This article reads like a press release or a news article and may be largely based on routine coverage .(October 2020) |
This page's infobox may require expansion, verification, or otherwise need cleanup. |
Lake Palmer | |||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 1600 West End Avenue Nashville, Tennessee United States | ||||||||||||||||||||||||||||||||||
Coordinates | 36°09′16″N86°47′37″W / 36.1545°N 86.7935°W | ||||||||||||||||||||||||||||||||||
Built | 2005 | ||||||||||||||||||||||||||||||||||
Max. length | 400 feet (120 m) | ||||||||||||||||||||||||||||||||||
Max. width | 300 feet (91 m) | ||||||||||||||||||||||||||||||||||
Average depth | 60 feet (18 m) | ||||||||||||||||||||||||||||||||||
|
Lake Palmer was a man-made lake in Nashville between 16th Ave and 17th Ave, south of Hayes St and north of West End Ave. [4] This was the proposed location of a long-mooted mixed-use construction project near downtown Nashville that failed to materialize for over ten years. [5] Conceived by Nashville-based Alex S. Palmer & Company, the project was originally planned to open in 2007 as the West End Summit, a $300 million project for office space and apartments.
Excavation initially started in 2005, but the project stalled as the developer attempted to cope with the credit crunch and sought an anchor tenant for the office portion of the project. [6] The resulting lake was a source of water for swimming pools and country clubs during water restrictions following the 2010 Tennessee floods. [7] The construction proposal was relaunched in September, 2012 with news that Nashville-headquartered Hospital Corporation of America (HCA) had signed leases to occupy two office towers on the site. In addition to the office towers, an InterContinental Hotel was planned as part of the development. After plans stalled, the property was sold to Propst Development in March, 2018. [7]
The site remained a massive, block-long excavation that was commonly called Lake Palmer, as this 85-foot-deep (26 m) hole was mostly filled with water. [8] As of September 2019, the lake was still visible on Google Maps and labelled as Lake Palmer. [9]
On September 27, 2012, Nashville Mayor Karl Dean, Gov. Bill Haslam, and HCA Chairman and CEO Richard Bracken, jointly announced the location of two corporate headquarters divisions of HCA at the site. [10] The proposed development was to include two towers of approximately 20 stories each, with a total floor area of 900,000 sq ft (84,000 m2). The corporate headquarters of Parallon Business Solutions would anchor one tower, and the other would be anchored by Sarah Cannon Research Institute (SCRI). The rainwater was completely drained (mostly into the street) in 2013 for the anticipated construction of the HCA building.
More than a year after HCA signed leases, construction had failed to start due to Alex S. Palmer & Company being unable to obtain equity financing for the $275 million project. In December 2013, HCA withdrew from the project, opting to build its own campus on a nearby site in Nashville's North Gulch district. The excavation filled back up with water.
Intercontinental Hotels withdrew their 12-story hotel proposal in February 2016. [11] The lake was again temporarily drained in March 2016, although no further proposal was revealed. [12]
The failed West End Summit project, along with developer Alex S. Palmer & Company, faced public and media scrutiny because of its numerous construction delays, financing woes and construction liens. [13] Harmon Inc. filed a lawsuit stating it was owed US$120,000 by Alex S. Palmer & Company and Bovis Lend Lease for engineering services related to the project. [14]
On March 23, 2018, Huntsville, Alabama-based Propst Development announced they had purchased Lake Palmer for $36.9 million. [15] [16] The announcement did not include detailed plans for the site. [17] Propst Development principal Chris Brown stated on June 27, 2018, that the mixed-use project would include a hotel and condos in a tower as high as 40 stories, and that another tower would include at least 500,000 sq ft (46,000 m2) of office space. Turner Construction Company returned jointly with Hoar Construction as contractors, and Cooper Carry was named as the firm providing architecture for the renamed "Broadwest" project. [3] On August 20, 2018, Brown told the Nashville Business Journal that the residential tower would be 34 stories and the office tower would be 21 stories, with a projected cost of $490 million entirely funded by the Propst family and Chartwell Hospitality, a hotel operator based in Franklin, Tennessee. The hotel in the residential tower would open in 2021 with 245 rooms, and be owner-operated by Chartwell Hospitality. [18] The plan included a park, and 2,500 vehicle parking spaces. Construction was expected to start in the fall of 2018. [19]
The first of four tower cranes was erected in March 2019. The 21-story office tower is planned to open in February 2021, and the 34-story residential tower is planned to open about six months later. [20]
Antioch is a neighborhood of Nashville located approximately 12 miles (19 km) southeast of Downtown Nashville. It is served by the Metropolitan Government of Nashville and Davidson County.
The Chicago Spire was a skyscraper project in Chicago that was partially built between 2007 and 2008 before being cancelled. Located at 400 N. Lake Shore Drive, it would have stood 2,000 feet (610 m) high with 150 floors and been the tallest building in the Western Hemisphere. When originally proposed as the Fordham Spire in July 2005, the design had 116 stories, included a hotel and condominiums, and was topped with a broadcast antenna mast. The building was designed and spearheaded by Spanish architect-engineer Santiago Calatrava and Chicago developer Christopher T. Carley of the Fordham Company. On March 16, 2006, the Chicago Plan Commission unanimously approved the initial design of the building. On November 4, 2016, a court ruling brought the original development plan and the extended litigation over the nine-year-old project to a close. Developer Garrett Kelleher signed over the property location to the project's biggest creditor, Related Midwest, who announced that they would not build the Spire and released plans for a different project.
Panorama Tower is a mixed-use 85-story skyscraper in Miami, Florida, United States. Located in the Brickell district of Downtown Miami, it is the tallest building in Miami, and the tallest building in Florida.
Brickell City Centre is a large mixed-use complex consisting of two residential high-rise towers, two office buildings, a high-rise hotel, and an interconnected five-story shopping mall and lifestyle center covering 9 acres (36,000 m2) located in the Brickell district of Downtown Miami, Florida. Situated at the junction of Miami Avenue and Eighth Street, it spans up to five blocks to the west of Brickell Avenue and to the south of the Miami River. Contrary to the name, the development is not in the traditional downtown Miami city centre, but in the more recently redeveloped financial district of Brickell. The retail shopping and lifestyle center is operated by Simon Malls.
Hyatt Regency Seattle, also known as 808 Howell Street and 8th & Howell, is a high-rise hotel in the Denny Triangle neighborhood of Seattle, Washington, United States that opened in December 2018. The 45-story hotel, operated by Hyatt, has 1,260 hotel rooms and is the largest in the city. It also has 103,000 square feet (9,600 m2) of meeting and event space, as well as two ballrooms and a lounge.
2nd & Pike, also known as the West Edge Tower, is a 440-foot-tall (130 m) residential skyscraper in Seattle, Washington. The 39-story tower, developed by Urban Visions and designed by Tom Kundig of Olson Kundig Architects, has 339 luxury apartments and several ground-level retail spaces. The 8th floor includes a Medical One primary care clinic.
Turnberry Associates is a real estate development and management company in the United States. The company has developed over $10 billion worth of properties during the course of its history. Current holdings in its portfolio include the Aventura Mall, the JW Marriott Nashville Marriott, and SoLé Mia. Jackie Soffer is chairman and chief executive officer. The company was founded in 1967 by Donald Soffer.
Arrivé is a 440-foot (130 m), 41-story skyscraper in the Belltown neighborhood of Seattle, Washington. The $190 million project, originally named Potala Tower after the Potala Palace in Tibet, was designed by Weber Thompson and consists of 342 apartments and a 142-room hotel. It was financed partially by Chinese nationals through the EB-5 visa program and began construction in April 2015.
The Fallon Company is a privately held commercial real estate owner and developer headquartered in Boston, Massachusetts. Founded by Joseph F. Fallon in 1993, The Fallon Company has developed over $6 billion in real estate, representing more than six million square feet of property. The company is recognized as a leader in mixed-use urban development and one of the most active private developers on the East Coast. The company focuses on large-scale urban design geared toward transforming neighborhoods into cohesive, community-driven environments. With offices in Boston, Charlotte, Raleigh, and Nashville, The Fallon Company has the capacity and resources to undertake projects throughout the United States.
Majestic Las Vegas is a cancelled high-rise condominium project that was to be built on property previously occupied by the La Concha Motel on the Las Vegas Strip, in Winchester, Nevada. The project was announced by La Concha owner Lorenzo Doumani in February 2004. The 42-story condominium tower was to be accompanied by Hilton's Conrad Las Vegas, a Conrad-branded, 37-story hotel that would operate in a separate high-rise building on the same property. The project was initially expected to open in February 2006.
Bellevue 600 is a future high-rise office building developed by Amazon in Bellevue, Washington, United States. It began construction in 2021 and is scheduled to be completed in 2024. The 43-story, 600-foot-tall (180 m) building would join 555 Tower as the tallest building in Bellevue. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A second phase would construct a 27-story tower to the west, replacing an existing office building.
The Gramercy is a mixed-use development project in Spring Valley, Nevada, west of the Las Vegas Strip. It includes two office buildings and 160 apartment units. Gemstone Development began construction of the project, originally known as ManhattanWest, in 2007. The project initially was to include condominiums, retail, and office space. Construction was suspended in December 2008, because of financial problems. ManhattanWest was sold in 2013, and construction resumed, with the project now known as The Gramercy. It opened in November 2014. An unfinished nine-story condominium tower was imploded in February 2015, as completing it would have been too costly.
Opus Place is an under construction development in Atlanta, Georgia, United States. Located in Midtown Atlanta, the development is currently expected to consist of a large residential high-rise, called No. 2 Opus Place, and possibly a smaller tower. Upon its completion, No. 2 Opus Place would be among the tallest buildings in Atlanta and the tallest residential building in the city. The project was first developed in 2014, but underwent a significant alteration in 2016.
WB1200, also known as 1200 Stewart, is a future twin skyscraper complex in the Denny Triangle neighborhood of Seattle, Washington, United States. The project is located at the intersection of Stewart Street and Denny Way and comprises 1,014 apartments and retail space in two 48-story buildings. The retail space, housed in a three-story podium with an indoor galleria, is planned to feature a music venue and a Boeing 747-400 fuselage. It began construction in 2018 and is scheduled to be completed in 2024.