Great Revere train wreck of 1871

Last updated

Great Revere train wreck of 1871
Revere station woodcut.jpg
Woodcut of the Revere station, made shortly after the accident, looking towards Boston. The two lines on the right are the double track main line, and the line on the left is the branch to East Boston.
Details
DateAugust 26, 1871
Location Revere, Massachusetts
Country United States
Line Eastern Railroad
Statistics
Deaths29—32 [1]
Injured29 [2]

The Great Revere train wreck of 1871 occurred on the evening of August 26, 1871, when the Eastern Railroad's Portland Express slammed into the rear of a stopped local train at Revere, Massachusetts. [3] [4] [5]

Contents

Background

The accident occurred on a very busy Saturday evening with three large weekend events taking place outside Boston causing heavier than usual traffic on the railroads, especially on the Eastern Railroad's line. Normally, the Eastern ran 152 trains on weekend days, but with two large revival meetings and military muster taking place, the number of trains running to accommodate the extra load of passengers was increased to 192.

The heavy traffic and the Eastern's management's conservative style of not using the telegraph to dispatch trains, led to long delays along the line.

Accident

The following description of the accident is based on that of the official report of the Massachusetts Railroad Commission, [6] with additional detail from additional sources. [7] [8] [9]

Four trains were scheduled to depart from the Boston terminus after 6.30 pm: a Saugus branch line train at 6.30 pm; a second Saugus branch train at 7.00 pm; a Beverly accommodation train (which stopped all stations) at 7.15 pm; and the Portland Express at 8.00 pm. Due to the dislocation of services all four trains departed late: the first Saugus train around 7 pm; the Beverly accommodation at 7.40 pm; the second Saugus train at 7.53 pm and the Express at 8.05 pm. The second Saugus train departed after the Beverly accommodation due to difficulty in getting a train crew.

The single track Saugus branch line left the main line at Everett Junction, just north of the Mystic River. When the first Saugus branch train arrived at Everett Junction, it could not proceed any further as an inbound branch line train was due and there was a specific rule prohibiting an outbound train from entering the branch when an inbound train was due. At this time the inbound branch train had not even departed from the other end of the branch at Lynn. It had written instructions to wait to connect with an extra (special train) coming from the Ashbury Grove revival meeting. The extra, however, was very late as it had earlier broken a coupling between the carriages. The inbound Saugus branch train eventually departed Lynn at 7.30 pm and arrived at Everett Junction at 8.10 pm.

By this time a queue of trains had built up at Everett Junction on the outbound line: the first Saugus branch train; a light locomotive for Salem; the Beverly accommodation; and the second Saugus branch train. Normally blockages at Everett Junction due to an outbound Saugus branch train waiting for an inbound train were avoided by the employee stationed there shunting the outbound train on to the branch or the inbound main line under flag protection. However, the regular employee was sick and his replacement simply left the trains on the main line.

With the arrival of the inbound Saugus branch train, the outbound Saugus branch train could finally clear the main line. This allowed the Beverly accommodation to depart on the main line (the light engine had been coupled to the accommodation). While this was happening, the Portland express arrived at Everett Junction and was stopped behind the second Saugus branch train. Once the second branch train had cleared the main line, the Portland express was allowed to depart.

At this point there was considerable confusion on the part of the Conductor of the Beverly accommodation and the Engineer of the Portland express as to the location and identity of each other's train.

The conductor of the Beverly accommodation had been reluctant to leave Boston so close in advance of the Portland express, but had been reassured by the Superintendent that the engineer of the express would be warned that the Beverly accommodation was running late. The conductor was under the impression that the train behind him in the queue at Everett Junction was the Portland express, and hence believed that the engineer would be well aware that the Beverly accommodation was running immediately in advance of him.

The engineer of the express had, indeed, been verbally warned at Boston by the depot master "to look out for other trains". Upon being stopped at Everett Junction behind the second Saugus branch train, the engineer assumed this was the train he had been warned about and thought the line in front of him was clear.

The two trains, the Beverly accommodation and the Portland express, departed Everett Junction not more than five minutes apart. At Chelsea, the station agent noted that the trains were unusually close together, but failed to warn the engineer of the express as he felt the two train crews would be aware of the location of the other train. On the straight approaching Revere, a passenger on the rear platform of the accommodation could see the headlight of the express behind him, but mist and the poor tail lamps meant that it was not possible for the engineer of the express to see the rear of the Beverly accommodation. Approaching Revere, the attention of the engineer of the express was focused upwards on a signal that would inform him whether the switches were set for the East Boston branch, not along the track.

The two train crews became aware of the other train when they were about 800 yards apart. The Engineer of the express whistled for brakes (neither of the trains was fitted with continuous brakes), reversed his engine, and jumped clear. The warning time was so short, however, that only two brakes on the express could be applied by the train crew. The express had slowed to 10 miles per hour (16 km/h) on impact, but even this low speed was sufficient to cause significant damage to the Beverly accommodation. The express train's engine telescoped about two thirds of its length into the rear passenger car. The impact knocked fittings off the boiler, allowing live steam to fill the remains of the carriage. The carriage then took fire from split kerosene (from the lanterns) and firebox of the locomotive. [10] [11] [12] The official report states that 29 people were killed, all in the rear car, and 57 were injured in the train. Some passengers that were trapped in the splintered rear coaches were burned alive. Bystanders from the station and surviving passengers attempted to rescue trapped victims by tearing parts of the roof off the coaches, but their effort was unsuccessful as fire quickly engulfed the shattered timbers.

Aftermath

After the accident some Bostonians accused the Eastern Railroad of deliberately murdering the passengers.

The railroad was condemned by the public for their conservative management, old fashioned equipment, not having the Westinghouse air brakes on their locomotives and their insistence on using the old time-interval system and not using the telegraph. Several lawsuits were filed against the Eastern and the company almost went bankrupt. This eventually led to the Eastern being merged with its rival, the Boston and Maine Railroad in 1884. [13]

Related Research Articles

<span class="mw-page-title-main">Boston and Maine Railroad</span> Former railroad in New England

The Boston and Maine Railroad was a U.S. Class I railroad in northern New England. Originally chartered in 1835, it became part of what was the Pan Am Railways network in 1983.

<span class="mw-page-title-main">Boston, Revere Beach and Lynn Railroad</span>

The Boston, Revere Beach and Lynn Railroad was a 3 ft narrow-gauge passenger-carrying shortline railroad between East Boston and Lynn, Massachusetts, from 1875 to 1940. Part of the railroad's right of way now forms the outer section of the Massachusetts Bay Transportation Authority's Blue Line rapid transit service.

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Newburyport/Rockport Line</span> Commuter rail service in Massachusetts, US

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.

<span class="mw-page-title-main">Eastern Railroad</span>

The Eastern Railroad was a railroad connecting Boston, Massachusetts to Portland, Maine. Throughout its history, it competed with the Boston and Maine Railroad for service between the two cities, until the Boston & Maine put an end to the competition by leasing the Eastern in December 1884. Much of the railroad's main line in Massachusetts is used by the MBTA's Newburyport/Rockport commuter rail line, and some unused parts of its right-of-way have been converted to rail trails.

<span class="mw-page-title-main">Bellingham Square station</span> Bus rapid transit station in Chelsea, Massachusetts, US

Bellingham Square station is a Massachusetts Bay Transportation Authority (MBTA) Silver Line bus rapid transit (BRT) station located near Bellingham Square slightly north of downtown Chelsea, Massachusetts. The station has two accessible side platforms for buses on the SL3 route. The Boston and Maine Railroad and predecessor Eastern Railroad served Chelsea station at the same location from the mid-1850s to 1958. The MBTA opened Chelsea station on the Newburyport/Rockport Line in 1985. Prior to its 2010 cancellation, the Urban Ring Project planned for a circumferential BRT line with a stop at Mystic Mall. Planning continued for the Chelsea segment; a Silver Line extension to Mystic Mall was announced in 2013. Construction began in 2015, and SL3 service to the renamed Bellingham Square station began on April 21, 2018. Commuter rail service moved to the newly constructed Chelsea station on November 15, 2021.

<span class="mw-page-title-main">River Works station</span> Commuter rail station in Lynn, Massachusetts

River Works station is an MBTA Commuter Rail station on the Newburyport/Rockport Line in West Lynn, Massachusetts. The only private station on the system, it is only open to GE Aviation employees who work at the adjacent River Works plant. The station has minimal facilities – two small sections of platform and several shelters – and is not accessible.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system. The rail station and parking garage temporarily closed on October 1, 2022, pending a reconstruction project, while the busway remained open. Interim platforms nearby opened in December 2023.

<span class="mw-page-title-main">Prides Crossing station</span> Former railway station in Beverly, Massachusetts

Prides Crossing station is a former MBTA Commuter Rail station on the Newburyport/Rockport Line, located in the village of Prides Crossing in Beverly, Massachusetts. It was opened by the Eastern Railroad as a flag stop in the mid-19th century. A stick style wooden station building was constructed around 1880 as wealthy residents built summer homes in the area. The Eastern Railroad was acquired in 1885 by the Boston and Maine Railroad (B&M), which operated commuter service to Prides Crossing until the Massachusetts Bay Transportation Authority (MBTA) took over in the 1970s. Prides Crossing was reduced to peak-hour-only service in 1981. It was temporarily closed in December 2020 because of low ridership and a lack of accessibility, with the closure becoming indefinite in April 2021. The former station building, not used by the railroad since the mid-20th century, is occupied by a private business.

<span class="mw-page-title-main">2008 Massachusetts train collision</span>

On May 28, 2008, shortly before 6 p.m., two westbound MBTA trains collided on the Green Line D branch between Woodland and Waban stations, behind 56 Dorset Road in Newton, Massachusetts. An investigation by the National Transportation Safety Board (NTSB) originally found the cause of the accident to be due to the operator texting while driving, but the NTSB later found that the operator of the rear train, Terrese Edmonds, had not been using her cell phone at the time of the crash, but rather went into an episode of micro-sleep, causing her to lose awareness of her surroundings and miss potential hazards up ahead. The collision killed Edmonds, and numerous others were injured. Fourteen passengers were taken to area hospitals; one was airlifted. This crash, along with another similar accident a year later, led the NTSB to set higher standards and regulations regarding the use of cell phones while operating a train.

<span class="mw-page-title-main">Shepherdsville train wreck</span> Rail accident in 1917

The Shepherdsville train wreck was a fatal rail accident that killed at least 49 people when an express collided with a local train at Shepherdsville, Kentucky on December 20, 1917. It was the deadliest train wreck in Kentucky's history. Blame was chiefly attributed to negligence by the driver and flagman of the local train, though the standard signalling routines were also found to be inadequate.

<span class="mw-page-title-main">1953 Pennsylvania Railroad train wreck</span> Train wreck in Washington, D. C.

The 1953 Pennsylvania Railroad train wreck occurred on January 15, 1953, when a passenger and mail train from Boston to Washington DC failed to brake sufficiently on its approach to Union Station, Washington, jumping the platform and plunging through the floor of the concourse. There were no deaths, but 43 people were injured.

<span class="mw-page-title-main">Saugus Branch Railroad</span>

The Saugus Branch Railroad was an American rail line that operated passenger service from 1853 to 1958. It serviced the Massachusetts communities of Saugus, Malden, Everett, Revere, and Lynn.

<span class="mw-page-title-main">Baker Bridge train wreck</span>

The Baker Bridge train wreck occurred on November 26, 1905, in Lincoln, Massachusetts, when two passenger trains on the Fitchburg line of the Boston and Maine Railroad were involved in a rear-end collision. Seventeen people were killed in the wreck. Engineer Horace W. Lyons was charged with manslaughter; however, a grand jury chose not to indict him.

References

  1. The New York Herald August 30, 1871 page 10 lists 30 fatalities
  2. The New York Herald August 30, 1871 page 10
  3. "Death on the Rail". New York Times. August 27, 1871. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  4. "Frightful Casualty. A Concentration of Horrors. Collision on a Railway Near Boston". The Pittsburgh Commercial. September 2, 1871. p. 1 via Newspapers.com. Open Access logo PLoS transparent.svg
  5. "Railway Slaughter". Chicago Tribune. August 30, 1871. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  6. "Annual report of the Board of Railroad Commissioners. v. 3 (1871)". HathiTrust. hdl:2027/nyp.33433057105367 . Retrieved February 4, 2020.
  7. Bradlee, Francis (1917). The Eastern Railroad. The Essex Institute. pp. 71–78.
  8. Shaw, Robert (1978). A History of Railroad Accidents, Safety Precautions and Operating Practices. Val-Ballou Press Inc. pp. 77–81.
  9. Adams, Charles Francis Jr (1879). Notes on Railroad Accidents. New York: G.P. Putnum's Sons. pp. 125–144.
  10. "Eastern Railroad Revere Train Wreck, 1871". Celebrate Boston.
  11. "Revere, MA Train Collision, Aug 1871". GenDisasters.
  12. "search results containing "Revere OR OR TRAIN OR WRECK"". Library of Congress: Chronicling America.
  13. Holbrook, Stewart H. (April 1957). "The Great Rail Wreck At Revere". American Heritage. Vol. 8, no. 3.

42°24′19.85″N71°0′13.28″W / 42.4055139°N 71.0036889°W / 42.4055139; -71.0036889