Milton Keynes wind farm is located 2 miles east of Emberton in the City of Milton Keynes, Buckinghamshire, UK. It was developed by Your Energy and is owned by Mistral Windfarms. The wind farm comprises seven turbines 125 m to the blade tip, and has a total installed capacity of 14 MW.[ citation needed ] They were expected to produce approximately 38 GWh of electricity per year.[ citation needed ]

Contents

Development and Construction

A planning application was submitted in August 2006 to Milton Keynes City Council by Your Energy Ltd, and was granted planning permission in January 2008.[ citation needed ]

The decision was challenged and upheld three separate times during 2008 by objectors to the project. It was the first wind farm challenge to go as high as the House of Lords.[ citation needed ]

The main contractor for civil and electrical works was Morrison Construction,[ citation needed ] part of the Galliford Try Group. Danish company Vestas supplied the turbines, Vestas V90-2MW machines.[ citation needed ] Engineering Renewables Ltd were Project Managers for construction and operations.

The turbines were delivered to the Port of Hull, where they continued their journey to Milton Keynes by road. Construction commenced in November 2009 and was completed by September 2010.[ citation needed ]

Community Benefit Fund

£190,000 will be contributed towards community projects over the life of the wind farm. [1] An additional £50,000 is being directed toward improving the biodiversity of the surrounding area and local footpath networks over the first five years.

A similar fund is in place at Burton Wold Wind Farm, also developed by Your Energy Ltd.

See also

Related Research Articles

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

<span class="mw-page-title-main">Vestas</span> Danish wind turbine company

Vestas Wind Systems A/S is a Danish manufacturer, seller, installer, and servicer of wind turbines that was founded in 1945. The company operates manufacturing plants in Denmark, Germany, the Netherlands, Taiwan, India, Italy, Romania, the United Kingdom, Spain, Sweden, Norway, Australia, China, Brazil, Poland and the United States, and employs more than 25,000 people globally.

<span class="mw-page-title-main">Portland Wind Farm</span>

The Portland wind farm is one of Australia's largest wind farms. Located on the coast of south-western Victoria near the city of Portland, it consists of four separate sites, all of which have been completed as of 2015. Completion of the entire 195 MW project was expected in 2011, at a capital cost of A$330 million.

<span class="mw-page-title-main">Blayney Wind Farm</span>

The Blayney wind farm is a wind power station at Lake Carcoar, south of Blayney, New South Wales, Australia. It was acquired by Trustpower in 2014, and is now owned by Tilt Renewables. Blayney has fifteen wind turbines, with a total nameplate capacity of 9.9 MW of electricity.

The Thanet Wind Farm is an offshore wind farm 7 miles (11 km) off the coast of Thanet district in Kent, England. On commissioning it was the world's largest offshore wind farm. It has a nameplate capacity of 300 MW and it cost £780–900 million (US$1.2–1.4 billion). Thanet is one of fifteen Round 2 wind projects announced by the Crown Estate in January 2004 but the first to be developed. It was officially opened on 23 September 2010, when it overtook Horns Rev 2 as the biggest offshore wind farm in the world. It has since been overtaken by many others.

<span class="mw-page-title-main">Wind power in Australia</span> Overview of wind power in Australia

Wind power is one of the main renewable energy sources in Australia and contributed 10% of electricity supplied in 2020, with 37.5% total renewable energy supply. Australia has greatly distinguished conditions for harvesting wind power. Abundant wind resources may be located close to residential areas in the southern parts of the country and on the slopes of the Great Dividing Range in the east.

<span class="mw-page-title-main">Wind power in Scotland</span> Overview of wind power in Scotland

Wind power in Scotland is the fastest-growing renewable energy technology, with 9,347 MW of installed wind power capacity as of June 2020. This included 8,366 MW from onshore wind in Scotland and 981 MW of offshore wind generators.

<span class="mw-page-title-main">Whitelee Wind Farm</span> Wind farm in East Ayrshire, Scotland, UK

Whitelee Wind Farm is a windfarm on the Eaglesham moor in Scotland. The main visitor centre is located in East Renfrewshire, but the majority of turbines are located in East Ayrshire and South Lanarkshire. It is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 megawatts (MW), with the average of 2.5 MW per turbine. Whitelee was developed and is operated by ScottishPower Renewables, which is part of the Spanish company Iberdrola.

<span class="mw-page-title-main">Burton Wold Wind Farm</span> Wind farm near Burton Latimer in Northamptonshire, UK

Burton Wold Wind Farm is a wind farm located near Burton Latimer in the English county of Northamptonshire, UK. The Wind Farm was developed by Your Energy Ltd, is owned by Mistral Windfarms and operated by Engineering Renewables Ltd. E.ON UK is buying the electricity output of the project under a long-term power purchase agreement. The farm is spread over three hectares. It has an installed capacity of 20 MW and generate on average around 40,000,000 units of electricity annually.

<span class="mw-page-title-main">Burbo Bank Offshore Wind Farm</span>

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

Turitea Wind Farm is a 222-megawatt wind farm under construction near Turitea, Palmerston North, New Zealand. The farm is owned and operated by Mercury Energy.

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

<span class="mw-page-title-main">Scout Moor Wind Farm</span> Renewable energy facility in England

Scout Moor Wind Farm is the second largest onshore wind farm in England. The wind farm, which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity, providing 154,000 MW·h per year; enough to serve the average needs of 40,000 homes. The site occupies 1,347 acres (545 ha) of open moorland between Edenfield, Rawtenstall and Rochdale, and is split between the Metropolitan Borough of Rochdale in northern Greater Manchester and the Borough of Rossendale in south-eastern Lancashire. The turbines are visible from as far away as south Manchester, 15–20 miles (24–32 km) away.

<span class="mw-page-title-main">Winscales Moor Wind Farm</span>

Winscales Moor Wind Farm is a group of 7 turbines located between the A595 and A66, near Winscales, in Cumbria, England. The turbines have a tip height of 81 metres, the total installed capacity is 5.95 MW. The wind farm was developed by Your Energy Ltd and is owned by Mistral Windfarms. Engineering Renewables Ltd manage the construction and operation.

Garves Wind Farm Wind farm in County Antrim, Northern Ireland

Garves Wind Farm consists of 5 turbines with an installed capacity of 15 MW. It is located near Dunloy in County Antrim, Northern Ireland. It is managed by Entap Limited on behalf of Garves Wind Limited. London-based project development company Your Energy Ltd bought the scheme from the original developer in 2007.

<span class="mw-page-title-main">Pates Hill Wind Farm</span>

Pates Hill Wind Farm is located near the village of West Calder in West Lothian, Scotland. It consists of 7 Vestas V-80 wind turbines, measuring 107 metres to the blade tip. It became operational in February 2010 and is expected to generate electricity equivalent to the needs of approximately 8,000 households annually.

<span class="mw-page-title-main">Meadow Lake Wind Farm</span> Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

Viking Wind Farm is a wind farm under construction which is being developed by Viking Energy, a partnership between Shetland Islands Council and SSE plc.

The Rush Creek Wind Project is a 600 megawatt (MW) wind facility in eastern Colorado, located south of the town of Limon. It increased the wind generating capacity in the state by 20% when it came online in late 2018. The facility is financed, owned, and operated by Xcel Energy, the largest public utility in the state. The project was developed primarily for its numerous economic benefits since Xcel previously met the minimum 30% requirement of Colorado's 2020 renewable portfolio standard.

The Port Augusta Renewable Energy Park is a combined wind and solar farm under construction south of Port Augusta in South Australia, Australia. The solar farm is planned to be at the northern end of the site, west of the Augusta Highway and south of Sundrop Farms. The wind turbines will be on both sides of the Augusta Highway, extending south as far as the road to Horrocks Pass. Construction formally started in October 2020 and is estimated to take about 18 months to complete. The total site is about 5,400 hectares.

References

  1. "Wind farm appeal blown out of court". MK News. 15 October 2008.