The electricity sector in Sweden has three operational nuclear power plants with 6 operational nuclear reactors, which produce about 30% of the country's electricity. [1] The nation's largest power station, Forsmark Nuclear Power Plant, has three reactors producing 3.3 GW and 14% of Sweden's electricity.
Sweden formerly had a nuclear phase-out policy, aiming to end nuclear power generation in Sweden by 2010. On 5 February 2009, the Government of Sweden announced an agreement allowing for the replacement of existing reactors, effectively ending the phase-out policy. [2]
In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. [3] At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040. [4]
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
Sweden began research into nuclear energy in 1947 with the establishment of the Atomic Energy Company, AB Atomenergi, which originated in the ongoing military research and development at the Defence Institute FOA. [5] In 1954, the country built its first small research heavy water reactor, the R1 nuclear reactor. The R1 was dismantled in 1970. It was followed by two heavy water reactors: Ågesta or R3 nuclear reactor, a small heat and power reactor in 1964, and Marviken or R4 nuclear reactor which was finished but never operated (was never loaded with nuclear fuel), due to several safety issues. [6] The R3 reactor stopped operations in 1974 and is to be demolished with work beginning in 2020 and ending 2025. The R4 project was cancelled in 1970, with the site being used in non-nuclear capacity since. Also a reactor named the R2 nuclear reactor, the second nuclear reactor in Sweden, was built in Studsvik, east of Nyköping. Studsvik also hosted a reactor named R2-0 nuclear reactor. Both R2 and R2-0 were small research reactors, and both were decommissioned in 2005. Furthermore there was also a third research reactor in Studsvik called FR-0 nuclear reactor which was a zero-power fast reactor with low power output. It was operated 1964–1971 and was then dismantled.
On 1 May 1969, the prototype nuclear cogeneration plant Ågestaverket (R3) suffered an incident in which secondary cooling water flooded through a broken valve and caused a number of electrical problems in the plant, resulting in a 4-day shutdown. [7]
R1, R3, and particularly the never finished R4 project at Marviken were heavy water reactors, motivated by the option to use Swedish uranium without isotope enrichment and by the possibility to use the reactors to produce weapons grade plutonium for Swedish nuclear warheads. The Swedish nuclear weapons program was eventually shut down, however, and Sweden signed the nuclear non-proliferation treaty in 1968. [8]
Six nuclear reactors began commercial service in the 1970s, and another six through 1985. Nine of the reactors were designed by Allmänna Svenska Elektriska Aktiebolaget (ASEA), and three supplied by Westinghouse.
After the Three Mile Island accident in 1979, there was a national referendum in Sweden about the future of nuclear power. As a result of this, the Riksdag decided in 1980 that no further nuclear power plants should be built, and that a nuclear power phase-out should be completed by 2010. Some observers have condemned the referendum as flawed because people could only vote "NO to nuclear", although three options were basically a harder or a softer "NO". [9] [10]
After the 1986 Chernobyl accident in USSR, the question of security of nuclear energy was again raised. In July 1992 an incident at Barsebäck 2 showed that the five older boiling water reactors had had potentially reduced capacity in their emergency core cooling systems since they started operation. Mineral wool was dislodged and ended up in the suppression pool where it clogged the suction strainers. [11] It was classified as a grade 2 incident in the IAEA INES scale, due to the degradation of defence-in-depth. All five reactors were ordered down by the Nuclear Inspectorate for remedial action where backwash and additional strainers were installed. Most of the reactors were back in operation by next Spring, but Oskarshamn 1 remained down until January 1996 due to other work being carried out.
During the late 1990s a unique capacity tax on nuclear power (effektskatten) was introduced. It was initially set at 5514 SEK per MWth per month, and only applied to nuclear power plants, thus penalizing them relative to other energy sources. In January 2006 it was almost doubled (at 10,200 SEK per MWth per month). [12] An agreement struck in June 2016 among other things meant the capacity tax would be phased out by 2019. By then the tax constituted about one third of the cost of operating a nuclear reactor. [13]
In 1997 the Riksdag decided to shut down one of the reactors at Barsebäck nuclear power plant by 1 July 1998 and the second before 1 July 2001, although under the condition that their energy production would be compensated. [14] The next conservative government tried to cancel the phase-out, but, after protests, decided instead to extend the time limit to 2010. At Barsebäck, block 1 was shut down on 30 November 1999 and block 2 on 1 June 2005.
In August 2006 three of Sweden's ten nuclear reactors were shut down due to safety concerns following an incident at Forsmark Nuclear Power Plant, in which two out of four emergency power generators failed causing a power shortage. It was classified as a grade 2 incident in the INES scale, due to the degradation of defence-in-depth.
In 2006 the Centre Party of Sweden, an opposition party that until then had supported the phase-out, announced that it was dropping its opposition to nuclear power, at least for the time being, claiming that it is unrealistic to expect the phase-out in the short term. It said it would now support the stance of the other opposition parties in Alliance for Sweden, which were considerably more pro-nuclear than the then Social Democratic government. [15]
On 17 June 2010, the Riksdag adopted a decision allowing the replacement of the existing reactors with new nuclear reactors, starting from 1 January 2011. [16]
In June 2016, the coalition government decided to abolish the nuclear power output tax in 2019 and to successively replace the existing reactors with new ones. [17] In October 2022, the new Swedish governing decided to have Ringhals 1 and 2 reactors restarted and the construction of further reactors examined. [18]
In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. [19] At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040. [20]
In November 2023, more details about the new nuclear policy, which is to enter into force on 1 January 2024, were revealed. The current 10 reactor cap will be dropped, permitting process will be shortened and new nuclear reactors will be allowed also on new sites and not just existing ones. A target of 2500 MWe of nuclear power by 2035 was announced, as electricity consumption is expected to rise to 300 TWh by 2045. [21] In 2024, a Swedish government study proposed a new financing and risk sharing model providing a sufficient return on investment for the private sector to invest in new nuclear power. The proposal involved three elements: government loans, contract for difference guaranteed electricity pricing financed by consumers, and a mechanism ensuring a minimum return for equity investors. [22]
Plant name | Unit No. | Type | Model | Status | Capacity (MW) | Begin building | Commercial operation | Closed | |
---|---|---|---|---|---|---|---|---|---|
Ågesta | 1 | PHWR | R3 | Shut down/in decommissioning | 10 | 1 Dec 1957 | 1 May 1964 | 2 Jun 1974 | [a] |
Barsebäck | 1 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Feb 1971 | 1 Jul 1975 | 30 Nov 1999 | [b] |
2 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Jan 1973 | 1 Jul 1977 | 31 May 2005 | [c] | |
Forsmark | 1 | BWR | ASEA-III, BWR-2500 | Operational | 986 | 1 Jun 1973 | 10 Dec 1980 | [d] | |
2 | BWR | ASEA-III, BWR-2500 | Operational | 1116 | 1 Jan 1975 | 7 Jul 1981 | [e] | ||
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1167 | 1 Jan 1979 | 18 Aug 1985 | [f] | ||
Oskarshamn | 1 | BWR | ASEA-I | Shut down/in decommissioning | 473 | 1 Aug 1966 | 6 Feb 1972 | 19 Jun 2017 | [g] |
2 | BWR | ASEA-II | Shut down/in decommissioning | 638 | 1 Sep 1969 | 1 Jan 1975 | 22 Dec 2016 | [h] | |
3 | BWR | ASEA-IV, BWR-3000 | Operational | 1450 | 1 May 1980 | 15 Aug 1985 | [i] | ||
Marviken | 1 | BHWR | R4 | Unfinished | 196 | 1 Apr 1965 | 27 May 1970 | [j] | |
Ringhals | 1 | BWR | ASEA-I | Shut down/in decommissioning | 881 | 1 Feb 1969 | 1 Jan 1976 | 31 Dec 2020 | [k] |
2 | PWR | WH 3-loops | Shut down/in decommissioning | 904 | 1 Oct 1970 | 1 May 1975 | 30 Dec 2019 | [l] | |
3 | PWR | WH 3-loops | Operational | 1062 | 1 Sep 1972 | 9 Sep 1981 | [m] | ||
4 | PWR | WH 3-loops | Operational | 1104 | 1 Nov 1973 | 21 Nov 1983 | [n] |
The decommissioned nuclear reactors of Sweden are:
The nuclear energy phase-out is controversial in Sweden. The energy production of the remaining nuclear power plants has been considerably increased in recent years to compensate for the Barsebäck shut-down.
In May 2005, a poll of residents living around Barsebäck found that 94% wanted it to stay. The subsequent leak of radioactive water from the nuclear waste store in Forsmark did not lead to a major change in public opinion. [28] According to a poll of January 2008, 48% of Swedes were in favour of building new nuclear reactors, 39% were opposed and 13% were undecided. However, the 2011 Fukushima Daiichi nuclear disaster in Japan reversed prior support of nuclear power, with polls showing that 64% of Swedes opposed new reactors while 27% supported them. [29] However, in a poll November 2019 the public opinion has changed with 78% in favor of nuclear power and only 11% against. [30]
Prior public support for nuclear power stood in contrast to the stances of the major political parties in Sweden, but after the polls in late 2019 the debate changed and the parties that want to build new nuclear power in Sweden (SD, M, KD, L ) put forth a demand to the leading government party, the Social Democrats to choose a path forward, otherwise they might break with the standing energy agreement and work to reform the policy towards nuclear power, outside of the influence of the minority government. [31]
Sweden has a well-developed nuclear waste management policy. Low-level waste is currently stored at the reactor sites or destroyed at Studsvik. The country has dedicated a ship, M/S Sigyn, to move waste from power plants to repositories. Sweden has also constructed a permanent underground repository, SFR, final repository for short-lived radioactive waste, with a capacity of 63,000 cubic meters for intermediate and low-level waste. A central interim storage facility for spent nuclear fuel, Clab, is located near Oskarshamn. The government has also identified two potential candidates for burial of additional waste (high-level), Oskarshamn and Östhammar. [32]
In June 2010, Greenpeace anti-nuclear activists invaded Forsmark nuclear power plant to protest the then-plan to remove the government prohibition on building new nuclear power plants. In October 2012, 20 Greenpeace activists scaled the outer perimeter fence of the Ringhals nuclear plant, and there was also an incursion of 50 activists at the Forsmark plant. Greenpeace said that its non-violent actions were protests against the continuing operation of these reactors, which it says are unsafe in European stress tests, and to emphasise that stress tests did nothing to prepare against threats from outside the plant. A report by the Swedish nuclear regulator said that "the current overall level of protection against sabotage is insufficient". Although Swedish nuclear power plants have security guards, the police are responsible for emergency response. The report criticised the level of cooperation between nuclear site staff and police in the case of sabotage or attack. [33]
A boiling water reactor (BWR) is a type of nuclear reactor used for the generation of electrical power. It is the second most common type of electricity-generating nuclear reactor after the pressurized water reactor (PWR).
A nuclear power plant (NPP), also known as a nuclear power station (NPS), nuclear generating station (NGS) or atomic power station (APS) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a generator that produces electricity. As of September 2023, the International Atomic Energy Agency reported that there were 410 nuclear power reactors in operation in 32 countries around the world, and 57 nuclear power reactors under construction.
Ringhals is a nuclear power plant in Sweden. It is situated on the Värö Peninsula in Varberg Municipality approximately 65 km south of Gothenburg. With a total power rating of 2,190 MWe, it is the second largest power plant in Sweden. It is owned 70% by Vattenfall and 30% by Uniper SE.
Barsebäck is a boiling water nuclear power plant currently undergoing the process of nuclear decommissioning. The plant is situated in Barsebäck, Kävlinge Municipality, Skåne, Sweden.
Forsmark Nuclear Power Plant is a nuclear power plant in Forsmark, Sweden that provides 14% of Sweden's total electricity output, and also the site of the Swedish Final repository for radioactive operational waste. It is operated by a company mainly owned by Vattenfall.
A generation II reactor is a design classification for a nuclear reactor, and refers to the class of commercial reactors built until the end of the 1990s. Prototypical and older versions of PWR, CANDU, BWR, AGR, RBMK and VVER are among them.
As of 2024, Finland has five operating nuclear reactors in two power plants, all located on the shores of the Baltic Sea. Nuclear power provided about 35% of the country's electricity generation in 2022. The first research nuclear reactor in Finland was commissioned in 1962 and the first commercial reactor started operation in 1977. The fifth reactor started operation in April 2023.
OKG AB is a Swedish corporation who owns and operates the Oskarshamn Nuclear Power Plant. It is majority owned by Sydkraft.
Nuclear power in Switzerland is generated by three nuclear power plants, with a total of four operational reactors (see list below). Since 1985, nuclear power has been contributing approximately 40% of Switzerland's electrical energy. In 2022, it produced 23 terawatt-hours (TWh) of electricity, and accounted for 37% of the nation's gross electricity generation of 62 TWh, while 55% was produced by hydroelectric plants and 8% came from conventional thermal power stations and non-hydro renewable energy sources.
R4 nuclear reactor was a nuclear reactor built at Marviken, Vikbolandet and the fourth nuclear reactor built in Sweden. It was heavy water moderated and intended for the dual role of 130 MWe of power generation as well as plutonium production. It had a central role in the Swedish nuclear weapon programme. During the mid 1960s, the social democratic government officially abandoned the project of designing Swedish nuclear weapons and the Marviken plant became derelict. It was never loaded with fuel, and the project was cancelled in 1970.
Studsvik is a supplier of nuclear analysis software and specialised services to the international nuclear industry. The company is headquartered in Nyköping, Sweden, and has five divisions: Sweden, United Kingdom, Germany, the United States, and Global Services. There are 1,100 employees in 8 countries. The company's shares are listed on the Nasdaq OMX Stockholm.
The Nuclear power station Oskarshamn is one of three active nuclear power stations in Sweden. The plant is about 30 kilometers (19 mi) north of Oskarshamn, directly at the Kalmarsund at the Baltic Sea coast and with one active reactor, producing about 10% of the electricity needs of Sweden. All reactors were built using BWR technology.
The Ågesta Nuclear Plant was the first Swedish commercial nuclear power plant built by ASEA. Also known as R3 nuclear reactor, it was the third nuclear reactor built in Sweden. Construction started in 1957 and ended in 1962, operations began in 1964 and continued until 1974.
High-level radioactive waste management addresses the handling of radioactive materials generated from nuclear power production and nuclear weapons manufacture. Radioactive waste contains both short-lived and long-lived radionuclides, as well as non-radioactive nuclides. In 2002, the United States stored approximately 47,000 tonnes of high-level radioactive waste.
Majority of electricity production in Sweden relies on hydro power and nuclear power. In 2008 the consumption of electricity in Sweden was 16018 kWh per capita, compared to EU average 7409 kWh per capita. Sweden has a national grid, which is part of the Synchronous grid of Northern Europe. A specialty of the Nordic energy market is the existence of so-called electricity price areas, which complicate the wholesale Nordic energy market.
Denmark imports but does not produce nuclear energy, which is in accordance with a 1985 law passed by the Danish parliament, prohibiting power production from nuclear energy in Denmark. In 2014 and 2015, imported nuclear power accounted for 3-4% of electricity consumption in Denmark.
Energy in Sweden is characterized by relatively high per capita production and consumption, and a reliance on imports for fossil fuel supplies.
After World War II, Sweden considered building nuclear weapons to defend themselves against an offensive assault from the Soviet Union. From 1945 to 1972 the government ran a clandestine nuclear weapons program under the guise of civilian defense research at the Swedish National Defence Research Institute (FOA).
This is a list of all the commercial nuclear reactors in the European Union and in Europe, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2021, there are 180 operable power reactors in Europe, with a combined electrical capacity of 159.36 GW. There are currently 8 power reactors under construction in Europe.