Kaniv Hydroelectric Pumped Storage Power Plant | |
---|---|
Country | Ukraine |
Location | Buchak, near Kaniv, Cherkasy Oblast |
Purpose | Power |
Status | Under construction |
Construction began | 1986 |
Construction cost | 12 billion hryvnias |
Owner(s) | Ukrhydroenergo |
Dam and spillways | |
Impounds | Dnieper River |
Power Station | |
Turbines | 4 x Francis-type reversible turbines |
Installed capacity | 1,000 MW (turbine mode), 1,040 MW (pump mode) |
Annual generation | 995 GWh |
Kaniv Pumped Storage Power Station is an unfinished pumped-storage hydroelectric power plant in the village of Buchak near the city of Kaniv in Cherkasy Oblast, Ukraine. Construction of the Kaniv PSP with a capacity of 3600 MW began in 1986 but was halted in 1991. An updated project adapted to the current state of Ukraine's unified energy system envisages the construction of a pumped storage power plant with a reduced capacity of 1000 MW. [1]
The project for the construction of the power plant, developed in 1985 by the Kharkiv Institute "Ukrhydroproject", envisaged the construction of a PSP with daily and weekly load regulation of the energy system with a capacity of 3600 thousand kW, consisting of 16 rotating hydro units with capacities of 225 and 250 thousand kW in generator and pump modes, respectively.
Construction work on the PSP began in 1984. A pit for the upper reservoir was excavated, power lines, a concrete road, and a railway were built, 759 thousand cubic meters of sand were deposited, and the banks of the Kaniv Reservoir were partially reinforced. The residents of the village of Buchak, located in the construction zone, were resettled (a total of 85 households). Compensation was paid to the resettled residents. A total of 57 million rubles (at 1984 prices) was spent. [2] Construction was suspended in 1991 during the implementation of emergency measures to stabilize Ukraine's economy. On the initiative of the Dniprohydroenergo, supported by the Ministry of Energy and Coal Industry of Ukraine, the moratorium on the construction of the Kaniv PSP was lifted by the Cabinet of Ministers of Ukraine decree No. 307-р dated April 19, 1999. This created the necessary preconditions for the continuation of construction work.
From 2006 to 2007, PJSC "Ukrhydroproject" (Kharkiv) developed and approved an updated feasibility study for the construction of the Kaniv PSP. According to the decree of the Cabinet of Ministers of Ukraine dated November 8, 2007 No. 965-р, construction of the PSP was planned to resume in 2009. The project, designed for completion by 2015, envisaged the construction of a station with a design installed capacity in turbine mode of 1000 MW, in pump mode - 1120 MW, consisting of four hydro units of the POHT-851 type. [3] [4] In November 2008, public hearings were held in the villages of Pshenichniki and Bobrytsia in Kaniv Raion, Cherkasy Oblast, on the continuation of the construction of the Kaniv PSP, and the construction and operation of the power plant were approved by the local community, as documented in the relevant protocols. [5]
In early July 2011, the Ukrainian hydropower operator PJSC "Ukrhydroenergo" and Sinohydro LLC. (China) signed a memorandum of cooperation for the construction of the Kaniv PSP. [6] In 2013, a new project was approved, [7] with an installed capacity of 1000 MW in turbine mode and 1040 MW in pump mode. [8] The estimated construction period was set at 6.5 years, with a project payback period of 10 years, and a budget of 12 billion hryvnias, of which 70% would be financed by international financial institutions. [9] The project implementation was suspended due to political events but resumed in July 2016 when the Cabinet of Ministers of Ukraine adopted a new hydropower development program, which includes the construction of the Kaniv PSP. [10] In October 2016, Ukrhydroenergo announced a tender for the construction of priority facilities and structures at the PSP. [11]
Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation. Low-cost surplus off-peak electric power is typically used to run the pumps. During periods of high electrical demand, the stored water is released through turbines to produce electric power.
The Dnieper Hydroelectric Station, also known as the Dnipro Dam, is a hydroelectric power station in the city of Zaporizhzhia, Ukraine. Operated by Ukrhydroenergo, it is the fifth and largest station in the Dnieper reservoir cascade, a series of hydroelectric stations on the Dnieper river that supply power to the Donets–Kryvyi Rih industrial region. Its dam has a length of 800 metres (2,600 ft), a height of 61 metres (200 ft), and a flow rate of 38.7 metres (127 ft) per second.
State Enterprise National Nuclear Energy Generating Company "Energoatom", commonly known as just Energoatom, is a state enterprise operating all four nuclear power plants in Ukraine. It is the largest power producer in Ukraine.
There are almost 200 large dams in Myanmar. Myanmar (Burma) has a large hydroelectric power potential of 39,000 megawatts (52,000,000 hp), although the economical exploitable potential is about 37,000 megawatts (50,000,000 hp). Between 1990 and 2002, the country tripled its installed capacity of hydro plants, increasing from 253 megawatts (339,000 hp) to 745 megawatts (999,000 hp). Total installed capacity in 2010 is at least 2,449 megawatts (3,284,000 hp) MW, 6% of potential. Several large dams are planned to increase future hydro utilization.
India is 5th globally for installed hydroelectric power capacity. As of 31 March 2020, India's installed utility-scale hydroelectric capacity was 46,000 MW, or 12.3% of its total utility power generation capacity. Additional smaller hydroelectric power units with a total capacity of 4,683 MW have been installed. India's hydroelectric power potential is estimated at 148,700 MW at 60% load factor. In the fiscal year 2019–20, the total hydroelectric power generated in India was 156 TWh with an average capacity factor of 38.71%.
The Kannagawa Hydropower Plant (神流川発電所) is an under construction pumped-storage hydroelectric power plant near Minamiaiki in Nagano Prefecture and Ueno in Gunma Prefecture, Japan. The power plant utilizes the Minamiaiki River along with an upper and lower reservoir created by two dams, the upper Minamiaiki Dam and the lower Ueno Dam. The power station in between the two dams will contain six 470 megawatts (630,000 hp) pump-generators for a total installed capacity of 2,820 megawatts (3,780,000 hp). Unit 1 commenced commercial operation in 2005 and Unit 2 in 2012. When completed, the plant will have the third-largest pumped-storage power capacity in the world.
The Lam Takhong Dam is an embankment dam on the Lam Takhong River between Pak Chong District and Sikhio District in Nakhon Ratchasima Province, Thailand. The dam was originally constructed in 1974 for the purposes of irrigation and water supply but after 2002, its water storage also serves as the lower reservoir for the Lam Takhong pumped storage power plant, Thailand's first power plant of that type.
The Dniester Pumped Storage Power Station is a pumped storage hydroelectric scheme that uses the Dniester River 8 kilometres (5.0 mi) northeast of Sokyriany in Chernivtsi Oblast, Ukraine. Currently, four of seven 324-megawatt (434,000 hp) generators are operational and when complete in 2028, the power station will have an installed capacity of 2,268 megawatts (3,041,000 hp).
The Coo-Trois-Ponts Hydroelectric Power Station is a pumped-storage hydroelectric power station located in Trois-Ponts, Province of Liege, Belgium. Located next to the Amblève River, one of the few sites where 250+ meter local elevation can be found in Belgium. The power station uses its water to support a power scheme where water is pumped from a lower reservoir to one of two upper reservoirs known as Coo I and Coo II. When energy demand is high, water can be released from these reservoirs for power generation. The water then returns to the lower reservoir and the process repeats as needed. The same machines that pump the water to the upper reservoirs at a higher elevation are also used as generators. The plant was commissioned in two stages, Coo I (1969) and Coo II (1978). It is owned by Engie-Electrabel and has an installed capacity of 1,164 MW.
As of 2018, hydroelectric power stations in the United Kingdom accounted for 1.87 GW of installed electrical generating capacity, being 2.2% of the UK's total generating capacity and 4.2% of UK's renewable energy generating capacity. This includes four conventional hydroelectric power stations and run-of-river schemes for which annual electricity production is approximately 5,000 GWh, being about 1.3% of the UK's total electricity production. There are also four pumped-storage hydroelectric power stations providing a further 2.8 GW of installed electrical generating capacity, and contributing up to 4,075 GWh of peak demand electricity annually.
PJSC «Ukrhydroenergo» is a Ukrainian state-owned enterprise that administers many major hydro power plants along the Dnieper and Dniester rivers. It is Ukraine's main hydropower generating company. It is capable of covering peak loads and providing FCAS for the United Energy Systems of Ukraine (UESU). Hydroelectricity is a renewable energy source, and does not require the combustion of fossil fuels in its operation. The company operates ten power plants on the Dnieper and Dniester rivers: Kyivska HPP, Kyivska PSP, Kanivska HPP, Kremenchutska HPP, Seredniodniprovska HPP, Dniprovska HPP No. 1, Dniprovska HPP No. 2, Kakhovska HPP, Dnistrovska HPP, and Dnistrovska PSP. Enabling works are underway at Kanivska PSP and Kakhovska HPP No. 2.
The Kyiv Pumped-Storage Power Plant is a pumped-storage power station on the west bank of the Kyiv Reservoir in Vyshhorod, Ukraine. The Kyiv Reservoir serves as the lower reservoir and the upper reservoir is located 70 m (230 ft) above the lower. Water sent from the upper reservoir generates electricity with three 33.3 megawatts (44,700 hp) conventional hydroelectric generators and three 45 megawatts (60,000 hp) reversible pump generators. During periods of low demand, such as nighttime, the pump generators push water from the lower reservoir to the upper for use during peak hours. The first generator was commissioned in 1970, and the last in 1972.
Hydroelectricity is currently China's largest renewable energy source and the second overall after coal. According to the International Hydropower Association, China is the worlds largest producer of hydroelectricity as of 2021. China's installed hydroelectric capacity in 2021 was 390.9 GW, including 36.4 GW of pumped storage hydroelectricity capacity, up from 233 GW in 2011. That year, hydropower generated 1,300 TWh of power, an increase of 68 TWh over 2018 when hydropower generated 1,232 TWh of power, accounting for roughly 18% of China's total electricity generation.
Vietnam utilizes four main sources of renewable energy: hydroelectricity, wind power, solar power and biomass. At the end of 2018, hydropower was the largest source of renewable energy, contributing about 40% to the total national electricity capacity. In 2020, wind and solar had a combined share of 10% of the country's electrical generation, already meeting the government's 2030 goal, suggesting future displacement of growth of coal capacity. By the end of 2020, the total installed capacity of solar and wind power had reached over 17 GW. Over 25% of total power capacity is from variable renewable energy sources. The commercial biomass electricity generation is currently slow and limited to valorizing bagasse only, but the stream of forest products, agricultural and municipal waste is increasing. The government is studying a renewable portfolio standard that could promote this energy source.
In Ukraine, the share of renewables within the total energy mix is less than 5%. In 2020 10% of electricity was generated from renewables; made up of 5% hydro, 4% wind, and 1% solar. Biomass provides renewable heat.
Hydro is an important source of electricity in Ukraine. State operating company is Ukrhydroenergo and Energoatom. Design of main power plants is carried out by Ukrhydroproject.
Chyhyryn Nuclear Power Station is an unfinished nuclear power plant located to the east of Chyhyryn in Ukraine, on the territory adjacent to the Kremenchuk Reservoir shore, between the villages Stetsivka and Vitove.
Tashlyk Pumped-Storage Power Plant is a pumped-storage power station near Yuzhnoukrainsk in Mykolaiv Oblast, Ukraine. It connects Tashlyk reservoir with Oleksandrivska reservoir on the Southern Bug River.
Trypilska TPP was a 1800 MW thermal power station located on the Dnipro river, about 40 km downstream of the city of Kyiv, in Ukraine, built by the Soviet Union in 1969 and completed in 1977.