Granite Reliable Wind Farm

Last updated
Granite Reliable Wind Farm
Granite Reliable Wind Farm
CountryUnited States
Location Coos County, New Hampshire
Coordinates 44°47′N71°19′W / 44.783°N 71.317°W / 44.783; -71.317 Coordinates: 44°47′N71°19′W / 44.783°N 71.317°W / 44.783; -71.317
StatusOperational
Construction beganFebruary 2011
Commission date December 2011
Owner(s) Brookfield Renewable
Wind farm
Type Onshore
Power generation
Units operational33
Make and model Vestas: V90-3.0 MW
Nameplate capacity 99 MW

Granite Reliable Wind Farm is a 99-megawatt wind farm, opened in 2011 in Millsfield and Dixville, New Hampshire, in the northeast United States. Owned by Brookfield Renewable, it is the second major wind-power installation in the state of New Hampshire. Most of the electricity generated will be sold to utilities in Vermont, Central Vermont Public Service and Green Mountain Power. [1] Power from the wind turbines is connected through three 34.5 kV lines to a substation and from there through a 115 kV line. [2] The wind farm was constructed by Madison, Wisconsin-based RMT Inc. [3]

Located in Millsfield and Dixville, in Coos County, it has 33 V90-3.0 MW Vestas turbines wind turbines, in four sections, with seven wind turbines on Dixville Peak, eight located on Mount Kelsey, six on Owlhead Mountain, and 12 wind turbines along Fishbrook Ridge. It was originally developed by Noble Energy, and sold to Brookfield.

Related Research Articles

Wind power The conversion of wind energy into a useful form

Wind power or wind energy is the use of wind to provide mechanical power through wind turbines to turn electric generators and traditionally to do other work, like milling or pumping. Wind power is a sustainable, renewable energy source that has a much smaller impact on the environment compared to burning fossil fuels.

Mount Kelsey is a mountain located in the western portion of Millsfield, New Hampshire. The western slopes of the mountain are contained within the township of Erving's Location, New Hampshire. The summit is occupied by part of the Granite Reliable Wind Farm, with road access from the Phillips Brook watershed to the south.

New Hampshire Route 26 is a 30.860-mile-long (49.664 km) state highway located in northern New Hampshire. It runs across the state in a roughly northwest-to-southeast trajectory, stretching from the Vermont border in the west to the Maine border in the east. NH 26 is a multi-state route with both states.

Windy Hill Wind Farm

Windy Hill Wind Farm is a wind power station near Ravenshoe on the Atherton Tablelands, Queensland, Australia. Windy Hill has 20 wind turbines with a generating capacity of 12 MW of electricity, providing enough power for about 3,500 homes. The cost of the project was A$20 million. It was the second wind farm to be constructed in Queensland after the 0.45Mw station on Thursday Island (1997).

Equinox Mountain mountain in United States of America

Equinox Mountain is a mountain in Bennington County, Vermont, United States, in the town of Manchester. The mountain is the highest peak of the Taconic Range, and the highest point of Bennington County. It is one of thirteen peaks in Vermont with a topographic prominence over 2,000 feet (610 m), ranked third behind Mansfield and Killington. Equinox is the second highest peak in southern Vermont, after Stratton Mountain.

Wild Horse Wind Farm

The Wild Horse Wind Farm is a 273-megawatt wind farm that generates energy for Puget Sound Energy that consists of one hundred twenty seven 1.8-megawatt Vestas V80 turbines and twenty two 2.0-megawatt Vestas V80 turbines on a 10,800-acre (4,400 ha) site in Kittitas County, Washington, 17 miles (27 km) east of Ellensburg, Washington. The turbines are placed on the high open Shrub-steppe ridge tops of Whiskey Dick Mountain, which was chosen for its energetic wind resource, remote location, and access to nearby power transmission lines. The towers are 221 feet (67 m) tall, and each blade is 129 feet (39 m) long, with a total rotor diameter of 264 feet (80 m), larger than the wingspan of a Boeing 747. The turbines can begin producing electricity with wind speeds as low as 9 mph (14 km/h) and reach full production at 31 mph (50 km/h). They shut down at sustained wind speeds of 56 mph (90 km/h). The site is also home to one of the largest solar array (500 kW) in Washington.

Cedar Creek Wind Farm Wind farm in Colorado, USA

The Cedar Creek Wind Farm is a 551.3 megawatt (MW) wind farm located about 8 miles east of the town of Grover in north-central Weld County, Colorado. It consists of 397 wind turbines and was constructed in two phases, Cedar Creek I and Cedar Creek II, becoming fully operational in 2010. The electricity is sold to the Public Service Company of Colorado.

Prince Township Wind Farm Wind farm in Ontario

Prince Wind Farm is a large wind farm in northern Ontario. Prince Wind Farm is owned by Brookfield Power Prince Wind LP, a subsidiary of Brookfield Power. It is located north of Sault Ste. Marie, Ontario, mostly within the township of Prince but also extending into Unorganized Algoma, however it is visible from as far away as Pancake Bay Provincial Park. Prince I, 99 MW was completed in September 2006, Prince II, 90 MW, in November 2006. The average capacity factor for the first five full years of operation was 27.2%.

The Gunning Wind Farm project is a wind farm development in the Cullerin Range, north-east of Gunning, in New South Wales. Wind turbines in the farm are visible from the Hume Highway.

Community wind energy

Community wind projects are locally owned by farmers, investors, businesses, schools, utilities, or other public or private entities who utilize wind energy to support and reduce energy costs to the local community. The key feature is that local community members have a significant, direct financial stake in the project beyond land lease payments and tax revenue. Projects may be used for on-site power or to generate wholesale power for sale, usually on a commercial-scale greater than 100 kW.

Lempster Mountain Wind Power Project

Lempster Mountain Wind Power Project is a 24-megawatt wind farm, opened in 2008 in Lempster, New Hampshire in the northeast United States. Owned by Iberdrola, it is the first major wind-power installation in the state of New Hampshire.

Wind power in Maine Electricity from wind in one U.S. state

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity and responsible for 13.85% of in-state electricity production in 2017. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

Wind power in New Hampshire Electricity from wind in one U.S. state

Wind power in New Hampshire began in 1980, with the installation of the world's first wind farm at Crotched Mountain, consisting of 20 30 kW wind turbines, although it closed decades ago. As of 2020, five wind power projects are operating in the state of New Hampshire – Lempster Mountain, which opened in 2008, Granite Reliable Wind Farm, which opened in late 2011, Groton Wind, which opened in 2012, Jericho Mountain, which opened in 2015, and Antrim Wind, which opened in 2020.

Wind power in Vermont Electricity from wind in one U.S. state

In 2016, Wind power in Vermont consisted of 119 megawatts (MW) of operational wind farms, responsible for 15.4% of in-state electricity generation. Together these wind projects were estimated to meet the electrical needs of approximately 56,000 average Vermont households. In 2019, the capacity increased to 149 MW, generating 17.5% of Vermont's electricity in that year.

The Macarthur Wind Farm is a wind farm located in Macarthur, Victoria, Australia, near Hamilton, 260 km west of Melbourne. It is on a 5,500 ha site which has an installed capacity of 420 megawatts (MW). Based on a capacity factor of around 35%, it is estimated that the long-term average generation will be approximately 1,250 GWh per year. The energy produced annually by a wind farm varies year-to-year, and during FY2015 the farm produced 977.9 GWh.

Wind power in Arizona Electricity from wind in one U.S. state

As of 2016, Arizona has 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

Wind turbines on public display

The great majority of wind turbines around the world belong to individuals or corporations who use them to generate electric power or to perform mechanical work. As such, wind turbines are primarily designed to be working devices. However, the large size and height above surroundings of modern industrial wind turbines, combined with their moving rotors, often makes them among the most conspicuous objects in their areas. A few localities have exploited the attention-getting nature of wind turbines by placing them on public display, either with visitor centers on their bases, or with viewing areas farther away. The wind turbines themselves are generally of conventional horizontal-axis, three-bladed design, and generate power to feed electrical grids, but they also serve the unconventional roles of technology demonstration, public relations, and education.

Wind power in Hawaii Electricity from wind in one U.S. state

Wind power in Hawaii has the potential to provide all of the electricity generation in the electricity sector in Hawaii. The 114 commercial wind turbines in the state have a total capacity of 206 MW. In 2015, wind turbines produced 6.4% of Hawaii's electricity. In 2017, sources of renewable power were: In 2012, Hawaii generated 367 million kWh from wind power.

Groton Wind Power Project a 48-megawatt wind farm, also known as Groton Wind Farm was constructed in 2012 in Groton, New Hampshire in the northeast United States. Owned by Iberdrola Renovables, it is the third major wind-power installation in the state of New Hampshire. Power is being sold to NSTAR under a power purchase agreement, and will go to the Boston area.

The Limon Wind Energy Center is a 600.6 megawatt (MW) wind farm in eastern Colorado near the town of Limon. It became the largest wind facility in the state when construction completed in 2014. The electricity is being sold to Xcel Energy under long-term power purchase agreements.

References