Nottely Dam

Last updated
Nottely Dam
Nottley dam.jpg
Nottely Dam
Official nameNottely Dam
Location Union County, Georgia, United States
Coordinates 34°57′31″N84°5′16″W / 34.95861°N 84.08778°W / 34.95861; -84.08778
Construction beganJuly 17, 1941
Opening dateJanuary 24, 1942
Operator(s) Tennessee Valley Authority
Dam and spillways
Impounds Nottely River
Height184 feet (56 m)
Length2,300 feet (700 m)
Reservoir
Creates Lake Nottely

Nottely Dam is a hydroelectric and flood storage dam on the Nottely River in Union County, in the U.S. state of Georgia. The dam is owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s as a flood control structure and to help regulate flow at nearby Hiwassee Dam. [1] The dam impounds the Lake Nottely of 4,180 acres (16.9 km2). [2] While the dam was built primarily for flood storage, a generator was installed at Nottely in the 1950s, giving it a small hydroelectric output. [3]

Contents

Nottely Dam was named for the Nottely River. [1] The river itself was named after the Cherokee village of Naduhli (ᎾᏚᏟ), which was once situated along its banks. [4] The village name is described variously as coming from the Cherokee for "daring horseman" [5] or from the Muscogee language via Cherokee. [6] [ better source needed ]

Location

The Nottely River, which rises near the Union-Lumpkin county line, flows northward across Union County before crossing into North Carolina en route to its mouth along the Hiwassee River. Nottely Dam is located 21 miles (34 km) upstream from the Nottely's mouth, just south of the Georgia-North Carolina state line. Nottely Lake stretches southward for 20 miles (32 km) along the Nottely to Blairsville, Georgia. Both the dam and reservoir are surrounded by the Chattahoochee National Forest.

Capacity

Nottely Dam is an earth-and-rock dam 184 feet (56 m) high and 2,300 feet (700 m) long. [3] The dam's spillway is a concrete overflow "ski-jump" type situated adjacent to the dam and has a maximum discharge of 11,500 cubic feet per second (330 m3/s). [1] [2] The dam utilizes a concrete intake tower (connected via footbridge to the mainland), where water is diverted into a tunnel and carried downstream. [1] The lone generator at Nottely has a generating capacity of 15,000 kilowatts. Nottely Lake has a flood storage capacity of 61,588 acre-feet (75,968,000 m3), 4,180 acres (16.9 km2) of water surface, and 106 miles (171 km) of shoreline. [2] [3]

Background and construction

TVA's design plan for Nottely Dam, circa 1941 Nottely-dam-design-tva1.jpg
TVA's design plan for Nottely Dam, circa 1941

Before the completion of Nottely Dam, the upper Nottely River was a rugged gorge with several excellent potential sites for a hydroelectric dam. Several private entitiesmost notably the Southern States Power Company and Union Power Companyhad bought up land along the river for future dam projects, but nothing ever materialized. After its creation in 1933, the Tennessee Valley Authority conducted an extensive survey of the Hiwassee watershedwhich had been determined to be a major contributor to flooding in Chattanooga and in 1940 completed Hiwassee Dam (a few miles downstream from the mouth of the Nottely). The outbreak of World War II in Europe in 1941 brought an emergency demand for electricity, which was needed to power aluminum production operations in East Tennessee. Nottely Dam (identified as the "Thompson Canyon site" in early reports), along with several other dam projects in the area, was authorized July 16, 1941. Work on the dam began the following day. [1]

Nottely Dam, shortly after construction in the 1940s Nottely-dam-tva1.jpg
Nottely Dam, shortly after construction in the 1940s

The construction of Nottely Dam required the purchase of 7,984 acres (32.3 km2) of land (most of it from Southern States Power and Union Power), 2,485 acres (10.1 km2) of which had to be cleared. 91 families and 21 miles (34 km) of roads had to be relocated. The dam was initially built solely for flood storage, but was designed so that a generator could easily be added should the need for one arise. The dam was formed by building a rock and stone "crib" and lining the middle with earthen fill. The dam was built as quickly as possible in hopes of allowing its reservoir ample time to fill during the rainy winter months. The speed of its construction was aided by the use of rock-and-fill rather than concrete (the spillway was the only major section that required concrete) and the dam's relatively simple design, which was also employed at nearby Chatuge Dam. Since Nottely's reservoir would fill slowly and create mosquito-breeding environments, various precautions were taken to prevent malaria outbreaks. [1]

Nottely Dam was completed and its gates closed January 24, 1942. The project's final cost was just over $8 million. Throughout its early years, Nottely Dam was operated in conjunction with Hiwassee Dam and Chatuge Dam to allow maximum hydroelectric production at Hiwassee Dam. [1] Nottely was outfitted with its own generator in the 1950s. [3] In 1985, TVA raised Nottely Dam by 15 feet to accommodate higher rainfall. [7]

Related Research Articles

<span class="mw-page-title-main">Fort Loudoun Dam</span> Dam in Tennessee, United States

Fort Loudoun Dam is a hydroelectric dam on the Tennessee River in Loudon County, Tennessee, in the southeastern United States. The dam is operated by the Tennessee Valley Authority (TVA), which built the dam in the early 1940s as part of a unified plan to provide electricity and flood control in the Tennessee Valley and create a continuous 652-mile (1,049 km) navigable river channel from Knoxville, Tennessee to Paducah, Kentucky. It is the uppermost of nine TVA dams on the Tennessee River.

<span class="mw-page-title-main">Nickajack Dam</span> Dam in Tennessee, United States

Nickajack Dam is a hydroelectric dam in Marion County in the U.S. state of Tennessee. It is one of nine dams on the Tennessee River owned and operated by the Tennessee Valley Authority, which built the dam in the mid-1960s to replace the outdated Hales Bar Dam 6 miles (9.7 km) upstream. The dam impounds the 10,370-acre (4,200 ha) Nickajack Lake and feeds into Guntersville Lake. Nickajack Dam is named for a Cherokee village once located just upstream from the dam. The village was the namesake for Nickajack Cave, which was partially flooded by the reservoir.

<span class="mw-page-title-main">Chickamauga Dam</span> Dam in Tennessee, United States

The Chickamauga Dam is a hydroelectric dam on the Tennessee River in Chattanooga, Tennessee, United States. The dam is owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s as part of a New Deal era initiative to improve navigation and bring flood control and economic development to the Tennessee Valley. The dam impounds the 36,240-acre (14,670 ha) Chickamauga Lake and feeds into Nickajack Lake. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.

<span class="mw-page-title-main">Douglas Dam</span> Dam in Tennessee, United States

Douglas Dam is a hydroelectric dam on the French Broad River in Sevier County, Tennessee, in the southeastern United States. The dam is operated by the Tennessee Valley Authority (TVA), which built the dam in record time in the early 1940s to meet emergency energy demands at the height of World War II. Douglas Dam is a straight reinforced concrete gravity-type dam 1705 feet long and 202 feet high, impounding the 28,420-acre (11,500 ha) Douglas Lake. The dam was named for Douglas Bluff, a cliff overlooking the dam site prior to construction.

<span class="mw-page-title-main">Apalachia Dam</span> Dam in North Carolina, United States

Apalachia Dam is a hydroelectric dam on the Hiwassee River in Cherokee County, in the U.S. state of North Carolina. The dam is the lowermost of three dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s to provide emergency power for aluminum production during World War II. While the dam is in North Carolina, an 8.3-mile (13.4 km) underground conduit carries water from the dam's reservoir to the powerhouse located 12 miles (19 km) downstream across the state line in Polk County, Tennessee. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017. Apalachia Dam is classified by the U.S. Army Corps of Engineers as a high-hazard dam, meaning a dam failure may pose a deadly threat to nearby residents. The dam's condition is not made available to the public due to security concerns.

<span class="mw-page-title-main">Cherokee Lake</span> Artificial reservoir in Tennessee, United States

Cherokee Lake, also known as Cherokee Reservoir, is an artificial reservoir in the U.S. state of Tennessee formed by the impoundment of the Holston River behind Cherokee Dam.

<span class="mw-page-title-main">Watauga Dam</span> Dam in Tennessee, United States

Watauga Dam is a hydroelectric and flood control dam on the Watauga River in Carter County, in the U.S. state of Tennessee. It is owned and operated by the Tennessee Valley Authority, which built the dam in the 1940s as part of efforts to control flooding in the Tennessee River watershed. At 318 feet (97 m), Watauga is the second-highest dam in the TVA river and reservoir system, and at the time of its completion was one of the highest earth-and-rock dams in the United States. The dam impounds the TVA Watauga Reservoir of 6,430 acres (2,600 ha), and its tailwaters feed into Wilbur Lake.

<span class="mw-page-title-main">Cherokee Dam</span> Dam in Tennessee, United States

Cherokee Dam is a hydroelectric dam located on the Holston River in Grainger County and Jefferson County, Tennessee, in the southeastern United States. The dam is operated and maintained by the Tennessee Valley Authority, which built the dam in the early 1940s to help meet urgent demands for energy at the outbreak of World War II. Cherokee Dam is 175 feet (53 m) high and impounds the 28,780-acre (11,650 ha) Cherokee Lake. It has a generating capacity of 136 megawatts. The dam was named for the Cherokee, a Native American tribe that controlled much of East Tennessee when the first European settlers arrived in the mid-18th century.

<span class="mw-page-title-main">Blue Ridge Dam</span> Dam in Georgia, United States

Blue Ridge Dam is a hydroelectric dam on the Toccoa River in Fannin County, in the U.S. state of Georgia. It is the uppermost of four dams on the Toccoa/Ocoee River owned and operated by the Tennessee Valley Authority. The dam impounds the 3,300-acre (1,300 ha) Blue Ridge Lake on the southwestern fringe of the Blue Ridge Mountains.

<span class="mw-page-title-main">Ocoee Dam No. 3</span> Dam in Tennessee, United States

Ocoee Dam No. 3 is a hydroelectric dam on the Ocoee River in Polk County, in the U.S. state of Tennessee. It is one of four dams on the Toccoa/Ocoee River owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s to meet emergency demands for electricity during World War II. The dam impounds the 360-acre (150 ha) Ocoee No. 3 Reservoir, which stretches 11 miles (18 km) upriver to the Tennessee-Georgia state line. Ocoee No. 3's powerhouse is actually located several miles downstream from the dam, and is fed by a 2.5-mile (4.0 km) conduit that carries water to it from the reservoir.

<span class="mw-page-title-main">Hiwassee Dam</span> Dam in North Carolina, United States

Hiwassee Dam is a hydroelectric dam on the Hiwassee River in Cherokee County, in the U.S. state of North Carolina. It is one of three dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s to bring flood control and electricity to the region. The dam impounds the Hiwassee Lake of 6,000 acres (2,400 ha), and its tailwaters are part of Apalachia Reservoir. At 307 feet (94 m), Hiwassee Dam is the highest overspill dam east of the Mississippi River and is second only to Grand Coulee dam in the nation. At the time it was completed, it was the highest overspill dam in the world.

<span class="mw-page-title-main">Chatuge Dam</span> Dam in North Carolina, United States

Chatuge Dam is a flood control and hydroelectric dam on the Hiwassee River in Clay County, in the U.S. state of North Carolina. The dam is the uppermost of three dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s for flood storage and to provide flow regulation at Hiwassee Dam further downstream. The dam impounds the 7,000-acre (2,800 ha) Chatuge Lake, which straddles the North Carolina-Georgia state line. While originally built solely for flood storage, a generator installed at Chatuge in the 1950s gives the dam a small hydroelectric output. At the time it was built, Chatuge Dam was the highest earthen dam in the world until the Aswan Dam was built in Egypt in 1964. The dam and associated infrastructure was listed on the National Register of Historic Places in 2017.

<span class="mw-page-title-main">South Holston Dam</span> Dam in Tennessee, United States

South Holston Dam is a hydroelectric and flood control dam on the South Fork Holston River in Sullivan County, in the U.S. state of Tennessee. It is the uppermost of three dams on the South Fork Holston owned and operated by the Tennessee Valley Authority, which built the dam in the 1940s as part of efforts to control flooding in the Tennessee River watershed. On October 21, 1950 the valve gate closed and water began backing up to create South Holston Reservoir. Work began on the dam in December 1941, but in November 1942, the War Production Board requested that the operation be suspended because of a shortage of critical materials. Work did not resume until July 1, 1947. The dam now impounds the South Holston Lake of 7,550 acres (3,060 ha), which extends northeastward across the Tennessee-Virginia state line.

<span class="mw-page-title-main">Boone Dam</span> Dam in Tennessee, United States

Boone Dam is a hydroelectric and flood control dam on the South Fork Holston River on the border between Sullivan County and Washington County in the U.S. state of Tennessee. It is one of three dams on the South Fork Holston owned and operated by the Tennessee Valley Authority, which built the dam in the early 1950s as part of greater efforts to control flooding in the Tennessee River watershed. The dam impounds the 4,500-acre (1,800 ha) Boone Lake, and its tailwaters are part of Fort Patrick Henry Lake. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.

<span class="mw-page-title-main">Fort Patrick Henry Dam</span> Dam in Tennessee, United States

Fort Patrick Henry Dam is a hydroelectric dam on the South Fork Holston River within the city of Kingsport, in Sullivan County in the U.S. state of Tennessee. It is the lowermost of three dams on the South Fork Holston owned and operated by the Tennessee Valley Authority, which built the dam in the early 1950s to take advantage of the hydroelectric potential created by the regulation of river flow with the completion of Watauga Dam, South Holston Dam, and Boone Dam further upstream in preceding years. The dam impounds the 872-acre (353 ha) Fort Patrick Henry Lake. While originally built for hydroelectric generation, the dam now plays an important role in the regulation of water flow and water temperature for the John Sevier Fossil Plant and other industrial plants downstream. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.

<span class="mw-page-title-main">Chatuge Lake</span> American water reservoir on the North-Carolina–Georgia border

Lake Chatuge is a man-made reservoir in Towns County, Georgia, and Clay County, North Carolina. It was formed by the Tennessee Valley Authority's construction of Chatuge Dam in 1942. The lake is relatively shallow with depths of 30 feet (9.1 m) and reaches 144 feet (44 m) by the dam. In an average year the water level varies 10 feet (3.0 m) from winter to summer to provide seasonal flood storage. Lake Chatuge is the highest major lake in the state of Georgia. It takes up 7,000 acres and is 13 miles (21 km) long.

<span class="mw-page-title-main">Hiwassee Lake</span> Water reservoir in North Carolina, US

Hiwassee Lake is a man-made reservoir in Cherokee County, North Carolina. It lies along the Hiwassee River created by the Hiwassee Dam which finished construction in 1940. Hiwassee Lake stretches along the river for approximately 22 miles (35 km) to the town of Murphy, North Carolina. It has 180 miles (290 km) of shoreline, a storage capacity of 434,000 acre⋅ft (535,000 dam3), and 205,590 acre⋅ft (253,590 dam3) of flood storage.

<span class="mw-page-title-main">Mission Dam</span> Dam in North Carolina, United States

Mission Dam is a dam on the Hiwassee River in Clay County, in the U.S. state of North Carolina. The dam is located between Hiwassee Dam and Chatuge Dam. The city of Andrews, North Carolina built the dam in 1924 at a cost of $500,000 to supply energy. The dam is the oldest on the river. Nantahala Power and Light bought the facility in 1929 and upgraded it in 1943. Unlike other dams on the river, it is operated by Duke Energy instead of the Tennessee Valley Authority.

References

  1. 1 2 3 4 5 6 7 Tennessee Valley Authority, The Hiwassee Valley Projects Volume 2: The Apalachia, Ocoee No. 3, Nottely, and Chatuge Projects, Technical Report No. 5 (Washington, D.C.: U.S. Government Printing Office, 1948), pp. 1-8, 15-19, 50-53, 210, 495.
  2. 1 2 3 Tennessee Valley Authority, The Nickajack Project: A Report on the Planning, Design, Construction, Initial Operations, and Costs, Technical Report No. 16 (Knoxville, Tenn.: Tennessee Valley Authority, 1972), pp. 10-11.
  3. 1 2 3 4 Tennessee Valley Authority, Nottely Reservoir. Retrieved: 27 January 2009.
  4. "Nottely River". Britannica .
  5. Cooksey, Elizabeth (2006). "Union County". New Georgia Encyclopedia. Retrieved 2023-08-08.
  6. Currahee, John (12 November 2010). "Cherokee Place Names, Part 6" . Retrieved 2023-08-08.
  7. "Chatuge Dam Project Underway". Clay County Progress . 1985-04-04. p. 1.