Coordinates 42°06′23″N19°49′37″E / 42.10639°N 19.82694°E / 42.10639; 19.82694
Construction began1979
Opening date1985;41 years ago (1985)
Owner Albanian Power Corporation
Dam and spillways
Type of dam Rock-fill dam
Impounds Drini River
Height130 m (427 ft)
Length275 m (902 ft)
Spillway capacity3,400 m3/sec
Reservoir
Creates Koman Reservoir
Total capacity16,000,000,000 m3 (5.7×1011 ft3)
Surface area12 km2 (5 mi2)
Maximum water depth96 m (315 ft)
Power Station
Operator Albanian Power Corporation
Turbines 4 × 150 MW
Installed capacity 600 MW

The Koman Hydroelectric Power Station (Albanian : Hidrocentrali i Komanit) is a large hydroelectric power station (HPP), for which a dam on the Drin River was built. The dam is near the settlement of Koman, northern Albania. It is the second of three dams of the Drin River cascade; the Fierza Hydroelectric Power Station upstream, and the Vau i Dejës Hydroelectric Power Station downstream. The dam, 130m tall, was completed in 1985 and the reservoir was filled with water at full capacity in 1986. [1]

Completed in 1986, the power station consists of four turbines of French origin with a nominal capacity of 150 MW each, totalling the installed capacity to 600 MW. [2]