Line 5 | |||
---|---|---|---|
Overview | |||
Status | Proposed | ||
Owner | Government of the State of Nuevo León | ||
Locale | Monterrey | ||
Termini |
| ||
Stations | 13 | ||
Website | https://www.nl.gob.mx/?P=metrorrey_principal | ||
Service | |||
Type | Autonomous Rail Rapid Transit | ||
System | Metrorrey | ||
Operator(s) | Sistema de Transporte Colectivo Metrorrey | ||
History | |||
Opened | 31 August 2027 | ||
Technical | |||
Line length | 10.6 km (6.6 mi) | ||
Operating speed | 65 km/h (40 mph) | ||
|
MetrorreyLine 5 is one of the three Metrorrey lines currently under construction of that will connect the south of Monterrey with the center of Monterrey. The system shall be an Autonomous Rail Rapid Transit (ART) line, that is that it will use electric transport vehicle without rails or catenary and virtual semi-automatic guidance. Each vehicle will have a capacity of 300 passengers. It will have an extension of approximately 10.6 kilometers. It will connect with lines 4 and 6 at the Hospital de Ginecología station, connected to line 3 at the Santa Lucía station (in front of the High Specialty Medical Unit No. 23 of the Mexican Social Security Institute).
On 29 April 2022, the Government of the State of Nuevo León launched an international public tender for the construction of the line. Construction work is expected to begin in November 2024 and end on August 31, 2027, according to the secretary of mobility, Hernán Villarreal. However, the government was uncertain as to whether this line would be elevated or on the surface. [1] [2]
On 30 April 2023 it was officially confirmed that line 5 will be ART type with elevated, surface and hybrid sections.
In late 2021, governor of Nuevo León Samuel García announced the construction of lines 4 and 5 of the Metrorrey, then reported through a video on his social networks the place where the new metro lines will pass. The first plan presented provided that line 5 would depart from the center of Monterrey to the Mederos colony in the south of the municipality, having an original length of 8.5 kilometres (5.3 mi). [3] However, in the publication of the tender, the length was extended to 10.6 kilometres (6.6 mi) long. [1]
On 9 September 2022, the technical openings were completed as part of the process of the international public tender, two consortia were registered to win the award of the construction of Lines 4, 5 and 6. One of the consortia is made up of the companies Mota-Engil Mexico and China Communications Construction Company, which also built a section of the Tren Maya . The other consortium consists of the companies Ferrovías del Bajío, Hercules Construcciones de Monterrey, Constructora Moyeda, Manufacturas Metálicas Ajax, Tordec, Inversiones Ferroviarias de México, Consega Diseño y Construcciones, and Vivienda y Construcciones. [4]
On 15 September 2022 the economic proposals were submitted by both consortia and, in accordance with the timetable for the tender, on 23 September 2022 the final judgment was awarded to the winning consortium. During the presentation stage of economic proposals for construction, the Secretariat of Urban Mobility and Planning of Nuevo León rejected the proposal of the consortium composed of the Mexican companies Ferrovías del Bajío, Hércules Construcciones de Monterrey, Constructora Moyeda, Manufacturas Metálicas Ajax, Tordec, Inversiones Ferroviarias de México, Consega Diseño y Construcciones, and Vivienda y Construcciones. It was explained that in none of the above-mentioned contracts had the consortium built any light rail, metro, or monorail lines in the last 15 years. Similarly, they were made aware that braking traction systems and automatic driving systems have not been constructed or operated by any of the members of that consortium. [5]
On 23 September 2022, the tender was awarded for the construction of lines 4, 5 and 6 of the Metro to the consortium formed by the Portuguese firm Mota-Engil de México and the Chinese CRRC Hong Kong. At a press conference, it was reported that CRRC will be the supplier of rolling stock, while Mota-Enegil will take care of the construction. The Secretary of Urban Mobility and Planning of Nuevo León Hernán Villarreal explained that the tender has two cost options and that both are profitable for the administration. If the 3 lines are raised, the amount will amount to 25.861 million pesos plus VAT. If line 5 is built at level, the cost would drop to 25.857 million pesos plus VAT. The consortium formed by Mota-Engil and CRRC will sign the contract on 26 September at 10:00, at the offices of the Legal Directorate of the Secretariat of Mobility and Urban Planning, located in the Administrative Tower. Regarding the possibility of building part of the transport system at the street level, during the reading of the failure of the SMPU-LPI-001-2022 tender it was specified that this topic will be defined in November 2024. [6] [7] The construction process began on 30 September 2022 for lines 4 and 6 being monorail type. A popular consultation will be held in November 2024 to determine whether Metrorrey Line 5 will be an elevated monorail or a rapid transit line at ground level.
On 30 June 2023, Governor Samuel García began the construction of Line 5. This line would be hybrid at level, with three elevated sections and will use electric trains with rubber wheels (Autonomous Rail Rapid Transit), unlike lines 4 and 6, which will have a monorail. The governor explained that the Line 5 project is based on four main axes. The first is the installation of green corridors, the second is the increase of public transport, the third is to remove the transport of cargo from Avenida Garza Sada that does not have as its destination Monterrey, and finally, the construction of the necessary infrastructure for the Line itself is contemplated. [8] [9]
In the early 2022, following the announcement of the first master plan of the new lines of the Metrorrey, neighbors of southern Monterrey demonstrated against the construction of line 5 by considering that a high viaduct will be detrimental to this whole sector, demanding that the line should be underground. [10] They argued that lanes would be reduced on Garza Sada Avenue, businesses with the works would be closed and, in addition, aesthetically, will impact the properties and surplus value. For this reason, on 15 February 2022 they protested in front of the Palace of Government, where they delivered a letter addressed to the governor of Nuevo León, Samuel García, to listen to them and build Line 5 underground. [11] After this, the government of Nuevo León announced that they would include in the master plan Line 6 that would travel from the center of the municipality of Monterrey to the center of the municipality of Apodaca in case the construction of Line 5 was not possible. [12] In August 2022, García warned the opponents that the work on Line 5 will be done, since in the last months of last year the support of the vast majority of the southern neighborhoods has been quite positive and encouraging. Hence, as García said, it is only necessary to wait for further information on the project and the initiative of its construction. [13]
Line F is a planned addition to the Buenos Aires Underground. In 2019, the government of Buenos Aires was looking for a group to create a plan of the line, but this study was cancelled in 2022. The city decided to create a study with their own staff, which is still underway as of 2024. The estimated cost of the project has risen from 800 million dollars, to 2 billion USD.
The Lima and Callao Metro is a rapid transit system that serves the cities of Lima and Callao, which make up the Lima metropolitan area. The existing metro lines currently link the district of Villa El Salvador in the south of Lima with San Juan de Lurigancho in the northeast of the city, as well as a 5 km (3.1 mi) segment in the east of the metro area. Furthermore, there are four additional lines planned for the network.
The Bilbao metro is a rapid transit system serving the city of Bilbao and the region of Greater Bilbao. Lines 1 and 2 have a "Y" shape, as they transit both banks of the river Ibaizabal and then combine to form one line that ends in the south of Bilbao. Line 3 has a "V" shape connecting the municipality of Etxebarri with the Bilbao neighbourhood of Matiko; the apex of the "V" is Zazpikaleak/Casco Viejo station, where all three current lines meet. The metro is connected with the Bilbao tram, Bilboko Aldiriak, Euskotren Trena, Feve, Renfe long-distance trains, and Bilbao's bus station. All three lines use metre gauge.
Metrorrey, officially Sistema de Transporte Colectivo Metrorrey, is a rapid transit system that serves the metropolitan area of Monterrey. It is operated by the Sistema de Transporte Colectivo Metrorrey, which is part of the decentralized public administration of Nuevo León. In 2022, it was the sixth largest metro system in North America by ridership.
The Y Griega Station is a station on Line 1 of the Monterrey Metro, a light rail system in Monterrey, Mexico. The station was opened on 25 April 1991 as part of the inaugural section of Line 1, going from San Bernabé to Exposición.
The Cuauhtémoc Station is a station on the Monterrey Metro. It is located in the north end of Cuauhtémoc Avenue, in the north side of downtown Monterrey. The Line 1 station was opened on 25 April 1991 as part of the inaugural section of Line 1, going from San Bernabé to Exposición.
The Exposición Station is a terminal station on Line 1 of the Monterrey Metro. It is located on Juárez and Exposición Avenues in the La Hacienda neighborhood in Guadalupe, Nuevo León, Mexico. The station was opened on 25 April 1991 as the eastern end point or terminus of the inaugural section of Line 1, going from San Bernabé to Exposición.
The Roca line is a 1,676 mm gauge commuter rail service in the Buenos Aires Province, Argentina, part of General Roca Railway network. The service is currently operated by State-owned company Trenes Argentinos, from the city-centre terminus of Constitución south to Ezeiza, Alejandro Korn, La Plata, Cañuelas, Chascomús, Gutiérrez and Lobos, and west to Sarmiento Line's station Haedo. The transfer stations between the branch lines are Avellaneda, Temperley, Bosques and Berazategui.
The Bogotá Metro is a rapid transit project under construction in Bogotá, Colombia, it is projected to be in operation in 2028. Construction started in October 2020.
The Panama Metro is a rapid transit system in Panama City, Panama. It links neighborhoods north and the east of the metropolitan area to the city center.
Jaime Heliodoro Rodríguez Calderón, sometimes referred to by his nickname "El Bronco", is a Mexican politician. He served as the Governor of Nuevo León from 2015 to 2021 and was a candidate in the 2018 presidential election.
Autonomous Rail Rapid Transit (ART) is a lidar guided bi-articulated bus system for urban passenger transport. Developed and manufactured by CRRC through CRRC Zhuzhou Institute Co Ltd, it was unveiled in Zhuzhou in the Hunan province on June 2, 2017. ART is specifically referred to as a train or rapid transit as Digital-rail Rapid Transit by its manufacturer, however the public describes it as a bus. Its exterior is composed of individual fixed sections joined by articulated gangways, resembling a rubber-tyred tram and translohr.
Line 2 is a line on the Metrorrey system. It has 13 stations and it runs 13.036 km (8.100 mi) from Sendero to Zaragoza. The line opened on 30 November 1994.
Santiago Metro Line 8 is a planned rapid transit line that will form part of the Santiago Metro. It is planned to have an approximate length of 20 kilometres (12 mi), connecting the communes of Providencia on the northeast and Puente Alto on the southeast of the Chilean capital.
Line 3 is a line on the Metrorrey system. It has 8 stations and is 7.5 km (4.7 mi) long. The line opened on February 27, 2021.
Samuel Alejandro García Sepúlveda is a Mexican lawyer and politician serving as the Governor of Nuevo León. A member of the Citizens' Movement party, he served as a local deputy in the Congress of Nuevo León from 2015 to 2018 and represented Nuevo León in the Senate from 2018 to 2020.
Metrorrey Line 4 is an under-construction Metrorrey line that will municipalities of Monterrey and San Pedro Garza García. It will have an extension of approximately 7.5 kilometers. It will connect with lines 3, 5 and 6 at the Saint Lucia station.
Metrorrey Line 6 is one of the three lines currently planned by Metrorrey, which will connect the municipalities of Monterrey, Guadalupe, San Nicolás de los Garza and Apodaca. It will have an extension of approximately 17.6 kilometers. It will connect with lines 3, 4 and 5 at the Saint Lucia station, in front of the High Specialty Medical Unit No. 33 of the Mexican Social Security Institute (IMSS). It connects to line 1 at the Y.A. station. Officially it does not have a distinctive color, but on the map, it is shown as purple.
The Tren Suburbano de Monterrey is a future commuter rail line in Monterrey, Nuevo León, Mexico. The cost of the project will be 12 billion pesos, Phase 1, of which 3 billion come from the federal government of Mexico, via Fonadin, another 3 billion via Banobras and 6 billion from the private initiative, under a private-public association scheme. Samuel García clarified that in 2022 they intend to start with the technical studies of the project themselves that will cost up to 500 million pesos.