| Line 1 | |
|---|---|
| Overview | |
| Status | In operation |
| Locale | Taiyuan, Shanxi Province, China |
| Termini | |
| Stations | 24 |
| Service | |
| Type | Rapid transit |
| System | Taiyuan Metro |
| Services | 1 |
| Depot(s) | Malianying depot Xishan parking lot |
| Daily ridership | 235,600 (February 22, 2025) [1] |
| History | |
| Commenced | 2019 |
| Opened | 22 February 2025 |
| Technical | |
| Line length | 28.737 [2] km (17.856 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Line 1 of Taiyuan Metro is the second metro line in Taiyuan. The line opened on February 22, 2025. [3]
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Helongwan — Wusu 1 Hao / 2 Hao Hangzhanlou | February 22 2025 | 28.737 km (17.86 mi) | 24 | Phase 1 |
Phase 1 of Line 1 runs from Helongwan in the northwest to Wusu 1 Hao / 2 Hao Hangzhanlou in the southeast and has 24 stations. [2] Phase 2 includes Wusu 3 Hao Hangzhanlou station, the station will be constructed together with the terminal 3 of Wusu Airport. [4]
| Station Name | Connections | Distance km | District | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Helongwan | 河龙湾站 | Wanbailin | |||
| Ximinglu | 西铭路站 | ||||
| Xikezhan | 西客站 | | |||
| Jinyanglu | 金阳路站 | ||||
| Yanjiagou (Xiaojingyulu) | 闫家沟(小井峪路)站 | ||||
| Xiayuan | 下元站 | ||||
| Taiyuanligongdaxue | 太原理工大学站 | ||||
| Taoyuanlu | 桃园路站 | Yingze | |||
| Da'nanmen | 大南门站 | 2 | |||
| Liunan | 柳南站 | ||||
| Wuyiguangchang | 五一广场站 | ||||
| Taiyuanzhan Xiguangchang | 太原站西广场站 | | |||
| Taiyuanzhan Dongguangchang | 太原站东广场站 | ||||
| Haojiagou | 郝家沟站 | ||||
| Chaoyangjie | 朝阳街站 | ||||
| Shuangta | 双塔站 | ||||
| Nanshifangjie | 南十方街站 | ||||
| Changfengdongjie | 长风东街站 | ||||
| Xuefudongjie | 学府东街站 | Xiaodian | |||
| Xutandongjie | 许坦东街站 | ||||
| Taiyuannanzhan | 太原南站 | | |||
| Beiying | 北营站 | ||||
| Huangling | 黄陵站 | ||||
| Wusu 1 Hao / 2 Hao Hangzhanlou | 武宿1号2号航站楼站 | | |||
| Wusu 3 Hao Hangzhanlou | 武宿3号航站楼站 | ||||
Line 1 began construction in December 2019.
In phase 1, it has a total length of 28.737 km, 24 stations and 2 depots.
The length of phase 2 is 1.85km. It only has 1 station to connect new termianl 3 of Wusu Airport. [5]