White Pine Energy Station

Last updated
White Pine Energy Station
White Pine Energy Station
CountryUnited States
Location Steptoe Valley, White Pine County, Nevada
Coordinates 39°43′47″N114°46′32″W / 39.729695°N 114.775508°W / 39.729695; -114.775508 Coordinates: 39°43′47″N114°46′32″W / 39.729695°N 114.775508°W / 39.729695; -114.775508
Status Mothballed
Construction beganInitially scheduled for 2006
Construction cost$1 billion to $3 billion (2007 estimate)
Owner(s)White Pine Energy Associates, LLC

The White Pine Energy Station was a proposed coal-fired power plant that was to be built in White Pine County, Nevada. The plant was to be built in the county's Steptoe Valley, and would be located 34 miles north of the city of Ely. White Pine Energy Associates, LLC, a subsidiary of LS Power, announced the project in February 2004, with plans to begin construction in 2006, with the possibility of having it operational in 2010. The 1,590-megawatt project would consist of three units, each producing 530 megawatts.

Contents

The project went through several delays and faced opposition from senator Harry Reid, as well as concerned environmental groups and the National Park Service, which believed that the plant would diminish air quality and affect the wildlife at the nearby Great Basin National Park. Supporters of the project included Nevada governor Jim Gibbons, the Ely Shoshone Tribe, and some Ely city officials. LS Power postponed the project indefinitely in March 2009, due to a declining economy and increasing uncertainty regarding regulations.

History

Announcement and overview

The White Pine Energy Station was announced in February 2004, and was proposed by White Pine Energy Associates, LLC, a privately held subsidiary of LS Power. The company had previously developed nine natural-gas fired power plants. The new project would be a coal-fired power generation station, initially with the ability to produce 500 to 800 megawatts of capacity, with the potential to be expanded to 1,600 megawatts. Construction was scheduled to begin in 2006, with the possibility of the project being operational in 2010. Approximately 600 construction workers were expected to work on the project, and 100 workers would be employed at the station upon its completion. The project would be built at a cost of $600 million to $1 billion. [1] [2]

The project was to be built in White Pine County, Nevada, north of the Ely area. Permits and approval for the project had not yet been obtained at the time of the announcement, as several sites north of Ely were still being considered. The Ely area had been chosen after a statewide search. The company liked Ely for its "progressive attitude," as well as the availability of water for cooling the coal-powered plant. [1] [2] Upon initially being proposed, the project was to use up to 8 billion U.S. gallons (30 million cubic meters) of groundwater each year. [3] The close proximity of transmission lines was also considered beneficial. Also taken into consideration were plans by the city of Ely to own and operate the Nevada Northern Railway, as the plant would need a way to receive low-sulfur coal from Wyoming's Powder River Basin. [1] [2] LS Power ultimately helped the city of Ely to purchase the railroad line by providing a payment. [4]

Development director Lawrence Willick said White Pine County officials were enthusiastic about the power plant, saying, "Their economy has been so dependent on mining and the ups and downs of mining." Willick noted the potential for the plant to be linked to Sierra Pacific Power Company's nearby transmission grid, allowing the plant to serve utilities and cooperatives in northern Nevada and Utah, although discussions had not yet been held with Sierra Pacific Power. [1] [2] [5] Beginning in June 2004, project manager Eric W. Crawford spent five weeks meeting with numerous agencies, people, and politicians to progress the project. [6]

Site location and project permits

Several factors were taken into consideration when choosing a suitable site for the plant. [6] In July 2004, LS Power chose a 1,300-acre (530 ha) site for the plant, [6] located 21 miles north of McGill, Nevada, [7] near Cherry Creek. [6] The chosen site was located 34 miles north of Ely, [8] in Steptoe Valley. [9] A possible alternate site was also chosen for the project. [10] Environmental impact statements (EIS) were underway in August 2004, after LS Power hired CH2M Hill as the main contractor, with EDAW as a subcontractor. [11] The plant was estimated, by the Nevada State Commission on Economic Development, to generate over $100 million in tax revenue during construction and the first six years of its operation. [10]

In December 2004, Crawford said the power plant was on schedule as the company was preparing the EIS and focusing on obtaining right-of-ways from the Bureau of Land Management (BLM). [12] The EIS was still being worked on in March 2005, while LS Power remained focused on the same site despite concerns about air quality being affected by the plant. [13] [7] In April 2005, Crawford said construction could cost up to $2 billion, depending on the size of the project. Construction was to begin in phases beginning in 2006, with the first phase possibly operational by 2010. Up to 1,200 construction workers would be employed on the project, which would ultimately employ between 100 and 130 plant workers. LS Power said it would begin construction only after wholesale customers signed long-term contracts to buy the power generated by the plant. [14]

In May 2005, the Ely City Council unanimously approved a resolution to support the project. [15] The project's construction schedule remained on track as of June 2005, with permits, approvals, and project agreements expected to be obtained the following year. [16] In August 2005, Crawford said state permit applications would be filed within several months, while work on the EIS was also ongoing. [17] In December 2005, LS Power filed for an air permit with the Nevada Department of Environmental Protection, as it was required for the plant. The BLM was expected to release an EIS for the power plant in 2006. [18]

In January 2006, Crawford said the project would proceed despite the recent announcement of another coal plant, the Ely Energy Center, proposed by Sierra Pacific Resources. [19] By May 2006, the White Pine Energy Station was expected to cost $3 billion. [20] That month, LS Power stated that consumers of electrical power in Nevada would save $600 million over a three-year period if Nevada Power Company and its affiliate, Sierra Pacific Power, would purchase power from the White Pine Energy Station rather than building their own coal plant; [21] the two companies rejected LS Power's proposal. [22] In July 2006, LS Power expected to have permits for the plant by early 2007. [23] In October 2006, LS Power announced a joint venture with energy producer Dynegy to combine the two companies. [24] LS Power acquired 40 percent of Dynegy in early 2007. [25]

Environmental concerns

In March 2007, the United States Environmental Protection Agency (EPA) stated that LS Power should provide additional documentation about technology the company planned to use to reduce sulfur dioxide emissions. The EPA also requested further analysis of the proposed plant's effect on visibility. By April 2007, analysts believed that only one coal plant would be built in the county, with the Ely Energy Center being considered as more likely to proceed. [22]

By May 2007, after receiving public comments on the project, LS Power had reduced the amount of water the proposed plant would use, from 25,000 acre-feet to 5,000 acre-feet. The reduction was made possible with the utilization of a hybrid cooling system. [3] That month, in response to LS Power's application for an air quality permit, the National Park Service warned state environmental officials that the power plant would hamper views and kill trout at the nearby Great Basin National Park, located 60 miles southeast of the proposed plant. The National Park Service stated that LS Power should "assume a burden of protecting the resources in that park from the effects of its operations. That may mean 'going the extra mile' to employ advanced ... pollution control technology. If (the builder) is not willing to do so, it should consider an alternate location." Crawford said, "This will be one of the cleanest coal plants in the country. The community is very supportive and actually desires a project like this in (the) region." [26] [27]

One of the National Park Service's primary concerns was LS Power's intention to use dry scrubbers at the plant to reduce sulfur dioxide pollution rather than wet scrubbers, which are preferred by the park service. Crawford said dry scrubbers were more advantageous. [28] Another concern was that acid rain could destroy the park's limestone caves. [26] Crawford hoped for construction to begin in 2008, after the regulatory process was expected to be completed. [28] By that time, the plant was to consist of three units, each one producing 530 megawatts. [26] In June 2007, the EPA wrote to the BLM that its draft EIS for the proposed project was lacking information that would help the EPA fully determine the impacts that the plant would have on the nearby area. [29]

In July 2007, senator Harry Reid said he would fight the development of the two coal projects. Ely city officials expressed disappointment with Reid's position. [30] [31] Nevada governor Jim Gibbons, a supporter of the two coal plants, reaffirmed his support for the projects after Reid's comment. [32] At the end of the month, seven groups submitted a petition to the Nevada Environmental Commission requesting that permits for the two coal plants be delayed until the commission enacted new limits on the amount of pollution allowed by such plants. [33] A hearing on the matter was set for September 7, 2007. [34] In August 2007, the BLM was revising the project's EIS. At the time, Crawford said the project did not yet have a customer to purchase the power that would be generated by the 1,590-megawatt plant, which would provide enough power for nearly 1.2 million households. Crawford said the power would be sold to "investor-owned utilities, rural electric cooperatives and municipal electric utilities." [35]

In September 2007, Dynegy was among five companies that received subpoenas from New York Attorney General Andrew Cuomo, who stated that Dynegy failed to disclose risks involved in the development of coal-fired plants, including the White Pine Energy Station. [25] By November 2007, construction costs for a scaled-down version of the plant had increased from an estimated $600 million to more than $1 billion, while the facility in its fully developed form could cost over $3 billion. [36]

In December 2007, LS Power was awaiting final approval of a draft air permit, which was delayed while the EPA reviewed concerns from an environmental group about the project threatening endangered species. EPA spokesman Dante Pistone said, "It involves a question about the impact (of additional carbon dioxide) on coral in the Gulf of Mexico." [37] [8] In January 2008, the Ely Shoshone Tribe announced support for both coal plants, considering them to be an economic necessity. [38] In February 2008, LS Power offered to compensate White Pine County for the amount of water it would use for the plant. [39]

In May 2008, the National Parks Conservation Association stated that the two coal plants would cause Great Basin National Park to suffer from acid rain pollution over time, ultimately harming the park's plants, fish, and other wildlife. The association also stated that the coal plants would affect air quality at the nearby Zion National Park in Utah. [40]

Further developments and postponement

In August 2008, the BLM approved LS Power to build a transmission line that would connect electrical grids located in northern and southern Nevada. The transmission line would carry power from the White Pine Energy Station to Las Vegas, although LS Power planned to build the transmission line regardless of whether the coal plant got built. [41]

The BLM's final EIS, originally expected to be released in August 2008, [42] was instead released that October. LS Power had yet to receive a final air permit, as the EPA was busy determining whether the plant complied with the Endangered Species Act. LS Power stated that construction of the first 720-megawatt phase of the project could begin in late 2009, as long as the company received the air permit and other necessary government approvals. [43] [44] As of November 2008, LS Power was awaiting a record of decision from the BLM and a final permit from the Nevada Division of Environmental Protection. [45] Later that month, Reid requested that Gibbons "join with me in putting Nevada quickly on a cleaner plat toward a renewable energy and efficiency driven economy and safer future." [46]

On December 17, 2008, Dynegy denied that the White Pine Energy Station was in jeopardy after an earlier report stated that the company was reevaluating its development of new power plants. [47] On December 22, 2008, the BLM approved the project to be built on the land. [48] [49] However, Mark Milburn, director of project development at LS Power, expected the decision to be appealed by environmental groups. Jon Summers, spokesman for Reid, said, "LS Power would be wiser and more helpful to its own investors to withdraw the proposal to build an enormous coal plant to import millions of tons of coal, pollute Nevada's skies and sell its power to other states, and instead focus on developing clean renewable power in our state as rapidly as possible." [48]

On January 2, 2009, Dynegy and LS Power announced the end of their partnership in developing the White Pine Energy Station, as well as other new projects, including the proposed transmission line, known as the Southwest Intertie Project. LS Power planned to continue both projects, of which they would have full ownership and development rights. Milburn expected the project to receive a final air permit early in the year, as well as approval from the Public Utilities Commission by April 2009. [50] [51] [52] On January 21, 2009, environmental groups filed an appeal of the BLM's approval of the project. [53] [54] On February 27, 2009, after the Ely Energy Center was indefinitely delayed, Milburn said the White Pine Energy Station was "moving full speed ahead", stating, "We're at the final steps." [55]

On March 5, 2009, LS Power announced that it was indefinitely postponing construction on the White Pine Energy Station due to a declining economy and increasing uncertainty regarding regulations. [56] [57] [58] Reaction from local residents to the postponement was mixed. [59] A July 2009 report from the Government Accountability Office confirmed that air quality and visibility at Great Basin National Park would be affected if either of the coal plants were built. [60]

Related Research Articles

<span class="mw-page-title-main">Dynegy</span> Electricity company based in Houston, Texas

Dynegy Inc. is an electric company based in Houston, Texas, in the United States. It owns and operates a number of power stations in the U.S., all of which are natural gas-fueled or coal-fueled. Dynegy was acquired by Vistra Corp on April 9, 2018. The company is located at 601 Travis Street in Downtown Houston. The company was founded in 1984 as Natural Gas Clearinghouse. It was originally an energy brokerage, buying and selling natural gas supplies. It changed its name to NGC Corporation in 1995 after entering the electrical power generation business.

<span class="mw-page-title-main">NV Energy</span> Public utility in the United States

NV Energy is a public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno–Sparks metropolitan area of northern Nevada. Based in Las Vegas, Nevada, it serves about 1.3 million customers and over 40 million tourists annually.

<span class="mw-page-title-main">Moss Landing Power Plant</span> Natural gas-fired power station in Moss Landing, California

The Moss Landing Power Plant is a natural gas powered electricity generation plant located in Moss Landing, California, United States, at the midpoint of Monterey Bay. Its large stacks are landmarks, visible throughout the Monterey Bay Area. The plant is owned and operated by Houston-based Dynegy and currently has a generation capacity of 1020 MW (net) from its two combined cycle generation units. It was once the largest power plant in the state of California, with a generation capacity of 2560 MW, before its two large supercritical steam units were retired in 2016.

<span class="mw-page-title-main">William H. Zimmer Power Station</span>

The William H. Zimmer Power Station, located near Moscow, Ohio, was a 1.35-gigawatt coal power plant. Planned by Cincinnati Gas and Electric (CG&E), with Columbus & Southern Ohio Electric and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Today, the plant is owned and operated by Vistra Corp.

<span class="mw-page-title-main">Coyote Springs, Nevada</span> Unincorporated community located in the State of Nevada, United States of America

Coyote Springs, Nevada, is a master-planned community being developed in Lincoln County and Clark County, Nevada. The community was initially planned by developer and attorney-lobbyist Harvey Whittemore and Pardee Homes. Thomas Seeno and Albert Seeno, Jr. became the sole owners of Coyote Springs following Whittemore's resignation from the Wingfield Nevada Holding Group amidst legal troubles. No homes had been built as of June 2018.

<i>City</i> (artwork) Land art sculpture in Nevada, U.S.

City is a land art sculpture by Michael Heizer. Located in Garden Valley, a desert valley in rural Lincoln County in the U.S. state of Nevada. Spanning more than a mile in length, it is the largest contemporary artwork ever built. The work was begun in 1972, taking 50 years to complete, and cost an estimated total of $40 million. City is maintained by the Triple Aught Foundation and opened on September 2, 2022, to limited, reservation-only viewing by a maximum of six visitors per day.

<span class="mw-page-title-main">Steptoe Valley</span>

The Steptoe Valley is a long basin located in White Pine County, in northeastern Nevada in the western United States. From the historic community of Currie, the valley runs south for approximately 100 miles (160 km). To the west are the high Egan Range and the Cherry Creek Range, while to the east is the even higher Schell Creek Range. U.S. Route 93 passes through much of the northern section of the valley, past the historic mining town of Cherry Creek and the communities of McGill and Ely, before crossing the Schell Creek Range at Connors Pass. Also found in this valley are the Ward Charcoal Ovens State Historic Park, the Steptoe Valley Wildlife Management Area, and Cave Lake State Park. At Egan Canyon and Schellbourne Pass, the Overland Stage Line and the subsequent Pony Express and Transcontinental Telegraph made their way through the mountains of central Nevada in the 1860s.

<span class="mw-page-title-main">Mark Amodei</span> U.S. Representative from Nevada

Mark Eugene Amodei is an American lawyer and politician serving as the U.S. representative for Nevada's 2nd congressional district since 2011. The only Republican in Nevada's congressional delegation since 2019, Amodei served in the Nevada Assembly from 1997 to 1999 and in the Nevada Senate, representing the Capital District, from 1999 to 2011.

<span class="mw-page-title-main">Danskammer Generating Station</span>

Danskammer Generating Station is located on the shore of the Hudson River in the Town of Newburgh, New York, United States, 0.5 miles (0.8 km) upstream of the larger oil-fired Roseton Generating Station. Danskammer 'units 1 and 2 burn natural gas as a primary fuel, and oil as a backup fuel, whereas units 3 and 4 are exclusively fired with natural gas.

<span class="mw-page-title-main">Spring Valley Wind Farm</span> Wind farm in Nevada, USA

Spring Valley Wind Farm is Nevada's first wind farm. The farm is owned and operated by Pattern Energy. The facility is located in Spring Valley, northwest of Great Basin National Park and approximately 30 miles (48 km) east of Ely, Nevada. The 151.8 megawatts (203,600 hp) plant utilizes 66 2.3 megawatts (3,100 hp) wind turbines and occupies 77 acres (31 ha) in the center of Spring Valley, which consists of 7,673 acres (3,105 ha).

Toquop Energy Project is a proposed energy facility located in Lincoln County near Mesquite, Nevada.

The Thacker Pass Lithium Mine is a proposed lithium clay mining development project in Humboldt County, Nevada which is the largest known lithium deposit in the US, and one of the largest in the world. There has been significant exploration of Thacker Pass since 2007, and Record of Decision approving development of the mine was announced in January, 2021. The project site would cover 18,000 acres (7,300 ha), with less than 6,000 acres (2,400 ha) of that being mined, on a site 21 miles (34 km) west-northwest of Orovada, Nevada within the McDermitt Caldera. The mine is proposed by Lithium Nevada, LLC - a wholly owned subsidiary of Lithium Americas Corp, whose largest shareholder is the world's largest lithium mining company, Chinese Ganfeng Lithium. At full capacity it would produce 66,000 tons annually, equivalent to 25% of the current (2021) demand for lithium globally, which is expected to triple over the next five years. Development of the mine is driven by increasing demand for lithium used in electric vehicle batteries and grid storage of intermittently generated electricity from sources such as solar power or wind power.

The 2014 Bundy standoff was an armed confrontation between supporters of cattle rancher Cliven Bundy and law enforcement following a 21-year legal dispute in which the United States Bureau of Land Management (BLM) obtained court orders directing Bundy to pay over $1 million in withheld grazing fees for Bundy's use of federally owned land adjacent to Bundy's ranch in southeastern Nevada.

The Chokecherry and Sierra Madre Wind Energy Project is large-scale wind farm located near Rawlins, Wyoming, currently under construction. If completed as scheduled in 2026, it is expected to become the largest wind farm in the United States and one of the largest in the world. Located largely on federal lands, the project is being built in conjunction with the TransWest Express transmission line to supply power to the California market. Originally slated for completion in 2020, the goal was extended to 2026 in 2019 amid permitting, environmental, and construction delays.

<span class="mw-page-title-main">Anthem, Henderson</span> Place in Nevada, United States

Anthem is a master-planned community in Henderson, Nevada, part of the Las Vegas Valley. It was developed by Del Webb Corporation, and opened in 1998. As of 2011, it had one of the highest average household incomes by ZIP code in the Las Vegas Valley, with an average household income of $131,445.

<span class="mw-page-title-main">Blue Diamond Hill</span>

Blue Diamond Hill is a 4,931-foot (1,503 m) peak that borders Red Rock Canyon in Nevada, west of Las Vegas. The Blue Diamond Mine is located on the hill, and the small community of Blue Diamond, Nevada is located nearby. Several housing projects have been proposed for the hill since 2002.

The TransWest Express Transmission Line Project (TWE) is a planned bipolar HVDC transmission line between Rawlins, Wyoming and Marketplace substation near Las Vegas.

The Ely Energy Center was a proposed coal-fired power plant that was to be built in Steptoe Valley, north of the city of Ely and located in White Pine County, Nevada. The plant was proposed by Nevada Power Company and Sierra Pacific Resources in January 2006. Construction was to begin on a 750-megawatt power unit in 2007, with completion by 2011. A second 750-megawatt unit was to be built within a few years after the first one, with a total cost of $3.8 billion. The companies also planned to ultimately add two 500-megawatt coal gasification plants to the project as soon as such technology became commercially viable. The total cost, upon full completion, would amount to $5 billion. The Ely Energy Center would have been the largest power plant in Nevada, and the state's largest energy project since the construction of Hoover Dam.

The Moapa Southern Paiute Solar Project is a 250 megawatt (MWAC) photovoltaic power plant located in Clark County, Nevada on the Moapa River lands of the Southern Paiute people. The project was commissioned in March 2017 and was constructed by First Solar and its sub-contractors in close consultation with the Moapa Band of Paiutes and federal agencies. It is the first utility-scale solar project to be located on North American tribal lands, and is anticipated to evolve as a model for similar future economic and environmental partnerships.

References

  1. 1 2 3 4 "Power plant to be built here" . The Ely Times. February 14, 2004. Retrieved September 21, 2017 via NewsLibrary.
  2. 1 2 3 4 Edwards, John G. (February 17, 2004). "Ely area tapped as site to develop electric power plant: Project would cost between $600 million and $1 billion and employ 100 workers". Las Vegas Review-Journal . Archived from the original on March 6, 2004.
  3. 1 2 "Mostly good, some bad in LS Power draft EIS" . The Ely Times. May 16, 2007. Retrieved September 21, 2017 via NewsLibrary.
  4. "LS Power helps Ely pay off $750,000 to LADWP" . The Ely Times. March 16, 2007. Retrieved September 21, 2017 via NewsLibrary.
  5. "Daily business briefs for February 17, 2004". Las Vegas Sun . February 17, 2004.
  6. 1 2 3 4 "Location set for new LLC power plant" . The Ely Times. July 23, 2004. Retrieved September 21, 2017 via NewsLibrary.
  7. 1 2 "LS Power still focused on project site near McGill" . The Ely Times. April 1, 2005. Retrieved September 21, 2017 via NewsLibrary.
  8. 1 2 "Enviros say EEC [sic] threatens Gulf coral" . The Ely Times. January 2, 2008. Retrieved September 21, 2017 via NewsLibrary.
  9. "Power plant joins chamber" . The Ely Times. July 23, 2004. Retrieved September 21, 2017 via NewsLibrary.
  10. 1 2 "WPEA Power plant will create $100 million in tax revenue" . The Ely Times. October 1, 2004. Retrieved September 21, 2017 via NewsLibrary.
  11. "EIS underway for proposed power plant" . The Ely Times. August 13, 2004. Retrieved September 21, 2017 via NewsLibrary.
  12. "LS Power tells county commission EIS on track" . The Ely Times. December 10, 2004. Retrieved September 21, 2017 via NewsLibrary.
  13. "Air quality concerns may re-site power plant" . The Ely Times. March 25, 2005. Retrieved September 21, 2017 via NewsLibrary.
  14. Edwards, John G. (April 15, 2005). "Power companies could finally link". Las Vegas Review-Journal. Archived from the original on September 11, 2005.
  15. "City council OKs resolution in support of power plant" . The Ely Times. June 3, 2005. Retrieved September 21, 2017 via NewsLibrary.
  16. "Proposed power plant permits to be completed next year" . The Ely Times. June 3, 2005. Retrieved September 21, 2017 via NewsLibrary.
  17. "White Pine Energy Associates to file state permits soon" . The Ely Times. August 26, 2005. Retrieved September 21, 2017 via NewsLibrary.
  18. Edwards, John G. (January 15, 2006). "What price cheap power? Company touts planned plant's cost savings, but advocate wonders". Las Vegas Review-Journal. Archived from the original on January 17, 2006.
  19. "LS Power project moving forward" . The Ely Times. January 20, 2006. Retrieved September 21, 2017 via NewsLibrary.
  20. "No deal on White Pine power plant" . Las Vegas Business Press. May 8, 2006. Retrieved September 21, 2017 via NewsLibrary. LS has already undertaken two years' development work on the $3 billion, 1,600-megawatt, coal-fired energy plant […]
  21. Edwards, John G. (May 5, 2006). "LS Power says its plant will save utilities cash" . Las Vegas Review-Journal. Retrieved September 21, 2017 via NewsLibrary.
  22. 1 2 Edwards, John G. (April 1, 2007). "Eastern Nevada site of power play: Battle brewing in Ely to build coal-fired plant -- or perhaps two". Las Vegas Review-Journal. Archived from the original on October 11, 2008.
  23. "LS Power expects permits by early 2007" . The Ely Times. July 28, 2006. Retrieved September 21, 2017 via NewsLibrary.
  24. "LS Power announces joint venture with Dynegy" . The Ely Times. October 6, 2006. Retrieved September 21, 2017 via NewsLibrary.
  25. 1 2 "Official: Plants' risks not told". Las Vegas Review-Journal. September 18, 2007. Retrieved September 21, 2017.
  26. 1 2 3 Sweet, Phoebe (May 19, 2007). "Pollution-free park plea". Las Vegas Sun.
  27. "Park slams LS Power in NDEP letter" . The Ely Times. May 23, 2007. Retrieved September 21, 2017 via NewsLibrary.
  28. 1 2 Edwards, John G. (June 5, 2007). "Park Service opposes LS Power project". Las Vegas Review-Journal.
  29. "EPA letter questions BLM draft WPEC EIS" . The Ely Times. August 17, 2007. Retrieved September 21, 2017 via NewsLibrary.
  30. "Ely councilmen react to Harry Reid's comments" . The Ely Times. August 1, 2007. Retrieved September 21, 2017 via NewsLibrary.
  31. "As We See It, Reid forsakes Nevada's interests" . The Ely Times. August 1, 2007. Retrieved September 21, 2017 via NewsLibrary.
  32. "Gov. Gibbons repeats support for WPEC and EEC" . The Ely Times. August 17, 2007. Retrieved September 21, 2017 via NewsLibrary.
  33. Riley, Brendan (July 31, 2007). "Plans for new coal-fired power plants in Nevada challenged". Elko Daily Free Press. Associated Press. Retrieved September 21, 2017.
  34. "Hearing set on power plant challenge". Elko Daily Free Press. Associated Press. August 6, 2007. Retrieved September 21, 2017.
  35. "EPA questions BLM study of proposed state coal plant" . Reno Gazette-Journal. Associated Press. August 10, 2007. Retrieved September 21, 2017 via NewsLibrary.
  36. "LS energy station's costs triple" . The Ely Times. November 28, 2007. Retrieved September 21, 2017 via NewsLibrary.
  37. Edwards, John G. (December 28, 2007). "Coral delays Ely coal project". Las Vegas Review-Journal. Retrieved September 21, 2017.
  38. "Ely Shoshone Tribe supports both coal-fired power plants" . The Ely Times. January 30, 2008. Retrieved September 21, 2017 via NewsLibrary.
  39. "LS Power offers WPC compensation for water" . The Ely Times. February 20, 2008. Retrieved September 21, 2017 via NewsLibrary.
  40. "Group Airs Warning". Las Vegas Review-Journal. May 17, 2008. Retrieved September 21, 2017.
  41. "BLM approves transmission line". Las Vegas Review-Journal. August 8, 2008. Retrieved September 21, 2017.
  42. "WPES EIS due next month" . The Ely Times. July 30, 2008. Retrieved September 21, 2017 via NewsLibrary.
  43. Edwards, John G. (October 4, 2008). "LS Power closer to coal deal". Las Vegas Review-Journal. Retrieved September 21, 2017.
  44. "BLM issues White Pine Energy Station's final EIS" . The Ely Times. October 8, 2008. Retrieved September 21, 2017 via NewsLibrary.
  45. Sweet, Phoebe (November 15, 2008). "Up in smoke: Future of 3 proposed Nevada coal plants in jeopardy". Las Vegas Sun. Retrieved September 21, 2017.
  46. Edwards, John G. (November 25, 2008). "Reid asks Gibbons to reconsider plans for coal-fired power plants". Las Vegas Review-Journal. Retrieved September 21, 2017.
  47. "LS Power denies WPES in jeopardy" . The Ely Times. December 17, 2008. Retrieved September 21, 2017 via NewsLibrary.
  48. 1 2 "Land for coal plant OK'd". Las Vegas Review-Journal. December 23, 2008. Retrieved September 21, 2017.
  49. "BLM issues record of decision on LS Power plant" . The Ely Times. December 24, 2008. Retrieved September 21, 2017 via NewsLibrary.
  50. "Houston company pulls out of coal-powered plant project". Las Vegas Review-Journal. January 3, 2009. Retrieved September 21, 2017.
  51. "Dynegy backs out of WPES, LS Power says project still a go" . The Ely Times. January 7, 2009. Retrieved September 21, 2017 via NewsLibrary.
  52. Sweet, Phoebe (January 12, 2009). "Foes of coal see hope in cancellation of Iowa plant: But developer says it's going ahead with plans for plant near Ely, despite losing partner". Las Vegas Sun. Retrieved September 21, 2017.
  53. "Appeal of WPES' EIS was expected, spokesman says" . The Ely Times. January 28, 2009. Retrieved September 21, 2017 via NewsLibrary.
  54. Tavares, Stephanie (January 30, 2009). "Groups band together to thwart coal-fired power plant". Las Vegas Sun. Retrieved September 21, 2017.
  55. Harding, Adella (February 27, 2009). "Second coal-fired plant still planned near Ely". Elko Daily Free Press. Archived from the original on July 7, 2013.
  56. Manning, Mary (March 5, 2009). "Second coal-fired plant project canceled in Nevada". Las Vegas Sun. Retrieved September 21, 2017.
  57. Robison, Jennifer (March 5, 2009). "Construction of White Pine Energy Station near Ely postponed". Las Vegas Review-Journal. Retrieved September 21, 2017.
  58. "LS Power cancels permit for its WPES" . The Ely Times. March 11, 2009. Retrieved September 21, 2017 via NewsLibrary.
  59. "Reactions vary on LS Power's shift" . The Ely Times. March 11, 2009. Retrieved September 21, 2017 via NewsLibrary.
  60. Manning, Mary (July 27, 2009). "Report: Coal-fired power plants would affect Great Basin National Park". Las Vegas Sun. Retrieved September 21, 2017.