercial solar plant. These plants have a combined capacity of 354 megawatts (MW) which made them the largest solar power installation in the world, until Ivanpah Solar Power Facility was finished in 2014.

Switch (company) American data center company

Switch is a company based in Las Vegas, Nevada, that develops and operates the SUPERNAP data center facilities and provides colocation, telecommunications, cloud services, and content ecosystems.

Solar power in Nevada Overview of solar power in the U.S. state of Nevada

Solar power in Nevada is growing due to a Renewable Portfolio Standard which requires 20% renewable energy by 2015, and 5% from solar power. The state has abundant open land areas and some of the best solar potential in the country.

Copper Mountain Solar Facility Solar power plant in Nevada, United States

The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW.

Crescent Dunes Solar Energy Project Solar power station in Nevada, United States

The Crescent Dunes Solar Energy Project is a solar thermal power project with an installed capacity of 110 megawatt (MW) and 1.1 gigawatt-hours of energy storage located near Tonopah, about 190 miles (310 km) northwest of Las Vegas. Crescent Dunes is the first commercial concentrated solar power (CSP) plant with a central receiver tower and advanced molten salt energy storage technology, following the experimental Solar Two.

Chuck Lenzie Generating Station is a 1,102-megawatt (1,478,000 hp) gas-fired power station located 30 miles north of Las Vegas, Nevada near the junction of Interstate 15 and the Great Basin Highway. Power is generated by two D-11 steam turbines powered by four 7FA combustion turbines. The plant is the first owned since a plant built in 1955.

One Nevada is a 235-mile (378 km), 500-kilovolt, 600-megawatt (800,000 hp) power line that runs from Southern to Northern Nevada. 25% of the transmission line is owned by NV Energy which operates and offers the line's capacity under the terms of NV Energy's Open Access Transmission Tariff. Great Basin Transmission South owns 75% of the line. The line runs from the new Robinson Summit Substation in Ely, Nevada to Apex, Nevada connecting with the existing NV Energy Harry Allen Generating Station, and uses tubular guyed-V towers on a single point foundation.

Spring Valley Wind Farm Wind farm in Nevada, USA

Spring Valley Wind Farm is Nevada's first wind farm. The farm is owned and operated by Pattern Energy. The facility is located in Spring Valley, northwest of Great Basin National Park and approximately 30 miles (48 km) east of Ely, Nevada. The 151.8 megawatts (203,600 hp) plant utilizes 66 2.3 megawatts (3,100 hp) wind turbines and occupies 77 acres (31 ha) in the center of Spring Valley, which consists of 7,673 acres (3,105 ha).

Toquop Energy Project is a proposed energy facility located in Lincoln County near Mesquite, Nevada.

The Harry Allen Generating Station is a 628-megawatt (842,000 hp) natural gas fired combined cycle power plant located in Clark County, Nevada about 30 miles north of Las Vegas. Electricity is generated by two GE Frame 7EA combustion turbines, two GE Frame 7FA+e combustion turbines, and a D11 steam turbine.

Edward W. Clark Generating Station is a 1,102 megawatt plant owned by Nevada Power on 000 acres (0 ha) located in the Las Vegas Valley town of Whitney, Nevada, USA. The plant consists of 19 units and first went into service in 1954 as "Nevada Power’s first power plant".

Apex Solar is a 154-acre (62 ha) 20 MWac photovoltaic solar power facility located entirely on private land within the Apex Industrial Park in the City of North Las Vegas, Nevada. The plant is connected to the local grid via an existing 69kV transmission line owned by NV Energy.

The Boulder Solar project is a 150 megawatt (MWAC) photovoltaic power station near Boulder City, Nevada. It was built in two phases by SunPower using its Oasis Power Plant system. The project is co-located with several other large solar power projects in the Eldorado Valley.

The Mountain View Solar Energy Project is a 20 MW solar photovoltaic power plant located in the Mountain View Industrial Park near North Las Vegas in Clark County, Nevada. All power generated by the nearly 84,000 modules is sold to NV Energy via a power purchase agreement. The plant is operated by Mountain View Solar, a subsidiary of NextEra Energy Resources

The Sandstone Solar Energy Project was an up to 1,600 megawatt (MW) solar thermal power project with 16 gigawatt-hours of energy storage, planned just to the east of Tonopah, about 170 miles (270 km) northwest of Las Vegas. The project was about up to eight 200 MW solar towers with integrated molten salt energy storage technology. The project, developed by SolarReserve and owned by Sandstone Solar Energy, LLC. was anticipated to cost about $5 billion. Planned energy output is 5,600 GW·h per year.