Kaleum is a district ( muang ) of Sekong province in southeastern Laos. [1] In 2013, more than 100 families who inhabited the district were displaced by the construction of the Sekong 4 Dam. [2]

Contents

Economy

In February 2021, the Lao government announced that two lignite-fired power plants will constructed in Sekong province, one of them in Kaleum District. Work is to begin in 2021 and be completed by 2025. The electricity generated will be sold to Cambodia for 7.2 US cents per kWh. The Kaleum plant will be built by Phonesack Group. It will have an installed capacity of 1,800 MW. The company will invest between US$3–4 billion, including the construction of transmission lines to export electricity to Cambodia. The government claims that coal reserves adjacent to the plant are sufficient to power it for the entire 25-year concession period. [3]

Settlements

Related Research Articles

<span class="mw-page-title-main">Laos</span> Country in Southeast Asia

Laos, officially the Lao People's Democratic Republic, is the only landlocked country in Southeast Asia. At the heart of the Indochinese Peninsula, Laos is bordered by Myanmar and China to the northwest, Vietnam to the east, Cambodia to the southeast, and Thailand to the west and southwest. Its capital and largest city is Vientiane.

<span class="mw-page-title-main">Kaysone Phomvihane</span> Lao politician, communist leader (1920–1992)

Kaysone Phomvihane was the first leader of the Communist Lao People's Revolutionary Party from 1955 until his death in 1992. After the Communists seized power in the wake of the Laotian Civil War, he was the de facto leader of Laos from 1975 until his death. He served as the first Prime Minister of the Lao People's Democratic Republic from 1975 to 1991 and then as the second President from 1991 to 1992.

<span class="mw-page-title-main">Stung Treng province</span> Province of Cambodia

Stung Treng is a province of Cambodia in the northeast. It borders the provinces of Ratanakiri to the east, Mondulkiri and Kratié to the south and Kampong Thom and Preah Vihear to the west. Its northern boundary is Cambodia's international border with Laos. The Mekong River bisects the province. The province is mostly covered by forest, but logging and fishing put high pressure on the forest and fishery reserves.

<span class="mw-page-title-main">Dams and reservoirs in Laos</span>

Dams and reservoirs in Laos are the cornerstone of the Lao government's goal of becoming the "battery of Asia".

<span class="mw-page-title-main">Thongloun Sisoulith</span> General Secretary of the Lao Peoples Revolutionary Party (2021-present)

Thongloun Sisoulith is a Lao historian and politician serving as General Secretary of the Lao People's Revolutionary Party since 15 January 2021 and President of Laos since 22 March 2021.

<span class="mw-page-title-main">Électricité du Laos</span>

Électricité du Laos(EDL) is the state corporation of Laos that owns and operates the country's electricity generation, electricity transmission and electricity distribution assets. The company also manages the import and export of electricity from the national electricity grid of the country. EDL was founded in 1959 and is headquartered in Vientiane.

<span class="mw-page-title-main">Hydropower in the Mekong River Basin</span>

The estimated hydropower potential of the lower Mekong Basin is 30,000 MW, while that of the upper Mekong Basin is 28,930 MW. In the lower Mekong, more than 3,235 MW has been realized via facilities built largely over the past ten years, while projects under construction will represent an additional 3,209 MW. An additional 134 projects are planned for the lower Mekong, which will maximize the river's hydropower generating capacity. The single most significant impact—both now and in the future—on the use of water and its management in the Mekong Region is hydropower.

The Sambor Dam is a proposed dam and hydroelectric power station on the Mekong River south of Sambor village in Prek Kampi District, Kratie Province, Cambodia. If built, it would be the lowest dam of the Mekong's mainstream dams, and largest in Cambodia.

The Lower Se San 2 Dam is a hydroelectric dam under development on the Se San River in Stung Treng Province, northeastern Cambodia. The Se San River is a major tributary of the Mekong River. The dam site is located 25 kilometres (16 mi) east of the provincial capital, also named Stung Treng. The first turbine began producing electricity in November 2017. The dam was officially opened on December 18, 2018.

<span class="mw-page-title-main">Xayaburi Dam</span> Dam in Xayaburi

The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of Sainyabuli (Xayaburi) town in northern Laos. Commercial operation of the dam started in October 2019. The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT). The project is surrounded in controversy due to complaints from downstream riparians and environmentalists. Preliminary construction began in early-2012, but work on the dam itself was suspended shortly thereafter due to complaints from Cambodia and Vietnam downstream. After making modifications to the dam's design, Laos started construction with a ceremony on 7 November 2012. The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.

The Don Sahong is a hydroelectric dam commissioned in 2020 on the Mekong River in Siphandone area of Champasak Province, Laos, less than two kilometers upstream of the Laos–Cambodia border.

Hoang Anh Gia Lai Group, registered as Hoang Anh Gia Lai Joint Stock Company, less formally known by its trading name Hoàng Anh Gia Lai (HAGL), is a diversified company headquartered in Pleiku, Vietnam.

The Houay Ho is a dam located in the Samakkhixay District of Attapeu Province, Laos, 160 km (99 mi) east of Pakse and 30 km (19 mi) northwest of Attapeu. The project is considered the first privately financed joint venture 'build-operate-transfer' (BOT) hydropower project in Laos. It has installed capacity of 152.1 megawatts (204,000 hp), almost all of which is exported to Thailand.

This page describes energy and electricity production, consumption and import in Laos.

<span class="mw-page-title-main">Attapeu province</span> Province of Laos

Attapeu is a province of Laos in the southeast of the country. It has five districts: Samakkixay, Xaysetha, Sanamxay, Sanxay, and Phouvong, covering an area of 10,320 square kilometres (3,980 sq mi) with a population of 127,285. Its capital city lies at Attapeu.

<span class="mw-page-title-main">Sekong province</span> Province of Laos

Sekong is a province of Laos in the southeast of the country.

Hongsa is a town in northwestern Laos. It is in Hongsa District in Sainyabuli Province. The town is 81 kilometres (50 mi) northwest of the provincial capital Sainyabuli. Nearby Ban Viengkeo is a rotating host to a major elephant festival. The district is the site of the Hongsa coal-fired power plant that began operation in 2015.

<span class="mw-page-title-main">Xaisomboun province</span> Province of Laos

Xaisomboun is a mountainous province in central Laos, between Vientiane province and Xiangkhouang province. The province covers an area of 8,300 square kilometres (3,200 sq mi) and had a population of 85,168 in 2015. Xaisomboun town in Anouvong District is the economic centre. There are extensive copper and gold mining operations nearby at Sana Somboun.

The 2018 Laos dam collapse was the collapse of Saddle Dam D, part of a larger hydroelectric dam system under construction in southeast Laos's Champasak Province, on 23 July 2018. The dam collapse lead to widespread destruction and homelessness among the local population in neighbouring Attapeu Province. As of 25 September, 40 people were confirmed dead, at least 98 more were missing, and 6,600 others were displaced.

La Mam is a district of Sekong province, Laos.

References

  1. "Maplandia world gazetteer". Maplandia.
  2. Luangkhot, Viengsay; Lipes, Joshua (11 September 2013). "Lao villagers displaced by dam await farmland six months after relocation". Refworld (UNHCR). Radio Free Asia. Retrieved 6 June 2020.
  3. Phonevilay, Latsamy (5 February 2021). "Laos to Build Two Coal-Fired Plants in Xekong Province". The Laotian Times. Retrieved 5 February 2021.