Line 1 | |
---|---|
Overview | |
Status | In operation |
Locale | Taiyuan, Shanxi Province, China |
Termini | |
Stations | 24 |
Service | |
Type | Rapid transit |
System | Taiyuan Metro |
Services | 1 |
Depot(s) | Malianying depot Xishan parking lot |
Daily ridership | 235,600 (February 22, 2025) [1] |
History | |
Commenced | 2019 |
Opened | 22 February 2025 |
Technical | |
Line length | 28.737 [2] km (17.856 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Line 1 of Taiyuan Metro is the second metro line in Taiyuan. The line opened on February 22, 2025. [3]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Helongwan — Wusu 1 Hao / 2 Hao Hangzhanlou | February 22 2025 | 28.737 km (17.86 mi) | 24 | Phase 1 |
Phase 1 of Line 1 runs from Helongwan in the northwest to Wusu 1 Hao / 2 Hao Hangzhanlou in the southeast and has 24 stations. [2] Phase 2 includes Wusu 3 Hao Hangzhanlou station, the station will be constructed together with the terminal 3 of Wusu Airport. [4]
Station Name | Connections | Distance km | District | ||
---|---|---|---|---|---|
English | Chinese | ||||
Helongwan | 河龙湾站 | Wanbailin | |||
Ximinglu | 西铭路站 | ||||
Xikezhan | 西客站 | ![]() | |||
Jinyanglu | 金阳路站 | ||||
Yanjiagou (Xiaojingyulu) | 闫家沟(小井峪路)站 | ||||
Xiayuan | 下元站 | ||||
Taiyuanligongdaxue | 太原理工大学站 | ||||
Taoyuanlu | 桃园路站 | Yingze | |||
Da'nanmen | 大南门站 | 2 | |||
Liunan | 柳南站 | ||||
Wuyiguangchang | 五一广场站 | ||||
Taiyuanzhan Xiguangchang | 太原站西广场站 | ![]() | |||
Taiyuanzhan Dongguangchang | 太原站东广场站 | ||||
Haojiagou | 郝家沟站 | ||||
Chaoyangjie | 朝阳街站 | ||||
Shuangta | 双塔站 | ||||
Nanshifangjie | 南十方街站 | ||||
Changfengdongjie | 长风东街站 | ||||
Xuefudongjie | 学府东街站 | Xiaodian | |||
Xutandongjie | 许坦东街站 | ||||
Taiyuannanzhan | 太原南站 | ![]() | |||
Beiying | 北营站 | ||||
Huangling | 黄陵站 | ||||
Wusu 1 Hao / 2 Hao Hangzhanlou | 武宿1号2号航站楼站 | ![]() | |||
Wusu 3 Hao Hangzhanlou | 武宿3号航站楼站 | ||||
Line 1 began construction in December 2019.
In phase 1, it has a total length of 28.737 km, 24 stations and 2 depots.
The length of phase 2 is 1.85km. It only has 1 station to connect new termianl 3 of Wusu Airport. [5]