Nenskra Hydropower Plant Project

Last updated
Nenskra Hydropower Plant Project
Georgia Samegrelo-Zemo Svaneti relief location map.svg
Red pog.svg
Location of Nenskra Hydropower Plant Project in Samegrelo-Zemo Svaneti
Relief Map of Georgia.png
Red pog.svg
Nenskra Hydropower Plant Project (Georgia)
Country Georgia
LocationZhoneti, Georgia
Coordinates 43°02′50″N42°22′50″E / 43.04722°N 42.38056°E / 43.04722; 42.38056
Reservoir
CreatesZhoneti
Nenskra Hydropower Plant
Website
nenskra.ge/en/

Nenskra Hydro Power Plant (also known as Nenskra HPP) is a proposed hydroelectric power station to be located on the southern slopes of the Central Caucasus mountains in Svaneti, Georgia.

Contents

The plant has a projected capacity of 280 MW, and a projected average annual energy production of 1.2 TWh. [1] It is being developed by JSC Nenskra Hydro, founded in 2015 as a joint venture between Korea Water Resource Corporation and JSC Partnership Fund. [2]

The project has faced significant opposition from representatives of all communities in Upper Svaneti. [3]

General Background

The Nenskra river joins the river Enguri from the right side. It is 42 km long with the watershed area of 623 km2. The river originates on elevation of 2915 m above the sea level and is nourished by glaciers, snow, rain, and ground waters. Its water regime is characterized with flood in spring and summer and shallowness in winter. Flood rate is the highest in autumn. In winter the river experiences flood icing, anchor ice, ice apron. Average annual discharge of the Nenskra river is 40.1 m³/sec.

In winter, when less water is available from rivers and domestic energy consumption rises, Georgia experiences a deficit in electricity supplies, and imports energy from neighbouring countries. Nenskra HPP is one of the four proposed power schemes with a large regulation capacity, intended to meet the government's strategy to reduce dependency on imported power during the winter. [4]

Description

Nenskra HPP will be constructed in the Nenskra and Nakra valleys on the southern slopes of the Central Caucasus mountains in Mestia Municipality, Svaneti. Construction is scheduled to start in 2020.

Nenskra HPP is being implemented based on BOT (Build-operate-transfer) model that stipulates transfer of the ownership to Georgia 36 years after the HPP is commissioned.

Nenskra Powerhouse

The Nenskra HPP powerhouse will house three vertical Pelton turbines of 93 MW capacity each and with 280 MW total installed capacity. Generated power will be transmitted to a Gas Insulated Substation (GIS Substation) and through the transmission line will be connected to the country's power grid.

Water flow of 47.0 m/sec will be transferred through a 15.1 km long and 4.5 m wide headrace tunnel to the turbines. In the close proximity with the HPP powerhouse, the headrace tunnel will branch into three separate penstocks to connect to the turbines. Water is transferred to a tunnel through a water intake located on the left bank of the reservoir creating a 130 m high asphalt faced-rockfill dam. The dam will be raised about 5 km off the village of Tita up the narrow gorge of the Nenskra river creating a live storage of 3,176 million m³. From the reservoir, water is to be supplied into the headrace tunnel. To improve the energy scheme, three low-pressure dams will be constructed in the Nakra river valley. Out of the created reservoir, 45.5 m/sec additional water is to be discharged into the Nenskra reservoir through a transfer tunnel allowing the Nenskra HPP to produce 1,219 GWh yearly.

The powerhouse of Nenskra HPP is planned on the left bank of the Nenskra river on the edge of village Chuberi. The power unit will consist of the HPP powerhouse and near-located GIS substation.

Nenskra Dam & Nakra Weir

The main structures of the Nenskra dam are to be a 125–130 high and 870 long dam on the upper Nenskra river to create a live storage of 176 million m³ and a reservoir area at supply level of 2.7 km2. The dam will capture the flows of the Nenskra river and the adjacent Nakra river upstream of the existing Khudoni HPP reservoir, exploiting the available head of 725 m. [4]

The Nakra Weir is 8.7 m high and 44 m long located on the Nakra river and is built for impoundment and diversion.

Tunnels

The Nakra transfer tunnel connects the Nakra valley with the Nenskra valley and is approximately 12.5 km long by 3.5 m in diameter and will divert water from behind the Nakra weir and into the Nenskra reservoir.

The Nenskra headrace tunnel follows the left bank of the Nenskra valley and is about 15.1 km long by 4.5 m wide. The tunnel connects to the surface penstock upstream of the Powerhouse at a level around 600 m above valley floor level.

The power unit will include the HPP powerhouse, tailrace for discharged water and GIS substation.

Water will be supplied from the intake of the headrace tunnel to the end of the penstock. The penstock starts from the surge, which then transfers into the turbine tunnels. Waste water will be discharged into the Nenskra river by tailrace.

During the operation, 3 units of Pelton turbine type electromechanical plants, each with installed capacity of 93MW will be installed.

To defend from the probable maximum flood, the diversion tunnel dimensions are designed to deal with probable maximum discharge of 1 101 m/sec that is 3.67 times as much as expected discharge of 300 m/sec with the rate of once in 10000 years.

Reservoir

According to the previously drawn up plan the reservoir will capture the flow slowly and gradually (layer by layer). The dam will operate in the natural regime of the river through a bottom outlet to keep the water at the level of 1 370 m.

Impacts

Environmental and Social Impact Assessment Reports (ESIA)

In 2015, the Nenskra Hydropower Project submitted the final Environmental & Social Impact Assessment Report (ESIA) to the Government of Georgia (GoG) as part of the national environmental permitting process.

The 2015 ESIA report has been prepared by Gamma Consulting Limited, a Georgian consultant, based on field investigations undertaken in 2011 and 2014 and following the public consultations held in May 2015. The Environmental Permit was issued by the Environmental Authorities in October 2015.

Several International Financial Institutions (the Lenders) have been approached to finance the Project. To ensure compliance with their Environmental and Social (E&S) policies, the Lenders recommended that a number of Supplementary E&S Studies be undertaken.

In 2017 the supplementary studies-based report consisting of ten volumes was disclosed to the general public. The report is available at JSC Nenskra Hydro web-site. [5]

Based on the research made JSC Nenskra Hydro has prepared The Environmental and Social Impact management Plan. The plan aims at implementing mitigation measures during the construction and operation in compliance with Georgian legislative requirements and international standards.

Disclosure of the report has started in March 2017. During the disclosure period JSC Nenskra Hydro should introduce the relevant report data to the general public of Georgia, Nenskra and Nakra valleys communities, NGOs, Government of Georgia and other stakeholders. [6]

Economical impact of the project

According to the National Statistics Office of Georgia, JSC Nenskra investment was among the 2015 direct investments Top 10. [7]

The Nenskra HPP Project will create jobs for the local population both during the construction and operation. 100% of unskilled labor will be represented by residents of the Nenskra and Nakra valleys. 75% of partly unskilled labor will be provided by Georgians, out of whom 50% will be residents of Mestia.

In 2016, the project company conducted a study to identify the needs of the local residents. With the study findings and needs of the population in view, the project company launched a community investment program with the following goals:

Social Impacts

Some 400 families live in close by villages (Chuberi and Nakra). The majority are Svans, an ethnic subgroup of Georgia's Caucasus mountains with their own language, laws and traditions. The traditions, culture, and identity of the Svans' is rooted in their mountain location. For generations, they have lived in isolation and self-dependence and their livelihoods depend on forestry, grazing and subsistence agriculture. [8] Approximately 28 households will be affected by the project's land acquisition phase, either through permanent loss of land or temporary loss of access to pastures near the dam and reservoir sites. [9]

Geological & Environmental Impacts

"[From a] nature preservation point of view, not all of these larger [rivers] like Enguri and smaller rivers like Nenskra and Nakra should be used for hydropower generation." Prof. Dr. Frank Schrader, International Consultant on Hydropower, in his review of the Nenskra ESIA. [10]

The project site was originally proposed to be included within the European system of protected areas as the ‘Svaneti 1’ Emerald site. In January 2016 the Georgian government attempted to exclude all territories to form part of the planned Nenskra project, without providing any evidence that the Nenskra and Nakra valleys are less important in terms of biodiversity than the rest of the Svaneti region. This resulted in a complaint to the Berne Convention on the Conservation of European Wildlife and Natural Habitats for a violation of a number of articles of the convention. [11]

The dam construction will also include constructions of bypass and access roads, high voltage transmission lines and substations. These construction may increase landslides. An indirect result of this project is also the increased chance of flooding because of the mudflows. These mudflows have the potential of blocking the Nakra river, creating flooding upstream. Svaneti is a landslides and mud-flows sensitive area. The local cemetery and agricultural fields of the village of Nakra are regularly flooded by mud-flows. These mudflows have the potential of blocking the Nakra river, creating flooding upstream. Yet according to a review of the Nenskra Environmental and Social Impact Assessment (ESIA), the geologic hazards and potential adverse impacts on locals have not been properly evaluated. [11]

Involvement of International Financial Institutions

The project involves the following international financial institutions: European Bank for Reconstruction and Development (EBRD), Asian Development Bank (ADB), European Investment Bank (EIB), Korean Development Bank (KDB), Italian Export Credit Agency (SACE) and Asian Infrastructure Investment Bank (AIIB). [8]

Project implementation

The Project is being implemented by K-water, a sole multi-purpose dam management company in Korea and international engineering companies, such as Stucky, Mott MacDonald and Lombardi.

The company has announced "international tender" to select Engineering, Procurement and Construction (EPC) Contractor.

Independent International Panel of Experts (IPOE) is monitoring all designs and activities, to ensure dam safety and its compliance with the environmental and social standards.

See also

Related Research Articles

<span class="mw-page-title-main">Kárahnjúkar Hydropower Plant</span> Dam

Kárahnjúkar Hydropower Plant, officially called Fljótsdalur Power Station is a hydroelectric power plant in Fljótsdalshérað municipality in eastern Iceland, designed to produce 4,600 gigawatt-hours (17,000 TJ) annually for Alcoa's Fjarðaál aluminum smelter 75 kilometres (47 mi) to the east in Reyðarfjörður. With the installed capacity of 690 megawatts (930,000 hp), the plant is the largest power plant in Iceland. The project, named after the nearby Kárahnjúkar mountains, involves damming the rivers Jökulsá á Dal and Jökulsá í Fljótsdal with five dams, creating three reservoirs. Water from the reservoirs is diverted through 73 kilometres (45 mi) of underground water tunnels and down a 420-metre (1,380 ft) vertical penstock towards a single underground power station. The smelter became fully operational in 2008 and the hydropower project was completed in 2009.

<span class="mw-page-title-main">Rogun Dam</span> Dam in southern Tajikistan

The Roghun Dam is an embankment dam under construction on the Vakhsh River in southern Tajikistan. The dam is situated 110 km from Dushanbe. It is one of the planned hydroelectric power plants of Vakhsh Cascade.

<span class="mw-page-title-main">Tsankov Kamak Hydro Power Plant</span> Dam in Tsankov Kamak downstream of Devin

The Tsankov Kamak Hydroelectric Power Plant, also Tsankov Kamak HPP, comprises an arch dam and hydroelectric power plant (HPP) in Tsankov Kamak, southwestern Bulgaria. It is situated on the Vacha River in Smolyan Province, on the borders of Pazardzhik Province and Plovdiv Province, roughly 40 kilometres (25 mi) southwest of Plovdiv and downstream (north) of the town of Devin. It is a part of the Dospat-Vacha cascade development of the Vacha River involving five dams and power stations within the Devin municipality, 250 kilometres (160 mi) southeast of Sofia. The other four dams are Dospat Dam, Teshel Dam, the Vacha Dam and the Krichim Dam.

Boškov Most Hydro Power Plant, referred to as Boškov Most HPP, is a derivation plant planned to be built in Mala Reka valley, in the southernmost part of the Mavrovo National Park, in North Macedonia. It will have a total capacity of 71,5 MW. Construction is expected to last 4 years.

<span class="mw-page-title-main">Khudoni Hydro Power Plant</span> Dam in Samegrelo-Zemo Svaneti

Khudoni Hydro Power Plant, hereinafter referred to as Khudoni HPP, is a projected power plant on Enguri River, in Samegrelo-Zemo Svaneti, Georgia that has 3 turbines with a nominal capacity of 233.3 MW each having a total capacity of 700 MW. The power plant is associated with a planned 200.5-metre (658 ft) tall concrete double-arch-gravity dam. According to the Georgian government-commissioned and the World Bank-supported study the construction of Namakhvani, Paravani and Khudoni hydro power plants are the most attractive scenarios for the development of Georgia's energy sector.

<span class="mw-page-title-main">Boguchany Dam</span> Dam in Kodinsk, Krasnoyarsk Krai

The Boguchany Dam is a large hydroelectric dam on the Angara River in Kodinsk, Krasnoyarsk Krai, Russia. It has an installed capacity of 2,997 MW. Construction of the power plant was completed when a ninth and final generator was brought online in January 2015.

<span class="mw-page-title-main">Yeywa Dam</span> Hydropower station in Myanmar

The Yeywa Hydropower Station, located on the Myitnge River, 52 kilometres (32 mi) southeast of Mandalay city, at Yeywa village in Kyaukse Township, Mandalay Region in central Myanmar, is the country's first roller-compacted concrete (RCC) dam, and the site of a 790-megawatt (1,060,000 hp) hydroelectric power plant, the largest in the country.

<span class="mw-page-title-main">Upper Kotmale Dam</span> Dam in Talawakele, Nuwara Eliya

The Upper Kotmale Dam is located in Talawakele, within the Nuwara Eliya District, in the Central Province of Sri Lanka. The dam feeds the third largest hydroelectric power station in the country.

<span class="mw-page-title-main">Irganai Dam</span> Dam in Untskul region

Irganai Dam is a hydroelectric dam in the Untskul region of Dagestan, Russia. It is located on the river Avar Koisu.

<span class="mw-page-title-main">Ruskin Dam and Powerhouse</span> Dam in Ruskin, British Columbia

Ruskin Dam is a concrete gravity dam on the Stave River in Ruskin, British Columbia, Canada. The dam was completed in 1930 for the primary purpose of hydroelectric power generation. The dam created Hayward Lake, which supplies water to a 105 MW powerhouse and flooded the Stave's former lower canyon, which ended in a small waterfall approximately where the dam is today.

The Upper Cisokan Pumped Storage Plant is a proposed pumped-storage hydropower facility in Indonesia, due for completion by 2025.

Gulpur Hydropower Plant (GHPP) is an operational run-of-the-river hydroelectric generation project located on Poonch River, a major tributary of Jhelum River near Gulpur in Kotli District of Azad Kashmir, Pakistan. The site is about 167 km from Federal Capital Islamabad and 285 kilometres (177 mi) from Punjab's Provincial Capital Lahore and is approachable directly from Islamabad and Lahore by a two-lane, all-weather, paved, partly mountainous road. The location of the project is about 28 km upstream of Mangla Dam Reservoir.

The Nadarivatu Dam, also known as the Korolevu Dam, is a concrete gravity dam on the upper reaches of the Sigatoka River in Nadarivatu District of Nadroga-Navosa Province, Fiji. The primary purpose of the dam is to generate hydroelectric power in a 41.7 megawatts (55,900 hp) run-of-the-river scheme. The Nadarivatu Hydropower Scheme was first identified in 1977 during a hydropower study. Detailed plans for the project were developed in 2002 and major construction began in 2009. The power station was commissioned on 7 September 2012 but an inauguration ceremony led by Prime Minister Frank Bainimarama was held a week later on 14 September. Funding and loans for the project was provided by several organizations to include the China Development Bank, Fiji Electricity Authority bonds, ADZ Bank. The 40 m (130 ft) tall dam diverts water from the Sigatoka River through a 3,225 metres (10,581 ft) long headrace/penstock tunnel to a power station along the Ba River to the southwest. The power station contains two 20.85 megawatts (27,960 hp) Pelton turbine-generators. The drop in elevation between the reservoir and the power station affords a gross hydraulic head of 335.7 metres (1,101 ft).

Dariali Hydropower Plant, referred to as Dariali HPP, is a 108 MW run-of-the-river hydropower plant built in 2017 in Georgia. It is located on the Tergi River in Kazbegi Municipality, at less than 1 km from the Russian-Georgian border, 160 km far from Tbilisi.

The Shuakhevi Hydro Power Plant is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs, allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 17.8 km Shuakhevi headrace and pressure tunnel. It is estimated that the project will cost US$417 million. For the purposes of developing, constructing and operating the Shuakhevi HPP, ADB and EBRD extended a loan to Adjaristsqali Georgia LLC of up to $86.5 million and IFC a loan of 80m USD. Adjaristsqali Georgia LLC is owned by the Norwegian Clean Energy Invest AS (40%), India's Tata Power (40%) and IFC Infraventures (20%), an investment fund created by the International Finance Corporation. Alstom was chosen to supply the electromechanical equipment for the project.

<span class="mw-page-title-main">Kulekhani Reservoir</span> Dam in Kulekhani, Makwanpur District, Narayani Zone

The Kulekhani Dam is a rock-fill dam on the Kulekhani River near Kulekhani in the Indrasarowar Rural Municipality of Makwanpur District in Bagmati Province, Nepal. The primary purpose of the dam is hydroelectric power generation and it supports the 60 MW Kulekhani I and 32 MW Kulekhani II Hydropower Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW Kulekhani III was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$117.84 million project received funding from the World Bank, Kuwait Fund, UNDP, Overseas Economic Cooperation Fund and OPEC Fund. It is owned by Nepal Electricity Authority.

<span class="mw-page-title-main">Denawaka Ganga Mini Hydro Power Project</span> Dam in Ratnapura, Sabaragamuwa Province

Denawaka Ganga Mini Hydro Power Project is a run of river mini hydro power project located in Ratnapura, Sri Lanka. The install capacity of the project is 7.2 MW and the annual generation is 25GWh. The generated energy is fed into the national electric grid of Sri Lanka.

<span class="mw-page-title-main">Vorotan Cascade</span> Dam in Syunik Province

The Vorotan Cascade, or the ContourGlobal™ Hydro Cascade, is a cascade on the Vorotan River in Syunik Province, Armenia. It was built to produce hydroelectric power and provide irrigation water. The Vorotan Cascade consists of three hydroelectric power plants and five reservoirs with a combined installed capacity of 404.2 MW. It is one of the main power generation complexes in Armenia.

The Mpatamanga Hydro Power Project, is a 361MW hydroelectric generating project under developpement at Mpatamanga on the Shire River, in Malawi

Rudi A Hydropower Station is a run-of-river hydro-electric plant located in the Kaski District of Nepal that came into operation in 2019. The flow from the Rudi River is used to generate 8.8 MW electricity.

References

  1. "Nenskra Hydropower Plant - Project Summary Information" (PDF). Asian Infrastructure Investment Bank. 19 March 2019.
  2. "Partnership Fund Launches Construction Works for Nenskra HPP". Georgia Today on the Web. Retrieved 2019-06-23.
  3. Kochladze, Manana; Chipashvili, David (May 2019). "Nenskra hydropower project: update" (PDF). Bankwatch.
  4. 1 2 "GEO: Nenskra Hydropower Project - Vol. 2: Draft Environmental and Social Impact Assessment" (PDF). Asian Development Bank. March 2017.
  5. "Reports | Nenskra". nenskra.ge. Retrieved 2019-06-23.
  6. nuca (2017-06-19). "Nenskra Hydropower Project Environmental and Social Impact Assessment Report Disclosure Process Continues". CBW.ge. Retrieved 2019-06-23.
  7. Cbw, Cbw (2016-03-10). "Top 10 Companies Who Invest the Most in Georgia". CBW.ge. Retrieved 2019-06-23.
  8. 1 2 "Nenskra hydropower plant - Key Facts [Updated 2019]". Bankwatch. Retrieved 2019-06-23.
  9. "Nenskra Hydropower Project, Volume 3: Social Impact Assessment" (PDF). JSC Nenskra Hydro. February 2017.
  10. Schrader, Frank (13 May 2015). "Review of Nenskra HEP ESIA Study" (PDF). Bankwatch. Retrieved 10 July 2019.
  11. 1 2 Kochladze, Manana; Chipashvili, David (December 2017). "Project Briefing, Nenskra hydropower project, Georgia" (PDF). Bankwatch. Green Alternative Georgia.