Guntersville Dam | |
---|---|
Official name | Guntersville Dam |
Location | Marshall County, Alabama, United States |
Coordinates | 34°25′16″N86°23′35″W / 34.42111°N 86.39306°W Coordinates: 34°25′16″N86°23′35″W / 34.42111°N 86.39306°W |
Construction began | December 4, 1935 |
Opening date | January 17, 1939 |
Operator(s) | Tennessee Valley Authority |
Dam and spillways | |
Impounds | Tennessee River |
Height | 94 ft (29 m) |
Length | 3,979 ft (1,213 m) |
Reservoir | |
Creates | Guntersville Lake |
Total capacity | 1,049,000 acre⋅ft (1,294,000 dam3) [1] |
Catchment area | 24,450 sq mi (63,300 km2) [1] |
Guntersville Dam is a hydroelectric dam on the Tennessee River in Marshall County, in the U.S. state of Alabama. It is one of nine dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s as part of a New Deal era initiative to create a continuous navigation channel on the entire length of the river and bring flood control and economic development to the region. The dam impounds the Guntersville Lake of 67,900 acres (27,500 ha), and its tailwaters feed into Wheeler Lake.
Guntersville Dam is named for the city of Guntersville, Alabama, which is located about 10 miles (16 km) upstream. [2] The city is named for its first settler, John Gunter (d. 1836), who arrived in the late 18th century. [3]
Guntersville Dam is located 349 miles (562 km) above the mouth of the Tennessee River, at a point where the southwestward-flowing river begins to change its course to a more northwestwardly direction. The dam's reservoir stretches for nearly 73 miles (117 km) to the base of Nickajack Dam, and includes parts of Marshall and Jackson counties in Alabama and Marion County in Tennessee. The reservoir's backwaters have formed embayments on the lower parts of Browns Creek and Spring Creek to the west and east of the city of Guntersville, respectively, effectively placing the city at the tip of a long peninsula.
Guntersville Dam is 94 feet (29 m) high and 3,979 feet (1,213 m) wide, and has a generating capacity of 140,400 kilowatts of electricity. The dam's 18-bay spillway has a total discharge capacity of 478,000 cubic feet per second (13,500 m3/s). Its reservoir has a storage capacity of 1,049,000 acre⋅ft (1,294,000 dam3), [1] with 162,000 acre⋅ft (200,000 dam3) reserved for flood control. The reservoir is the most stable reservoir in the TVA system, fluctuating just 2 feet (0.61 m) per year. [4]
Guntersville Dam is serviced by a 110-by-600-foot (34 by 183 m) navigation lock. The lock can lift and lower vessels up to 45 feet (14 m) between Guntersville Lake and Wheeler Lake. The dam's original 60-by-360-foot (18 by 110 m) lock is now used as an auxiliary lock. [2] [4]
In the early 1900s, the U.S. Army Corps of Engineers investigated several possible dam sites in the Guntersville vicinity in hopes of flooding a significant stretch of the river upstream from the city, which had unreliable water levels and had long been an impediment to major navigation in the upper Tennessee Valley. The Corps recommended building a dam at a site approximately 5 miles (8.0 km) upstream from the present dam site in 1914, but never obtained the necessary funding from Congress. More extensive investigations in the 1920s identified several more sites, including the present dam site, which they called the Coles Bend Bar site. After the Tennessee Valley Authority was formed in 1933, the Authority assumed control of all navigation and flood control projects in the Tennessee Valley. In 1935, TVA followed up the Army Corps investigations, deeming a dam at Guntersville necessary to extend the navigation channel beyond Wheeler Lake, which at that time was under construction. Guntersville Dam was authorized November 27, 1935, and construction began a few days later on December 4. [2]
The construction of Guntersville Dam and its reservoir required the purchase of 110,145 acres (44,574 ha) of land, of which 24,426 acres (9,885 ha) were forested and had to be cleared. 1,182 families, 14 cemeteries, and over 90 miles (140 km) of roads had to be relocated. A large dike was built to protect the city of Guntersville from reservoir backwaters, and substantial dredging was necessary to extend the navigable 9-foot (2.7 m) channel up to Hales Bar Dam (this dam has since been dismantled and replaced by Nickajack Dam, shortening Guntersville Lake). Widows Bar Dam, a small dam and lock approximately 58 miles (93 km) upstream from Guntersville Dam, was partially dismantled and submerged under the lake waters. [2]
Guntersville Dam was completed on January 17, 1939, constructed at a cost of $51 million. The dam's lock was designed by the Army Corps of Engineers and went into operation on January 24, 1939. The dam's first generator went online August 8, 1939. [2] The hydroelectric project's components were listed on the National Register of Historic Places in 2016.
Norris Dam is a hydroelectric and flood control structure located on the Clinch River in Anderson County and Campbell County, Tennessee, United States. The dam was the first major project for the Tennessee Valley Authority, which had been created in 1933 to bring economic development to the region and control the rampant flooding that had long plagued the Tennessee Valley. The dam was named in honor of Nebraska Senator George Norris (1861–1944), a longtime supporter of government-owned utilities in general, and supporter of TVA in particular. The infrastructure project was listed on the National Register of Historic Places in 2016.
Guntersville Lake is in northern Alabama between Bridgeport and Guntersville.
Watts Bar Dam is a hydroelectric dam on the Tennessee River in Meigs and Rhea counties in Tennessee, United States. The dam is one of nine dams on the main Tennessee River channel operated by the Tennessee Valley Authority, which built the dam in the early 1940s to provide flood control and electricity and to help create a continuous navigable channel along the entire length of the river. The dam is the technical boundary between the 39,090-acre (15,820 ha) Watts Bar Lake— which it impounds— and Chickamauga Lake, which stretches from the dam's tailwaters southward to Chattanooga.
Fort Loudoun Dam is a hydroelectric dam on the Tennessee River in Loudon County, Tennessee, in the southeastern United States. The dam is operated by the Tennessee Valley Authority (TVA), which built the dam in the early 1940s as part of a unified plan to provide electricity and flood control in the Tennessee Valley and create a continuous 652-mile (1,049 km) navigable river channel from Knoxville, Tennessee to Paducah, Kentucky. It is the uppermost of nine TVA dams on the Tennessee River.
Melton Hill Dam is a hydroelectric dam on the Clinch River just south of Oak Ridge, Tennessee, United States. The dam is operated by the Tennessee Valley Authority, which built the dam in the early 1960s to extend the Tennessee Valley's continuous navigation channel up the Clinch as far as Clinton and to increase TVA's overall power-generating capacity. The dam impounds the 5,470-acre (2,210 ha) Melton Hill Lake, and is the only TVA tributary dam serviced by a navigation lock. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.
Wheeler Dam is a hydroelectric dam on the Tennessee River between Lauderdale County and Lawrence County in Alabama. It is one of nine dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the mid-1930s as part of a New Deal-era initiative to improve navigation on the river and bring flood control and economic development to the region. The dam impounds the Wheeler Lake of 67,070 acres (27,140 ha) and its tailwaters feed into Wilson Lake.
Pickwick Landing Dam is a hydroelectric dam on the Tennessee River in Hardin County, in the U.S. state of Tennessee. The dam is one of nine dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the 1930s as part of a New Deal-era initiative to create a continuous navigation channel between the river's mouth and Knoxville, and bring economic development to the area. The dam impounds the 43,100-acre (17,400 ha) Pickwick Lake and its tailwaters are part of Kentucky Lake.
Wilson Dam is a dam spanning the Tennessee River between Lauderdale County and Colbert County in the U.S. state of Alabama. Completed in 1924 by the United States Army Corps of Engineers, it impounds Wilson Lake, and is one of nine Tennessee Valley Authority (TVA) dams on the Tennessee River. The dam was declared a National Historic Landmark on November 13, 1966, for its role as the first dam to come under the TVA's administration. The dam is named for former President of the United States Woodrow Wilson.
Nickajack Dam is a hydroelectric dam in Marion County in the U.S. state of Tennessee. It is one of nine dams on the Tennessee River owned and operated by the Tennessee Valley Authority, which built the dam in the mid-1960s to replace the outdated Hales Bar Dam 6 miles (9.7 km) upstream. The dam impounds the 10,370-acre (4,200 ha) Nickajack Lake and feeds into Guntersville Lake. Nickajack Dam is named for a Cherokee village once located just upstream from the dam. The village was the namesake for Nickajack Cave, which was partially flooded by the reservoir.
The Chickamauga Dam is a hydroelectric dam on the Tennessee River in Chattanooga, Tennessee, United States. The dam is owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s as part of a New Deal era initiative to improve navigation and bring flood control and economic development to the Tennessee Valley. The dam impounds the 36,240-acre (14,670 ha) Chickamauga Lake and feeds into Nickajack Lake. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.
Kentucky Dam is a hydroelectric dam on the Tennessee River on the county line between Livingston and Marshall counties in the U.S. state of Kentucky. The dam is the lowermost of nine dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s and early 1940s to improve navigation on the lower part of the river and reduce flooding on the lower Ohio and Mississippi rivers. It was a major project initiated during the New Deal of President Franklin D. Roosevelt's administration, to invest in infrastructure to benefit the country. The dam impounds the Kentucky Lake of 160,000 acres (65,000 ha), which is the largest of TVA's reservoirs and the largest artificial lake by area in the Eastern United States. It was designated as an National Historic Civil Engineering Landmark by the American Society of Civil Engineers in 1996 and listed on the National Register of Historic Places in 2017.
Hales Bar Dam was a hydroelectric dam once located on the Tennessee River in Marion County, Tennessee, United States. The Chattanooga and Tennessee River Power Company began building the dam on October 17, 1905, and completed it on November 11t, 1913, making Hales Bar one of the first major multipurpose dams and one of the first major dams to be built across a navigable channel in the United States. It began operation on November 13, 1913.
Watauga Dam is a hydroelectric and flood control dam on the Watauga River in Carter County, in the U.S. state of Tennessee. It is owned and operated by the Tennessee Valley Authority, which built the dam in the 1940s as part of efforts to control flooding in the Tennessee River watershed. At 318 feet (97 m), Watauga is the second-highest dam in the TVA river and reservoir system, and at the time of its completion was one of the highest earth-and-rock dams in the United States. The dam impounds the TVA Watauga Reservoir of 6,430 acres (2,600 ha), and its tailwaters feed into Wilbur Lake. The Appalachian Trail crosses the top of Watauga Dam.
Blue Ridge Dam is a hydroelectric dam on the Toccoa River in Fannin County, in the U.S. state of Georgia. It is the uppermost of four dams on the Toccoa/Ocoee River owned and operated by the Tennessee Valley Authority. The dam impounds the 3,300-acre (1,300 ha) Blue Ridge Lake on the southwestern fringe of the Blue Ridge Mountains.
Hiwassee Dam is a hydroelectric dam on the Hiwassee River in Cherokee County, in the U.S. state of North Carolina. It is one of three dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the late 1930s to bring flood control and electricity to the region. The dam impounds the Hiwassee Lake of 6,000 acres (2,400 ha), and its tailwaters are part of Apalachia Lake. At 307 feet (94 m), Hiwassee Dam is the third highest dam in the TVA system, behind only Fontana and Watauga. The dam and associated infrastructure was listed on the National Register of Historic Places in 2017.
Nottely Dam is a hydroelectric and flood storage dam on the Nottely River in Union County, in the U.S. state of Georgia. The dam is owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s as a flood control structure and to help regulate flow at nearby Hiwassee Dam. The dam impounds the Lake Nottely of 4,180 acres (16.9 km2). While the dam was built primarily for flood storage, a generator was installed at Nottely in the 1950s, giving it a small hydroelectric output.
Chatuge Dam is a flood control and hydroelectric dam on the Hiwassee River in Clay County, in the U.S. state of North Carolina. The dam is the uppermost of three dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the early 1940s for flood storage and to provide flow regulation at Hiwassee Dam further downstream. The dam impounds the 7,000-acre (2,800 ha) Chatuge Lake, which straddles the North Carolina-Georgia state line. While originally built solely for flood storage, a generator installed at Chatuge in the 1950s gives the dam a small hydroelectric output. The dam and associated infrastructure was listed on the National Register of Historic Places in 2017.
Boone Dam is a hydroelectric and flood control dam on the South Fork Holston River on the border between Sullivan County and Washington County in the U.S. state of Tennessee. It is one of three dams on the South Fork Holston owned and operated by the Tennessee Valley Authority, which built the dam in the early 1950s as part of greater efforts to control flooding in the Tennessee River watershed. The dam impounds the 4,500-acre (1,800 ha) Boone Lake, and its tailwaters are part of Fort Patrick Henry Lake. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.
Fort Patrick Henry Dam is a hydroelectric dam on the South Fork Holston River within the city of Kingsport, in Sullivan County in the U.S. state of Tennessee. It is the lowermost of three dams on the South Fork Holston owned and operated by the Tennessee Valley Authority, which built the dam in the early 1950s to take advantage of the hydroelectric potential created by the regulation of river flow with the completion of Watauga Dam, South Holston Dam, and Boone Dam further upstream in preceding years. The dam impounds the 872-acre (353 ha) Fort Patrick Henry Lake. While originally built for hydroelectric generation, the dam now plays an important role in the regulation of water flow and water temperature for the John Sevier Fossil Plant and other industrial plants downstream. The dam and associated infrastructure were listed on the National Register of Historic Places in 2017.
Wikimedia Commons has media related to Guntersville Dam . |