A man-hour or human-hour is the amount of work performed by the average worker in one hour. [1] [2] It is used for estimation of the total amount of uninterrupted labor required to perform a task. For example, researching and writing a college paper might require eighty man-hours, while preparing a family banquet from scratch might require ten man-hours.

Contents

Man-hours exclude the breaks that people generally require from work, e.g. for rest, eating, and other bodily functions. They count only pure labor. Managers count the man-hours and add break time to estimate the amount of time a task will actually take to complete. Thus, while one college course's written paper might require twenty man-hours to carry out, it almost certainly will not get done in twenty consecutive hours. Its progress will be interrupted by work for other courses, meals, sleep, and other human necessities.

Real-world applications

The advantage of the man-hour concept is that it can be used to estimate the impact of staff changes on the amount of time required for a task, which can done by dividing the number of man-hours by the number of workers available. For example, if a task takes 20 man-hours to complete then a team of 2 people will complete it in 10 hours of work, while a team of 5 people will complete it in 4 hours.

This is, of course, only appropriate to certain types of activities. It is of most use when considering 'piece-work', where the activity being managed consists of discrete activities having simple dependencies, and where other factors can be neglected. Therefore, adding another person to a packaging team will increase the output of that team in a predictable manner. In transport industry, this concept is superseded by passenger-mile and tonne-mile for better costing accuracy.

In reality, other factors intervene to complicate this model. If some elements of the task have a natural timespan, adding more staff will have a reduced effect: although having two chefs will double the speed of some elements of food preparation, they roast a chicken no faster than one chef. Some tasks also have a natural number of staff associated with them: the time to chop the vegetables will be halved with the addition of the second chef, but the time to carve the chicken will remain the same. Economies of scale and diseconomies of scale further lead to a non-linear relationship between the number of workers doing a given task and the amount of time it takes them to complete it. Some tasks cannot be done by less than a required minimum number of workers (e.g. lifting heavy loads) or they will be done with drastically better efficiency if the workforce exceeds a minimum efficient scale. In other cases an excessive number of workers might get in each other's way, reducing efficiency and the per person productivity of the individual worker.

Another example is the adage, "Just because a woman can make a baby in nine months, it does not follow that nine women can make a baby in one month." This adage is often cited in systems development to justify the belief that adding more staff to a project does not guarantee it will get done quicker.

Another problem with this model, as Fred Brooks noted, is that organization, training, and co-ordination activities could more than outweigh the potential benefits of adding extra staff to work on a task, especially if considered only over a shorter time period.

Similar units

The similar concept of a man-day, man-week, man-month, or man-year [3] [4] is used on large projects. It is the amount of work performed by an average worker during one day, week, month, or year, respectively. The number of hours worked by an individual during a year varies greatly according to cultural norms and economics. The average annual hours actually worked per person in employment as reported by OECD countries in 2007, for example, ranged from a minimum of 1,389 hours (in the Netherlands) to a maximum of 2,316 hours (in South Korea). [5]

Productive system hours

The concept of productive system hours (PSH) has been used in forestry in Austria and by extension to other work. It includes time for breaks and can be used to calculate how long it may take to complete a task, including required recovery times from physically strenuous work, as well as legally required breaks or other human interactions. If it includes 15-minute breaks, it is written as (PSH15).

A related concept is productive machine hours (PMH). [6]

See also

Related Research Articles

Time management is the process of planning and exercising conscious control of time spent on specific activities—especially to increase effectiveness, efficiency and productivity.

<i>The Mythical Man-Month</i> 1975 software engineering book by Fred Brooks

The Mythical Man-Month: Essays on Software Engineering is a book on software engineering and project management by Fred Brooks first published in 1975, with subsequent editions in 1982 and 1995. Its central theme is that adding manpower to a software project that is behind schedule delays it even longer. This idea is known as Brooks's law, and is presented along with the second-system effect and advocacy of prototyping.

Brooks's law is an observation about software project management that "Adding manpower to a late software project makes it later." It was coined by Fred Brooks in his 1975 book The Mythical Man-Month. According to Brooks, under certain conditions, an incremental person when added to a project makes it take more, not less time.

Overtime is the amount of time someone works beyond normal working hours. The term is also used for the pay received for this time. Normal hours may be determined in several ways:

<span class="mw-page-title-main">Wage</span> Payment by an employer to an employee for labour

A wage is payment made by an employer to an employee for work done in a specific period of time. Some examples of wage payments include compensatory payments such as minimum wage, prevailing wage, and yearly bonuses, and remunerative payments such as prizes and tip payouts. Wages are part of the expenses that are involved in running a business. It is an obligation to the employee regardless of the profitability of the company.

<span class="mw-page-title-main">Office</span> Room where administrative work is performed

An office is a space where the employees of an organization perform administrative work in order to support and realize the various goals of the organization. The word "office" may also denote a position within an organization with specific duties attached to it ; the latter is an earlier usage, as "office" originally referred to the location of one's duty. In its adjective form, the term "office" may refer to business-related tasks. In law, a company or organization has offices in any place where it has an official presence, even if that presence consists of a storage silo. For example, instead of a more traditional establishment with a desk and chair, an office is also an architectural and design phenomenon, including small offices, such as a bench in the corner of a small business or a room in someone's home, entire floors of buildings, and massive buildings dedicated entirely to one company. In modern terms, an office is usually the location where white-collar workers carry out their functions.

<span class="mw-page-title-main">Scientific management</span> Theory of management

Scientific management is a theory of management that analyzes and synthesizes workflows. Its main objective is improving economic efficiency, especially labor productivity. It was one of the earliest attempts to apply science to the engineering of processes in management. Scientific management is sometimes known as Taylorism after its pioneer, Frederick Winslow Taylor.

<span class="mw-page-title-main">Henry Gantt</span> American engineer (1861–1919)

Henry Laurence Gantt was an American mechanical engineer and management consultant who is best known for his work in the development of scientific management. He created the Gantt chart in the 1910s.

In economics, the lump of labour fallacy is the misconception that there is a finite amount of work—a lump of labour—to be done within an economy which can be distributed to create more or fewer jobs. It was considered a fallacy in 1891 by economist David Frederick Schloss, who held that the amount of work is not fixed.

<span class="mw-page-title-main">Part-time job</span> Form of employment that carries fewer hours per week than a full-time job

A part-time job is a form of employment that carries fewer hours per week than a full-time job. Workers are commonly considered to be part-time if they work fewer than 30 hours per week. Their hours of work may be organised in shifts. The shifts are often rotational.

Permatemp is a United States term for a temporary employee who works for an extended period for a single staffing client. The word is a portmanteau of the words permanent and temporary.

<span class="mw-page-title-main">Piece work</span> Payment of wages per unit of output

Piece work or piecework is any type of employment in which a worker is paid a fixed piece rate for each unit produced or action performed, regardless of time.

Scheduling is the process of arranging, controlling and optimizing work and workloads in a production process or manufacturing process. Scheduling is used to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials.

Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand. Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially. For calculations, it is the time to produce parts divided by the number of parts demanded in that time interval. The takt time is based on customer demand; if a process or a production line are unable to produce at takt time, either demand leveling, additional resources, or process re-engineering is needed to ensure on-time delivery.

<span class="mw-page-title-main">Workforce productivity</span> Concept in economics

Workforce productivity is the amount of goods and services that a group of workers produce in a given amount of time. It is one of several types of productivity that economists measure. Workforce productivity, often referred to as labor productivity, is a measure for an organisation or company, a process, an industry, or a country.

Work measurement is the application of techniques which is designed to establish the time for an average worker to carry out a specified manufacturing task at a defined level of performance. It is concerned with the duration of time it takes to complete a work task assigned to a specific job. It means the time taken to complete one unit of work or operation it also that the work should completely complete in a complete basis under certain circumstances which take into account of accountants time

Job performance assesses whether a person performs a job well. Job performance, studied academically as part of industrial and organizational psychology, also forms a part of human resources management. Performance is an important criterion for organizational outcomes and success. John P. Campbell describes job performance as an individual-level variable, or something a single person does. This differentiates it from more encompassing constructs such as organizational performance or national performance, which are higher-level variables.

The following is a glossary of terms relating to construction cost estimating.

Socially necessary labour time in Marx's critique of political economy is what regulates the exchange value of commodities in trade. In short, socially necessary labour time refers to the average quantity of labour time that must be performed under currently prevailing conditions to produce a commodity.

Shift-based hiring is a recruitment concept pioneered in Singapore that hires people for individual shifts, rather than hiring employees before scheduling them into shifts. Originally, it was intended as an efficient way to schedule shift-based part-time work, but it is now known that this concept can be applied to any job that requires a number of consecutive hours of commitment as a shift. This hiring concept focuses on employing workers for a particular shift on that particular day, rather than focusing on employing a worker to work recurrent shifts that can become part-time or full-time work, although the latter can be a result of employing a worker to work shifts that run at the same timing periodically. Every shift or a group of recurring shifts may be a unique job posting.

References

  1. "Definition from the Merriam-Webster Online Dictionary". Archived from the original on 2007-11-03. Retrieved 2010-04-13.
  2. "Person-hour definition - Dictionary". Encarta . MSN. Archived from the original on 2011-05-25.
  3. Infoplease.com
  4. "SFAF.org". Archived from the original on 2009-08-11. Retrieved 2006-12-25.
  5. OECD Employment Outlook 2009, Tackling The Jobs Crisis (PDF). Secretary-General of the Organisation for Economic Co-operation and Development. 2009. p. 269. ISBN   978-92-64-06791-2. Archived from the original (PDF) on 2016-12-20. Retrieved 2009-09-22. Swivel.com also publishes the Official data up to 2005 in spreadsheet format.
  6. "Archived copy" (PDF). Archived from the original (PDF) on 2013-11-02. Retrieved 2013-01-04.{{cite web}}: CS1 maint: archived copy as title (link) More details in the paper "Influence of Terrain Conditions and Thinning Regimes on Productivity of a Track-Based Steep Slope Harvester".

Sources