The following is a list of hydroelectric power stations in Brazil with a nameplate capacity of at least 100 MW.
According to the Associação Brasileira de Distribuidores de Energia Elétrica (ABRADEE) there are 201 hydroelectric power stations in Brazil with a nameplate capacity of more than 30 MW; the total capacity of these power stations in 2015 was 84,703 MW. There are an additional 476 hydroelectric power stations with a nameplate capacity between 1 and 30 MW and 496 micro hydroelectric power stations with a nameplate capacity of less than 1 MW. [1]
The Itaipu Dam is a hydroelectric dam on the Paraná River located on the border between Brazil and Paraguay. It is the third largest hydroelectric dam in the world, and holds the 45th largest reservoir in the world.
Eletrobras is a major Brazilian electric utilities company. The company's headquarters are located in Rio de Janeiro.
The Campos Novos Dam is a hydroelectric dam in the Santa Catarina state in southern Brazil. In 2006, at 200 metres (660 ft) dam height, it was regarded as the third highest dam of this type in the world, but, in June 2006, the water which it held back ran out following a break in the dam wall.
Brazil is the 10th largest energy consumer in the world and the largest in South America. At the same time, it is an important oil and gas producer in the region and the world's second largest ethanol fuel producer. The government agencies responsible for energy policy are the Ministry of Mines and Energy (MME), the National Council for Energy Policy (CNPE), the National Agency of Petroleum, Natural Gas and Biofuels (ANP) and the National Agency of Electricity (ANEEL). State-owned companies Petrobras and Eletrobras are the major players in Brazil's energy sector, as well as Latin America's.
Eletrobras Furnas is a regional power utility and a major subsidiary of Eletrobras. The company generates or transmits electricity to 51% of households in Brazil and more than 40% of the nation's electricity passes through their grid. The company has a generating capacity of 10,050 MW which corresponds to 10% of Brazil's electrical production.
The Luiz Carlos Barreto de Carvalho Dam is an embankment dam on the Grande River near Fronteira in São Paulo, Brazil. The dam serves an associated hydroelectric power plant with a 1,050 megawatts (1,410,000 hp) installed capacity.
Picote Dam is a concrete arch dam on the Douro, located in the municipality Miranda do Douro, in Bragança District, Portugal.
Bemposta Dam is a concrete arch dam on the Douro, where the river forms the national border line between Spain and Portugal. It is located in the municipality Mogadouro, in Bragança District, Portugal.
Miranda Dam is a concrete buttress dam on the Douro, where the river forms the national border line between Spain and Portugal. It is located in the municipality Miranda do Douro, in Bragança District, Portugal.
Aguieira Dam also known as Foz do Dão Dam is a concrete multiple arch dam on the Mondego River, where the river forms the border line between the districts of Coimbra and Viseu. It is located in the municipality Penacova, in Coimbra District, Portugal.
Cabril Dam is a concrete double curvature arch dam on the Zêzere River, where the river forms the border line between the districts of Castelo Branco and Leiria. It is located in the municipality Sertã, in Castelo Branco District, Portugal.
Carrapatelo Dam is a concrete gravity dam on the Douro, where the river forms the border line between the districts of Porto and Viseu. It is located in the municipalities of Marco de Canaveses, in Porto District, and Cinfães, Viseu District, Portugal.
Bouçã Dam is a concrete double curvature arch dam on the Zêzere River, where the river forms the border line between the districts of Castelo Branco and Leiria. It is located in the municipality Pedrógão Grande, in Leiria District, Portugal.
The Caniçada Dam is a concrete arch dam on the Cávado River, the civil parish of Parada do Bouro, in the municipality of Vieira do Minho, in the Portuguese Norte. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE).
Pocinho Dam is a concrete gravity dam on the Douro, where the river forms the border line between the districts of Guarda and Bragança. It is located in the municipality Vila Nova de Foz Côa, in Guarda District, Portugal.
Crestuma–Lever Dam is a concrete gravity dam on the Douro. It is located in the municipality Vila Nova de Gaia, in Porto District, Portugal.
Bolarque Dam is a concrete gravity dam on the Tagus in Spain, where the river forms the border between the provinces of Cuenca and Guadalajara. About 6 km downstream from the dam is the José Cabrera Nuclear Power Station.
The Jamanxim Dam is a proposed hydroelectric dam on the Jamanxim River in the state of Pará, Brazil.