Mindoro Wind Farm

Last updated

Mindoro Wind Farm
Mindoro Wind Farm
Official nameWind Energy Power System
Country Philippines
Location Mindoro Oriental
Coordinates 13°30′N120°57′E / 13.5°N 120.95°E / 13.5; 120.95 Coordinates: 13°30′N120°57′E / 13.5°N 120.95°E / 13.5; 120.95
Owner(s)Philippine Hybrid Energy Systems, Inc.
Wind farm
Type Onshore
Hub height70 m (230 ft)
Power generation
Units operational8 X 2 MW
Make and model Siemens Gamesa
Nameplate capacity 16 MW

The Wind Energy Power System (WEPS) is a wind farm project located near Puerto Galera, in the Philippine province of Mindoro Oriental. Once completed the project will generate an estimated 48MW of electricity. [1]

Project details

The WEPS is located in the municipality of Puerto Galera, on the island of Mindoro. The project is being developed by Philippine Hybrid Energy Systems, Inc. a joint Philippine, Italian, and American developer. The first stage of development was approved in June 2011 by Philippine Energy Secretary Jose Almendras. This comes as part of the Philippine Government's ambitious energy policy.

On March 7, 2012, in Mindoro, Philippine President Aquino signed the Proposed Luzon Mindoro-Interconnection (LMI) project with the full support of Cong. Rudy Valencia, Cong. Rey Umali, Governor Alfonso Umali, and the Local Government of Mindoro. This agreement will allow for excess electricity to be transported to the nearby island of Luzon, home to the nation's capital and largest city Manila. "Before I end my term in 2016, I want to see Mindoro exporting its surplus power to Luzon," commented President Benigno Aquino III during a recent signing ceremony. [2]

The project is being developed jointly by Philippine Hybrid Energy Systems, Inc. Italian power utility developer CMC Asia, Inc. and turbine manufacturer and building contractor Gamesa Eolica, S.L. Unipersonal of Spain.

Related Research Articles

<span class="mw-page-title-main">Geography of the Philippines</span> Overview of the geography of the Philippines

The Philippines is an archipelago that comprises 7,641 islands with a total land area of 300,000 square kilometers (115,831 sq mi). It is the world's fifth largest island country. The eleven largest islands contain 95% of the total land area. The largest of these islands is Luzon at about 105,000 square kilometers (40,541 sq mi). The next largest island is Mindanao at about 95,000 square kilometers (36,680 sq mi). The archipelago is around 800 kilometers (500 mi) from the Asian mainland and is located between Taiwan and Borneo.

<span class="mw-page-title-main">Oriental Mindoro</span> Province in Mimaropa

Oriental Mindoro, is a province in the Philippines located on the island of Mindoro under Mimaropa region in Luzon, about 140 kilometres (87 mi) southwest of Manila. The province is bordered by the Verde Island Passage and the rest of Batangas to the north, by Marinduque, Maestre de Campo Island, Tablas Strait and the rest of Romblon to the east, by Semirara and the rest of Caluya Islands, Antique to the south, and by Occidental Mindoro to the west. Calapan, the only city in the island, is the provincial capital and Mimaropa's regional center.

<span class="mw-page-title-main">Puerto Galera</span> Municipality of the Philippines in the province of Oriental Mindoro

Puerto Galera, officially the Municipality of Puerto Galera, is a 1st class municipality in the province of Oriental Mindoro, Philippines. According to the 2020 census, it has a population of 41,961 people. 

<span class="mw-page-title-main">National Power Corporation</span>

The National Power Corporation, is a Philippine government-owned and controlled corporation that is mandated to provide electricity to all rural areas of the Philippines by 2025, to manage water resources for power generation, and to optimize the use of other power generating assets. Prior to the deregulation of the power industry in 2001, NPC was a vertically integrated power utility engaged in the production, transmission and distribution of electric power and used to be the largest provider and generator of electricity in the Philippines. It was also the principal power provider for Manila Electric Company (Meralco), the only power distributor in the Metro Manila area and its nearby provinces. NPC also served as the operator and owner of the Philippine power grid and its related facilities and assets from its creation on November 3, 1936, until the turnover of operations, maintenance, and ownership of the grid to another government-owned corporation National Transmission Corporation (TransCo) on March 1, 2003.

<span class="mw-page-title-main">Calapan</span> Component city in Mimaropa

Calapan, officially known as the City of Calapan, is a 3rd class component city and capital of the province of Oriental Mindoro, Philippines. According to the 2020 census, it has a population of 145,786 people. 

<span class="mw-page-title-main">San Teodoro, Oriental Mindoro</span> Municipality of the Philippines in the province of Oriental Mindoro

San Teodoro, officially the Municipality of San Teodoro, is a 4th class municipality in the province of Oriental Mindoro, Philippines. According to the 2020 census, it has a population of 19,121 people. 

<span class="mw-page-title-main">AES Corporation</span> American energy company

The AES Corporation is an American utility and power generation company. It owns and operates power plants, which it uses to generate and sell electricity to end users and intermediaries like utilities and industrial facilities. AES is headquartered in Arlington, Virginia, and is one of the world's leading power companies, generating and distributing electric power in 15 countries and employing 10,500 people worldwide. AES Corporation is a global Fortune 500 power company. AES Ranks in the Top Ten of Fast Company's 2022 Best Workplaces for Innovators.

<span class="mw-page-title-main">Outline of the Philippines</span> Overview of and topical guide to the Philippines

The following outline is provided as an overview of and topical guide to the Philippines:

<span class="mw-page-title-main">First Philippine Holdings Corporation</span>

First Philippine Holdings Corporation (FPH) is a management and investment company whose major business is power generation and distribution, with strategic initiatives in manufacturing and property development. FPH is a member of the Lopez Group of Companies.

<span class="mw-page-title-main">Bangui Wind Farm</span> Wind farm in the Philippines

Bangui Wind Farm is a wind farm in Bangui, Ilocos Norte, Philippines. The wind farm uses 20 units of 70-meter (230 ft) high Vestas V82 1.65 MW wind turbines, arranged in a single row stretching along a 9-kilometer (5.6 mi) shoreline off Bangui Bay, facing the South China Sea.

The largest projects in the Philippine Economy includes both megaprojects, costing over $1 billion, and other large investment projects, typically costing between $10 million and $1 billion. Projects with investments below $10 million also may be included here, either as parts of larger projects, or in case of major international significance and media coverage. In case of projects involving new vehicle models, the cost of development is taken into account as well as the cost of production.

<span class="mw-page-title-main">Solar power in Florida</span> Overview of solar power in the U.S. state of Florida

Solar power in Florida has been increasing, as the cost of solar power systems using photovoltaics (PV) has decreased in recent years. Florida has low electricity costs compared with other states, which makes individual solar investment less attractive. Florida ranks ninth nationally in solar resource strength according to the National Renewable Energy Laboratory and tenth in solar generation by the Solar Energy Industries Association.

<span class="mw-page-title-main">Wind power in the Philippines</span>

Wind power in the Philippines accounts for a total of 443MW as of 2020 according to the Department of Energy, covering about 1.6% of the country's total installed capacity for both renewable and non-renewable energy sources. When it comes to existing renewable energy sources in the country, wind power has a total share of approximately 5.4%. Despite currently being a small contributor to the country's energy mix, wind power installations have increased from 33MW in 2012-2013 to 337MW in 2014, 427MW in 2015-2018, and 443MW in 2019-2021. Moreover, the Department of Energy's National Renewable Energy Plan (NREP) 2020-2040 aims to commission 2,345MW of total wind power capacity by 2030. There has been a setback, however, as the wind power industry was moderately affected by COVID, particularly in the import of wind turbines. Due to this, several projects such as the Aklan onshore wind project got delayed. To further drive the wind energy sector in the country, an increased demand for renewable energy, greater government commitments, and reduced wind power tariff are needed.

<span class="mw-page-title-main">Batangas International Port</span> Port in Philippines

The Batangas International Port or locally known as the Batangas Pier, is a seaport in Barangay Santa Clara, Batangas City primarily serving the Calabarzon region of the Philippines. The seaport covers an area of about 150 hectares.

<span class="mw-page-title-main">Pililla Wind Farm</span> Wind farm in Rizal, Philippines

The "Pililla, Rizal" Wind Energy Service Contract granted to Alternergy Philippine Holdings Corporation (APHC) covers an area of 4,515 hectares under Department of Energy WESC NO. 2009-09-018. This Wind Energy Service Contract (WESC) has two phases, Pililla Wind Power Project under WESC NO. 2009-09-018-AF1 and the Mt. Sembrano Wind Power Project under WESC NO. 2009-09-018-AP2.

The Mindoro–Batangas Super Bridge is a proposed 14 km (8.7 mi) pontoon bridge which is planned to connect the Philippine province of Batangas and Mindoro island.

<span class="mw-page-title-main">Electricity sector in the Philippines</span> Overview of the electricity sector in the Philippines

The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the Philippines. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.

Aboitiz Power Corporation also known as AboitizPower (AP), a subsidiary of Aboitiz Equity Ventures (AEV), is a holding company engaged in power distribution, generation and retail electricity services.

ACEN is the listed energy platform of the Ayala Group. The company has ~3,700 MW of attributable capacity in the Philippines, Vietnam, Indonesia, India, and Australia, with a renewable share of 93%, which is among the highest in the region.

<span class="mw-page-title-main">Reynaldo Umali</span> Filipino politician (1957–2021)

Reynaldo Villar Umali was a Filipino politician who served in the House of Representatives of the Philippines from 2010 to 2019 representing the 2nd district of Oriental Mindoro. He ran as governor of Oriental Mindoro during the 2019 Philippine gubernatorial elections but lost to Humerlito Dolor.

References

  1. "Mindoro Wind Farm Rising". Manila Standard Today. Archived from the original on October 9, 2012.
  2. Evora, Robert. "Mindoro wind farm dwarfs Ilocos plant". Manila Standard Today. Archived from the original on August 24, 2012.