Jamshoro Thermal Power Station | |
---|---|
Official name | TPS Jamshoro |
Country | Pakistan |
Coordinates | 25°28′20″N68°15′58″E / 25.47222°N 68.26611°E |
Status | Operational |
Commission date | Unit 1: January 1990 Unit 2: December 1989 Unit 3: June 1990 Unit 4: January 1991 Unit 5: 2023 (projected) Unit 6: 2029 (projected) |
Construction cost | Unit 5-6: US$1.5 billion |
Owner(s) | Government of Pakistan |
Operator(s) | WAPDA |
Thermal power station | |
Primary fuel | Unit 1: Furnace Oil Unit 2-4: Gas/Furnace Oil Unit 5-6: Coal |
Cooling source | Indus River |
Power generation | |
Units operational | 1 x 250 MW 3 x 210 MW [1] |
Make and model | Unit 1: Mitsui Engineering & Shipbuilding Unit 2-4: Harbin Unit 5-6: Siemens-Harbin JV |
Units under const. | 2 x 660 MW |
Nameplate capacity | 880 MW (operational) 2,200 MW (planned) |
External links | |
Website | www |
Commons | Related media on Commons |
Jamshoro Thermal Power Station also known by other names such as GENCO-I, and TPS Jamshoro is a gas / furnace oil and coal based thermal power plant with a total installed capacity of 880 MW located in Jamshoro near Hyderabad, Sindh in Pakistan. It is operated by the Jamshoro Power Company. The first phase of the project was commissioned between 1989 and 1991. It consists of one 250 MW unit and three 210 MW units. [2] [3] The power station is undergoing a planned expansion with additional 2 x 660 MW coal fired units. One 660 MW unit has been constructed and is ready for commissioning. Site preparation of second 660 MW unit is in progress with an expected commissioning date of July 2029. [4]
In February 2014, the Asian Development Bank agreed to loan $900m to the government of Pakistan for a project to install 2 x 660MW supercritical coal-fired power plant at Jamshoro. [5] The Islamic Development Bank (IDB) approved $220m for the Jamshoro Coal Power generation project. The Asian Development Bank had already approved $900m for the project, whereas $380m was to be contributed by the government to meet the overall estimated project cost of $1.5 billion.
The new 2 x 660 MW units will be supercritical coal-fired power plants. Unit 5 of 660 MW will be using an 80/20 blend of imported sub-bituminous coal (80%) and domestic lignite (20%) from Thar coalfield. Unit 6 will be based on 100% domestic lignite. [6]
NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.
The Hub Power Company Limited, colloquially known as Hubco, is a Pakistani power company based in Karachi, Sindh. It was the first independent power producer (IPP) to establish in Pakistan and as of 2024 is the largest IPP with a combined installed power generation capacity of 3,581 MW. The revenue of the company is United States Dollars denominated.
Panki Thermal Power Station is located at Panki in Kanpur Uttar Pradesh. Its first stage was commissioned in 1967 by the then Prime Minister, Indira Gandhi. It has an installed capacity of 660 Mega Watts. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam. It has a 275 Metres high chimney which is one of the tallest structures in India
The Cirebon Steam Power Plant is a 660 MW coal-fired power plant developed by PT Cirebon Electric Power (CEP) in the Kanci area to the southeast of Cirebon, Indonesia. The first unit of the plant was launched in mid October 2012. The reported cost of the plant was around $US 850 million. Construction began in 2008 and was substantially completed, a little behind time, in mid-2012. Sales from the plant to the Indonesian state-owned electricity company Perusahaan Listrik Negara (PLN) began on 27 July 2012.
Łagisza Power Station is a coal-fired thermal power station at Łagisza in Będzin, Poland. The power plant has a total installed power capacity of 1,060 MW and installed cogeneration thermal capacity of 335 MW. It is operated by Południowy Koncern Energetyczny, a subsidiary of the Tauron Group.
Adani Power is an Indian multinational power and energy company, subsidiary of Adani Group and based in Khodiyar in Ahmedabad, India. It is a private thermal power producer, with a capacity of 15,250 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat. Adani Godda Power is implementing a 1,600 MW plant at Jharkhand. The company has signed long term power purchase agreements of about 9,153 MW with the government of Gujarat, Maharashtra, Haryana, Rajasthan, Karnataka, and Punjab.
The Ennore Thermal Power Station is a coal based power plant located in Chennai Ennore, Tamil Nadu.
Mundra Thermal Power Station is located at Mundra in Kutch district in the Indian state of Gujarat. The power plant is one of the coal-based power plants of Adani Power. The coal for the power plant is imported primarily from Bunyu, Indonesia. Source of water for the power plant is sea water from the Gulf of Kutch.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
The Linkou Power Plant is a coal-fired power plant in Linkou District, New Taipei, Taiwan. With the previous total installed capacity of 600 MW, the power plant used to be the smallest coal-fired power plant in Taiwan. The power plant is currently undergoing retrofitting to increase its installed generation capacity to 2.4 GW.
Bandel Thermal Power Station is a coal-based power plant situated on the western bank of Hooghly River at Tribeni, a neighbourhood in Bansberia, near Bandel, in the Indian state of West Bengal, 3 kilometres (1.9 mi) off the Grand Trunk Road/ NH 19. The power plant is operated by the West Bengal Power Development Corporation Limited (WBPDCL). At the time of its commissioning in 1983, its Unit-5 was first of its kind in Eastern India and fifth in India.
Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.
Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on 21 August 2014.
Neyveli Uttar pradesh Power Limited-Ghatampur Thermal Power Project is an upcoming coal-based thermal power plant located in Ghatampur in Kanpur district, Uttar Pradesh. The power plant is owned by the Neyveli Uttar Pradesh Power Limited a joint venture between Neyveli Lignite Corporation (51%) and Uttar Pradesh Rajya Vidyut Utpadan Nigam (49%).
The 1,320 megawatt Pakistan Port Qasim Power Project comprises two 660 megawatt supercritical coal power plants, one of which was inaugurated in December 2016 as part of the China–Pakistan Economic Corridor. The $2.09 billion project is located on 330.7 acres at Port Qasim, 37 kilometers east of Karachi in Sindh Province. The project is part of a group of 14 energy projects which fall under the fast-tracked "Early Harvest" program of the $46 billion China Pakistan Economic Corridor project.
The Sahiwal Coal Power Project is a coal power plant project located in the province of Punjab in Pakistan by the name of Huaneng Shandong Ruyi (Pakistan) Energy (Limited). It has an installed capacity of 1320 MW. It commenced full operations on 3 July 2017.
The Engro Thar Coal Power Project (Thar-ll) is a coal-fired power plant developed as part of the China–Pakistan Economic Corridor by Sindh Engro Coal Mining Company and China Machinery Engineering Corporation in the Thar Block-II of the Thar Coalfield, Tharparkar District, Sindh, Pakistan 25 kilometers from the town of Islamkot near the village of Singharo-Bitra.
Khurja super thermal power project or Khurja STPS is a proposed 1320 megawatt, coal-fired supercritical power plant planned to be built at Khurja in Bulandshahr, Uttar Pradesh, India. The project is the first thermal power project by THDC Ltd, projected to cost ₹12676 crores. It is a two unit power plant, with the first unit expected to be completed by November 2022 and the second by April 2023.
The Gwadar Coal–Power Plant represents a 300-megawatt (MW) coal-fired power facility situated in Gwadar, Balochistan, Pakistan. It is part of the China-Pakistan Economic Corridor (CPEC).