Nuclear power in Sweden

Last updated
Sweden location map, 40south.svg
Purple pog.svg
R4
Nuclear power plants in Sweden (view)
Green pog.svg  Active plants
Black pog.svg  Closed plants
Purple pog.svg  Unfinished plants

The electricity sector in Sweden has three operational nuclear power plants with 6 operational nuclear reactors, which produce about 29.8% of the country's electricity. [1] The nation's largest power station, Forsmark Nuclear Power Plant, has three reactors producing 3.3 GW and 14% of Sweden's electricity.

Contents

Sweden formerly had a nuclear phase-out policy, aiming to end nuclear power generation in Sweden by 2010. On 5 February 2009, the Government of Sweden announced an agreement allowing for the replacement of existing reactors, effectively ending the phase-out policy. [2]

In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. [3] At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040. [4]

History

Electricity production in Sweden by type Electricity generation in Sweden.svg
Electricity production in Sweden by type
Nuclear power production in Sweden by reactor

Early history

Sweden began research into nuclear energy in 1947 with the establishment of the Atomic Energy Company, AB Atomenergi, which originated in the ongoing military research and development at the Defence Institute FOA. [5] In 1954, the country built its first small research heavy water reactor, the R1 nuclear reactor. The R1 was dismantled in 1970. It was followed by two heavy water reactors: Ågesta or R3 nuclear reactor, a small heat and power reactor in 1964, and Marviken or R4 nuclear reactor which was finished but never operated (was never loaded with nuclear fuel), due to several safety issues. [6] The R3 reactor stopped operations in 1974 and is to be demolished with work beginning in 2020 and ending 2025. The R4 project was cancelled in 1970, with the site being used in non-nuclear capacity since. Also a reactor named the R2 nuclear reactor, the second nuclear reactor in Sweden, was built in Studsvik, east of Nyköping. Studsvik also hosted a reactor named R2-0 nuclear reactor. Both R2 and R2-0 were small research reactors, and both were decommissioned in 2005. Furthermore there was also a third research reactor in Studsvik called FR-0 nuclear reactor which was a zero-power fast reactor with low power output. It was operated 1964–1971 and was then dismantled.

On 1 May 1969, the prototype nuclear cogeneration plant Ågestaverket (R3) suffered an incident in which secondary cooling water flooded through a broken valve and caused a number of electrical problems in the plant, resulting in a 4-day shutdown. [7]

R1, R3, and particularly the never finished R4 project at Marviken were heavy water reactors, motivated by the option to use Swedish uranium without isotope enrichment and by the possibility to use the reactors to produce weapons grade plutonium for Swedish nuclear warheads. The Swedish nuclear weapons program was eventually shut down, however, and Sweden signed the nuclear non-proliferation treaty in 1968. [8]

Six nuclear reactors began commercial service in the 1970s, and another six through 1985. Nine of the reactors were designed by Allmänna Svenska Elektriska Aktiebolaget (ASEA), and three supplied by Westinghouse.

Plans for nuclear phase-out

After the Three Mile Island accident in 1979, there was a national referendum in Sweden about the future of nuclear power. As a result of this, the Riksdag decided in 1980 that no further nuclear power plants should be built, and that a nuclear power phase-out should be completed by 2010. Some observers have condemned the referendum as flawed because people could only vote "NO to nuclear", although three options were basically a harder or a softer "NO". [9] [10]

After the 1986 Chernobyl accident in USSR, the question of security of nuclear energy was again raised. In July 1992 an incident at Barsebäck 2 showed that the five older boiling water reactors had had potentially reduced capacity in their emergency core cooling systems since they started operation. Mineral wool was dislodged and ended up in the suppression pool where it clogged the suction strainers. [11] It was classified as a grade 2 incident in the IAEA INES scale, due to the degradation of defence-in-depth. All five reactors were ordered down by the Nuclear Inspectorate for remedial action where backwash and additional strainers were installed. Most of the reactors were back in operation by next Spring, but Oskarshamn 1 remained down until January 1996 due to other work being carried out.

During the late 1990s a unique capacity tax on nuclear power (effektskatten) was introduced. It was initially set at 5514 SEK per MWth per month, and only applied to nuclear power plants, thus penalizing them relative to other energy sources. In January 2006 it was almost doubled (at 10,200 SEK per MWth per month). [12] An agreement struck in June 2016 among other things meant the capacity tax would be phased out by 2019. By then the tax constituted about one third of the cost of operating a nuclear reactor. [13]

In 1997 the Riksdag decided to shut down one of the reactors at Barsebäck nuclear power plant by 1 July 1998 and the second before 1 July 2001, although under the condition that their energy production would be compensated. [14] The next conservative government tried to cancel the phase-out, but, after protests, decided instead to extend the time limit to 2010. At Barsebäck, block 1 was shut down on 30 November 1999 and block 2 on 1 June 2005.

In August 2006 three of Sweden's ten nuclear reactors were shut down due to safety concerns following an incident at Forsmark Nuclear Power Plant, in which two out of four emergency power generators failed causing a power shortage. It was classified as a grade 2 incident in the INES scale, due to the degradation of defence-in-depth.

In 2006 the Centre Party of Sweden, an opposition party that until then had supported the phase-out, announced that it was dropping its opposition to nuclear power, at least for the time being, claiming that it is unrealistic to expect the phase-out in the short term. It said it would now support the stance of the other opposition parties in Alliance for Sweden, which were considerably more pro-nuclear than the then Social Democratic government. [15]

Phase-out abandoned

On 17 June 2010, the Riksdag adopted a decision allowing the replacement of the existing reactors with new nuclear reactors, starting from 1 January 2011. [16]

In June 2016, the coalition government decided to abolish the nuclear power output tax in 2019 and to successively replace the existing reactors with new ones. [17] In October 2022, the new Swedish governing decided to have Ringhals 1 and 2 reactors restarted and the construction of further reactors examined. [18]

Nuclear revival

In June 2023, the new Kristersson Cabinet established after the country's 2022 election voted to switch the national energy target from 100% renewable electricity by 2045 to 100% fossil fuel-free electricity by 2045, a move seen as supporting and extending the ongoing use of nuclear power in the country. [19] At the time, hydro, nuclear, and wind power already produced 98% of Sweden's electricity, with the government aiming to increase electricity production from carbon-free sources to meet an estimated doubling of national electricity consumption by 2040. [20]

In November 2023, more details about the new nuclear policy, which is to enter into force on 1 January 2024, were revealed. The current 10 reactor cap will be dropped, permitting process will be shortened and new nuclear reactors will be allowed also on new sites and not just existing ones. A target of 2500MWe of nuclear power by 2035 was announced, as electricity consumption is expected to rise to 300TWh by 2045. [21]

List of electricity producing nuclear reactors

Plant
name
Unit
No.
TypeModelStatusCapacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta 1 PHWR R3Shut down/in decommissioning101 Dec 19571 May 19642 Jun 1974 [lower-alpha 1]
Barsebäck 1 BWR ASEA-IIShut down/in decommissioning6001 Feb 19711 Jul 197530 Nov 1999 [lower-alpha 2]
2 BWR ASEA-IIShut down/in decommissioning6001 Jan 19731 Jul 197731 May 2005 [lower-alpha 3]
Forsmark 1 BWR ASEA-III, BWR-2500Operational9861 Jun 197310 Dec 1980 [lower-alpha 4]
2 BWR ASEA-III, BWR-2500Operational11161 Jan 19757 Jul 1981 [lower-alpha 5]
3 BWR ASEA-IV, BWR-3000Operational11671 Jan 197918 Aug 1985 [lower-alpha 6]
Oskarshamn 1 BWR ASEA-IShut down/in decommissioning4731 Aug 19666 Feb 197219 Jun 2017 [lower-alpha 7]
2 BWR ASEA-IIShut down/in decommissioning6381 Sep 19691 Jan 197522 Dec 2016 [lower-alpha 8]
3 BWR ASEA-IV, BWR-3000Operational14501 May 198015 Aug 1985 [lower-alpha 9]
Marviken 1 BHWR R4Unfinished1961 Apr 196527 May 1970 [lower-alpha 10]
Ringhals 1 BWR ASEA-IShut down/in decommissioning8811 Feb 19691 Jan 197631 Dec 2020 [lower-alpha 11]
2 PWR WH 3-loopsShut down/in decommissioning9041 Oct 19701 May 197530 Dec 2019 [lower-alpha 12]
3 PWR WH 3-loopsOperational10621 Sep 19729 Sep 1981 [lower-alpha 13]
4 PWR WH 3-loopsOperational11041 Nov 197321 Nov 1983 [lower-alpha 14]

Decommissioned reactors

The decommissioned nuclear reactors of Sweden are:

Public opinion

The nuclear energy phase-out is controversial in Sweden. The energy production of the remaining nuclear power plants has been considerably increased in recent years to compensate for the Barsebäck shut-down.

In May 2005, a poll of residents living around Barsebäck found that 94% wanted it to stay. The subsequent leak of radioactive water from the nuclear waste store in Forsmark did not lead to a major change in public opinion. [27] According to a poll of January 2008, 48% of Swedes were in favour of building new nuclear reactors, 39% were opposed and 13% were undecided. However, the 2011 Fukushima Daiichi nuclear disaster in Japan reversed prior support of nuclear power, with polls showing that 64% of Swedes opposed new reactors while 27% supported them. [28] However, in a poll November 2019 the public opinion has changed with 78% in favor of nuclear power and only 11% against. [29]

Prior public support for nuclear power stood in contrast to the stances of the major political parties in Sweden, but after the polls in late 2019 the debate changed and the parties that want to build new nuclear power in Sweden (SD, M, KD, L ) put forth a demand to the leading government party, the Social Democrats to choose a path forward, otherwise they might break with the standing energy agreement and work to reform the policy towards nuclear power, outside of the influence of the minority government. [30]

Nuclear waste

Sweden has a well-developed nuclear waste management policy. Low-level waste is currently stored at the reactor sites or destroyed at Studsvik. The country has dedicated a ship, M/S Sigyn, to move waste from power plants to repositories. Sweden has also constructed a permanent underground repository, SFR, final repository for short-lived radioactive waste, with a capacity of 63,000 cubic meters for intermediate and low-level waste. A central interim storage facility for spent nuclear fuel, Clab, is located near Oskarshamn. The government has also identified two potential candidates for burial of additional waste (high-level), Oskarshamn and Östhammar. [31]

Anti-nuclear activists

Environmental activists in front of the Barseback nuclear power plant. These road signs were put up on roads around the power plant two weeks after the Chernobyl disaster. Miljoaktivister - Barseback-Sweden - 1986.jpg
Environmental activists in front of the Barsebäck nuclear power plant. These road signs were put up on roads around the power plant two weeks after the Chernobyl disaster.

In June 2010, Greenpeace anti-nuclear activists invaded Forsmark nuclear power plant to protest the then-plan to remove the government prohibition on building new nuclear power plants. In October 2012, 20 Greenpeace activists scaled the outer perimeter fence of the Ringhals nuclear plant, and there was also an incursion of 50 activists at the Forsmark plant. Greenpeace said that its non-violent actions were protests against the continuing operation of these reactors, which it says are unsafe in European stress tests, and to emphasise that stress tests did nothing to prepare against threats from outside the plant. A report by the Swedish nuclear regulator said that "the current overall level of protection against sabotage is insufficient". Although Swedish nuclear power plants have security guards, the police are responsible for emergency response. The report criticised the level of cooperation between nuclear site staff and police in the case of sabotage or attack. [32]

See also

Notes

  1. The full reactor model name is R3/Adam [22]
  2. The full reactor model name is ASEA-ATOM Gen II [23]
  3. The full reactor model name is ASEA-ATOM Gen II [23]
  4. The full reactor model name is ASEA-ATOM Gen III, [23] BWR-2500, [23] BWR 69 [24]
  5. The full reactor model name is ASEA-ATOM Gen III, [23] BWR-2500, [23] BWR 69 [24]
  6. The full reactor model name is ASEA-ATOM Gen IV, [23] BWR-3000, [23] BWR 75 [24]
  7. The full reactor model name is ASEA-ATOM Gen I [23]
  8. The full reactor model name is ASEA-ATOM Gen II [23]
  9. The full reactor model name is ASEA-ATOM Gen IV, [23] BWR-3000, [23] BWR 75 [25]
  10. The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority. [22]
  11. The full reactor model name is ASEA-ATOM Gen I. [23] Closed at midnight on New Year's Eve. [26]
  12. The full reactor model name is Westinghouse 3-loops [23]
  13. The full reactor model name is Westinghouse 3-loops [23]
  14. The full reactor model name is Westinghouse 3-loops [23]

Related Research Articles

<span class="mw-page-title-main">Boiling water reactor</span> Type of nuclear reactor that directly boils water

A boiling water reactor (BWR) is a type of light water nuclear reactor used for the generation of electrical power. It is the second most common type of electricity-generating nuclear reactor after the pressurized water reactor (PWR), which is also a type of light water nuclear reactor.

<span class="mw-page-title-main">Light-water reactor</span> Type of nuclear reactor that uses normal water

The light-water reactor (LWR) is a type of thermal-neutron reactor that uses normal water, as opposed to heavy water, as both its coolant and neutron moderator; furthermore a solid form of fissile elements is used as fuel. Thermal-neutron reactors are the most common type of nuclear reactor, and light-water reactors are the most common type of thermal-neutron reactor.

<span class="mw-page-title-main">Ringhals Nuclear Power Plant</span> Nuclear power plant in Sweden

Ringhals is a nuclear power plant in Sweden. It is situated on the Värö Peninsula in Varberg Municipality approximately 65 km south of Gothenburg. With a total power rating of 2,190 MWe, it is the second largest power plant in Sweden. It is owned 70% by Vattenfall and 30% by Uniper SE.

<span class="mw-page-title-main">Advanced boiling water reactor</span> Nuclear reactor design

The advanced boiling water reactor (ABWR) is a Generation III boiling water reactor. The ABWR is currently offered by GE Hitachi Nuclear Energy (GEH) and Toshiba. The ABWR generates electrical power by using steam to power a turbine connected to a generator; the steam is boiled from water using heat generated by fission reactions within nuclear fuel. Kashiwazaki-Kariwa unit 6 is considered the first Generation III reactor in the world.

<span class="mw-page-title-main">Nuclear power phase-out</span> Discontinuation of usage of nuclear power for energy production

A nuclear power phase-out is the discontinuation of usage of nuclear power for energy production. Often initiated because of concerns about nuclear power, phase-outs usually include shutting down nuclear power plants and looking towards fossil fuels and renewable energy. Three nuclear accidents have influenced the discontinuation of nuclear power: the 1979 Three Mile Island partial nuclear meltdown in the United States, the 1986 Chernobyl disaster in the USSR, and the 2011 Fukushima nuclear disaster in Japan.

<span class="mw-page-title-main">Barsebäck Nuclear Power Plant</span> Decommissioned nuclear power plant in Sweden

Barsebäck is a boiling water nuclear power plant currently undergoing the process of nuclear decommissioning. The plant is situated in Barsebäck, Kävlinge Municipality, Skåne, Sweden.

<span class="mw-page-title-main">Forsmark Nuclear Power Plant</span> Nuclear power plant in Forsmark, Sweden

Forsmark Nuclear Power Plant is a nuclear power plant in Forsmark, Sweden that provides 14% of Sweden's total electricity output, and also the site of the Swedish Final repository for radioactive operational waste. It is operated by a company mainly owned by Vattenfall.

<span class="mw-page-title-main">Generation II reactor</span> Design classification for nuclear reactors

A generation II reactor is a design classification for a nuclear reactor, and refers to the class of commercial reactors built until the end of the 1990s. Prototypical and older versions of PWR, CANDU, BWR, AGR, RBMK and VVER are among them.

As of 2023, Finland has five operating nuclear reactors in two power plants, all located on the shores of the Baltic Sea. Nuclear power provided about 34% of the country's electricity generation in 2020. The first research nuclear reactor in Finland was commissioned in 1962 and the first commercial reactor started operation in 1977. The fifth reactor started operation in April 2023.

<span class="mw-page-title-main">OKG AB</span>

OKG AB is a Swedish corporation who owns and operates the Oskarshamn Nuclear Power Plant. It is majority owned by Sydkraft.

<span class="mw-page-title-main">Nuclear power in Switzerland</span> Overview of nuclear power in Switzerland

Nuclear power in Switzerland is generated by three nuclear power plants, with a total of four operational reactors (see list below). Nuclear power has contributed a steady fraction of around forty percent to the Swiss electricity production since 1985. In 2022, it produced 23 terawatt-hours (TWh) of electricity, and accounted for 37% of the nation's gross electricity generation of 62 TWh, while 55% was produced by hydroelectric plants and 8% came from conventional thermal power stations and non-hydro renewable energy sources.

<span class="mw-page-title-main">Studsvik</span>

Studsvik is a supplier of nuclear analysis software and specialised services to the international nuclear industry. The company is headquartered in Nyköping, Sweden, and has five divisions: Sweden, United Kingdom, Germany, the United States, and Global Services. There are 1,100 employees in 8 countries. The company's shares are listed on the Nasdaq OMX Stockholm.

<span class="mw-page-title-main">Oskarshamn Nuclear Power Plant</span> Nuclear power plant in Sweden

The Nuclear power station Oskarshamn is one of three active nuclear power stations in Sweden. The plant is about 30 kilometers (19 mi) north of Oskarshamn, directly at the Kalmarsund at the Baltic Sea coast and with one active reactor, producing about 10% of the electricity needs of Sweden. All reactors were built using BWR technology.

<span class="mw-page-title-main">Ågesta Nuclear Plant</span> Decommissioned nuclear power plant in Sweden

The Ågesta Nuclear Plant was the first Swedish commercial nuclear power plant built by ASEA. Also known as R3 nuclear reactor, it was the third nuclear reactor built in Sweden. Construction started in 1957 and ended in 1962, operations began in 1964 and continued until 1974.

<span class="mw-page-title-main">Electricity sector in Sweden</span> Overview of the electricity sector in Sweden

Majority of electricity production in Sweden relies on hydro power and nuclear power. In 2008 the consumption of electricity in Sweden was 16018 kWh per capita, compared to EU average 7409 kWh per capita. Sweden has a national grid, which is part of the Synchronous grid of Northern Europe. A specialty of the Nordic energy market is the existence of so-called electricity price areas, which complicate the wholesale Nordic energy market.

<span class="mw-page-title-main">Energy in Sweden</span> Overview of energy use in Sweden

Energy in Sweden describes energy and electricity production, consumption and import in Sweden. Electricity sector in Sweden is the main article of electricity in Sweden. The Swedish climate bill of February 2017 aims to make Sweden carbon neutral by 2045. The Swedish target is to decline emission of climate gases 63% from 1990 to 2030 and international transportation excluding foreign flights 70%. By 2014 just over half of the country's total final energy consumption in electricity, heating and cooling and transport combined was provided by renewables, the highest share amongst the then 28 EU member countries. About a third of Sweden's electricity is generated by nuclear power. In generating a year's worth of this energy, Swedes generate about 4 tonnes of CO2 emissions each. Since 2010, sustainability measures have reduced total emissions even as the population has increased.

<span class="mw-page-title-main">Swedish nuclear weapons program</span> Nuclear research sites and processing facilities of Sweden

After World War II, Sweden considered building nuclear weapons to defend themselves against an offensive assault from the Soviet Union. From 1945 to 1972 the government ran a clandestine nuclear weapons program under the guise of civilian defense research at the Swedish National Defence Research Institute (FOA).

This is a list of all the commercial nuclear reactors in the European Union and in Europe, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2021, there are 180 operable power reactors in Europe, with a combined electrical capacity of 159.36 GW. There are currently 8 power reactors under construction in Europe.

References

  1. "PRIS - Country Details".
  2. Borgenäs, Johan (November 11, 2009). "Sweden Reverses Nuclear Phase-out Policy". Nuclear Threat Initiative.
  3. Florence Jones (2023-06-22). "Sweden adopts new fossil-free target, making way for nuclear". Power Technology. Retrieved 2023-06-28.
  4. Simon Johnson (2023-06-20). "Swedish parliament passes new energy target, easing way for new nuclear power". Reuters. Retrieved 2023-06-28.
  5. T. Jonter: Nuclear Weapon Research in Sweden. The Co-operation Between Civilian and Military Research, 1947-1972, SKI Report 02:18
  6. Jonter ibid
  7. The Flooding Incident at the Ågesta Pressurized Heavy Water Nuclear Power Plant (pdf)
  8. "Neutral Sweden Quietly Keeps Nuclear Option Open", The Washington Post , 25 November 1994
  9. Nils-Olov Jonsson and Carl Berglöf (2016). "Nuclear Power Plants in Sweden during the Last 40 Years". European Nuclear Society. Archived from the original on 2018-10-02. Retrieved 2018-10-01.
  10. E. Denton (Jr.), Robert (2000). Political Communication Ethics: An Oxymoron?. Greenwood Publishing Group. p. 159. ISBN   9780275964832.
  11. "Bulletin 96-03: Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-".
  12. "Nuclear Energy in Sweden - World Nuclear Association".
  13. "Sweden strikes deal to continue nuclear power". The Local . 10 June 2016.
  14. M. Griffin, James (2003). Global Climate Change: The Science, Economics and Politics. Edward Elgar Publishing. p. 238. ISBN   9781843767138.
  15. Centre dumps nuclear deal Archived 2008-03-02 at the Wayback Machine , The Local, 30 May 2006
  16. "New phase for Swedish nuclear". World Nuclear News. 18 June 2010. Retrieved 18 June 2010.
  17. "Sweden abolishes nuclear tax". World Nuclear News. 2016-06-10. Retrieved 2022-11-08.
  18. "New Swedish government seeks expansion of nuclear energy". World Nuclear News. 2022-10-17. Retrieved 2022-10-18.
  19. Florence Jones (2023-06-22). "Sweden adopts new fossil-free target, making way for nuclear". Power Technology. Retrieved 2023-06-28.
  20. Simon Johnson (2023-06-20). "Swedish parliament passes new energy target, easing way for new nuclear power". Reuters. Retrieved 2023-06-28.
  21. "Sweden plans 'massive' expansion of nuclear energy". www.world-nuclear-news.org. Retrieved 2023-11-22.
  22. 1 2 "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 2007-03-31. Retrieved 12 Jan 2023.
  23. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 "IAEA Sweden reactors". IAEA. 2023-01-11. Retrieved 12 Jan 2023.
  24. 1 2 3 "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). Apr 2016. Retrieved 12 Jan 2023.
  25. "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 Jan 2023.
  26. "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 Oct 2020. Retrieved 29 Dec 2020.
  27. Vindkraftverk möter största motståndet i Skåne Archived 2005-12-26 at the Wayback Machine , Sydsvenskan, 15 August 2005
  28. Swedes oppose new nuclear power: poll, The Local, 19 March 2011
  29. Rekordfå är emot kärnkraft i Sverige, NyTeknik, 22 November 2019
  30. Tar strid för mer kärnkraft – kräver att S väljer väg, Aftonbladet, 29 October 2019
  31. "Nuclear Energy in Sweden". World Nuclear Association. April 2010. Retrieved 20 June 2010.
  32. "The antis attack!". Nuclear Engineering International. 5 April 2013.

Further reading

News